An Evaluation of Phare-financed Energy and Environment Programmes. Inventory Report

Size: px
Start display at page:

Download "An Evaluation of Phare-financed Energy and Environment Programmes. Inventory Report"

Transcription

1 An Evaluation of Phare-financed Energy and Environment Programmes Inventory Report September

2 This report was produced by "Environment Resources Management" (ERM) for the Evaluation Unit of the Joint External Relation Service (SCR) of the European Commission. The views and opinions expressed herein do not necessarily reflect those of the European Commission. The European Commission does not guarantee the accuracy of the data included in this report, nor does it accept responsibility for any consequence of their use. 2

3 TABLE OF CONTENTS:...ERROR! BOOKMARK NOT DEFINED. 1 INVENTORY RESULTS INTRODUCTION Background Approach to the Inventory INVENTORY RESULTS CONCLUSIONS IMPLICATIONS FOR PHASE METHODS USED OBJECTIVES OF THE INVENTORY KEY ACTIVITIES DATA COLLECTION Type of data Data Gathering Process Data Verification and Synthesis CLASSIFICATION AND DATA MANAGEMENT LIMITATIONS OF THE INVENTORY

4 1 INVENTORY RESULTS 1.1 INTRODUCTION Background This Inventory Report has been prepared by Environmental Resources Management (ERM) as the key output of Phase 1 of a project entitled: Evaluation of the Phare-financed Energy and Environment Programme. The Report contains the results of the inventory and a description of methods used. The inventory is based on records of all funds committed to Phare national and multi-country energy and environment programmes between 1990 and It covers 10 candidate member states including: Estonia, Latvia, Lithuania, Poland, Hungary, Czech Republic, Slovakia, Slovenia, Romania and Bulgaria. The inventory is designed to be used as a basis for selecting a representative sample of projects for detailed evaluation during Phase 2. The evaluation will focus on defining the relevance, effectiveness and impact of past Phare programming. The results of the evaluation will lead to a set of general recommendations for future programming, within the context of Phare s evolving role as a proactive and strategic instrument for directing the accession of selected CECs Approach to the Inventory This report follows three months of preparation and brief field visits to all 10 candidate member states. As there is currently no unified list of Phare energy and environment programmes and projects, the primary purpose of the field visits was to compile a detailed inventory. In addition to listing projects, we collected information on the outputs and objectives of each as a basis for classification. In terms of output we distinguish between Institutional reform and Investment projects, as follows: Institutional reform including - organisations; pricing; regulations; and awareness; Investment including - physical assets; demonstrations; investment funds; and investment preparation. There are a number of other projects which do not fall easily within these two categories. These include strategic planning projects and support for PMUs, both of which we consider to be inputs rather than outputs. Critical aid projects address specific issues at a given time and have not been included within institutional reform or investment. There are also a number of unknowns for which insufficient information is available and projects of multiple output. 4

5 At the objectives level, projects divide into those which aim to achieve one of the following: energy savings; improved energy supply; reduced waste and water use; improved waste services and water supply; pollution reduction; and biodiversity conservation. Following classification, we coded all projects and entered them into a database (operated via Microsoft Access). The database has proved to be an effective way of collating the inventory and presenting the results both visually and numerically. We present a more detailed description of methods used during inventory and classification in Section 2 of this report, as well as a full print-out of the database as Annex A. The full inventory, by country and by sector is presented as a separate document to this report (Appendix A). 1.2 INVENTORY RESULTS The inventory consists of 795 projects with a total expenditure (based on funds committed) of about 570 MECU. Figure 1 presents the evolution of the programme from 1990 to The graph shows an expected distribution of strategic studies peaking during the early years and dropping off thereafter, and a similar distribution for institutional reform, though rising again during the later years. We have included critical aid as a separate line to show an expected peak in the early years and to distinguish this from investments which are surprisingly high during the early years. Figure 1 also shows that expenditure has been declining since Figure 1: Evolution of Phare Energy and Environment Programmes 60 Expenditure (MECU) Strategies Institutional Investment Critical aid Year of Programme 5

6 Tables 1 and 2 provide a summary of the inventory by sector (energy and environment) and by country, demonstrating the following: overall expenditure committed to the environment sector programme (about 345 MECU) is significantly greater than the energy sector programme (about 225 MECU) (1) ; the environment sector programme started marginally earlier than the energy sector programme, with five out of ten countries beginning in 1990; expenditure on the environmental sector programme is highest in Poland and Hungary, followed by Bulgaria and the Czech Republic; and expenditure on the energy sector programme is highest in Bulgaria, followed by Romania and Lithuania. Table 1: Summary of Phare Environment Programme ( ) CountryNumber of Programmes Year of first Programme Year of last Programme Committed (MECU) Bulgaria Czech Rep Estonia Hungary Latvia Lithuania Poland Romania Slovenia Slovakia Multi-country Total Source: ERM, 1998 Table 2: Summary of Phare Energy Programme ( ) CountryNumber of Programmes Year of first Programme Year of last Programme Committed (MECU) Bulgaria Czech Rep Estonia Hungary Latvia Lithuania Poland Romania Slovenia Slovakia Multi-country Total Source: ERM, 1998 (1) May 1998 figures 6

7 Figure 2 presents the average size of projects demonstrating a typical bimodal distribution. Small projects (under 1.0 MECU) are the most numerous while larger projects (over 1.0 MECU) account for most of the spending - 70% of total expenditure. Figure 2: Numbers of projects and expenditure (MECU) by size category Size category (MECU) Expenditure Number Total expenditure on energy and environment sector programmes by country is presented in Figure 3. Three countries dominate overall spending including, in ascending order, Hungary, Poland and Bulgaria. With the exception of Bulgaria, there is less variance in the size of the energy programme between countries that the environment programme. Expenditure on energy is surprisingly low both in Hungary and Poland considering their relative size. Expenditure on the energy programme in Bulgaria is particularly high, as compared to other countries. Lithuania, Slovakia and the Czech Republic are the only two countries which appear to have equal spending on energy and environment, with all other countries tending to favour one or the other. Figure 3: Country distribution for energy and environment ( ) Expenditure (MECU) BG CR ES HU LE LI PL RO SL SR ZZ Country ENE ENV Figure 4 presents expenditure by output. Investments in physical assets dominate the programme both for energy and environment. Other important 7

8 project outputs include institutional support for organisations, investment preparation and strategic studies. Project management support is the 5 th largest output category accounting for about 7% of total expenditure. Figure 4: Expenditure (MECU) by output Z3 Unknown Z2 M ultiple Z1 Project m anagem ent V 5 Critical aid V 4 Investm ent preparation V 3 Financing V 2 D emonstrations V 1 Physical assets S4 A w areness S3 Regulations S2 Pricing S1 Organisations S0 Strategy Energy Environment Expenditure (M ECU) Table 3 presents expenditure as a matrix of project outputs against project objectives. Overall, it shows that about 20% of all expenditure is on institutional reform and about 60% on investment activities; the remainder being classified as other. The cells in the matrix define groupings of projects of similar output and objective. We have identified ten key project groupings (based on total expenditure) which are marked in bold. Collectively these key project groupings account for about 380 MECU or about 70% of total expenditure. Figure 5 compares expenditure on the ten key project groupings showing considerable variation. In five out of ten groups, expenditure is in the range of MECU. For the remaining groupings expenditure ranges from 30 to 80 MECU. Seven out of ten key project groupings are investment projects. The most significant of these in ascending order are investments in physical assets to: improve energy supply; improve waste management and water supply; and to reduce pollution. 8

9 Table 3 9

10 Figure 5: Total expenditure (MECU) by key project grouping 9 Biodiversity assets 8 Pollution investment preparation 7 Pollution assets 6 Waste/water assets 5 Energy savings funds 4 Energy supply demos 3 Energy supply assets 2 Pollution organisations 1 Energy supply organisations 0 Strategies Expenditure (MECU) A further review of the key project groupings in Figure 6 shows some variation in mean project size. In all but two, mean project size is less than 2 MECU and in five cases below 1 MECU. Only in the case of investment in physical assets for improving energy supply is the mean project size above 3 MECU. Figure 6: Average project size (MECU) within key project groupings 9 Biodiversity assets 8 Pollution investment preparation 7 Pollution assets 6 Waste/water assets 5 Energy savings funds 4 Energy supply demos 3 Energy supply assets 2 Pollution organisations 1 Energy supply organisations 0 Strategies Average project expenditure (MECU) Table 4 presents the key project groupings by country in percentage terms. We have shaded those cells where expenditure in a given country appears to be unusually high. A review of Table 4 indicates the following: expenditure on institutional strengthening has been low in all countries with the exception of Slovakia where 15% of spending has been on institutional reform in support of pollution control; Slovenia, the Czech Republic and Slovakia appear to have prioritised expenditure on energy saving funds more than other countries; Estonia, Hungary and Lithuania have prioritised investments in improving waste management and water supply more than other countries; Hungary, Lithuania and Slovakia appear to have the most balanced programme, with expenditure in at least eight of the ten key project groupings; 10

