Western Europe. Pipe rehabilitation. Auger boring. CIPP works during the cold snap. Take-off by the Boeing plant. Expanding the market share

Size: px
Start display at page:

Download "Western Europe. Pipe rehabilitation. Auger boring. CIPP works during the cold snap. Take-off by the Boeing plant. Expanding the market share"

Transcription

1 Pipe rehabilitation CIPP works during the cold snap Western Europe Expanding the market share Auger boring Take-off by the Boeing plant ISSN

2 16 AUGER BORING Keeping the traffic moving Replacement of an aged water main under busy routes feeding traffic to the world s largest building called for careful planning Overview of Highway 99 distributionsystem improvement programme Construction of the project without disrupting daytime traffic to and from Boeing s plant was paramount to the overall success of the project The Alderwood Water and Wastewater District (AWWD), located roughly 20 miles (32km) north of Seattle in Washington, was formed in The area has seen rapid growth and the district now serves over 214,000 customers. In 2012, AWWD began construction of the Highway 99 distribution-system improvements that consisted of the replacement of 80-year-old water mains along Highway 99 and new pipe under State Route 525. These are two major highways carrying Boeing workers to the Everett factory (home to the world s largest building by volume, housing 42,000 employees), at an Average Daily Traffic (ADT) volume of 38,900 and 61,000 vehicles each day respectively. The basic problem is common to many utility projects: installing new or replacement water and sewer lines, while minimising both safety concerns and impacts to the motoring public. However, when the road involved is a six-lane arterial with a speed limit of 45mph (72kmph), the challenge is to avoid any daytime road interference. POTENTIAL TRAFFIC IMPACTS In 2011, the federal government, through the American Recovery and Reinvestment Act, commissioned a transportation report for the Evergreen Way/Highway 99 Revitalization Plan. The report identified Evergreen Way/ Highway 99 as a highway of regional significance within the AWWD project area. According to the 2011 Transportation Report, Highway 99 south of Airport Road currently has an ADT of 38,900 vehicles (Perteet 2011). According to the 2013 Washington State Department of Transportation (WSDOT) Annual Traffic Report, State Route 525 saw an ADT of 62,000 vehicles on average in 2013 (WSDOT 2013). Construction of the proposed project without disrupting daytime traffic to and from Boeing s plant was paramount to the overall success of the project. Boeing runs three shifts at the plants, so shift-change times had to be taken into consideration during the planning. TRENCHLESS SOLUTIONS During the preliminary design phase, in evaluating alignment and construction options, several project goals were identified: Minimise the possibility of damaging the fragile water mains during construction, failure of which would disrupt traffic and potentially undermine the road section; Avoid existing utilities where possible to minimise construction conflicts and utility relocations; Minimise water-service interruptions to businesses; Minimise surface restoration within the paved right-of-way; and Minimise traffic impacts. The risks in using the trenchless techniques included boring into unknown utilities, heaving the road, groundwater seepage, the casing veering outside of tolerances, hitting a large boulder and other more minor risks. These risks were evaluated and in light of WSDOT s stance on not allowing open-cutting the roadway for transverse crossings, the risks were deemed acceptable. The design called for the installation of three waterline crossings of Highway 99 and one crossing of State Route 525. The crossings of Highway 99 included both water-main replacements and future pressure-zone continuation. The crossing of State Route 525 was part of the concept that eliminated a significant portion of high-cost work along the east side of Highway 99 and allowed the district to eliminate additional ageing infrastructure. TRAFFIC CONTROL The overarching goal during construction, other than pipe replacement, was the safety of the travelling public and all parties involved in the project. The contractor s work hours

