1 Disaster Recovery Awareness 1
2 Threats to Business Environmental: Fire, flood, earthquake, etc. Loss of utilities & services: Power interruption, etc. Systems or equipment failure Information security breach Civil protest/unrest Disruptions in third parties and business partners Pandemic outbreaks Acts of terrorism 2
3 Impacts Due to Disaster Revenue Loss Angry Customers Non-Compliance with Laws and Regulations Embarrassment 3
4 Definitions, Acronyms and Abbreviations High Availability (failover) is the characteristic of a system to protect against or recover from minor IT outages in a short time frame with largely automated means. Disaster Recovery (DR) is the ability to continue with services in the case of major IT outages, often with reduced capabilities or performance. Disaster Recovery solutions typically involve manual activities. Business Continuity (BC) takes Disaster Recovery one step further, and includes facilities, work force continuity, vital business operations, etc. 4
5 Definitions, Acronyms and Abbreviations (Continued) Recovery Time Objective (RTO) Recovery Point Objective (RPO) Tier 0 The maximum elapsed time a business function can sustain a service interruption from the time a crisis is identified to the restoration of service. The amount of data loss that is acceptable. For example, if an RPO of 6 hours is acceptable, SPE will be able to restore systems back to the state they were in 6 hours before the disaster or less. Any data created or modified inside a recovery point objective will be either lost or must be recreated during a recovery. Basic Infrastructure (Such as DNS, LDAP, Active Directory, network services, etc.), required for business application to run. Tier 1 Application with Recovery Time Objective of less than 12 hours and Recovery Point Objective of less than 5 minutes. Tier 2 Tier 3 Application with Recovery Time Objective of more than 12 hours but less than 48 hours, and Recovery Point Objective of less than 24 hours. Application with Recovery Time Objective of more than 48 hours and less than 15 days, and Recovery Point Objective of less than 36 hours. Tier 4 Application with Recovery Time Objective of more than 15 days and Recovery Point Objective of less than 36 hours. 5
6 DR Plan Disaster Recovery Plan: Aims to provide an organized way to respond to a disruptive event. Addresses the IT procedures to be followed before, during and after a loss to identified applications at Primary Datacenter (Chandler, AZ) The primary objective is to provide the capability to bring up critical applications and data at an alternate site within a time frame that minimizes the loss to the organization. Per Business Impact Analysis 2008 Tier s determined & DR Environment implemented for the following SPE Business Critical Applications. As of January 2013 DR Systems located at El Segundo colo. (SAP in process of establishing DR environment) evmi ITSM/C2C PRISM TAAS GPMS 6
7 DR Site DR Site Name: Digital Realty Trust co-location. (El Segundo Datacenter) Address: 2260 E El Segundo Blvd, City, State ZIP: El Segundo, CA Directions: Contact Name / Phone: 15 minute drive from Corporate Pointe, Culver City, CA Ron Goede Director Facilities SPE - EIS 600 Corporate Pointe Office Cell Ron_Goede@spe.sony.com Web: 7
8 DR Process Life Cycle Project Planning- Completed in 2008 Completed in 2008 Risk Assessment & Business Impact Analysis Established in 2008 updates in progress DR Environment Implementation Maintenance & Updating evmi, PRISM, ITSM/C2C, TAAS, GPMS DR Procedure Documentation Awareness & Training DR Testing & Exercising DR testing & exercising is performed after implementation phase to ensure DR environment can be brought up within the required time (RTO) using the documented DR procedure. 8
9 DR Methodology Applications were classified as Tier1/Tier2/Tier3 based on the results of Risk Assessment Determined RTO and RPO to ensure minimum business impact DR environments were set up at the DR site (currently being updated to mirror Prod.) DR Procedure Documents developed (currently being updated) Tests conducted Tier Maintain RTOthe Document RPO 1 Less than 12 hrs Minutes to 6 hrs hrs 6-24 hrs 3 2 wks Less than 36 hrs 4 4 wks Less than 36 hrs 9