11 Slovenia appears to have the most skewed programme with expenditure in only four out of ten key project groupings. Table 4: Percentage expenditure (%) by country and key project grouping Key Project GroupingBGCRESHULELIPLROSLSRZZAvg 0 Strategies Energy supply organisations Pollution organisations Energy supply assets Energy supply demonstrations Energy saving funds Waste and water assets Pollution assets Pollution investment prep Biodiversity assets CONCLUSIONS The inventory and database which we have compiled provide evidence of the range and balance of Phare support to energy and environment. We have drawn a number of conclusions from analysis of the results of the inventory. Since 1990, the Phare energy and environment programme has provided support to about 800 projects with a total committed expenditure of about 570 MECU. Nearly two-thirds of projects are less than 0.5 MECU is size. Those of more than 1.0 MECU account for about two-thirds of total expenditure. Overall expenditure on the environment sector programme (60%) is significantly greater that the energy sector programme (40%). The evolution of the energy and environment programme shows early peaks in expenditure for both institutional and investment projects, dropping off during the middle years before rising again in the later years. Investments account for 60% of Phare expenditure on energy and environment, as opposed to 20% on institutional strengthening and 10% on other (principally strategic studies and support for PMUs). Projects providing support in the form of physical assets account for about 40% of total expenditure and tend to be the larger projects: 1.5 and 3.5 MECU, as opposed to less than 1.0 MECU for other types of output. Bulgaria, Poland and Hungary have each received more than double the expenditure of any other country. Most countries have spent significantly more on environment than on energy projects, though Bulgaria and Romania have spent more on energy, and Lithuania has spent roughly in equal proportions. 11

12 There are clear differences in the balance of programmes between countries. For example, Bulgaria and Romania have a high proportion of expenditure on investment in assets for energy supply; and the Czech and Slovak Republics have devoted a high proportion of expenditure to investment in pollution reduction and the establishment of energy savings funds. We have identified a total of ten key project groupings representing clusters of projects of similar output and objective. Of these ten the most significant (in terms of expenditure) are investment projects in physical assets addressing: (i) improving energy supply; (ii) improving waste management and water supply; and (iii) reducing pollution. Hungary, Lithuania and Slovakia appear to have the most balanced programmes with expenditure in at least eight of the ten key project groupings, while Slovenia has the most skewed programme with expenditure in only four out of ten. 1.4 IMPLICATIONS FOR PHASE 2 Within the context of this study, the inventory provides a basis against which to select an appropriate project sample for detailed evaluation. The results which we have outlined above have a number of implications for Phase 2. Given that total expenditure on the environment sector is significant greater than the energy sector, it is probable that our project sample should be weighted accordingly. The perception that the Phare programme has moved progressively from critical aid to institutional strengthening to investment is only partly reflected in expenditure allocations. The importance of investment throughout the period, and in terms of total expenditure, suggests that particular attention should be given to this in the evaluation. Given that 70% of total expenditure is accounted for by ten key project groupings, these groupings constitute an appropriate population from which to select our project sample. While there are clear differences between countries in the focus of the programme, the primary focus of evaluation will be the effectiveness and relevance of the Phare energy and environment programmes as a whole, rather than the performance of national project portfolios. 12

13 2 METHODS USED 2.1 OBJECTIVES OF THE INVENTORY The purpose of the inventory was to compile a comprehensive list of the outputs and objectives of environment and energy sector programmes in ten EU candidate member states, as a basis for the selection of a representative sample for evaluation during Phase 2, and to facilitate analysis of the range and balance of the programmes. In defining environment and energy, the scope of our search was limited to national programmes falling within the responsibility of energy and environment Project Management Units (PMUs) in each country, as well as multi-country programmes. Cross-border and horizontal programmes and excluded from the evaluation. 2.2 KEY ACTIVITIES From the start of the project in May, the inventory phase has progressed as follows: May: briefing with DG1A and desk research to compile draft inventory tables based on available Financial Memoranda, Work Programmes, OMAS reports and financial databases; June-July: brief inventory field visits to 10 candidate countries in order to validate inventory tables and assess information availability for Phase 2; August: classification of projects, development of project database, analysis of results, validation of preliminary conclusions with DG1A, and selection of sample for evaluation. The full inventory is voluminous. We have presented it as a separate document (Appendix A to the Inventory Report) also containing a full list of meetings held during the inventory phase and our questionnaire protocol using during interviews. 2.3 DATA COLLECTION Type of data From May to July we assimilated a large amount of data into country-specific tables describing all Phare energy and environment projects in 10 candidate countries, including two multi-country programmes. In compiling the inventory we collected the following data: the name, timing and budget for each Programme; a list of every project and sub-project carried out within each Programme; 13

14 the approximate duration of each project to indicate both the length and temporal position of the project within the study period ( ); and financial data showing amount allocated, committed and disbursed as of May In addition, we collected information on the outputs of each project and subproject as a basis for (i) classifying according to output, and (ii) selecting a sample for detailed evaluation during Phase Data Gathering Process Having prepared draft inventory tables based on a review of project documents available from DG1A in Brussels, field teams (comprising one ERM specialist supported by a local specialist from ERM local offices and the Regional Environmental Centre) visited each candidate country. Country visits generally lasted three to five days depending on the size of the programme. The teams gathered data via one-to-one interviews and analysis of secondary data sources held in-country. Interviews We carried out interviews with PMUs or EU delegation staff using a questionnaire protocol developed by ERM (Appendix A to this report ), focusing on the following areas: validation of our draft inventory tables; the policy context to Phare energy and environment programmes including national policies and Phare funding policy in these sectors; the role of each institution within the project cycle and its relationship to other involved institutions; the type and level of data available for the evaluation stage. The information gathered during the meetings was generally sufficient, though information of disbursements and project duration were sometimes lacking. Lack of information occurred when we interviewed staff with limited or no first hand experience of a given project or programme. In such cases, it was important to review secondary sources. On completion of the country visits, we met all available task managers at DG1A in Brussels in order to validate and discuss our findings Secondary Sources We reviewed the main operational documents identified during discussions with key staff at DG1A, EU Delegations and the PMUs. The two principal documents were the Financial Memoranda and Work Programmes. While Financing Memoranda are a good first reference point, we found that they do not always contain sufficiently comprehensive and up-to-date project information to act as sole sources. Work Programmes, OMAS reports and sometimes project terms of reference were the most useful sources of secondary information to which we referred after the interview stage. 14

15 The PMUs were generally able to provide up-to-date print outs of financial information from the PERSEUS database. This data provides financial allocation, commitment and disbursement on a project by project basis. It also distinguishes between those contracts managed and funded directly from Brussels and those managed locally Data Verification and Synthesis We carried out an iterative process of speaking to PMU staff, reviewing work programmes and re-confirming our interpretation of project outputs and objectives. At the end of the visit, once the inventory tables were completed, we submitted draft tables to the PMU and EU delegation for review and approval. Completed inventory tables are presented in Annex A. We reviewed summary results of the inventory with selected task managers and the evaluation unit at DG1A, in order to obtain early feedback on the methods which we used and an interpretation of emerging trends. 2.4 CLASSIFICATION AND DATA MANAGEMENT We have classified projects according to output and objective, following logical framework terminology. This provides the basis of a matrix within which we can analyse patterns and ultimately select a sample of projects for evaluation. We have defined categories of output and objective in an attempt to reflect the guidance provided in our terms of reference and preliminary discussions/review from DG1A. The categories are as follows: Output Category Code Organisations (O) Pricing (P) Regulations (R) Awareness (A) Physical assets (Y) Demonstrations (D) Investment funds (F) Investment preparation (I) Strategic studies (S) Critical aid (C) Multiple projects (Z) Unknown (?) Objective category Energy savings Improved energy supply Reduced waste and water use Waste services and water supply Pollution reduction Biodiversity conservation Code (C) (S) (C) (S) (P) (B) From the information contained in the inventory tables we have coded each project according to output and objective and entered these details into a database. In some cases, we found projects to have multiple outputs or 15

