1 SE GIS Project Plan Project Plan SE Spatial Data Management Project A Component of Saskatchewan Environment Enterprise SDE/GIS Implementation Author: Ken Yurach Creation Date: November 21, 2003 Last Updated: ongoing Version: 1.0

2 Acknowledgement : Saskatchewan Environment adapted the following project plan from a document created by Alaska Department of Natural Resources with permission and assistance from the author, Richard Clements. Clement, R A Component of The Mining & Land Records Information System. 32p 12/11/03 y Project Plan 2

3 TABLE OF CONTENTS APPROVALS...4 SIGN-OFF SHEET...4 INTRODUCTION...5 PURPOSE OF PLAN...5 BACKGROUND INFORMATION ABOUT THE PROJECT...5 PROJECT APPROACH...5 GOALS AND OBJECTIVES...7 BUSINESS GOALS AND OBJECTIVES...7 PROJECT GOALS AND OBJECTIVES...8 SCOPE...9 SCOPE DEFINITION...9 COSTS, BENEFITS AND RISKS...10 PROJECT PRODUCTS/DELIVERABLES LIST...10 MILESTONES...16 IMPACTED BUSINESS AREAS...16 ASSUMPTIONS...17 PROJECT ASSUMPTIONS...17 CONSTRAINTS...17 PROJECT CONSTRAINTS...17 RELATED PROJECTS...17 CRITICAL DEPENDENCIES...18 QUALITY MANAGEMENT APPROACH...18 ACTIVITY REVIEWS/WALK-THROUGHS...18 PERFORMANCE/QUALITY STANDARDS...18 TRAINING...18 PROJECT MANAGEMENT APPROACH...19 WORK BREAKDOWN STRUCTURE (WBS) GANTT CHART...19 BASIS OF ESTIMATES...19 PROJECT EFFORT ESTIMATION...19 PROJECT STANDARDS...19 PROJECT ROLES, RESPONSIBILITIES AND COMPETENCIES...19 PROJECT TEAMS MEMBERSHIP SELECTION CRITERIA...21 CHANGE AND ISSUE MANAGEMENT APPROACH...21 COMMUNICATIONS AND CONTROL APPROACH...21 ATTACHMENTS/APPENDICES...23 APPENDIX A PROJECT WORK PLAN...23 APPENDIX B RISK ASSESSMENT...28 APPENDIX C PROJECT BUDGET REPORT/COST BENEFIT ANALYSIS REPORT...28 APPENDIX D PROJECT IMPACT REPORT...28 APPENDIX E REVISION CHART...28 APPENDIX F TEAM MEMBERS /11/03 y Project Plan 3

4 APPROVALS Sign-off Sheet I have read the above Project Plan and will abide by its terms and conditions and pledge my full commitment and support for the project. Executive Sponsor: EXEC. Com Executive Sponsor: EXEC. Com Executive Sponsor: EXEC. Com Executive Sponsor: EXEC. Com Executive Sponsor: Grant Godwin, Director IMB Project Manager: Ken Yurach Project Team Member: IMB Staff Project Team Member: IMB Staff Project Team Member: F&W Staff Project Team Member: FEB Staff Project Team Member: ETC Project Team Member: ETC Date Date Date Date Date Date Date Date Date Date Date Date SE Spatial Data Management Project Plan Page 4 of 30

5 INTRODUCTION Purpose of Plan The purpose of this plan is to provide definition of the SE Spatial Data Management Project, including the business goals, objectives and project scope. This plan will serve as a contract between the Project Manager, Departmental Sponsor and Project Team members and other Saskatchewan Environment management associated with or affected by the project. Background Information About the Project The SE Spatial Data Management Project began during budget cycle and serves as a vehicle to reach many long-term goals identified over the past years. Earlier initiatives were smaller in scope due to lack of funding, lack of resources and technological constraints. SE staff have been working towards an operational Enterprise GIS model which included SDE implementation over the past few years. Acquiring many of the necessary components as funding became available from a variety of sources. Project Approach To be successful, this project will require a common vocabulary, teamwork, leadership and a welldefined and accepted project cycle. These elements are common to successful projects that have been implemented in the public and private sectors. The project will depend on these teams: Team Team Members Responsibilities 1 Project Team Project Manager and technical staff ƒplanning, scheduling and controlling (Project Manager) ƒcompleting the deliverable product at the User-Required performance, within cost, on Project Review Team Status Plat SuperUser Team Representatives of the financial, business and technical sectors of SE Technical representatives from all impacted SE areas time and within scope. ƒensure that the project is within scope, on or under budget and satisfies the customers needs ƒuser Requirements and Functionality Review ƒtransition Stage / Training Phase 1 See " Project Roles and Responsibilities" for a detailed listing. SE Spatial Data Management Project Plan Page 5 of 30