3 AUGER BORING 17 were different for northbound and southbound traffic and depended on whether a shoulder, one-lane, or two-lane closures were required for any given stretch of the several mile-long project. Typically, work hours with lane closures were limited to between 11pm and 5am, which did not allow much time for production. The bore-pit locations were designed to be off the used part of the road, so that work could be completed during the day for more efficient production (and lower cost) and less inconvenience to the public. Some of the tie-in excavations did require construction in the roadway, since the alignment of the water mains was in a travelled lane, and required cutting out a piece of the bore casing in the middle of the highway. CONSTRUCTION SEQUENCING The contractor had flexibility in sequencing the construction work on the highway. The district expected that two or three crews would be working at any given time on the project. Because of the way that the traffic-control work was paid (on a per-unit basis), the contractor had more crews than anticipated with many flaggers on site, so the traffic-control cost was higher than originally projected. There were many drunk-drivers observed, and a few minor incidents and near hits, with additional police presence to minimise the possibility of accidents. The sequencing of the borings was dictated in part by the general contractor s approach to the project, with the order of the bores following the contractor s work. The casings were installed during daytime work in a straightforward manner without issues, except for where contaminated soil that was discovered at one bore pit. The contamination delayed the start of the bore for several days while tests were run to determine Bore 1: Highway 99 and State Route 525 The first auger-bore crossing of Highway 99 occurred approximately 300ft (91.4m) north of the off-ramp from State Route 525 to Highway 99. This called for the installation of 115ft of 36in (914.4mm)-diameter steel casing, which would house the 12in-diameter ductile iron carrier pipe. The boring had to cross six lanes of traffic while avoiding storm, fibre-optic, phone, gas, The traffic-control cost was higher than originally projected. There were many drunkdrivers observed, and a few minor incidents and near hits The site of the project s first auger bore water, and underground and overhead power lines. The jacking pit was constructed in an existing WSDOT access road on the east side of Highway 99, while the receiving pit was built on the west side. The size of the jacking pit was limited to a 40ft by 40ft temporary construction easement. The bore was installed at a depth of approximately 14ft below Highway 99.

4 18 AUGER BORING Bore 2: Highway 99 and Russell Way Aerial view of the site for the second bore The second auger-bore crossing of Highway 99 occurred just south of Russell Way in front of a property with a busy recreational-vehicle (RV) sales business. This road crossing was unique because it required the installation of two separate carrier-pipe systems: a 12in ductile iron pipe for the 724 pressure zone, and a 16indiameter pipe for future extension of the 635 pressure zone. This was accomplished through the installation of approximately 80ft of 42in-diameter steel casing, which housed both carrier pipes. The jacking pit was again installed on the east side of Highway 99, but this time it was within the RV sales lot. Two stages in the boring process for the second bore A temporary construction easement was negotiated with the property owner and required that the contractor construct the auger bore within tight site constraints. Access to the RV lot needed to be maintained as well. The receiving pit at this crossing was located within the Highway 99 ROW, which required that the intertie be constructed at night. This crossing was installed at a depth of approximately 15ft. Each of the proposed auger bores presented its own unique challenges the contaminants and the affected soils were removed. The timing of the tie-in excavations was co-ordinated and required lane closures. This type of work was completed at night per the permit conditions. Bore 3: Highway 99 and Airport Way Third bore location The final Highway 99 crossing was just south of Airport Road. The new pipe serving the 724 pressure zone had to cross from the west side of Highway 99 to the east and then travel north along it across Airport Road in parallel with a new 12in-diameter ductile iron waterline serving the 635 pressure zone. The crossing was constructed using a 36in-diameter steel casing, 77ft long. The jacking pit AUGER-BORE CONSTRUCTION Each of the proposed auger bores presented its own unique challenges. Each of the jacking and receiving pits had to be located within the existing right of way (ROW), or additional easements Work under way on the third bore was designed on the west side of Highway 99 in a vacant lot. The receiving pit was in the eastern turn lane for Airport Road, and required night construction for the final intertie. This crossing was at a depth of approximately 14ft below the road. had to be obtained to allow for construction. The pits had to be situated so that they did not interfere with the constant traffic flow and contractors could not move or relocate existing utilities. In addition, two of the four auger-bore installations required that the contractor excavate intertie pits within the travelled lanes of Highway 99 at night to allow for the proper alignment of the proposed water installation. Each of the four auger bores is discussed in further detail in the boxes on these pages. CONCLUSION AND SUMMARY The success of this project rested heavily on the design research and details, construction sequencing, and selection of good bore and receiving pit locations. Additionally, selecting the appropriate method of trenchless construction avoided major problems during construction. The design team conducted a detailed alternatives analysis to determine the most cost-effective and least risky way of replacing the waterlines in Highway 99.