16 objectives. Occasionally we have had to post a? in the database due to lack of information. We present a sample of the database below and a full print out in Annex A. Sector code Country code Prog. code Proj. code Sub-proj. Code TitleObjective code Output code Commit. (MECU) ENVRO Institutional devt...po1.19 ENVRO Plan for monitoring...po1.19 Having completed the database and generated Table 3 (see Section 1) we were able to define the most important project groupings based on total expenditure. We identified a total of 10 key project groupings which collectively represent the core of the programme, and a suitable population from which to select a sample of projects for evaluation. The key project groupings are presented in Figure 5 (see Section 1). Because all projects in any given cell share similar outputs and objectives, we can expect that they should lead to similar lessons about effectiveness, from which useful recommendations can be generated. 2.5 LIMITATIONS OF THE INVENTORY Inevitably the process described above is subject to certain limitations relating principally to quality of information and to a certain level of judgement/subjectivity that has been necessary. Classification of projects according to output and objective was carried out on the basis of an interpretation of information provided in the inventory tables. Much of the time this was relatively straightforward but occasionally judgement was required. In order to minimise randomness being introduced into the database in this way, classification was carried out by two members of the team only working closely together to ensure consistency in any judgement made. In a number of cases, projects clearly had multiple outputs or objectives. When one of these was clearly dominant, we classified the project according to the dominance output or objective. Otherwise, our approach was to assign the project to a multiple category by which it is effectively excluded from selection in the sample, (except in the case of strategies). In a number of cases, insufficient project level information was available either in Brussels or at the country level, particularly for projects during the early years of Phare. We have been obliged to classify these projects as unknowns. We found information on individual project duration to be very variable, particularly during the early years. This has limited our ability to provide an accurate temporal analysis of energy and environment programmes. As a proxy, we have used the programme date (ie. RO 9105). This will have the effect of producing a more theoretical distribution of projects against time, rather than one based on fact. 16

17 Evaluation of Phare-Financed Energy and Environment Programmes: Appendix A to the Inventory Report August 1998 This report has been prepared by Environmental Resources Management the trading name of Environmental Resources Management Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. In line with our company environmental policy we purchase paper for our documents only from ISO certified or EMAS verified manufacturers. This includes paper with the Nordic Environmental Label.

18 CONTENTS This document forms Appendix A to the Inventory Report. It contains important reference material relevant to the inventory, as follows: Appendix A1 - full inventory tables by country and sector; Appendix A2 - records of all meetings held in the 10 candidate countries during compilation of the inventory; Appendix A3 - the questionnaire protocol used by ERM during interviews with EU delegation staff, PMU staff and representatives from relevant government ministries.

19 Appendix 1 Inventory Tables

20

21

22

23

24

25

26 Estonia

27

28 Energy

29 Environment

30 **** TABLE 1 NOT INCLUDED IN INVENTORY **** Table 1: TACIS Programme, 1991 Programme Code: ES 9101 Duration: 1992 Amount: M Project Code Project and sub-project Title 9101 Energy advisor to the Ministry of Industry and Trade Duration A C D Outputs Notes Institutional strengthening through the provision of energy policy advice and training to the government and utilities by the advisor. Start co-ordinating donor funding. Source: OMAS, Desiree, discussion with PIU. Duration data were estimates made by the PIU; and outputs were from the Terms of References.

31 Table 2: General Technical Assistance Facility (GTAF), (energy), 1992 Programme Code: ES Duration: Amount: 0.2 M Project Code Project and sub-project Title Duration A C D Outputs Notes Energy Adviser to the Ministry of Trade and Industry Provision of team leader for the PIU. Groundwork laid for the establishment of a PIU. Continued capacity building through the provision of energy policy advice to the government. Source: OMAS, Desiree, discussion with PIU. Duration data were estimates made by the PIU; and outputs were from the Terms of References.

32 Table 3: General Technical Assistance Facility (GTAF) (energy), 1993 Programme Code: ES Duration: Amount: M Project Code Project and sub-project Title Dration A C D Outputs Notes Project Management Unit Operational PIU assisting the government in policy development (particularly restructuring the energy sector and improving energy efficiency) and enhancement of project programming implementation and co-ordination capacities Energy Database An operational Estonian National Energy Database. The object is to improve the availability of information about the energy sector in Estonia through establishing an energy database. The first phase will evaluate the existing situation concerning energy data according to the EU standards. Based on that experience, an updated energy database, meeting the EU requirements, will be established and implemented. This includes a transfer of skills to database users. The database is to be used by the Estonian Energy Research Institute which will provide information on request to interested government institutions. Database is now in operation and information is still being inputted. Source: OMAS, Desiree, discussion with PIU. Duration data were estimates made by the PIU; and outputs were from the Terms of References.

33 Table 4: Energy Programme, 1994 Programme Code: ES 9404 Expected Duration: 7/94-12/96 Amount: 3.0 M Project Code Project and sub-project Title Duration A C D Outputs Notes Estonian Electricity Sector Restructuring An Action Plan detailing the organisational structure, management, financing and operational arrangements for Eesti Energia (the state monopoly company for electricity generation and distribution). The Plan will be based on an assessment of existing situation and modelling various future scenarios. The Plan was to be agreed with Eesti Energia so recommendations could be adopted, leading to the sector operating in a more commercially viable manner. Eesti Energia is the largest company in Estonia. The study was thus subject to political debate over privatisation. This debate is still going on Elaboration of a Transmission Network Business Plan Energy Conservation Strategy: assessment and development of the Energy Conservation Programme Assistance to Eesti Energia work group to elaborate a business plan for the transmission network The project outputs include: guidelines and procedures to evaluate and rank proposed energy projects tools for monitoring the development of energy conservation programmes data to set priorities for implementing cost effective energy efficiency measures a strategic framework for future energy conservation actions Addendum to above project. Small and complicated and limited output. The objective is for the Strategy to provide state and local authorities with up-to-date tools for the development and monitoring of energy efficiency improvements. The results will be an enhanced local capability to identify, design, monitor and assess the effectiveness of energy conservation programmes.

34 Project Code Project and sub-project Title Duration A C D Outputs Notes Energy Strategy Plan for Estonia Estonia s first Integrated Energy Strategy (IES) proposing means (legal and otherwise) of achieving sector restructuring and investigating future fuel supply options (oil shale vs gas). The project will assist the government in preparing the IES by: assessing the existing situation in the energy sector; investigating various development scenarios using a computer model and to propose to the government an strategy and action plan for the energy sector and its sub-sectors (oil, gas etc) Regional Energy Centres Establishment (equipping and staffing) of three Regional Energy Centres, located throughout Estonia - Rakvere, Vilkandi and Voru, as part of a national network. The aim of the network of RECs is to: assist and train municipalities and companies in the restructuring process and implementation of energy efficiency measures. reduce emission levels and improve the environmental situation through energy conservation measures The RECs will mainly work with local governments in small towns and rural communities. Project completed. Additional contract under 97 programme Institutional development of the energy sector Improved institutional and organisational structure of the energy sector. The project will assist the government in achieving this by analysing the current institutional situation and making recommendations for improving its structure. The study looks at role, objectives, management, performance and staff needs assessment of all relevant government institutions. The recommendations should include proposals for required amendments to legislation to support institutional change and training Standardisation of the energy sector Standardisation of heat load and energy consumption Standard codes of practice in the energy sector in order to fulfil EU directives Development of standardised methods for calculating heat load and energy consumption of buildings. The output is a Draft Standard for Calculating Heat Load and Energy Consumption of Buildings to fulfil EU directives.

35 Project Code Project and sub-project Title Duration A C D Outputs Notes Oil shale study Two main outputs: a test to see if oil shale could be burnt in a fluidized bed combustion (FBC) boiler; and a binding commercial offer to construct a demonstration FBC boiler. The test combustion will be the basis for the design of a new pilot power plant. The commercial offer for the demonstration boiler will be based upon M&O cost estimates for such a boiler. The objective of the project is to assist in the modernisation process of existing shale oil burning boilers in the energy sector and take into account environmental requirements. Results were positive. Source: OMAS, Desiree, discussion with PIU. Duration data were estimates made by the PIU; and outputs were from the Terms of References.