6 This project will be proactively managed in an orderly, methodical and disciplined way. The project cycle will be conducted in a sequence of three or five stages. The number of stages will be determined after the initial Study Stage (see Appendix A Project Work Plan). These phases represent milestones in the project timeline. The project is controlled by a series of gates. These gates occur at the end of each phase (see Appendix A). At these gates, the Project Review Team will analyze the deliverables. This analysis results in acceptance, rejection or a request for project change. If accepted, the Development Team continues to the next phase. If rejected, the Development Team starts the phase again. If the Project Review Team requests a change in the project, the Development Team calculates the results of the change. These results are used to update the deliverables. These deliverables are resubmitted to the Project Review Team. This cycle is performed until the Project Review Team accepts the phase deliverables. SE Spatial Data Management Project Plan Page 6 of 30

7 GOALS AND OBJECTIVES Business Goals and Objectives Goals: Saskatchewan Environment 6DVNDWFKHZDQ(QYLURQPHQWPDQGDWHLVWRPDQDJHHQKDQFHDQGSURWHFW6DVNDWFKHZDQV QDWXUDODQGHQYLURQPHQWDOUHVRXUFHVILVKZLOGOLIHODQGVIRUHVWVSDUNVDQGSURWHFWHGDUHDVDLU ZDWHUDQGVRLOIRUFRQVHUYDWLRQUHFUHDWLRQVRFLDODQGHFRQRPLFSXUSRVHVDQGWRHQVXUHWKH\DUH VXVWDLQHGIRUIXWXUHJHQHUDWLRQV 6SHFLILFDOO\WKHGHSDUWPHQWVPDQGDWHLV Protection of primary resources including air, water and soil using regulatory and non-regulatory controls; Management and protection of natural resources including forests, fish, wildlife, lands, parks and their natural and cultural resources, in such a way as to ensure their sustainability and biological diversity; Assessment, regulation, minimization, and mitigation of the impact of alterations to the natural environment by development activities through implementation of the environmental impact assessment program; Maximization of economic and social benefits from renewable resources and programs while maintaining resource sustainability; Promotion of public, stakeholder and Aboriginal peoples involvement in environmental and resource management through developing and enhancing public involvement programs and partnerships; Promotion of respect and a sense of stewardship for the environment and its natural, recreational and cultural resources through interpretive programs, partnerships, and informational materials; and Cooperation in the development of interjurisdictional, national and global initiatives aimed at enhancing environmental and resource conservation and management. SE Spatial Data Management Project Plan Page 7 of 30

8 Project Goals and Objectives Goals: This project shares many goals in common with departments roles and responsibilities. Some of these are listed below along with those that are unique to the SE Spatial Data Management Project. Improve corporate and public access to Environmentally sensitive data Bridge related provincial and federal land record systems by implementing open systems, standards-based design for accessing and maintaining provincial land data. Significantly reduce the amount of time for decision-making by providing better access to current and timely information about current land conditions and related information. Deliver accurate Internet-based mapping and data querying capability to the department Build a foundation that will accommodate other program s based components Design and implementing standard map products displaying land status information that serve the business needs of SE staff and the general public Objectives: Improve access to land related information Decrease duplication of effort and data redundancy by over 25% Reduce risk to Province due to inaccurate land status information Upgrade all department spatial data to the provincial and national standards - NAD83 (North American Datum 1983) SE Spatial Data Management Project Plan Page 8 of 30

9 SCOPE Scope Definition These items are within the scope of this project: 1. Design, develop and implement a relational database system containing spatial and tabular SE data and selected base/framework data (NTS, Cadastre). 2. Design, develop and implement a data warehouse methodologies using relational database technology containing a selected subset of SE data 3. Design, develop and implement a system to maintain SE spatially referenced information utilizing ArcSDE technology. 4. Design, develop and implement systems to update a selected subset of SE data in geodatabase. 5. Eliminate redundant data entry tasks identified in the current SE Datasets and business processes. 6. Design, develop and implement a publicly available web-based application to view provincial land status information. These items are NOT within the scope of this project: 1. Design and develop a system to maintain existing applications. 2. Design and develop a system that delivers on-line mapping capabilities of Environmental and resource information. 3. Provide maintenance for any and/or all systems completed by the Project Team while carrying out this project, t he data maintenance work will be performed by other designated staff in SE. SE Spatial Data Management Project Plan Page 9 of 30