10 Tiers based on Business Impact Analysis 2008 Application name Division Tier Financial Impact Per Day 5 Time And Attendance System (TAAS) Corporate Tier 1 $6 M (If it occurs on any Monday) 25 evmi HE Tier 1 $4,693, ITSM, C2C, ITSM-S, SARA TV-I Tier 2 $3.2 Million 30 SPIRIT MP Tier 1 $2.7 Million 8 Timecapture Imageworks Corporate Tier 1 > $2 M (If it occurs on any Monday or Friday) 24 PRISM & Pathfinder HE Tier 2 $1 Million 34 Domestic TV Sales Management TV-D Tier 2 $64, Sales Estimation Tool (SET) HE Tier 2 (Tier 1?) $50, SPIRITworld MP Tier 1 $18, GPMS Suite MP Tier 3 $18, InterPlan MP Tier 2 (Tier 1?) $16,000 7 Hyperion Enterprise Corporate Tier 1 (Tier 2?) $5, Sony Pictures Stock Footage DMG Tier 1 $5, Revenue Sharing System (REVSHARE) HE Tier 3 $5, cineshare+ / cineview DMG Tier 2 $3,900 4 HR Connection Corporate Tier 3 $3,000 1 IRIMS Incident Management Corporate Tier 3 $800 6 Medical Services System - Medgate Corporate Tier 3 $350 3 Remedy IT Corporate Tier 1 $0 9 E-911 LAN Alert (Siemens Phone System) Corporate Tier 1 (Tier 3?) 17 SPiDR (Stellent) ETS Tier 1 (Tier 0?) $0 12 Secure File Distribution Services DMG Tier 2 $0 20 myspe, myspej, myspti ETS Tier 2 $0 13 Digital Media Repository DMG Tier 3 $0 36 DealMaker TV-D Tier 3 $0 37 SPT B2B Marketing TV-D Tier 3 $0 10 ACORN/DMI DMG Tier 1 * Tier 1 Tier 2 Tier 3 29 Spent and Committed MP Tier 1 * 32 Automated System for Ad/Pub fulfillment (ASAP) MP Tier 2 * $0 39 Harris Landmark Traffic and Ad Sales TV-I Tier 2 * 40 Harris VISION Scheduling TV-I Tier 2 * 2 CorpTax Corporate Tier 3 * * Awaiting final number 10
11 Disaster Levels Asset Level Recovery Level I Site Level Recovery Level II City Level Recovery Level III Can we work from the same premises? Can we operate from any other location within LA (SPE Lot)? Recovery Team Leader to mobilize all Recovery Teams and guide them to relocate to another SPE location outside LA or mobilize teams from other SPE location outside LA (London, etc.) Operations at Recovery Location Recovery Team Leader to mobilize the required Recovery Teams and guide them to relocate to another area within the same premises Recovery Team Leader to mobilize the required Recovery Teams and guide them to relocate to another SPE location within LA Restoration Begin Recovery Procedures Begin Recovery Procedures Begin Recovery Procedures 11
12 DR Network Strategy Emergency Types Description Causes Network Recovery Strategy Level 1 Asset Level Failure System crashes, disk failures, theft, hacking, virus threats SPE LAN to be used primarily. However, if administrators are away from the primary site, they could use VPN and make the DR site as primary. Level 2 Site Level Failure Major power outages, communication link failures, network component failures, sabotage Administrators would be required to use Sony LAN from the alternate site or VPN and make the DR site as primary. Level 3 City Level Failure Total outage because of natural or manmade disasters Administrators in the US may not be able to use either LAN or VPN and would need to depend on administrators outside US (Europe/India etc). 12
13 DR Operations Flow Recovery Flowchart Disaster Notify DR Team & Crisis Management Team Crisis Management Team/Facilities Management Alert Damage Assessment Team Emergency Plan Activation (Evacuation) Verification & Assessment DR Plan Activation & Notification Procedures Assemble Teams DR Teams IT Recovery Team Salvage Team Perform Recovery at Alternate Site Begin Salvage Operations at Primary Site Normal Operations Team Return to Normal Operation End of Crisis 13
14 Teams & Responsibilities Team Crisis Management Team Responsibilities Directs, allocates resources and oversees the situation Damage Assessment Team Assesses the impact of disaster event and informs Crisis Management Team Coordinates the collection of information & evidence required for insurance claims Salvage Team Disaster Recovery Team Normal Operations Team Returns primary site to normal operating conditions Clears and repairs the primary processing facility Implements recovery procedure at DR Site Recovers the systems & data at DR Site Returns Production from DR to Primary Site Other teams required during Disaster Recovery are: Emergency Response Team Evacuation of employees, coordinating with non-spe emergency teams (Fire Dept., etc.) Public Relations Team Handling media, public, etc. Security Incident Response Team If there is any security incident (Denial of Service (DoS), Virus Attack, etc.) 14
15 Current Status DR architecture has not been updated since 2011 to match Production architecture. Operational Testing documents for the 5 identified applications that have DR in place (PRISM, evmi, ITSM/C2C, GPMS and TAAS ) date back to 2011 In the process of determining the requirements for additional infrastructure: oto account for changes in the architecture and Infrastructure for currently established DR applications oto provision Infrastructure for changes in the architecture and infrastructure for existing DR platforms as well as new DR platforms (such as Oracle on AIX, JBoss, etc.)