36 Table 5: Energy Programme, 1996 Programme Code: ES 9617 Duration: 6/96-on-going Amount: 2.0 M Project Code Project and sub-project Title Duration A C D Outputs Notes PIU 97-ongoing??? PIU to assist the energy sector in Estonia during the restructuring process for accession to the EU. The PIU involves EU and local experts to provide technical assistance to the Minister and relevant officials in developing policies, strategies and plans concerning energy supply and efficiency. 75% complete (approx) extension contract Training staff in energy sector 97-ongoing Training courses for utilities, local government and state departments to assist the energy sector in its transition to the market based economy and accelerate the integration process with EU. 60 people selected for the training, in economics, management and energy planning % complete (approx) Investment Preparation Facility Post implementation performance analysis for energy investments Metering Plan for electricity sector 98-ongoing Assistance to municipalities to prepare energy efficiency investments. The project is implemented by the Regional Energy Centres. They will develop guidelines for supporting local activities and provide technical assistance to the local authorities for energy planning activities and following the guidelines Continued assistance to the government in developing the Energy Saving Program. Review projects implemented to-date and assist in identifying goals for future energy investments combined with knowledge transfer from other countries experience in this field A metering plan for electricity sector including generation, transmission, export - import and distribution of both active and reactive power. This plan is to serve as a basis of the investment program for renovating the metering system. Within the framework of this project, the needed know how/technology transfer for the renovation is to be provided by a demonstration project. 20% complete (approx) 99% complete (approx) 50% complete (approx) Promoting decentralisation of the grid system and institutional restructuring of Eesti Energia. Source: Desiree, discussion with PIU, summary project data sheets, PIU final report, 97. Note: disbursement does not necessarily reflect the percentage a project is complete.

37 Table 1: General Technical Assistance Facility (GTAF), (environment component), 1992 Programme Code: ES Duration:8/92-12/93 Amount: 0.32 M Project Code Project and sub-project Title Duration A C D Outputs Notes TA to MoE (PIU) 10/92-12/ Operational PIU providing environmental policy advice to the Ministry, particularly focused on environmental funds, legislation and environmental liability Source: draft OMAS, discussion with environment PIU. Financial data: Project Financial Breakdown Data Sheet (PIU) provide committed financial data. Allocated and Disbursed financial data were not available. Need to request Desiree spreadsheets from Brussels. Duration: Programme/Project Status Data Sheet (PIU)

38 Table 2: General Technical Assistance Facility (GTAF) (environment), 1993 Programme Code: ES Duration: 1/93-12/95 Amount: 0.41 M Project Code Project and sub-project Title Duration A C D Outputs Notes Oil Shale Mine (final design) 4/84-2/ Design of a model project (a farm) to demonstrate options for the reclamation of disturbed soil (from oil shale mining) to farmers and the MOE. Subsequent contract for supplying equipment for reclamation Institutional Support to MOE for National Environmental Strategy (NES) 2/95-8/ A National Environment Strategy (NES) providing the first national framework of priorities. The project provided technical expertise to help with the strategies formulation. NES approved by Parliament in The NES formed the basis for the NEAP (implementation stage of the process). Source: draft OMAS, discussion with environment PIU. Financial data: Project Financial Breakdown Data Sheet (PIU) provide committed financial data. Allocated and Disbursed financial data were not available. Need to request Desire spreadsheets from Brussels. Duration: Programme/Project Status Data Sheet (PIU)

39 Table 3: Pollution Monitoring and Enforcement Programme, 1994 Programme Code: ES 9408 Duration: 12/94-on-going Amount: 2.5 M Project Code Project and sub-project Title Duration A C D Outputs Notes Master Plan for Pollution Monitoring and Enforcement (MPME) 2/96-on-going Establishment of an operational PIU at the Environmental Information Centre to co-ordinate the Master Plan preparation. Project included training of new PIU staff in management and monitoring and enforcement skills. A Masterplan for Pollution Monitoring and Enforcement was produced by the PIU. The development of the Masterplan included assessing national capacity, legislation and policy and made recommendations on how to strengthen the system and meet EU standards. The PIU was also responsible for the subsequent implementation of 4 projects identified in the Masterplan (through providing assistance in project design, tendering, evaluation and supervision). The projects are detailed below. The plan was adopted in April projects were identified in the Masterplan for funding. Phare funded 4 of them (presented below). Other were funded by other donor agencies Improvement of data use and data management in environmental monitoring programme (DADAM) 10/97-8/ ? Objective is to increase and improve the Environmental Information Centre s use of environmental monitoring data for management and policy/system development. Output includes tools which EIC can use to interpret data - eg environmental indicators, water quality objectives. The project included TA and equipment. Project nearly complete /03 Improvement of environmental monitoring and enforcement capabilities (ENMOCAP) 11/97-9/ ? Objective is to help the Environmental Inspectorate improve its environmental monitoring and enforcement capacity. Outputs included guidelines for monitoring; pilot tests of the guidelines; and an integrated permit database. The components include training of the Environment Inspectorate staff in wastewater, air and landfill monitoring. Project nearly complete Sampling and laboratory equipment supply (SALES) Mobile unit for air emission monitoring (MOBAIR) 11/97-6/ ? The objective is improved national environmental quality monitoring through the provision of laboratory and field equipment to government environmental laboratories and inspectorates and the provision of hydrometric monitoring stations to the Institute of Hydrology, which are all part of a national monitoring network. Project also provides training for use of equipment.. 11/97-6/ ? Mobile air monitoring unit to be used by the Environmental Inspectorate for air quality testing with the objective of improving air pollution control. Project nearly complete Project nearly complete Source: draft OMAS, discussion with environment PIU. Financial data: Project Financial Breakdown Data Sheet (PIU) provide committed financial data. Allocated and Disbursed financial data were not available. Need to request Desiree spreadsheets from Brussels.

40 Duration: Programme/Project Status Data Sheet (PIU)

41 Table 4: Infrastructure Development Programme (environment), 1995 Programme Code: ES Duration: 8/95 on-going Amount: 3.5 M Project Code Project and sub-project Title Duration A C D Outputs Notes Reduction of pollution in oil shale mining areas - Water Resource Management (REDOS I) 11/95-11/ A strategy for water management in north east Estonia (an old industrial area with oil shale pollution and very poor water quality). The strategy put forward a set of options for the following: strengthening public management minimising water use in industries water management and reduction of abstraction technical rehabilitation of water distribution systems Being implemented under RADOS II National Environmental Action Plan (NEAP) 3/97-5/ A NEAP through provision of TA to the MOE in its formulation. The process is reported to have worked very well 9504? Establishment of a GIS based biodiversity monitoring system Provision of equipment for Matsalu Nature Reserve 1/98-12/ ? A GIS based Biodiversity Monitoring System. Project includes a biodiversity monitoring masterplan, the establishment of the Estonian biodiversity monitoring system and a GIS based biodiversity information system. 1/98-1/ Provision of equipment (tractor, mowers etc) and marine monitoring equipment to Matsalu Reserve. Part of Phare commitment under the World Bank Haapsalu-Matsalu environment project. 30% of budget for equipment procurement Tendering scheduled for summer Small municipalities environment project - TA 6/96-(6/99) 0.30? Technical assistance to the Estonian Water Company to design water and sewer network rehabilitation in 3 towns (out of the 13 being financed under the EBRD loan). Training component included. The consultants were to act as a PIU and drafted the TORs etc for the 2 following equipment provision projects. SMEP is part of a $50 EBRD loan. Phare contributed 2.5 M as cofinanciers. Includes the 2 projects below Small municipalities environment project - Equipment and services 8/97-10/ ? Improved cleaning and inspection of sewers in the 3 towns by providing municipalities with equipment for cleaning and detecting leakage from water mains. Included cleaning of the sewers and showing local staff how to use the hi-tech equipment to clean the sewers (acting as a demonstration and technology transfer project). 70% of budget for equipment procurement

42 Project Code Project and sub-project Title Duration A C D Outputs Notes Small municipalities environment project - Materials and equipment 12/97-12/ ? Water pipeline rehabilitation in small towns through provision of equipment and materials to municipalities. Municipalities to pay for the installation of the equipment as local contribution to the project Civil engineering and project preparation support (APSU interim contract) 1/98-3/ Continued running of the PIU before launch of the APSU through provision of a bridging loan. Source: draft OMAS, discussion with environment PIU. Financial data: Project Financial Breakdown Data Sheet (PIU) provide committed financial data. Allocated and Disbursed financial data were not available. Need to request Desiree spreadsheets from Brussels. Duration: Programme/Project Status Data Sheet (PIU)