5 AUGER BORING 19 The major project risks included construction equipment or vibrations impacting the deteriorated mains, causing a major water-main break in the heavily travelled highway and protecting the safety of the participants and public during construction work, most of which occurred at night with cars speeding by. The team oversaw the installation of new waterlines to improve the pressures in the project area while minimising project risk. The effort was facilitated without affecting existing utilities or interrupting water service throughout construction. Additionally, surface restoration and traffic impacts during construction were minimised. The combined strategies allowed the AWWD to replace this critical infrastructure without significant impacts to the roughly 36,000 local customers, the near-by industries, including Boeing, or thousands of daily commuters. These important improvements are a vital section of the 660 miles of water main used to reliably deliver 9 billion gallons of potable water a year to the district s residents and businesses. Bore 4: State Route 525 The auger-bore crossing of State Route 525 was part of the low-pressure improvement phase of the project. It was developed by AWWD and Stantec staff to minimise construction on Highway 99 while eliminating additional ageing waterlines. During design it was determined that a route alternative for the replacement of the 635 pressure zone piping could reduce the need for approximately 6,000ft of pipe on Highway 99. The bore involved installing 115ft of 36in-diameter steel casing to carry a 12in-diameter ductile iron pipe across State Route 525. A jacking pit of approximately 20ft by 35ft was Views of the final crossing bore installed on the east side of the road roughly 190ft south of 149th Place SW. The receiving pit was installed in the ROW for State Route 525. The receiving pit had to be installed on a sloped area to avoid existing utilities, which complicated the work. At its deepest point, the casing was 11ft below the road. Boring under State Route 525 The effort was facilitated without affecting existing utilities or interrupting water service throughout construction This article is an edited version of AWWD uses auger boring to keep the traffic moving by Erik Waligorski and Laurie Fulton from Stantec, and Jeff Clarke and Paul Richart from Alderwood Water and Wastewater District. Original presentation given at NASTT s 2015 No-Dig Show. North American Society for Trenchless Technology. All rights reserved. Editorial Editor Luke Buxton T +44 (0) E luke.buxton@aspermontmedia.com F +44 (0) Advertisement contacts Sales director: Richard Dolan T +44 (0) F +44 (0) E richard.dolan@aspermontmedia.com Advertising production: Sharon Evans T +44 (0) E sharon.evans@aspermontmedia.com Publisher Robin Booth Head of production Tim Peters Senior sub editor Jim Adlam Sub editor Woody Phillips Senior account manager: Bea Ramdhonee T +44 (0) F +44 (0) E bea.ramdhonee@aspermontmedia.com Head office Aspermont Media, 4th floor, 68 Upper Thames Street, London, EC4V 3BJ, UK Subscriptions and circulation T +44 (0) E subscriptions@tunnelling-and-trenchless-world.com Aspermont Media Ltd, Chancery Exchange, 10 Furnival Street, London EC4A 1YH, United Kingdom Chairman Andrew Kent Annual subscription UK and Europe ( euros) Rest of the world US$ Additional current copies are available to subscribers at 12 (US$21; 18) each Trenchless World (ISSN ) USPS No: is published monthly (except January & July) by Aspermont Media, 4th floor, 68 Upper Thames Street, London, EC4V 3BJ, UK. Printed by Stephens & George Magazines, Merthyr Tydfil, UK The 2015 US annual subscription price is US$170. Airfreight and mailing in the US by Agent named Air Business, c/o WorldNet Shipping USA Inc, th Avenue, Jamaica, New York, NY Periodicals postage paid at Jamaica NY US Postmaster: send address changes to Trenchless World, Air Business Ltd, c/o WorldNet Shipping USA Inc, th Avenue, Jamaica, New York, NY11434 Subscription records are maintained at Aspermont Media Ltd, Chancery Exchange, 10 Furnival Street, London EC4A 1YH, UK Aspermont Media, publisher and owner of Trenchless World ( the publisher ) and each of its directors, officers, employees, advisers and agents and related entities do not make any warranty whatsoever as to the accuracy or reliability of any information, estimates, opinions, conclusions or recommendations contained in this publication and, to the maximum extent permitted by law, the publisher disclaims all liability and responsibility for any direct or indirect loss or damage which may be suffered by any person or entity through relying on anything contained in, or omitted from, this publication whether as a result of negligence on the part of the publisher or not. Reliance should not be placed on the contents of this magazine in making a commercial or other decision and all persons are advised to seek independent professional advice in this regard. Media Aspermont Media 2015 ISSN A member of BPA Worldwide