16 Current Status Business Impact Analysis was completed in 2007 since then no formal updates have been published. New applications may not have a DR environment/plan SAP -Draft of Disaster Recovery Plan being finalized. Infrastructure has been provisioned. Per Business Continuity Team (Scot Falkenstein) - we are aligned with policy effective May 12, 2012 Testing will need to be re-scheduled once the architectural and design changes, Version upgrades and WebLogic to JBoss conversions are completed. (TAAS, ITSM/C2C, GPMS, PRISM)
17 Process Flow for 2013 DR Parallel Testing SAP evmi Review current documents on File Perform Initial Analysis Architecture updates? Personnel changes? Call tree? 3. Meet with Application & Platform Leads 4. Coordinate Application review and updates 5. Confirm DR Servers including platform interfaces 6. Upgrade platforms 7. Update DR Env. & Testing Documents 8. Schedule Test 9. Conduct Test 10. Document results, learnings and resolve issues 11. Prepare for Full Test ITSM, PRISM, TAAS, WebMethods, WDG, Datastage, IDM, D-Series, Alfresco, Oracle, JBoss, Weblogic, Apache, BO
18 Disaster Recovery Flow Chart During Disaster (evmi Recovery at DR Site) SAMPLE Crisis Management Team Disaster Chandler Network/ Storage Team Server Team Database Team ETL Team Application Team IT Recovery Coordinator Activate the Salvage team to recover/salvage from the Primary site Send notifications To DR Teams Ensure connectivity to DR Site Check & stop applications or services running at Chandler (if any) Stop replication Recover & import volumes Mount volumes & check file systems E No All volumes mounted & file systems consistent? Network team Storage team Yes Mount and start the Oracle and DB2 databases Start middleware (webmethods, Datastage & D-Series) Change Pegasus interface to point to DR site A 18
19 Disaster Recovery Flow Chart During Disaster (Recovery at DR Site) Continued... SAMPLE Crisis Management Team Network/ Storage Team Server Team Database Team ETL Team Application Team IT Recovery Coordinator A Start evmi Application & Services Test evmi services & Test evmi application E No Is evmi application running? Yes Inform users to Switch over to DR URL Declare DR site up Inform Crisis Management Team Monitor the situation Is Primary site up? B Yes No 19
20 Disaster Recovery Flow Chart After Disaster (Restoration to Normal Operations) SAMPLE Crisis Management Team B Network/ Storage Team Ensure connectivity to primary site Server Team Database Team ETL Team Application Team IT Recovery Coordinator Start reverse replication of data from DR site Stop replication, recover & import primary volumes Mount Primary volumes & check file systems No All volumes mounted & file systems consistent? Yes Mount and start the Oracle and DB2 databases Start middleware (webmethods, Datastage & D-Series) Change Pegasus interface to point to Primary site Start Siteminder & evmi Application & Services Test evmi services & Test evmi application Network team Storage team Is evmi application running? Yes 20 C No
21 Disaster Recovery Flow Chart After Disaster (Restoration to Normal Operations) Continued SAMPLE Crisis Management Team Network/ Storage Team Server Team Database Team ETL Team Application Team IT Recovery Coordinator C Check & stop applications or services running at DR (if any) Inform users to Switch-over to Chandler Prod. URL Declare Primary site up Inform Crisis Management Team Start replication to DR STOP Network team Storage team 21
22 Important Contact Details SAMPLE Notification Tree Sample - evmi. 22
23 Type of Tests Parallel The DR site is activated Only test transactions are carried out at the DR site Main business continues at the primary site without any interruptions Full The primary (Prod) site is shut down DR site is activated as the primary Business is conducted at the DR site 23
24 Testing Strategy and Prioritization DR testing for current DR Applications has been prioritized by determining when their changes, upgrades and conversions will be complete. oif changes are due to complete in the next 3 months (May 2013), we have scheduled DR testing to occur after changes are complete. (PRISM & ITSM/C2C) oif changes are greater than 3 months away we will test as soon as architecture has been updated, then re-test after changes are made. o evmi has fewer dependencies therefore we will conduct some testing in April 2013, a Parallel test in June 2013 & re-test in the 4 th Quarter when all changes are complete. othe GPMS team has specifically requested that we delay all DR testing till October 2013 osap failover to El Segundo has been tested successfully (March 2013). DR Parallel testing will be conducted once all changes/updates are complete
25 Tentative Schedule DR Parallel Testing TAAS MAY 2013 PRISM MAY/JUNE 2013 ITSM/C2C MAY/JUNE 2013 GPMS 4th QUARTER PER REQUEST evmi APRIL 2013 SAP MARCH 2013 (FAILOVER TESTED)
26 You cannot control disaster. But you can be prepared for it. 26
Best Practices in Disaster Recovery Planning and Testing
Best Practices in Disaster Recovery Planning and Testing axcient.com 2015. Axcient, Inc. All Rights Reserved. 1 Best Practices in Disaster Recovery Planning and Testing Disaster Recovery plans are widely
More informationBUSINESS CONTINUITY PLAN OVERVIEW
BUSINESS CONTINUITY PLAN OVERVIEW INTRODUCTION The purpose of this document is to provide Loomis customers with an overview of the company s Business Continuity Plan (BCP). Because of the specific and