43 Table 5: Environment Programme, 1996 Programme Code: ES 9616 Duration: 6/96-on-going Amount: 1.0 M Project Code Project and sub-project Title Duration A C D Outputs Notes Civil engineering and project preparation support (contract addendum) 4/96-12/ Addendum to PIU management contract / Accession Programme Support Unit (APSU) 4/98-3/ ? Operational APSU, supervising the accession process and assisting with design, monitoring and supervision of Phare environmental projects. Source: draft OMAS, discussion with environment PIU. Financial data: Project Financial Breakdown Data Sheet (PIU) provide committed financial data. Allocated and Disbursed financial data were not available. Need to request Desiree spreadsheets from Brussels. Duration: Programme/Project Status Data Sheet (PIU)

44 Table 6: Infrastructure Programme (environment), 1997 Programme Code: ES Duration: 12/96-on-going Amount: 3.3 MECU Project Code Project and sub-project Title Duration A C D Outputs Notes Implementation of the Water Resource Management Plan for Ida-Virumaa region (REDOS II - TA) 3/98-11/ ? Implementation of key recommendations of the REDOS project ( ) through the provision of TA for improving the water supply network in priority areas of the Ida-Virumaa region. Output is a series of design documents (solutions) for the water and wastewater infrastructure systems for the area and a series of technical specifications for the equipment needed (to be purchased in the project below) REDOS II - Materials and Works Keila water and waste water project (equipment and materials) Implementation of key recommendations of the REDOS project ( ) through the provision of equipment for improving the water supply network in priority areas of the Ida-Virumaa region Reconstruction of the water supply network in Keila city through the provision of equipment and materials for construction and reconstruction for the water supply network. Expected to be contracted by end of Contract just signed. Source: draft OMAS, discussion with environment PIU. Financial data: Project Financial Breakdown Data Sheet (PIU) provide committed financial data. Allocated and Disbursed financial data were not available. Need to request Desiree spreadsheets from Brussels. Duration: Programme/Project Status Data Sheet (PIU)

45 Latvia

46

47 Energy

48 Environment

49 Table 1: General Technical Assistance Facility (GTAF) (Energy component), 1993 Programme Code: LE 9302 Duration: 9/94-11/95 Amount:? Project Code Project and sub-project Title Duration A C D Outputs Notes 9302 PIU for energy 9/94-11/95??? Assistance and training to the energy department and utilities to support energy sector restructuring. The PIU once established also to manage future projects. Source: Financial Memorandum, OMAS, discussion with PMU, PERSEUS database.

50 Table 2: Infrastructure Development Programme (energy component), 1995 Programme Code: LE 9503 Duration:11/95-on-going Amount: 2.15 M Project Code Project and sub-project Title Duration A C D Outputs Notes Licensing of entrepreneurial activities in the energy sector 6/96-12/ ? 0.19 Implementation of certain provisions of the Energy Regulatory Law. The TA is to assist the Energy Regulatory Board to implement licensing procedures (preparing operating documents and procedures). The licenses allow power companies to provide energy supply PIU energy (95 contract) 11/95-2/97??? Coordination of foreign aid flow in Latvia. Institutional strengthening through policy advise from the long term advisor and training by short term advisors to Energy Department staff on technical and management issues related to energy sector restructuring. Also assistance in project preparation, application for funding, draft TORs etc and to act as a transfer of knowledge of EU practices and legislation to Ministry staff. Companies must demonstrate fair operation and charging to obtain licenses. A continuation of activities under the 1993 budget.? Feasibility study for establishment of Energy Fund 9/6-9/ A study for options and needs for an energy efficiency fund. The study identified areas for energy savings and investment needs.? Deposit to Energy Fund 6/98-ongoing Setting up of the Fund. Working on tender documents to select a bank to manage the Fund. The funds in this project are also for disbursement to start providing soft loans for the energy efficiency projects Peat extraction, processing and utilisation in energy sector Commercial accounting systems for Latvenergo? Emergency situation management 3/97-4/ ? 0.35 A study identifying the extent to which energy supply could be provided by peat in order to try to national energy sources. The study included an identification of potential environmental problems and possible investment opportunities to exploit peat resources. 1/97-6/ ? 0.08 Implementation of international accountancy standards in the national power company Latvenergo to be used during daily work practices. The project is to increase the transparency of the company to comply with EU directives and promote its further commercialisation. 6/97-6/ ? 0.01 A feasibility study to identify what regulations need to be drafted to secure oil supply during supply crisis. The project will develop an emergency planning system. Both the planning system and the regulations are to fulfil EU directives.

IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE?

IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE? IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE? Rita Raudjärv, Ljudmilla Kuskova Energy is a resource without which it is hard to imagine life in today's world. People seem to take it for granted that energy

More information

EUROPEAN AREA OF SKILLS AND QUALIFICATIONS

EUROPEAN AREA OF SKILLS AND QUALIFICATIONS EUROPEAN AREA OF SKILLS AND QUALIFICATIONS REPORT Fieldwork: April - May 2014 Publication: June 2014 This survey has been requested by the European Commission, Directorate-General for Education and Culture

More information

INNOBAROMETER 2015 - THE INNOVATION TRENDS AT EU ENTERPRISES

INNOBAROMETER 2015 - THE INNOVATION TRENDS AT EU ENTERPRISES Eurobarometer INNOBAROMETER 2015 - THE INNOVATION TRENDS AT EU ENTERPRISES REPORT Fieldwork: February 2015 Publication: September 2015 This survey has been requested by the European Commission, Directorate-General

More information

Guideline on good pharmacovigilance practices (GVP)

Guideline on good pharmacovigilance practices (GVP) 22 June 2012 EMA/541760/2011 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration with Member

More information

Developing Estonian energy policy hand in hand with EU energy packages

Developing Estonian energy policy hand in hand with EU energy packages Developing Estonian energy policy hand in hand with EU energy packages Einari Kisel Secretary General of Energy of the Estonian Ministry of Economic Affairs and Communications 2008 will go down in history

More information

Guideline on good pharmacovigilance practices (GVP)

Guideline on good pharmacovigilance practices (GVP) 1 2 20 February 2012 EMA/541760/2011 3 4 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration

More information

Summary Project Fiche

Summary Project Fiche Summary Project Fiche 1. Basic Information 1.1. Désirée Number: BG 0203.13 1.2. Title: Development and Implementation of VIES requirements and EU interoperability standards in the field of VAT within the

More information

The energy industry and energy price issues in Slovakia during recent years 1

The energy industry and energy price issues in Slovakia during recent years 1 The energy industry and energy price issues in Slovakia during recent years 1 Ing. Mikulá Cár, PhD. National Bank of Slovakia The energy industry and energy prices are becoming a subject of political decisions

More information

THE ORGANISATION AND FINANCING OF HEALTH CARE SYSTEM IN LATVIA

THE ORGANISATION AND FINANCING OF HEALTH CARE SYSTEM IN LATVIA THE ORGANISATION AND FINANCING OF HEALTH CARE SYSTEM IN LATVIA Eriks Mikitis Ministry of Health of the Republic of Latvia Department of Health Care Director General facts, financial resources Ministry

More information

Definition of Public Interest Entities (PIEs) in Europe

Definition of Public Interest Entities (PIEs) in Europe Definition of Public Interest Entities (PIEs) in Europe FEE Survey October 2014 This document has been prepared by FEE to the best of its knowledge and ability to ensure that it is accurate and complete.