10 Costs, Benefits and Risks The benefits of this project will be realized by the department and the entire provincial environmental community and other members in the public and private sectors by decreasing the amount of time required to publish the results of a change in land status (cycle time). This will lead to more informed decisions by private and public parties when determining areas open for access, permitting, leasing, and other land transactions. Project Products/Deliverables List Each phase deliverable will require and include: An analysis of the risks involved in implementing the results found in the phase. These will address the technical, budget and business aspects of the phase. This will include a risk mitigation analysis. A detailed Work Breakdown Structure (WBS) describing the next phase. A signed document by the sign-off participants. The Project Deliverables are listed on the following pages. The deliverables roughly correspond to the project phases, yet not all phases of the project have a deliverable. Some phases have been rolled together to form one deliverable. Each phase listed below is described by: Product Name Product Type Description Purpose Tasks Audience Sign-off Participants The name of the physical product or deliverable. Format of the product. Description of the product. The reason that the product is required for the projects success. An overview of the types of tasks required creating the product. This is not intended to be exhaustive; The WBS will list all tasks for each phase. A list of the team(s) that will be involved in creating the product. A list of the teams that will review the products and approve the products. SE Spatial Data Management Project Plan Page 10 of 30

11 1. Study Stage 1.1 User Requirements Definition Phase Product Name: User Requirements Document Product Type: MS Word2000, MS Excel2000 Description: Descriptive document and spreadsheet identifying all user requirements. Purpose: Comprehensive listing of requirements for Project Team evaluation. Tasks: Assessment by the Project Team as to the difficulty of implementation on a scale of 1 to 10, with 1 being simple and 10 being impossible. Each requirement will be assigned a value/cost to implement. Each requirement will be evaluated to determine if the requirement is within scope, as defined in this document. Audience: Project Team, Status SuperUser Team 1.2 Current Functionality Assessment Product Name: Current Functionality Document Product Type: MS Word2000, MS Excel2000 Description: Listing of current functionality used by Status Graphics technicians (Cartographers) to create, update, read and delete the LSGIS data. List of interfaces with other systems or subsystems and their purposes. List of data access methods used by customers. Purpose: To support an analysis of the gap between the required functionality and the current functionality. This analysis will identify the must have function that are required by the business to support the users and is an important ingredient for phase 1.6, Software Evaluation Phase. Tasks: Assessment by the Project Team of the current software modules that are required to support the business needs. Audience: Project Team 1.3, 1.4 Database Design Product Name: Database Design Product Type: Entity Relationship Diagram with supporting textual description Description: Entity relationship model (ERM). Purpose: Develop an unambiguous, implementation-independent data model that can be used by developers for constructing the database. Tasks: An iterative, prototyping approach will be taken for the database design. The system will be designed to support the create, replace, update and delete functions (CRUD) for the spatial data. It is assumed that the FEB and FWB data will supply all the textual components of the database. These textual components will be stored in a data warehouse within the same system as the spatial data. This warehouse will be updated from their respective databases of record. Audience: Project Team SE Spatial Data Management Project Plan Page 11 of 30

12 1.5 Database Physical Implementation Product Name: Database Physical Implementation Product Type: MS Word2000, MS Excel2000 and other diagrams and code; database implemented with Oracle8i and ArcSDE technologies Description: Documents describing database implementation in Oracle8i Purpose: Describe the methods used to implement the logical database design Tasks: Implement the database described in the Database Design documentation, write DDL statements to create the physical database Audience: Project Team Data Conversion Product Name: Data Conversion Product Type: MS Word2000, MS Excel2000, diagrams and charts, code and spatial/tabular database(s). Description: Documents describing the mapping of the current FEB, IMB, and FWB data to the logical database design described in the Database Design documentation. Code (most likely AML and SQL), which performs the conversion of the data and the population of the physical database. Purpose: To document the data conversion process, and convert the data. Tasks: Writing documentation; designing, developing, prototyping, debugging and executing scripts that perform the data conversion. Performing quality control, statistical analysis and verification on data conversion methods and results. Audience: Project Team 1.6 Software Evaluation Product Name: Software Evaluation Product Type: MS Word2000, MS Excel2000, diagrams and charts. Description: Documents describing the evaluation of commercially available software based on the business needs and technical requirements identified in phases 1.1 and 1.2. Purpose: To quantify the functionality of database and data input/update software and assess the use of those software tools with the required functionality described in the User Requirements Document. Tasks: Design an evaluation strategy based on the business objectives, scope and risks. Assess qualified vendors products against the requirements. Identify a possible commercial, off-the-shelf (COTS) solution if no customization to the products is required. Identify any needed customization to the products and assess degree of difficulty required to customize the products. Audience: Project Team, Project Review Team SE Spatial Data Management Project Plan Page 12 of 30