More informationBusiness Continuity. Client Briefing
Business Continuity Client Briefing About this document This document describes Mediaocean s disaster recovery and business continuity policy. Mediaocean LLC. Mediaocean Systems Limited 2015 This manual
More informationAbhi Rathinavelu Foster School of Business
Abhi Rathinavelu Foster School of Business What is Disaster? A disaster is considered any incident or event that results in a major interruption of business operations Major: Earthquake >5.0, Volcanic
More informationOracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0 Unless otherwise stated, these Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies
More informationASX CLEAR (FUTURES) OPERATING RULES Guidance Note 10
BUSINESS CONTINUITY AND DISASTER RECOVERY The purpose of this Guidance Note The main points it covers To assist participants to understand the disaster recovery and business continuity arrangements they
More informationLondon Borough of Merton
London Borough of Merton STRATEGIC BUSINESS CONTINUITY PLAN April 2014 Distribution List: Name Ged Curran Caroline Holland Yvette Stanley Simon Williams Chris Lee Title Chief Executive Director of Corporate
More informationDisaster Recovery Plan Checklist
Disaster Recovery Plan Checklist Your guide for setting up or updating a Disaster Recovery Plan for your business. ArcSource Disaster Recovery Plan Checklist 1. Compile Your Internal Contacts Information
More informationASX SETTLEMENT OPERATING RULES Guidance Note 10
BUSINESS CONTINUITY AND DISASTER RECOVERY The purpose of this Guidance Note The main points it covers To assist participants to understand the disaster recovery and business continuity arrangements they
More informationThe 5 Most Commonly Used Disaster Recovery Process
DR Risk Assessment White Paper This document provides an overview of Equilibrium s disaster recovery risk analysis and remediation methodology. This methodology was developed over a period of 10+ years
More informationThe University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1
Version 3.1 November 22, 2004 TABLE OF CONTENTS PART 1: DISASTER RECOVERY EXPECTATIONS... 3 OVERVIEW...3 EXPECTATIONS PRIOR TO AN INCIDENT OCCURRENCE...3 EXPECTATIONS PRIOR TO A DISASTER OCCURRENCE...4
More informationTemple university. Auditing a business continuity management BCM. November, 2015
Temple university Auditing a business continuity management BCM November, 2015 Auditing BCM Agenda 1. Introduction 2. Definitions 3. Standards 4. BCM key elements IT Governance class - IT audit program
More informationContinuity of Operations Planning. A step by step guide for business
What is a COOP? Continuity of Operations Planning A step by step guide for business A Continuity Of Operations Plan (COOP) is a MANAGEMENT APPROVED set of agreed-to preparations and sufficient procedures
More informationBest Practices in Developing an IT Disaster Recovery Plan. Vijaykumar Kulkarni AGM Product Management
Best Practices in Developing an IT Disaster Recovery Plan Vijaykumar Kulkarni AGM Product Management PRESENTER PROFILE Vijaykumar Kulkarni Assistant General Manager - Product Management in Netmagic Solutions,
More informationDisaster Recovery 101. Sudarshan Ranganath & Matthew Phillips Ellucian
Disaster Recovery 101 Sudarshan Ranganath & Matthew Phillips Ellucian SESSION OBJECTIVES Business continuity is critical to every institution and its IT organization. How do you set up your ERP and other
More informationBlackboard Managed Hosting SM Disaster Recovery Planning Document
BLACKBOARD MANAGED HOSTING Blackboard Managed Hosting SM Disaster Recovery Planning Document Prepared By: MH Services Modified Date: March 2009 Revision: 1.8 1. OBJECTIVES... 3 2. SCOPE... 3 3. ASSUMPTIONS...
More informationHow to Design and Implement a Successful Disaster Recovery Plan
How to Design and Implement a Successful Disaster Recovery Plan Feb. 21 ASA Office-Administrative Section is Sponsored by Today s ASAPro Webinar is Brought to You by the How to Ask a Question Questions
More informationAUSTRACLEAR REGULATIONS Guidance Note 10
BUSINESS CONTINUITY AND DISASTER RECOVERY The purpose of this Guidance Note The main points it covers To assist participants to understand the disaster recovery and business continuity arrangements they
More informationIT Disaster Recovery Plan Template
HOPONE INTERNET CORP IT Disaster Recovery Plan Template Compliments of: Tim Sexton 1/1/2015 An information technology (IT) disaster recovery (DR) plan provides a structured approach for responding to unplanned
More information<Client Name> IT Disaster Recovery Plan Template. By Paul Kirvan, CISA, CISSP, FBCI, CBCP
IT Disaster Recovery Plan Template By Paul Kirvan, CISA, CISSP, FBCI, CBCP Revision History REVISION DATE NAME DESCRIPTION Original 1.0 2 Table of Contents Information Technology Statement
More informationDISASTER RECOVERY WITH AWS
DISASTER RECOVERY WITH AWS Every company is vulnerable to a range of outages and disasters. From a common computer virus or network outage to a fire or flood these interruptions can wreak havoc on your
More informationRLI PROFESSIONAL SERVICES GROUP PROFESSIONAL LEARNING EVENT PSGLE 125. When Disaster Strikes Are You Prepared?
RLI PROFESSIONAL SERVICES GROUP PROFESSIONAL LEARNING EVENT PSGLE 125 When Disaster Strikes Are You Prepared? Copyright Materials This presentation is protected by US and International Copyright laws.