More information

European best practice regarding to the licensing in the energy sector

European best practice regarding to the licensing in the energy sector 99333 EU- INOGATE programme, project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) European best practice regarding to the licensing in the energy sector The content of

More information

The River Devoll Project

The River Devoll Project EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile

More information

Country specific notes on municipal waste data

Country specific notes on municipal waste data EUROPEAN COMMISSION EUROSTAT Directorate E: Sectoral and regional statistics Unit E-2: Environmental Statistics and Accounts; Sustainable Development Country specific notes on municipal waste data Last

More information

Privatization in Central and Eastern Europewe

Privatization in Central and Eastern Europewe Privatization in Central and Eastern Europewe ŁukaszZalicki, Partner at Ernst & Young Privatization - what s next Warsaw May 13th, 13 Central and Eastern European Countries - CEECs Czech Rep., Estonia,

More information

Energy Efficiency and Renewable Energy Sources in Sweden

Energy Efficiency and Renewable Energy Sources in Sweden Energy Efficiency and Renewable Energy Sources in Sweden Swedish Energy Agency www.stem.se Yelena Varasteh yelena.varasteh@stem.se Slovakia, 24-25 April 2006 Total energy supply in Sweden in 2004 Total

More information

Running a Business in Georgia

Running a Business in Georgia Enterprise Surveys Country Note Series Georgia World Bank Group Country note no. 6 rev. 1/211 Running a Business in Georgia N ew data from the Enterprise Surveys indicate that senior managers in Georgian

More information

The European Entrepreneur Exchange Programme

The European Entrepreneur Exchange Programme The European Entrepreneur Exchange Programme Users Guide 2 Contents 1.0 Introduction... 5 2.0 Objectives... 6 3.0 Structure... 7 3.1 Basic elements... 7 3.2 Four phases... 8 4.0 Implementation... 9 4.1

More information

English version. Manual for Determination of Combined Heat and Power (CHP)

English version. Manual for Determination of Combined Heat and Power (CHP) CEN/CENELEC WORKSHOP CWA 45547 September 2004 AGREEMENT ICS 27.100 English version Manual for Determination of Combined Heat and Power (CHP) This CEN/CENELEC Workshop Agreement has been drafted and approved

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Examples for financing of biogas projects in Italy

Examples for financing of biogas projects in Italy IEE Project BiogasIN Examples for financing of biogas projects in Italy D.3.2., WP3 - Henning Hahn, Dominik Rutz, Erik Ferber, Franz Kirchmayer - November 2010 Contents 1. Introduction... 3 2. Basics of

More information

Office for the CEI Fund at the EBRD. CEI Know-how Exchange Programme (KEP) KEP ITALY. Financed by the CEI Fund at the EBRD contributed by Italy

Office for the CEI Fund at the EBRD. CEI Know-how Exchange Programme (KEP) KEP ITALY. Financed by the CEI Fund at the EBRD contributed by Italy Office for the CEI Fund at the EBRD CEI Know-how Exchange Programme (KEP) KEP ITALY Financed by the CEI Fund at the EBRD contributed by Italy Call for Proposals 201 Date of publication on www.cei.int 29

More information

Official Journal of the European Union

Official Journal of the European Union ISSN 1977-091X Official Journal C 76 A of the European Union English edition Information and Notices Volume 55 15 March 2012 Notice No Contents Page V Announcements ADMINISTRATIVE PROCEDURES European Personnel

More information

MERKO EHITUS GROUP Annual General Meeting of Shareholders. 29 April 2015 Nordic Hotel Forum, Tallinn

MERKO EHITUS GROUP Annual General Meeting of Shareholders. 29 April 2015 Nordic Hotel Forum, Tallinn MERKO EHITUS GROUP Annual General Meeting of Shareholders 29 April 2015 Nordic Hotel Forum, Tallinn Agenda 1. Approval of the annual report of the year 2014 and overview of the results and the prospective

More information

European judicial training 2014. Justice

European judicial training 2014. Justice European judicial training 2014 Justice Europe Direct is a service to help you find answers to your questions about the European Union. Freephone number (*): 00 800 6 7 8 9 10 11 (*) Certain mobile telephone

More information

Monitoring the social impact of the crisis: public perceptions in the European Union (wave 6) REPORT

Monitoring the social impact of the crisis: public perceptions in the European Union (wave 6) REPORT Eurobarometer Monitoring the social impact of the crisis: public perceptions in the European Union (wave 6) REPORT Fieldwork: December 2011 Publication: April 2012 This survey has been requested by Directorate-General

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

EUROPEAN CITIZENS DIGITAL HEALTH LITERACY

EUROPEAN CITIZENS DIGITAL HEALTH LITERACY Flash Eurobarometer EUROPEAN CITIZENS DIGITAL HEALTH LITERACY REPORT Fieldwork: September 2014 Publication: November 2014 This survey has been requested by the European Commission, Directorate-General

More information

THE ROLE OF PUBLIC SUPPORT IN THE COMMERCIALISATION OF INNOVATIONS

THE ROLE OF PUBLIC SUPPORT IN THE COMMERCIALISATION OF INNOVATIONS Flash Eurobarometer THE ROLE OF PUBLIC SUPPORT IN THE COMMERCIALISATION OF INNOVATIONS REPORT Fieldwork: January February 2014 Publication: May 2014 This survey has been requested by the European Commission,

More information

INDICATIVE GUIDELINES ON EVALUATION METHODS: EVALUATION DURING THE PROGRAMMING PERIOD

INDICATIVE GUIDELINES ON EVALUATION METHODS: EVALUATION DURING THE PROGRAMMING PERIOD EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 INDICATIVE GUIDELINES

More information

Home Savings Act. The Slovak National Council has approved the following Act: P A R T O N E. Basic Provisions. Article 1

Home Savings Act. The Slovak National Council has approved the following Act: P A R T O N E. Basic Provisions. Article 1 Home Savings Act The full wording of Act of the National Council of the Slovak Republic No. 310/1992 Coll. of 6 May 1991, Home Savings Act, as amended by Act of the National Council of the Slovak Republic

More information

ERASMUS FOR YOUNG ENTREPRENEURS : A NEW EXCHANGE PROGRAMME

ERASMUS FOR YOUNG ENTREPRENEURS : A NEW EXCHANGE PROGRAMME PRESS DOSSIER INDEX PRESS DOSSIER...1 INDEX...2 ERASMUS FOR YOUNG ENTREPRENEURS : A NEW EXCHANGE PROGRAMME...3 WHO CAN PARTICIPATE?...5 WHAT BENEFITS AND FOR WHOM?...6 HOW DOES IT WORK? STRUCTURE AND IMPLEMENTATION...7

More information

Developing an Implementation Plan

Developing an Implementation Plan Initiative October 2013 / V1 Guidance Note: 3 Developing an Implementation Plan Introduction A key requirement of an application to join CoST is an implementation plan. The implementation plan should respond

More information

ERASMUS+ MASTER LOANS

ERASMUS+ MASTER LOANS ERASMUS+ MASTER LOANS Erasmus+ Master Loan: opening up access to more affordable lending for cross-border studies The Erasmus+ programme makes it possible for students who want to take a full Master's-level

More information

Electricity, Gas and Water: The European Market Report 2014

Electricity, Gas and Water: The European Market Report 2014 Brochure More information from http://www.researchandmarkets.com/reports/2876228/ Electricity, Gas and Water: The European Market Report 2014 Description: The combined European annual demand for electricity,

More information

Papua New Guinea: Supporting Public Financial Management, Phase 2

Papua New Guinea: Supporting Public Financial Management, Phase 2 Technical Assistance Report Project Number: 44379 012 Capacity Development Technical Assistance (CDTA) November 2012 Papua New Guinea: Supporting Public Financial Management, Phase 2 The views expressed

More information

RETAIL FINANCIAL SERVICES

RETAIL FINANCIAL SERVICES Special Eurobarometer 373 RETAIL FINANCIAL SERVICES REPORT Fieldwork: September 211 Publication: April 212 This survey has been requested by the European Commission, Directorate-General Internal Market

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /.. EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument

More information

INNOVATION IN THE PUBLIC SECTOR: ITS PERCEPTION IN AND IMPACT ON BUSINESS

INNOVATION IN THE PUBLIC SECTOR: ITS PERCEPTION IN AND IMPACT ON BUSINESS Flash Eurobarometer INNOVATION IN THE PUBLIC SECTOR: ITS PERCEPTION IN AND IMPACT ON BUSINESS REPORT Fieldwork: February-March 22 Publication: June 22 This survey has been requested by the European Commission,

More information

Assessment Report for CDM proposed standardized baseline (Version 01.0)

Assessment Report for CDM proposed standardized baseline (Version 01.0) Assessment Report for CDM proposed standardized baseline (Version 01.0) (To be used by the UNFCCC secretariat in assessing the quality of a proposed standardized baseline only when requested by eligible

More information

The National Greenhouse and Energy Reporting (NGER) Legislation and Contractors/Subcontractors

The National Greenhouse and Energy Reporting (NGER) Legislation and Contractors/Subcontractors Environmental Accounting White Paper The National Greenhouse and Energy Reporting (NGER) Legislation and Contractors/Subcontractors by Kim Farrant, Net Balance Charlie Knaggs, Net Balance To facilitate

More information

NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT

NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT International Conference Nuclear Energy for New Europe 2002 Kranjska Gora, Slovenia, September 9-12, 2002 www.drustvo-js.si/gora2002 NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT

More information

ANALYSIS OF THE STAKEHOLDER CONSULTATION ON

ANALYSIS OF THE STAKEHOLDER CONSULTATION ON ANALYSIS OF THE STAKEHOLDER CONSULTATION ON Science and Technology, the key to Europe s future: guidelines for future European policy to support research COM(353)2004 DG Research, European Commission,