Dewatering - Time and Cost Relief by way of Trenchless Construction

Dewatering - Time and Cost Relief by way of Trenchless Construction North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-02 WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW Mark Oberschmidt, P.E., Stantec,

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

Risk Control Industry Guide Series. Utility Contractors Industry

Risk Control Industry Guide Series. Utility Contractors Industry Risk Control Industry Guide Series Utility Contractors Industry This study reflects on information derived from insurance claims. These claims form a database that can be analyzed to determine the many

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T3-05 Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

Status Report on Settlement. City Council Briefing December 15, 2014

Status Report on Settlement. City Council Briefing December 15, 2014 Status Report on Settlement City Council Briefing December 15, 2014 1 City Response Timeline November 21: SDOT informed of minor settlement (~0.1 ) December 3: SDOT informed of measurement anomaly in deep

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

River Management 2013 Colorado Flood

River Management 2013 Colorado Flood River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Alternatives Presentation Meeting Middlebury WCRS(23)

Alternatives Presentation Meeting Middlebury WCRS(23) Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College

More information

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within

More information

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address: City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

Chapter Thirteen WORK ZONE TRANSPORTATION MANAGEMENT PLANS BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Thirteen WORK ZONE TRANSPORTATION MANAGEMENT PLANS BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Thirteen WORK ZONE TRANSPORTATION MANAGEMENT PLANS BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Thirteen WORK ZONE TRANSPORTATION MANAGEMENT PLANS Table of Contents Section Page 13-1 GENERAL...

More information

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future

More information

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

PROCEDURE MANUAL FOR ENGINEERING CONSULTANTS

PROCEDURE MANUAL FOR ENGINEERING CONSULTANTS PROCEDURE MANUAL FOR ENGINEERING CONSULTANTS CITY OF GREATER SUDBURY ENGINEERING SERVICES DIVISION JUNE 2005 TABLE OF CONTENTS Chapter 1 - Reference Procedure Manuals and Specifications - CAD Drawing Requirements

More information

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

FOR IMMEDIATE RELEASE September 17, 2013 Contact: NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled

More information

REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND

REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-5-04 REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY

More information

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS 10.1 APPLICATION REQUIREMENTS AND PROCEDURES 10.1.1 A permit shall be required for any construction or installation within the public right-of-way

More information

Tunnelling & Underground. Specialists

Tunnelling & Underground. Specialists Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING EDWARD ALAN AMBLER, PE BILL THOMAS, PHD, PE COLLINS ORTON AGENDA Introduction Asbestos

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS I "i,, I, 1 " CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS CHAPTER 10 PERMIT PROCEDURES A N D BONDING REQUIREMENTS FOR CONTRACTORS, Section I -, INDEX :, - % I I,,J Topic b 101

More information

Plumbers Packet. Right-of-Way Management Program Permit Fees and Regulations

Plumbers Packet. Right-of-Way Management Program Permit Fees and Regulations Plumbers Packet Right-of-Way Management Program Permit Fees and Regulations Plumbers doing work in the City ROW will be required to apply for and obtain an Excavation Permit or an Obstruction Permit depending

More information

The Mersey Gateway Project

The Mersey Gateway Project The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

11 p.m. to. Tuesday, June. will remain open. 14. closed

11 p.m. to. Tuesday, June. will remain open. 14. closed June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access

More information

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS

RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS Contra Costa Environmental Health 2120 Diamond Blvd., Suite 200 Concord, CA 94520 Phone: (925) 692-2500 Fax: (925) 692-2504 www.cchealth.org/eh/ RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

The leader in trenchless rehabilitation

The leader in trenchless rehabilitation The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers

More information

Frequently asked questions July 2014

Frequently asked questions July 2014 Carlton Main Sewer Frequently asked questions July 2014 We understand you might have some questions for us, so we ve prepared a selection of FAQs to provide you with some general information. If you would

More information

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel Cyclists CRASH STATISTICS FOR THE YEAR ENDED 31 DECEMBER 212 Prepared by the Ministry of Transport CRASH FACTSHEET November 213 Cyclists have a number of risk factors that do not affect car drivers. The

More information

Project Accidents. Section. Responsibilities of the Inspector-in-Charge

Project Accidents. Section. Responsibilities of the Inspector-in-Charge Section 10 Project Accidents Responsibilities of the Inspector-in-Charge A ccidents happen. By paying attention to your surroundings, remembering safe working habits and practicing all that you ve learned,