More informationNew Clerk Academy. August 13, 2015
New Clerk Academy August 13, 2015 Disaster Recovery OVERVIEW Presentation Agenda Introduction and Definitions DR Motivators and Drivers Recovery Challenges Scope of Disasters Components of Recovery Plans
More informationCourse: Information Security Management in e-governance. Day 2. Session 5: Disaster Recovery Planning
Course: Information Security Management in e-governance Day 2 Session 5: Disaster Recovery Planning Agenda Introduction to Disaster Recovery Planning (DRP) Need for disaster recovery planning Approach
More informationIT Disaster Recovery Plan Template ABC PVT LTD
IT Disaster Recovery Plan Template ABC PVT LTD Primary site ABC Towers Bangalore India 560047 Secondary site ABC Towers Delhi India 110059 Aerial distance between sites 1800 KMS Inter-site connectivity
More informationOffsite Disaster Recovery Plan
1 Offsite Disaster Recovery Plan Offsite Disaster Recovery Plan Presented By: Natan Verkhovsky President Disty Portal Inc. 2 Offsite Disaster Recovery Plan Introduction This document is a comprehensive
More informationTaking a Proactive Approach to Crisis Management while Maintaining Business Continuity in a Tiered Environment
Taking a Proactive Approach to Crisis Management while Maintaining Business Continuity in a Tiered Environment John Linse Director of Business Continuity Services, EMC 1 Setting the Stage Taking a Proactive
More informationBusiness Continuity Planning (BCP) / Disaster Recovery (DR)
Business Continuity Planning (BCP) / Disaster Recovery (DR) Introduction Interruptions to business functions can result from major natural disasters such as earthquakes, floods, and fires, or from man-made
More informationZerto Virtual Manager Administration Guide
Zerto Virtual Manager Administration Guide AWS Environment ZVR-ADVA-4.0U2-01-23-07-15 Copyright 2015, Zerto Ltd. All rights reserved. Information in this document is subject to change without notice and
More informationTHORNBURG INVESTMENT MANAGEMENT THORNBURG INVESTMENT TRUST. Business Continuity Plan
THORNBURG INVESTMENT MANAGEMENT THORNBURG INVESTMENT TRUST Business Continuity Plan June 2012 Purpose The purpose of this Business Continuity Plan ( BCP ) is to define the strategies and the plans which
More informationLunch and Learn: Modernize Your Data Protection Architecture with Multiple Tiers of Storage Session 17174, 12:30pm, Cedar
Lunch and Learn: Modernize Your Data Protection Architecture with Multiple Tiers of Storage Session 17174, 12:30pm, Cedar Kevin Horn Principal Product Manager Enterprise Data Protection Solutions March
More informationBusiness Continuity Planning in IT
Introduction: Business Continuity Planning in IT The more your business relies on its IT systems, the more you need to consider how unexpected disruptions might affect your business. These disruptions
More informationDISASTER RECOVERY BUSINESS CONTINUITY DISASTER AVOIDANCE STRATEGIES
DISASTER RECOVERY BUSINESS CONTINUITY DISASTER AVOIDANCE STRATEGIES Dejan Živanović EMC Technology Solutions Group SEE Presales Manager Dejan.Zivanovic@emc.com 1 The Business Maturity Model V Enabled Web
More informationThe State of Global Disaster Recovery Preparedness
Computer Network Solutions Disaster Recovery Preparedness Benchmark Survey The State of Global Disaster Recovery Preparedness ANNUAL REPORT 2014 The Disaster Recovery Preparedness Council publishes this
More informationMicrosoft Hyper-V Powered by Rackspace & Microsoft Cloud Platform Powered by Rackspace Support Services Terms & Conditions
Microsoft Hyper-V Powered by Rackspace & Microsoft Cloud Platform Powered by Rackspace Support Services Terms & Conditions Your use of the Microsoft Hyper-V Powered by Rackspace or Microsoft Cloud Platform
More informationThe Weill Cornell Medical College and Graduate School of Medical Sciences. Responsible Department: Information Technologies and Services (ITS)
Information Technology Disaster Recovery Policy Policy Statement This policy defines acceptable methods for disaster recovery planning, preparedness, management and mitigation of IT systems and services
More informationDesktop Scenario Self Assessment Exercise Page 1
Page 1 Neil Jarvis Head of IT Security & IT Risk DHL Page 2 From reputation to data loss - how important is business continuity? Neil Jarvis Head of IT Security (EMEA) DHL Logistics IT Security Taking
More informationDisaster Recovery Plan
Disaster Recovery Plan Date: February 2, 2009 Revision: 9.0 EXTERNAL BUSINESS CONTINUITY PLAN PAGE 1 of 13 Federal regulation states, and internal corporate policies require, that Penson Financial Services,
More informationIT Disaster Recovery and Business Resumption Planning Standards
Information Technology Disaster Recovery and Business IT Disaster Recovery and Business Adopted by the Information Services Board (ISB) on May 28, 1992 Policy No: Also see: 500-P1, 502-G1 Supersedes No:
More informationWhy Should Companies Take a Closer Look at Business Continuity Planning?