13 2. Interface Design Stage 2.1 System Model Product Name: System Model Product Type: MS Word2000, MS Excel2000, diagrams and charts. These will use the UML 1 (version 1.2) notation. Description: Detailed analysis of the business activities described by the project scope. Purpose: To create an abstract model of the processes described in phases 1.1 and 1.2. This model is critical for the system design. Tasks: Analyze and model all processes that will be used to create, replace, update, delete and read all the data. Audience: Project Team 2.2, 2.3, 2.5, 2.6 System Design Product Name: System Design Product Type: MS Word2000, MS Excel2000, diagrams and charts. These will use the UML (version 1.2) notation. Description: Detailed system design that supports the system model. Purpose: To create a system design in terms of the automated and manual procedures that will comprise the system. Develop outline dialogs and proposed screen layouts for the most important automated system procedures. Tasks: Map the system processes (identified in phase 2.1) to procedures that can be translated to application code. An iterative approach will be taken with validation of the design by the Status Plat SuperUser Team and Status Graphics Unit technicians. Audience: Project Team, Status Plat SuperUser Team, and Project Review Team 2.4 Prepare Implementation Strategies Product Name: System Implementation Strategy Product Type: MS Word2000, MS Excel2000, diagrams and charts. These will use the UML (version 1.2) notation. Description: Documentation of a transition, or cut-over strategy Purpose: To plan the implementation of the new system. This may include dramatic changes to the current processes that support the requirements of the current system. Tasks: Identify and document the new business practices that are defined in the system design. Audience: Project Team, Status Plat SuperUser Team, and Project Review Team 1 UML : Unified Modeling Language, the Object Managements standard language for Object Oriented analysis and design. SE Spatial Data Management Project Plan Page 13 of 30

14 3. Construction Phase 3.1 Preparation Product Name: Construction Preparation, Requests for Proposals (RFP s) Product Type: MS Word2000, MS Excel2000, diagrams and charts Description: Documents describing the testing facilities and test strategy. Requests for Proposals that can be delivered to prospective software engineering firms. Purpose: To identify the criteria that will be used to test the completed system, identify software engineering firms. Tasks: Develop a comprehensive set of testing procedures for all aspects of the system. Develop detailed RFP documents. Identify software engineering firms. Release RFP Audience: Project Team 3.2 Construction Product Name: System Construction Product Type: Computer code, MS Word2000, MS Excel2000, diagrams and charts Description: Completed business system, description of construction methods, testing methods and source code. Purpose: Completed business system that satisfies the functional requirements identified in the system Design document (phase 2.5) Tasks: Build completed business system. Audience: Contractor (?), Project Team, and Project Review Team 3.3 System Documentation Product Name: System Documentation Product Type: online user help files, MS Word2000, MS Excel2000, diagrams and charts Description: Detailed documents describing system as coded. Purpose: Document the final system and develop operational instructions. Tasks: Through documentation that describes all aspects of the completed business system. Audience: Contractor (?), Project Team Sign-off Participants: Project Team, and Project Review Team 3.4 Transition Preparation Product Name: Transition Preparation Product Type: MS Word2000, MS Excel2000, diagrams and charts Description: Documents describing the implementation of the completed business system Purpose: Development of a transition plan to implement the completed business system Tasks: Planning the physical installation of the system, documenting all plans and contingencies. Audience: Project Team SE Spatial Data Management Project Plan Page 14 of 30

15 3.5 Verify Construction Product Name: Completed Business System Acceptance Product Type: MS Word2000 Description: Verification of completed business system Purpose: To ensure that the system meets the required functionality Tasks: System testing as described in the documents developed in phase 3.1. Audience: Project Team, Status Plat SuperUser Team 4. Transition Stage 4.1 Conduct User Training Product Name: User Training Product Type: MS Word2000 Description: Initial user training with the completed business system. Purpose: To develop new training material and to augment the operational material developed in phase 3.3 Tasks: Plan training curriculum, plan training dates, develop training material. Audience: Project Team 4.2, 4.3 Install Production System Product Name: Production Installation Product Type: MS Word2000, MS Excel2000 Description: Installation of the production system Purpose: To create a manual for the installation of the production system that accounts for the current hardware and computer systems. Tasks: Analyze current (and possibly planned) hardware and operating systems, including versions, etc. Update any installation procedures developed during earlier project phases. Install production system; negotiate maintenance, turn over maintenance to operations personnel. Verify that installation was performed successfully. Tune infrastructure, fix problems. Audience: Project Team 4.4 Wrap-up Product Name: Completion Report Product Type: MS Word2000, MS Excel2000 Description: Quantitative summary of the project Purpose: To bring an orderly conclusion to the project and to document the results. Tasks: Summarize project achievements, identify lessons learned, evaluate possible best practices for future projects, release project resources. Audience: Project Team SE Spatial Data Management Project Plan Page 15 of 30

16 Milestones The completion of each stage in the project cycle defines a milestone. Other intermediate phase completions may be considered a milestone, as defined by the Project Manger, Project Team, Project Review Team and management. Impacted Business Areas These areas of the Saskatchewan Environment and the public will be impacted during and after the execution of this project: Operations Division Programs Division Policy and Assessment Division Corporate Services Division Information Services Corporation Other Departments of the Province of Saskatchewan Public SE Spatial Data Management Project Plan Page 16 of 30