More information

1What purpose do guard

1What purpose do guard g u a r d F c a b A l e Q f re q u e n t l y a s k e d q u e s t i o n s 1What purpose do guard cables serve? Cross-Median Fatalities The purpose of high-tension guard cable is to prevent vehicles that,

More information

the Ministry of Transport is attributed as the source of the material

the Ministry of Transport is attributed as the source of the material Disclaimer All reasonable endeavours are made to ensure the accuracy of the information in this report. However, the information is provided without warranties of any kind including accuracy, completeness,

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

King County/Skyway Water & Sewer District Infiltration and Inflow Reduction Project

King County/Skyway Water & Sewer District Infiltration and Inflow Reduction Project King County/Skyway Water & Sewer District Infiltration and Inflow Reduction Project Public Meetings March 30 and April 2, 2011 Summary of Public Comment In late March and early April 2011, the King County

More information

Incident Management Response Plan Hampton Roads Highway Incident Management Committee

Incident Management Response Plan Hampton Roads Highway Incident Management Committee Incident Management Response Plan Hampton Roads Highway Incident Management Committee Multi-Jurisdictional Memorandum of Understanding Highway Incident Management Plan This memorandum of understanding

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

Prepared by Kory Menken & Andrew Finzen 10/26/14. North Sioux City Economic Development Corporation Flynn Business Park

Prepared by Kory Menken & Andrew Finzen 10/26/14. North Sioux City Economic Development Corporation Flynn Business Park North Sioux City Economic Development Corporation Flynn Business Park South Dakota Certified Ready Sites Application Prepared by Kory Menken & Andrew Finzen 10/26/14 Table of Contents 1.0 Ownership Information...

More information

Successful Incident Management on a Major Reconstruction Project

Successful Incident Management on a Major Reconstruction Project Transportation Research Board 81 st Annual Meeting January 13-17, 2002 Washington, DC Successful Incident Management on a Major Reconstruction Project Pacific Motorway Project, Queensland Australia Professor

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

Section 9315. Operations Section Organizational Guidance

Section 9315. Operations Section Organizational Guidance Section 9315 Operations Section Organizational Guidance T able of Contents Section Page 9315 Operations Section Organizational Guidance... 9315-1 9315.1 Minor Inland Spill Scenario... 9315-1 9315.2 Minor

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

Gas Line And Sewer Crossbores. Danny Hixon & Jeff Griffiths 513-410-3301 757-353-1521

Gas Line And Sewer Crossbores. Danny Hixon & Jeff Griffiths 513-410-3301 757-353-1521 Gas Line And Sewer Crossbores Danny Hixon & Jeff Griffiths 513-410-3301 757-353-1521 GOAL OF HYDROMAX USA Hydromax USA is a Professional Services company that provides accurate and easily interpreted data,

More information

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR ABSTRACT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 Virginia

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story Cover Story Making Connections in Miami: County improves plants, integrates cooling loops One of the many issues facing cities, towns and campuses throughout North America is the challenge of replacing

More information

Guidelines for Fiber Optic Cable Permits

Guidelines for Fiber Optic Cable Permits Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway

More information

Technical Memorandum Cost Criteria for 2010 System Capacity Plan

Technical Memorandum Cost Criteria for 2010 System Capacity Plan 2010 SASD SEWER SYSTEM CAPACITY PLAN UPDATE Technical Memorandum Cost Criteria for 2010 System Capacity Plan PREPARED BY: My Huynh DATE: September 13, 2011 REVIEWED BY: Sonny Lunde INTRODUCTION This Technical

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160

More information

Bond Release Process for New Subdivision Developments in Fairfax County

Bond Release Process for New Subdivision Developments in Fairfax County Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Section 02415. Installation of pipe and casing for sanitary sewer by methods of augering.

Section 02415. Installation of pipe and casing for sanitary sewer by methods of augering. ITY OF PRLN UGRING PIP OR SING FOR SWRS Section 02415 UGRING PIP OR SING FOR SWRS 1.0 G N R L 1.01 STION INLUS Installation of pipe and casing for sanitary sewer by methods of augering. References to Technical

More information

Town of Bellingham DEPARTMENT OF PUBLIC WORKS. Snow and Ice Control FAQs. Q. Can I push snow from my property onto the sidewalk or street?