More information

72/2015-21 April 2015

72/2015-21 April 2015 72/2015-21 April 2015 Provision of deficit and debt data for 2014 - first notification Euro area and EU28 government deficit at 2.4% and 2.9% of GDP respectively Government debt at 91.9% and 86.8% In 2014,

More information

Assessment of compliance with the Code of Practice for Official Statistics

Assessment of compliance with the Code of Practice for Official Statistics Assessment of compliance with the Code of Practice for Official Statistics Statistics on National Insurance Number Allocations to Adult Overseas Nationals Entering the UK (produced by the Department for

More information

User language preferences online. Analytical report

User language preferences online. Analytical report Flash Eurobarometer 313 The Gallup Organization Flash Eurobarometer European Commission User language preferences online Analytical report Fieldwork: January 2011 Publication: May 2011 This survey was

More information

Securities markets regulators in transition

Securities markets regulators in transition Securities markets regulators in transition Below is a list of the securities regulators, in the EBRD region with summaries of their objectives and competencies (plus links to the website): [Note: If you

More information

PROJECT: EURO-AUDITS THE EUROPEAN ROAD SAFETY AUDITOR TRAINING SYLLABUS APPENDIX E SURVEY RESULTS. October 2007

PROJECT: EURO-AUDITS THE EUROPEAN ROAD SAFETY AUDITOR TRAINING SYLLABUS APPENDIX E SURVEY RESULTS. October 2007 PROJECT: EURO-AUDITS THE EUROPEAN ROAD SAFETY AUDITOR TRAINING SYLLABUS APPENDIX E SURVEY RESULTS October 2007 A European Commission co-funded project Appendix E Survey Results Contents: Survey Results

More information

GHELBER & GOURDON Law firm

GHELBER & GOURDON Law firm GHELBER & GOURDON Law firm Paris Office 12 rue Cortambert 75116 PARIS Tel. : (33) 1 45 03 35 35 - Fax. : (33) 1 45 03 28 00 ghelber@wanadoo.fr GENERAL PRESENTATION The Ghelber & Gourdon s Paris based Law

More information

Statistical Data on Women Entrepreneurs in Europe

Statistical Data on Women Entrepreneurs in Europe Statistical Data on Women Entrepreneurs in Europe September 2014 Enterprise and Industry EUROPEAN COMMISSION Directorate-General for Enterprise and Industry Directorate D SMEs and Entrepreneurship Unit

More information

New environmental liabilities for EU companies

New environmental liabilities for EU companies New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,

More information

Annual European Union greenhouse gas inventory 1990 2013 and inventory report 2015

Annual European Union greenhouse gas inventory 1990 2013 and inventory report 2015 EEA Technical report No 19/2015 Annual European Union greenhouse gas inventory 1990 2013 and inventory report 2015 Submission to the UNFCCC Secretariat ISSN 1725-2237 EEA Technical report No 19/2015 Annual

More information

European Bank for Reconstruction and Development

European Bank for Reconstruction and Development European Bank for Reconstruction and Development The Municipal Finance Facility Special Fund Annual Financial Report 31 December 2009 European Bank for Reconstruction and Development The Municipal Finance

More information

Electricity and natural gas price statistics 1

Electricity and natural gas price statistics 1 Electricity and natural gas price statistics 1 Source: Statistics Explained (http://epp.eurostat.ec.europa.eu/statistics_explained/) - 21/11/2011-09:11:44 Electricity and natural gas price statistics Data

More information

R&D ACTIVITIES. Two in one A value added way to tax optimization

R&D ACTIVITIES. Two in one A value added way to tax optimization R&D ACTIVITIES Two in one A value added way to tax optimization 2 in 1 - A value added way to tax optimization One of the main priority fields of the Hungarian Government in relation to the 2014-2020 European

More information

RETAIL FINANCIAL SERVICES

RETAIL FINANCIAL SERVICES Special Eurobarometer 373 RETAIL FINANCIAL SERVICES REPORT Fieldwork: September 211 Publication: March 212 This survey has been requested by Directorate-General Internal Market and Services and co-ordinated

More information

The education system and lifelong learning in Finland. October 2015 Petri Haltia

The education system and lifelong learning in Finland. October 2015 Petri Haltia The education system and lifelong learning in Finland October 2015 Petri Haltia FINLAND Population: year 2012: 5,421,827 density: 16/km 2 Area: total 338,424 km 2 water 10 % GDP (nominal) 2011 estimate:

More information

Training Module on Accessing Technical, Management and Financial Assistance for Basin Support Officers and Basin Management Committee members

Training Module on Accessing Technical, Management and Financial Assistance for Basin Support Officers and Basin Management Committee members IWRM in the Cuvelai-Etosha Basin Training Module on Accessing Technical, Management and Financial Assistance for Basin Support Officers and Basin Management Committee members July 2013 Developed by Desert

More information

Public Sector and it s Functions. The framework. Why we need public sector? What is the public sector?

Public Sector and it s Functions. The framework. Why we need public sector? What is the public sector? Public Sector and it s Functions The framework What is the public sector? Roles of the public sector, and its main functions Distribution of functions Why we need public sector? The market mechanism cannot

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

CENTRAL BANK OF CYPRUS

CENTRAL BANK OF CYPRUS APPENDIX 2 NOTIFICATION BY A BANK INCORPORATED IN CYPRUS, WHICH WISHES TO PROVIDE SERVICES, ON A CROSS BORDER BASIS, IN OTHER EUROPEAN UNION (E.U.) MEMBER STATES IN ACCORDANCE WITH ARTICLE (28) OF THE

More information

Annex 1: Conceptual Framework of the Swiss-Polish Cooperation Programme

Annex 1: Conceptual Framework of the Swiss-Polish Cooperation Programme Annex 1: Conceptual Framework of the Swiss-Polish Cooperation Programme The Conceptual Framework is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the

More information

AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM. (As amended 30 November 2007)

AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM. (As amended 30 November 2007) AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM (As amended 0 November 2007) AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM (As amended 0 November 2007) TABLE OF CONTENTS PREAMBLE Article 1... 6 Chapter I EMERGENCY

More information

EUROPEAN YOUTH: PARTICIPATION IN DEMOCRATIC LIFE

EUROPEAN YOUTH: PARTICIPATION IN DEMOCRATIC LIFE Flash Eurobarometer EUROPEAN YOUTH: PARTICIPATION IN DEMOCRATIC LIFE REPORT Fieldwork: April 2013 Publication: May 2013 This survey has been requested by the European Commission, Directorate-General for

More information

4 3 Divisional update

4 3 Divisional update 4 3 Divisional update Industry Denis Gasquet Water Jean-Michel Herrewyn Environmental Services Jérôme Le Conte Energy Services Franck Lacroix Transport Jérôme Gallot 99 Veolia Energy: key figures 900 urban/

More information

Opportunities for the Georgian Hydropower industry to benefit from Directive 2009/28EC of the European Parliament

Opportunities for the Georgian Hydropower industry to benefit from Directive 2009/28EC of the European Parliament Promotion hidroenergetikasi Project investiciebis (HIPP) Opportunities for the Georgian Hydropower industry to benefit from Directive 2009/28EC of the European Parliament What Europe wants to do Comply

More information

TPI: Traffic Psychology International on a common European curriculum for postgraduate education in traffic psychology

TPI: Traffic Psychology International on a common European curriculum for postgraduate education in traffic psychology TPI: Traffic Psychology International on a common European curriculum for postgraduate education in traffic psychology Sucha, M.*, Sramkova, L.** DeVol, D.* * TPI - Traffic Psychology International **

More information

EU-10 AND THE CAP CONTENTS

EU-10 AND THE CAP CONTENTS Agricultural Policy Perspectives Brief April 2014 EU-10 AND THE CAP 10 YEARS OF SUCCESS Thinkstockphotos.com CONTENTS 1. Structural Adjustment 2. Income 3. CAP expenditure 4. Land Tenure 5. Prices and

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS

EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS 1 INTRODUCTION 1. Aim of the Evaluation Guide The aim of the Evaluation Guide is: - to identify

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Our financing of the energy sector in 2013

Our financing of the energy sector in 2013 Our financing of the energy sector in 213 rbs.com/sustainable About this document This report is the fourth Our financing of the energy sector briefing that we have produced since 21. The aim remains the