17 ASSUMPTIONS Project Assumptions The Project Team and the Project Review Team will work together to satisfy the needs of the customers. Management will gain support from all affected parties to ensure that a spirit of cooperation exists during the execution of this project. SE resources will be made available as described in the Work Breakdown Structure (WBS) for each phase. An open systems approach will be taken when selecting tools and components. The Java/Xml programming language will be used wherever possible to leverage cross-platform deployment and utilization of existing SE computer systems. CONSTRAINTS Project Constraints The project must work within the limited budget and tight timelines agreed to in this document. The project will use the current hardware and network configuration in existence at SE. Related Projects Other projects within SE have been identified which have similar or complementary goals and objectives. These are: - SWIM - TIS - FIS - SFC VDW The Project Manager for the CoreGIS project will make every effort to work together with the other project managers so that efforts are not redundant and that resource conflicts are resolved. SE Spatial Data Management Project Plan Page 17 of 30

18 Critical Dependencies Cooperation between all impacted SE divisions to ensure that all user requirements are gathered during the Study Stage, and that all users validate the functionality of the products prior to the Transition Stage. These stages will require that users time is made available by SE management. QUALITY MANAGEMENT APPROACH Activity Reviews/Walk-throughs A thorough review of the results from the Software Evaluation and Application Solution Phase will be conducted. If the products require customization or a completely new application is constructed (Stage 2 Interface Design Stage and Stage 3 Construction Stage), then a thorough review will be conducted at the completion of Stage 2. It is important to review the project deliverables at that time with a wide audience (customers, management, Project Review Team and other affected parties) to validate that the system design is meeting the customers requirements, the business need for the products. It is also a critical time to review the project budget. Other reviews will be conducted as needed. These will be arranged through negotiations with the Project Manager. Performance/Quality Standards The project will use these database and software development standards: OMG Unified Modeling Language Specification (version 1.2)????? database modeling notation Conformance Test Guidelines for OpenGIS Simple Features Specification for SQL, Revision 1.1 The project will also use the following standard as a guide for database design: Cadastral Data Content Standard for the National Spatial Data Infrastructure, version 1.1, Cadastral Subcommittee, Federal Geographic Data Committee, April 1999 Training Training should been planned during spring of 2004 for the Project Team for Oracle 9i and ArcSDE. This will be an introductory class, and will be followed by training for an Oracle DBA and for the ESRI ArcSDE Spatial software. Other training will be planned for the Project staff according to the results of the Study Stage (stage 1). The appropriate staff training will be determined by conducting a skills inventory of the Project Team and comparing this with the skills required constructing the system. Only those systems that will be built or coded by the Project Team will be used in this analysis. This measured gap in skills will be addressed by providing the training necessary to complete the project. SE Spatial Data Management Project Plan Page 18 of 30

19 Training for customers (users of the system) will be planned and executed during the Transition Stage (stage 4). This training will be performed in the method identified by the customers in the User Requirements Document, completed during phase 1.1. PROJECT MANAGEMENT APPROACH Work Breakdown Structure (WBS) Gantt Chart CoreGIS WBS Basis of Estimates Estimations of phase schedule times are a rough estimate at this time. A refined, accurate schedule will be prepared as part of each stage. The goal of this refined schedule is to estimate phase deliverables within 10%. Project Effort Estimation See Work Breakdown Structure Gantt Chart (above). The chart was created with the assumption that project resources would be available 100% of the time required for each project phase. Project Standards The Project Team will use the technical standards used at LRIS. The Project Team will develop technical standards in areas (e.g., coding standards, naming conventions) where necessary. Project Roles, Responsibilities and Competencies Project Manager: Responsible for making sure that the project is completed on time, within budget, within scope and at the desired level of performance. The Project Manager will ensure that the project objectives are met by proactive planning, scheduling and controlling. The Project Manager is responsible for day-to-day management, Project Team leadership and all communications. The Project Manager is responsible for negotiating with management to ensure that resources are allocated to the project when required to complete the next phase. Project Manager Composition and Required Skills: This position is filled by a single person and will be a permanent employee of the Information Management Branch of SE. The skills required for this position are characterized by the specifications for SR. GIS Analysts. SE Spatial Data Management Project Plan Page 19 of 30