whitepaper Why Should Companies Take a Closer Look at Business Continuity Planning? How Datalink s business continuity and disaster recovery solutions can help organizations lessen the impact of disasters
More informationINSIDE. Preventing Data Loss. > Disaster Recovery Types and Categories. > Disaster Recovery Site Types. > Disaster Recovery Procedure Lists
Preventing Data Loss INSIDE > Disaster Recovery Types and Categories > Disaster Recovery Site Types > Disaster Recovery Procedure Lists > Business Continuity Plan 1 Preventing Data Loss White Paper Overview
More informationDisaster Recovery Plan
Disaster Recovery Plan Date: Revision: 8.0 EXTERNAL BCP PLAN PAGE 1 OF 12 Federal regulation states, and internal corporate policies require, that Penson Financial Services, Inc. (Penson) develop Business
More informationInformation Technology Services (ITS)
Information Technology Services (ITS) Disaster Recovery Plan Version 2.11 DOCUMENT VERSION CONTROL Version Date Description/Notes Author/s V2.00 02/06/2014 New plan based on updated Standby plan. V2.10
More informationConsulting Solutions Disaster Recovery. Yucem Cagdar
Consulting Solutions Disaster Recovery Yucem Cagdar Disaster Recovery Strategy How efficient is your DR Plan? Many are not prepared: 42% are not adequately armed with modern disaster recovery solutions,
More informationSCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com
SCADA Business Continuity and Disaster Recovery Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com Business Continuity Planning, a Sound Process A Business Continuity Plan: "A
More informationExhibit to Data Center Services Multisourcing Service Integrator Master Services Agreement
Exhibit to Data Center Services Multisourcing Service Integrator Master Services Agreement DIR Contract No. DIR-DCS-MSI-MSA-001 Between The State of Texas, acting by and through the Texas Department of
More informationMANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION
MANAGEMENT AUDIT REPORT OF DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION REPORT NO. 13-101 City of Albuquerque Office of Internal Audit
More informationDISASTER RECOVERY 101 3 Steps You Need to Take (Before It s Too Late)
DISASTER RECOVERY 101 3 Steps You Need to Take (Before It s Too Late) Introduction... 4 Disaster Recovery vs. Business Continuity... 4 Why You Need to Read this ebook... 5 Chapter 1: The Risks (aka, The
More informationBusiness Continuity & Recovery Plan Summary
Introduction An organization s ability to survive a significant business interruption is determined by the company s ability to develop, implement, and maintain viable recovery and business continuity
More informationTemplate Courtesy of: Cloudnition LLC 55 W. 22 nd St Suite 115 Lombard, IL 60148 (630) 297-4090 www.cloudnition.com
Template Courtesy of: Cloudnition LLC 55 W. 22 nd St Suite 115 Lombard, IL 60148 (630) 297-4090 www.cloudnition.com 1 1.1 Introduction 1.2 Purpose 1.3 Priorities 2.1 About your business 2.1.1 Business
More informationIs Cloud-Based WMS an Option for Complex Distribution Centers?
Is Cloud-Based WMS an Option for Complex Distribution Centers? Chuck Fuerst HighJump Software IARW Warehouse Management Systems Manages warehouse inventory, space, equipment, and labor resources to direct
More informationBusiness Continuity & Recovery Plan Summary
Introduction An organization s ability to survive a significant business interruption is determined by the company s ability to develop, implement, and maintain viable recovery and business continuity
More informationTable of Contents... 1
... 1 Chapter 1 Introduction... 4 1.1 Executive Summary... 4 1.2 Goals and Objectives... 5 1.3 Senior Management and Board of Directors Responsibilities... 5 1.4 Business Continuity Planning Processes...
More informationInteractive-Network Disaster Recovery
Interactive-Network Disaster Recovery BACKGROUND IT systems are vulnerable to a variety of disruptions, ranging from mild (e.g., short-term power outage, disk drive failure) to severe (e.g., terrorism,
More informationLeveraging Virtualization for Disaster Recovery in Your Growing Business
Leveraging Virtualization for Disaster Recovery in Your Growing Business Contents What is Disaster Recovery?..................................... 2 Leveraging Virtualization to Significantly Improve Disaster
More informationBusiness Continuity and Disaster Survival Strategies for the Small and Mid Size Business. www.integrit-network.com
Business Continuity and Disaster Survival Strategies for the Small and Mid Size Business www.integrit-network.com Business Continuity & Disaster Survival Strategies for the Small & Mid Size Business AGENDA:
More informationDesigntech Cloud-SaaS Hosting and Delivery Policy, Version 1.0, 2013. Designtech Cloud-SaaS Hosting and Delivery Policy
Designtech Cloud-SaaS Hosting and Delivery Policy, Version 1.0, 2013 Page i Designtech Cloud-SaaS Hosting and Delivery Policy Designtech Cloud-SaaS Hosting and Delivery Policy, Version 1.0, 2013 Page ii
More informationMARQUIS DISASTER RECOVERY PLAN (DRP)
MARQUIS DISASTER RECOVERY PLAN (DRP) Disaster Recovery is an ongoing process to plan, develop, test and implement changes, processes and procedures supporting the recovery of the critical functions in
More informationDisaster Recovery Hosting Provider Selection Criteria
Disaster Recovery Hosting Provider Selection Criteria By, Solution Director 6/18/07 As more and more companies choose to use Disaster Recovery (DR), services the questions that keep coming up are What
More informationMiServer and MiDatabase. Service Level Expectations. Service Definition
MiServer and MiDatabase Service Description Service Definition As part of the NextGen Michigan initiative, Information and Technology Services has engaged in building a private cloud offering to support
More informationGuidelines for Maintaining Business Continuity for Your Organization
Guidelines for Maintaining Business Continuity for Your Organization Protect your business from disruptions and keep your workforce productive. Every organization faces the possibility of disruptions.