More information

Ex-Post Evaluation of Projects and Activities Financed under the LIFE Programme

Ex-Post Evaluation of Projects and Activities Financed under the LIFE Programme Directorate General Environment, Unit E4 LIFE Ex-Post Evaluation of Projects and Activities Financed under the LIFE Programme Final Report Part 1: Methodology and description of the LIFE Programme and

More information

REPORT. on the Polish Banking Ombudsman activities. in 2011

REPORT. on the Polish Banking Ombudsman activities. in 2011 REPORT on the Polish Banking Ombudsman activities in 2011 Warsaw, January 2012 A. General information The Polish Banking Ombudsman Scheme (PBO) at the Polish Bank Association was established on March 1,

More information

SURVEY ON THE TRAINING OF GENERAL CARE NURSES IN THE EUROPEAN UNION. The current minimum training requirements for general care nurses

SURVEY ON THE TRAINING OF GENERAL CARE NURSES IN THE EUROPEAN UNION. The current minimum training requirements for general care nurses SURVEY ON THE TRAINING OF GENERAL CARE NURSES IN THE EUROPEAN UNION This survey serves as a background document for the discussion of the Commission's legislative proposal to modernize the minimum requirements

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 3.3.2015 COM(2015) 78 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the work under the nuclear decommissioning assistance

More information

EUROPEANS SATISFACTION WITH RAIL SERVICES

EUROPEANS SATISFACTION WITH RAIL SERVICES Flash Eurobarometer 382a EUROPEANS SATISFACTION WITH RAIL SERVICES SUMMARY Fieldwork: September 2013 Publication: December 2013 This survey has been requested by the European Commission, Directorate-General

More information

National Greenhouse Gas Inventory System in Finland

National Greenhouse Gas Inventory System in Finland January 00 1 National Greenhouse Gas Inventory System in Finland Helsinki 00 1 1 1 1 1 1 1 Foreword Statistics Finland has prepared this description of Finland s Greenhouse Gas Inventory System as part

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL CEP/AC.10/2005/5 12 April 2005 ORIGINAL: ENGLISH ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON ENVIRONMENTAL POLICY Working Group on Environmental

More information

Let's talk about rural development money!

Let's talk about rural development money! EU Agricultural Economics Briefs No 10 October 2013 Let's talk about rural development money! Financial planning and implementation of rural development programmes in the 2007-13 programming period Contents

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Minimum Wage Protection Current German and European Debates

Minimum Wage Protection Current German and European Debates Årskonferanse i Fafo Østforum Fire år etter EU-utvidelsen: Status og framtidsperspektiver Oslo, 3 June 2008 Minimum Wage Protection Current German and European Debates Thorsten Schulten Wirtschafts- und

More information

Advanced training for tax auditors in the field of computer audit. 1.1 CRIS Number: 2006/018-180.01-03 Twinning No: PL/06/IB/FI/01/TL

Advanced training for tax auditors in the field of computer audit. 1.1 CRIS Number: 2006/018-180.01-03 Twinning No: PL/06/IB/FI/01/TL 1. Basic Information Advanced training for tax auditors in the field of computer audit 1.1 CRIS Number: 2006/018-180.01-03 Twinning No: PL/06/IB/FI/01/TL 1.2 Title: Advanced training for tax auditors in

More information

ALENA RAKAVA SUMMARY

ALENA RAKAVA SUMMARY ENERGY SECURITY OF BELARUS: STEREOTYPES, THREATS, TRENDS 1 ALENA RAKAVA SUMMARY The issue of energy security is on the agenda of many countries. However, the policy debate on energy security often focuses

More information

Domestic Energy Prices: Data sources and methodology

Domestic Energy Prices: Data sources and methodology Domestic Energy Prices: Data sources and methodology 1. Introduction 1.1 Background Domestic Energy Prices Statistics Domestic price statistics provide important information for monitoring the energy market.

More information

European Network on Independent Living European Coalition for Community Living, April 2015

European Network on Independent Living European Coalition for Community Living, April 2015 Briefing on the use of European Structural and Investment Funds to support the transition from institutional care to community living for people with disabilities European Network on Independent Living

More information

Study on comparison tools and third-party verification schemes

Study on comparison tools and third-party verification schemes Justice and Consumers Study on comparison tools and third-party verification schemes ECCG 25/03/2015 Julien Brugerolle JUST E6 Introduction Study objectives Explore consumer behavioural patterns in the

More information

Fédération des Experts Comptables Européens ACCRUAL ACCOUNTING IN THE PUBLIC SECTOR. January 2007. A Paper from the FEE Public Sector Committee

Fédération des Experts Comptables Européens ACCRUAL ACCOUNTING IN THE PUBLIC SECTOR. January 2007. A Paper from the FEE Public Sector Committee Fédération des Experts Comptables Européens ACCRUAL ACCOUNTING IN THE PUBLIC SECTOR A Paper from the FEE Public Sector Committee CONTENTS Executive Summary...4 Introduction...4 Nature of this paper...4

More information

YOUNG PEOPLE AND DRUGS

YOUNG PEOPLE AND DRUGS Eurobarometer YOUNG PEOPLE AND DRUGS REPORT Fieldwork: June 2014 Publication: August 2014 This survey has been requested by the European Commission, Directorate-General for Justice and co-ordinated by

More information

Agencies and Public Bodies Team Public Bodies: A Guide for Departments

Agencies and Public Bodies Team Public Bodies: A Guide for Departments Agencies and Public Bodies Team Public Bodies: A Guide for Departments Chapter 7: Financial Management Planning, Funding and Control Chapter 7: Financial Management - Planning, Funding and Control FINANCIAL

More information

European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation. Joint procurement.

European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation. Joint procurement. European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation Joint procurement Fact sheet Toolkit developed for the European Commission by ICLEI - Local Governments

More information

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4

More information

Energy efficiency is a priority for the Russian Federation in its energy policy

Energy efficiency is a priority for the Russian Federation in its energy policy Energy efficiency is a priority for the Russian Federation in its energy policy Mikhail Soloviev Geneva, 7-9 October 2009 Purpose and Principles of Government Energy Policy Purpose: most efficient use

More information

Interreg Baltic Sea Region 2 nd Call for Applications Priorities 1-3. Announcement Note for Step 1: Concept Note Timeline: 1 March 2016 1 June 2016

Interreg Baltic Sea Region 2 nd Call for Applications Priorities 1-3. Announcement Note for Step 1: Concept Note Timeline: 1 March 2016 1 June 2016 Interreg Baltic Sea Region 2 nd Call for Applications Priorities 1-3 Announcement Note for Step 1: Concept Note Timeline: 1 March 2016 1 June 2016 1. Introduction Interreg Baltic Sea Region is launching

More information

Family Law. Analytical Report

Family Law. Analytical Report Flash Eurobarometer European Commission Family Law Analytical Report Fieldwork: June 2006 Report: October 2006 Flash Eurobarometer 188 The Gallup Organization This survey was requested by Directorate-General

More information

Special Eurobarometer 431 DATA PROTECTION REPORT

Special Eurobarometer 431 DATA PROTECTION REPORT Special Eurobarometer 431 DATA PROTECTION REPORT Fieldwork: March 2015 Publication: June 2015 This survey has been requested by the European Commission, Directorate-General for Justice and Consumers and

More information

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World... ESBI Company Profile ESB International Bringing Energy Innovation to the World... ESB International ESBI is one of Europe s most progressive and commercially focused electricity consultancy firms with

More information

Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation

Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Valerie Fogleman Consultant, Stevens & Bolton LLP Professor of Law, Cardiff University

More information

ATTITUDES OF EUROPEANS TOWARDS BUILDING THE SINGLE MARKET FOR GREEN PRODUCTS

ATTITUDES OF EUROPEANS TOWARDS BUILDING THE SINGLE MARKET FOR GREEN PRODUCTS Flash Eurobarometer 367 ATTITUDES OF EUROPEANS TOWARDS BUILDING THE SINGLE MARKET FOR GREEN PRODUCTS SUMMARY Fieldwork: December 2012 Publication: July 2013 This survey has been requested by the European

More information

Quality Assurance/Quality Control Plan: Samples and Manual for Development

Quality Assurance/Quality Control Plan: Samples and Manual for Development DRAFT Quality Assurance/Quality Control Plan: Samples and Manual for Development Report prepared by Dr. Natalya Parasyuk for project CAPACITY BUILDING FOR IMPROVING THE QUALITY OF GREENHOUSE GAS INVENTORIES

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 25.9.2014 COM(2014) 592 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation in the period from 4 December 2011 until 31 December

More information