20 Project Team: Responsible for executing technical tasks as outlined in the Work Breakdown Schedule as the project progresses through each phase. Where necessary, a member of the Project Team may be identified as a technical lead for an aspect of the project (e.g., user interface, database design, etc.). The Project Team will choose these roles. The Project Team will also be responsible for documenting the effects of proposed changes to the project plan and deliverables. The Project Team members are responsible for identifying resources. Project Team Composition and Required Skills: The Project Team will be composed of staff members from all relevant branches within the department. Team members may also be contracted employees from private agencies. The size of this team will flex according to the tasks defined by the Work Breakdown Structure for each project phase. It is anticipated that there will be no fewer than three and no more than ten members on this team during any project phase. Team member skills include those described in the department Career Descriptions 183, 190, and 191. Project Review Team: Ensure that the project is within scope, on or under budget and satisfies the customers needs. Review of phase deliverables for acceptance, change or rejection. Review of proposed changes and their affects as documented by the Project Team. Project Review Team Composition and Required Skills: This team is composed of managers representing the impacted branches, divisions, sections or agencies. These members can be characterized by the provincial classificaition system with expertise in areas related to Resource Management. Representatives from impacted provincial agencies may also act as members of this team. It is anticipated that there will be no fewer than five and no more than seven members on this team during the life of the project. Status SuperUser Team: Provide expert advice to the Project Team when questions arise regarding User Requirements and conceptual design of entire system or system components. Status SuperUser Team Composition and Required Skills: This team is primarily composed of highly experienced users of GIS related technology. It is anticipated that there will be no fewer than eight and no more than twenty members on this team during the entire life of the project. SE Spatial Data Management Project Plan Page 20 of 30

21 Project Teams Membership Selection Criteria Membership Category Project Manager Membership Selection Criteria Selected by Project Sponsors Project Team Project Manager and Project sponsors develop a list of candidates from SE staff and interview candidates. Candidates are offered a position on the team and either accept or reject the offer. The manager and sponsors may override this method if critical skills are not present in the pool of candidates that accept the offer. Project Review Team Project Manager and Project sponsors develop a list of candidates from SE and other impacted agencies. These candidates are invited to join the team. The project sponsors may petition the division or agency management if the team does not attain a critical distribution across divisions to achieve its goals. Status SuperUser Team Project Manager and Project sponsors develop a list of candidates from SE staff. These candidates are invited to join the team. The project sponsors may petition the division management if the team does not attain a critical distribution across divisions to achieve its goals. Change and Issue Management Approach Changes to the Project Plan and project deliverables will be implemented by the procedure outlined in the Change Control Procedure Document. Click here to view the Change Control Plan Communications and Control Approach Communications The Project Manager will report the status of the project according to the Work Breakdown Structure, which describes the detailed tasks and each project phase. This communication will be in the form of a memorandum submitted to SE Executive management on a monthly basis. This communication will be distributed to all affected parties via the web and/or . The memo will describe status of current tasks and tasks scheduled for the next month. The Project Manager will be responsible for composing and delivering all presentations regarding the status and deliverables of the project. SE Spatial Data Management Project Plan Page 21 of 30

22 Control The Project Manager will control the project while each phase is in its formative stage; that is, while the Project Team is developing the deliverables. The main control will be ensuring that the project tasks as defined in the Work Breakdown Structure (WBS) are being performed on schedule. The Project Review Team is responsible for controlling the project at a higher level. This control is implemented by a series of control gates. These gates occur at the end of each project phase. To accommodate changes in the project plan or changes to the project deliverables, a standard process will be used. This process is described in the document Change Control Process. At the end of each phase, the Project Review Team will meet and the Project Manager will present the results of the project phase. The Project Review Team evaluates these results (deliverables). The Project Review Team will use these criteria to analyze the results of the project phase deliverables: Ensure that all current phase activities and deliverables are complete. Ensure that moving to the next project phase is based on hard evidence that the Project Team is prepared and that the risk of proceeding is acceptable. This review results in one of the following: Acceptance proceed to the next phase Acceptable with changes Change Control Process* is used to implement change Unacceptable do not proceed; repeat review Unsalvageable terminate project Phase Deliverables Project Review Team Acceptance Rejection Continue to Next phase Project halted Indefinitely Change Request Calculate Effect on Project scope, Budget, time * see attached document Change Control Process for a description of the Change Control Process SE Spatial Data Management Project Plan Page 22 of 30

23 ATTACHMENTS/APPENDICES Appendix A Project Work Plan This section describes a high level view of the Project Work Plan. Each phase has a deliverable product that will be reviewed by the Project Review Team (see section Project Products/Deliverables List for a description of the deliverables). The Project Team prepares the deliverable products. This document describes the Stages, Phases, Task Groups and tasks to be performed by the Project Team. The goal of this document is to categorize the tasks to be completed during the course of the project. This is a living document and will be updated as the project progresses through its Stages. Ultimately, this document will identify tasks that take no longer than two weeks to complete. A Gantt chart for the entire project and each Stage will be created based on the tasks identified in this document. This document has this format: X. Stage X.X. Phase X.X.X. Task Group X.X.X.X. Task The Project Team will be responsible for identifying; scheduling and estimating the time required completing the tasks for each Task Group. This will be conducted at the beginning of each Phase. 1. Study Stage 1.1. User Requirements Definition Phase Create Customer Survey Identify Customers Plan Customer Surveys Perform Customer Survey 1.2. Current Functionality Assessment Phase Identify and document current relationship with other systems Identify and document current systems and subsystems Document and describe current functionality Document and describe current data model Assess current functionality SE Spatial Data Management Project Plan Page 23 of 30