More informationProgram: Management Information Systems. David Pfafman 01/11/2006
Effective 04/20/2005 Page - 1 - POLICY: PURPOSE: It is the policy of to provide a plan to insure the accessibility of protected health information (PHI) in the event of data loss due to an emergency or
More informationEmergency Preparedness for Design Firms. RLI Design Professionals Design Professionals Learning Event DPLE 244 September 16, 2015
Emergency Preparedness for Design Firms RLI Design Professionals Design Professionals Learning Event DPLE 244 September 16, 2015 RLI Design Professionals is a Registered Provider with The American Institute
More informationOngoing Help Desk Management Plan
Ongoing Help Desk Management Plan HELP DESK IMPLEMENTATION /MANAGEMENT The Vendor shall provide in its Response to DIR a Help Desk Implementation Plan which shall include, but not be limited to: a. Customer
More informationBusiness Continuity Plan
Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions
More informationDISASTER RECOVERY PLANNING GUIDE
DISASTER RECOVERY PLANNING GUIDE AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING FOR JD EDWARDS SOFTWARE CUSTOMERS www.wts.com WTS Disaster Recovery Planning Guide Page 1 Introduction This guide will provide
More informationCA ARCserve and CA XOsoft r12.5 Best Practices for protecting Microsoft SQL Server
CA RECOVERY MANAGEMENT R12.5 BEST PRACTICE CA ARCserve and CA XOsoft r12.5 Best Practices for protecting Microsoft SQL Server Overview Benefits The CA Advantage The CA ARCserve Backup Support and Engineering
More informationAdvent. Disaster Recovery: Options for Investment Managers. A White Paper from Advent Software and CyGem Ltd. Advent Software, Inc.
Advent Disaster Recovery: Options for Investment Managers A White Paper from Advent Software and CyGem Ltd. Advent Software, Inc. This communication is provided by Advent Software, Inc. for informational
More informationBusiness Continuity Planning Toolkit. (For Deployment of BCP to Campus Departments in Phase 2)
Business Continuity Planning Toolkit (For Deployment of BCP to Campus Departments in Phase 2) August 2010 CONTENTS: Background Assumptions Business Impact Analysis Risk (Vulnerabilities) Assessment Backup
More information2014 NABRICO Conference
Business Continuity Planning 2014 NABRICO Conference September 19, 2014 6 CityPlace Drive, Suite 900 St. Louis, Missouri 63141 314.983.1200 1520 S. Fifth Street, Suite 309 St. Charles, Missouri 63303 636.255.3000
More informationDisaster Preparedness & Response
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 A B C E INTRODUCTION AND PURPOSE REVIEW ELEMENTS ABBREVIATIONS NCUA REFERENCES EXTERNAL REFERENCES Planning - Ensuring
More informationIs Cloud-Based WMS an Option for Complex Distribution Centers?
Welcome to Session 233 Is Cloud-Based WMS an Option for Complex Distribution Centers? Presented by: Sponsored by: Chuck Fuerst 2012 Material Handling Industry. Copyright claimed as to audiovisual works
More informationProactive IT Solutions More Reliable Networks Are Our Business
Proactive IT Solutions Logo Proactive IT Solutions More Reliable Networks Are Our Business Copyright 2005 Primetime, Inc. All rights reserved. Catalin Ursu info@catcomcomputers.com 973-233-1888 B 973-233-1887
More informationRL Solutions Hosting Service Level Agreement
RL Solutions Hosting Service Level Agreement April 2012 Table of Contents I. Context and Scope... 1 II. Defined Terms... 1 III. RL Solutions Responsibilities... 2 IV. Client Responsibilities... 4 V. The
More informationSchedule 5: SaaS Premium Service Level Agreement
Schedule 5: SaaS Premium Service Level Agreement Service Level Agreement Number - - - - - _- _- _- _ ( ) Document Version: SLA (with SAAS) V_1_4 Contents 1. Provision of Service Warranty 3 1.1. Formula
More informationa Disaster Recovery Plan
Construction of a Disaster Recovery Plan David Godwin, Sr. Sales Engineer March 18, 2014 Objectives Understand What Disaster Recovery is? Why is Disaster Recovery Needed? Effectively assist customers or
More informationDisaster Recovery Planning
Disaster Recovery Planning NOW or NEVER Disaster Recovery Team Aura Advanced Technologies Aura Advanced Technologies Inc 1301-1121 Sixth Avenue SW Calgary, Alberta T2P 5J4 Phone: 403-269-6123 Fax: 403-269-6169
More informationCreating a Business Continuity Plan
Family Office Information Creating a Business Continuity Plan Hurricanes, fires, terrorist attacks, earthquakes and tsunamis aren t the only kinds of events that can cripple a family office. More common
More informationEXECUTIVE SUMMARY 1.1 PROJECT OBJECTIVES
1 1.1 PROJECT OBJECTIVES The main objective of the project is to develop a comprehensive IT Business Continuity/Disaster Recovery Plan for the Rochester-Genesee Regional Transportation Authority (RGRTA)
More informationSpeeding Recovery Through the Cloud Presentation to Mid TN ISC2 Matthew Stevens, Senior Solutions Engineer Windstream Hosted Solutions
Speeding Recovery Through the Cloud Presentation to Mid TN ISC2 Matthew Stevens, Senior Solutions Engineer Windstream Hosted Solutions November 7, 2014 1 Agenda My Background Current Trends in the Datacenter
More informationHA / DR Jargon Buster High Availability / Disaster Recovery
HA / DR Jargon Buster High Availability / Disaster Recovery Welcome to Maxava s Jargon Buster. Your quick reference guide to Maxava HA and industry technical terms related to High Availability and Disaster
More informationTO AN EFFECTIVE BUSINESS CONTINUITY PLAN
5 STEPS TO AN EFFECTIVE BUSINESS CONTINUITY PLAN Introduction The Snowpocalypse of 2015 brought one winter storm after another, paralyzing the eastern half of the United States. It knocked out power for
More informationHow to write a DISASTER RECOVERY PLAN. To print to A4, print at 75%.