Town of Bellingham DEPARTMENT OF PUBLIC WORKS. Snow and Ice Control FAQs. Q. Can I push snow from my property onto the sidewalk or street? Frequently Asked Questions Town of Bellingham DEPARTMENT OF PUBLIC WORKS Snow and Ice Control FAQs Q. Can I push snow from my property onto the sidewalk or street? Bylaw 15.02 restricts this act and you

More information

PROFESSIONAL CONTRACTORS INSURANCE PACKAGE

PROFESSIONAL CONTRACTORS INSURANCE PACKAGE PROFESSIONAL CONTRACTORS INSURANCE PACKAGE MASTER CERTIFICATE NO. TLD/CC/01/00924 NAME: Individual Contractors being any individual temporary worker whether trading in his/her own name or as a Limited

More information

July 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul

July 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul July 2010 Chair Peter Bell of the Metropolitan Council speaks about the Met Council s contribution of $1 million to a $1.5 million small business loan fund during a July 20 news conference with Mayor R.T.

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

City of Mill Valley Sewer Capital Improvement Plan 2012 2016

City of Mill Valley Sewer Capital Improvement Plan 2012 2016 City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM

More information

Changing the Face at the Busiest Airport in the World through Project Management

Changing the Face at the Busiest Airport in the World through Project Management Changing the Face at the Busiest Airport in the World through Project Management Refurbishing Heathrow Airport Terminal 1, On Time, On Budget, With No Disruptions to Travelling Public Background: Dated

More information

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements

More information

1-800-327-8276 www.jfcson.com

1-800-327-8276 www.jfcson.com Trenchless Cost Effective Internal Pipe Rehabilitation 101 East Broadway, Hackensack, N.J. 07601 Folsom, NJ Linden, NJ Beltsville, MD Sylmar, CA 1-800-327-8276 www.jfcson.com In-Weg Internal Joint Sealing

More information

Performance Measures for RIDOT s Traffic Management Center

Performance Measures for RIDOT s Traffic Management Center Performance Measures for RIDOT s Traffic Management Center Catherine Burns, EIT Transportation Engineer Sudhir Murthy, PE, PTOE President 5/2011 Presentation Outline RIDOT Performance Measures Public Outreach

More information

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta HUNT OIL COMPANY OF CANADA INC. APPLICATION FOR A SWEET NATURAL GAS PIPELINE HARMATTAN-ELKTON, RICINUS, Examiner Report 2001-3 AND CAROLINE FIELDS Application

More information

Traffic Management Guidelines

Traffic Management Guidelines Ministry of Transportation Traffic Management Guidelines For Work On Roadways September 2001 TABLE OF CONTENTS COVER PAGE 1 TABLE OF CONTENTS 2 LIST OF FIGURES AND TABLES 5 PREFACE 6 PART 1 - INTRODUCTION

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Draft Transportation Management Plan for Via Verdi Repair Project

Draft Transportation Management Plan for Via Verdi Repair Project for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...

More information

TECHNIQUES FOR MANUALLY ESTIMATING ROAD USER COSTS ASSOCIATED WITH CONSTRUCTION PROJECTS

TECHNIQUES FOR MANUALLY ESTIMATING ROAD USER COSTS ASSOCIATED WITH CONSTRUCTION PROJECTS TECHNIQUES FOR MANUALLY ESTIMATING ROAD USER COSTS ASSOCIATED WITH CONSTRUCTION PROJECTS by Ginger Daniels, P.E. Associate Research Engineer Texas Transportation Institute David R. Ellis, Ph.D. Associate

More information

Machine Foundation Design

Machine Foundation Design Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

PERFORMANCE REPORT Quarter 2 2014/15

PERFORMANCE REPORT Quarter 2 2014/15 PERFORMANCE REPORT Quarter 2 2014/15 CONTENTS 1. RELIABILITY... 3 2. NETWORK DISRUPTION... 9 3. TRAFFIC VOLUMES... 15 4. TRAFFIC SPEEDS... 17 5. ROAD SAFETY... 18 6. ASSET AVAILABILITY... 19 7. STATE OF

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet

Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet This packet contains the requirements and forms needed to apply for a permit allowing test bore, monitoring