24 1.3. Database Design Phase (see Data Conversion, below) 1.4. Finalize Database Design Phase (see Data Conversion, below) 1.5. Database Physical Implementation Phase (see Data Conversion, below) 1.6. Software Evaluation Phase Design and implement a stable technical environment Design and implement a data model supporting the functional requirements Refine data model Identify products that meet the functional requirements Populate database by converting geographically contiguous data Create evaluation criteria ( must haves, weighted requirements and performance) Acquire products that satisfy functional criteria Perform testing of products Assess Products If any products satisfy enough of the functional requirements (without customization) as determined by the Project Team and the Project Review Team, then State 4 is initiated. This identifies the noncustomized, COTS-based solution will be chosen as the final product. If the products tested did not meet the functional requirements, the project moves to Stage 2. This is the customized product or build your own solution. 2. Interface Design Stage 2.1. System Model Phase Complete Entity Model Complete Process Model Perform Interaction Analysis Confirm Model Develop Entity/Process Model 2.2. System Design Phase Define System Design Procedures Identify Reusable Design Components Design System Structure Design Screen/Report Layouts Review Transition Requirements Identify Open Issues 2.3. Refine System Design Phase Confirm Consistency and Completeness Develop Prototypes Develop Preliminary Data Structure 2.4. Prepare Implementation Strategies Phase Estimate Construction Effort SE Spatial Data Management Project Plan Page 24 of 30

25 Finalize Construction Approach Develop Testing Strategy Develop Transition Plan 2.5. Finalize System Design Phase Resolve Open Design Issues Discuss Suggested Design Improvements Review Transition Plan 2.6. Validate System Design Phase Prepare for Design Review Perform Design Review 3. Construction Stage 3.1. Preparation Phase Test Production Facilities Finalize Testing Strategy Identify Software Engineering Firms Prepare RFP documents Finalize RFP documents Release RFP documents 3.2. Construction Phase Review Proposals Select Contract Winner Generate Code Perform Unit Tests Manage Coordinating Model Perform Integration Tests 3.3. System Documentation Phase Develop Operations Instructions Develop Documentation 3.4. Transition Preparation Phase Finalize Transition Strategy Develop Training Plan Finalize Contingency Plan Complete Transition Work Plan Develop Training Materials Follow-up on Organizational Issues Prepare Transition Procedures 3.5. Verify Construction Phase Review Integration Testing Review System Test Plan Perform System Tests Devise Acceptance Tests Perform Acceptance Tests SE Spatial Data Management Project Plan Page 25 of 30

26 4. Transition Stage 4.1. Conduct User Training Phase Finalize Training Materials Schedule Training Conduct Training Develop Permanent Training 4.2. Install Production System Phase Adjust Hardware and System Software Train Operations Staff Raise System Components to Production Status Update Production Libraries Configure System Environment Activate Help Support Deploy Databases Deploy System Fix Problems Tune Infrastructure Deploy Systems to Users Set Maintenance Procedures 4.3. Verify System Installation Phase Review Hardware and System Software Review Training Develop in-place System Testing Procedures Conduct in-place System Testing 4.4. Wrap-up Phase Summarize Project Results Identify Lessons Learned Collect Project Metrics Throw a REALLY Big Party Release Project Resources SE Spatial Data Management Project Plan Page 26 of 30

27 Data Conversion For the purposes of this Project Plan, Data Conversion is not considered a Stage or a Phase. The initiation of the Data conversion process is dependent on a preliminary physical data model, developed and completed as part of Phases 1.3, 1.4 and 1.5. The successful completion of Data Conversion determines the date that the Transition Stage can begin. Successful Data Conversion is critical to the project deliverables. 1. Data Preparation 1.1. Create Data Conversion Plan 1.2. Devise Data Conversion Quality Control Standards 1.3. Review Data Conversion Plan 2. Data Inventory (Current Format) 2.1. Collect Statistics 2.2. Analyze Statistics 2.3. Prepare Data Inventory Report 2.4. Update Data Conversion Plan 3. Database Design 3.1. Create Logical Model 3.2. Refine Logical Model 3.3. Validate Logical Model 3.4. Finalize Logical Model 3.5. Create Data Map (current format to converted format) 4. Database Physical Implementation 4.1. Code DDL for database 4.2. Enforce Database Security 4.3. Convert Logical Model to Physical Model 5. Populate Spatial Database 5.1. Code Data Loading Scripts 5.2. Test Data Loading Scripts 5.3. Execute Data Loading Scripts 5.4. Fix Problems 5.5. Quality Control 6. Data Inventory (Converted Format) 6.1. Collect Statistics 6.2. Analyze Statistics 6.3. Prepare Data Inventory Report 7. Verify Data Conversion 7.1. Perform Database Tuning 7.2. Test Data Queries 7.3. Retune Database 7.4. Retest Queries SE Spatial Data Management Project Plan Page 27 of 30