How to write a DISASTER RECOVERY PLAN To print to A4, print at 75%. TABLE OF CONTENTS SUMMARY SUMMARY WHAT IS A DRP AND HOW CAN IT HELP MY COMPANY? CHAPTER PREPARING TO WRITE YOUR DISASTER RECOVERY PLAN
More informationThe Promise of Virtualization for Availability, High Availability, and Disaster Recovery - Myth or Reality?
B.Jostmeyer Tivoli System Automation bjost@de.ibm.com The Promise of Virtualization for Availability, High Availability, and Disaster Recovery - Myth or Reality? IBM Systems Management, Virtualisierung
More informationOperational Continuity
Solution Brief Operational Continuity Achieve Maximum Uptime In a recent speech, Omar Sherin of the Qatar CERT, shared how they shifted their focus from protection and detection to response in the wake
More informationPutting all of your pieces in place. Continuity Planning for Nonprofit Organizations
Putting all of your pieces in place Continuity Planning for Nonprofit Organizations ...when natural or man-made disasters strike, nonprofit agencies must be positioned to continue providing services when
More informationDisaster Recovery Checklist Disaster Recovery Plan for <System One>
Disaster Recovery Plan for SYSTEM OVERVIEW PRODUCTION SERVER HOT SITE SERVER APPLICATIONS (Use bold for Hot Site) ASSOCIATED SERVERS KEY CONTACTS Hardware Vendor System Owners Database Owner
More informationClovis Municipal School District Information Technology (IT) Disaster Recovery Plan
Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan Revision History REVISION DATE NAME DESCRIPTION Draft 1.0 Eric Wimbish IT Backup Disaster Table of Contents Information
More informationMSP Service Matrix. Servers
Servers MSP Service Matrix Microsoft Windows O/S Patching - Patches automatically updated on a regular basis to the customer's servers and desktops. MS Baseline Analyzer and MS WSUS Server used Server
More informationVoyageur Internet Inc. 323 Edwin Street Winnipeg MB R3B 0Y7 Main: (204) 233-5555 Fax: (204) 975-0554 support@voyageurinternet.ca
1. Scope of Service Level Agreement (Effective June 1, 2013) 1.1. This Service Level Agreement (SLA) documents the commitment for "Voyageur Internet Corporation." (herein referred to as "Voyageur") to
More informationAppendix E to DIR Contract Number DIR-TSO-2736 CLOUD SERVICES CONTENT (ENTERPRISE CLOUD & PRIVATE CLOUD)
Appendix E to DIR Contract Number DIR-TSO-2736 CLOUD SERVICES CONTENT (ENTERPRISE CLOUD & PRIVATE CLOUD) Enterprise Cloud Resource Pool Services Features Sungard AS will provide the following in connection
More informationNetwork & Information Security Policy
Policy Version: 2.1 Approved: 02/20/2015 Effective: 03/02/2015 Table of Contents I. Purpose................... 1 II. Scope.................... 1 III. Roles and Responsibilities............. 1 IV. Risk
More informationNETWORK SERVICES WITH SOME CREDIT UNIONS PROCESSING 800,000 TRANSACTIONS ANNUALLY AND MOVING OVER 500 MILLION, SYSTEM UPTIME IS CRITICAL.
NETWORK SERVICES WITH SOME CREDIT UNIONS PROCESSING 800,000 TRANSACTIONS ANNUALLY AND MOVING OVER 500 MILLION, SYSTEM UPTIME IS CRITICAL. Your Credit Union information is irreplaceable. Data loss can result
More informationBusiness Continuity Planning. Donna Curran, Director Audit and Risk Management February, 2014
Business Continuity Planning Donna Curran, Director Audit and Risk Management February, 2014 Agenda Business Continuity Defined The Importance of a Plan Determining the Costs Business Impact Analysis MTO,
More informationBusiness Continuity Management
Business Continuity Management cliftonlarsonallen.com Introductions Brian Pye CliftonLarsonAllen Senior Manager Business Risk Services group 15 years of experience with Business Continuity Megan Moore
More informationThe Difference Between Disaster Recovery and Business Continuance
The Difference Between Disaster Recovery and Business Continuance In high school geometry we learned that a square is a rectangle, but a rectangle is not a square. The same analogy applies to business
More informationBenefits and Potential Drawbacks to Implementing SAP as a Hosted Solution; Run SAP Like a Factory Factory Controls
8/24/12 Information Systems Audit and Control Association Silicon Valley Conference (ISACA SV) Benefits and Potential Drawbacks to Implementing SAP as a Hosted Solution; Run SAP Like a Factory Factory
More informationDisaster recovery strategic planning: How achievable will it be?
Disaster recovery strategic planning: How achievable will it be? Amr Ahmed Ernst & Young Advisory Services, Executive Director amr.ahmed@ey.com Christopher Rivera Ernst & Young Advisory Services, Manager
More informationBusiness Continuity Glossary
Developed In Conjuction with Business Continuity Glossary ACTIVATION: The implementation of business continuity capabilities, procedures, activities, and plans in response to an emergency or disaster declaration;
More informationBusiness Continuity Planning (BCP) / Disaster Recovery (DR)
Business Continuity Planning (BCP) / Disaster Recovery (DR) Introduction Interruptions to business functions can result from major natural disasters such as earthquakes, floods, and fires, or from man-made