28 Appendix B Risk Assessment Risk assessment will be performed as part of each phase. This will described the risks involved in implementing the phase deliverables. The risk assessment will describe each risk as identified by the Project Team as it affects the business, budget and technical aspects of the phase. This will include any risk mitigation strategies recommended by the Project Manager and the Project Team. Appendix C Project Budget Report/Cost Benefit Analysis Report Not available at this time. Appendix D Project Impact Report Not available at this time. Appendix E Revision Chart This chart contains a history of this document s revisions. Version Primary Author(s) Description of Version Date Completed SE Spatial Data Management Project Plan Page 28 of 30

29 Appendix F Team Members Project Team Members Name Division/Office Section/Team Class Primary Role and Responsibilities Project Review Team Members Name Division/Office Section/Team Class Status Plat SuperUsers (Customer Representatives) SE Spatial Data Management Project Plan Page 29 of 30

30 Name Division/Office Section/Team Class Group Location SE Spatial Data Management Project Plan Page 30 of 30

Exhibit F. VA-130620-CAI - Staff Aug Job Titles and Descriptions Effective 2015

Exhibit F. VA-130620-CAI - Staff Aug Job Titles and Descriptions Effective 2015 Applications... 3 1. Programmer Analyst... 3 2. Programmer... 5 3. Software Test Analyst... 6 4. Technical Writer... 9 5. Business Analyst... 10 6. System Analyst... 12 7. Software Solutions Architect...

More information

This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.

This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA. Red River College Course Learning Outcome Alignment with BABOK Version 2 This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed

More information

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

System/Data Requirements Definition Analysis and Design

System/Data Requirements Definition Analysis and Design EXECUTIVE SUMMARY This document provides an overview of the Systems Development Life-Cycle (SDLC) process of the U.S. House of Representatives. The SDLC process consists of seven tailored phases that help

More information

Appendix 2-A. Application and System Development Requirements

Appendix 2-A. Application and System Development Requirements Appendix 2-A. Application and System Development Requirements Introduction AHRQ has set up a Distributed Systems Engineering Lab (DSEL) to support all internal development efforts and provide a facility

More information

Louisiana Department of Insurance. Software Development Standards

Louisiana Department of Insurance. Software Development Standards Louisiana Department of Insurance Software Development Standards Table of Contents EXECUTIVE SUMMARY... 3 LDI SOFTWARE DEVELOPMENT STANDARDS GOAL... 4 IMPLEMENTATION OBJECTIVES... 5 LDI SYSTEMS INTEGRATION...

More information

GIS Support RFP Questions and Answers

GIS Support RFP Questions and Answers GIS Support RFP Questions and Answers 4.6 Vendor Support/Training reference to standard support offerings, which is more appropriate for a software vendor than for a services provider ANSWER: This is a

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

System Development and Life-Cycle Management (SDLCM) Methodology. Approval CISSCO Program Director

System Development and Life-Cycle Management (SDLCM) Methodology. Approval CISSCO Program Director System Development and Life-Cycle Management (SDLCM) Methodology Subject Type Standard Approval CISSCO Program Director A. PURPOSE This standard specifies content and format requirements for a Physical

More information

National Research Council Canada IP Prosecution and IP License Management Solution Project

National Research Council Canada IP Prosecution and IP License Management Solution Project National Research Council Canada IP Prosecution and IP License Management Solution Project Appendix 1 Statement of Work Version 6.0, 10 December 2013 ii Table of Contents 1. Instructions to Bidders...

More information

VA ICJIS. Program Management Plan

VA ICJIS. Program Management Plan VA ICJIS Program Management Plan 1 08/29/01 Program Management Plan VA Integrated Criminal Justice Information System (ICJIS) Program 1. Introduction. The Commonwealth of Virginia Integrated Criminal Justice

More information

How To Write An Slcm Project Plan

How To Write An Slcm Project Plan SLCM 2003.1 Artifacts in a Nutshell ( as of 01/21/2005) Project Development Phases Pension Benefit Guaranty Corporation s (PBGC) System Life Cycle Methodology (SLCM) is comprised of five project development

More information

NASCIO EA Development Tool-Kit Solution Architecture. Version 3.0

NASCIO EA Development Tool-Kit Solution Architecture. Version 3.0 NASCIO EA Development Tool-Kit Solution Architecture Version 3.0 October 2004 TABLE OF CONTENTS SOLUTION ARCHITECTURE...1 Introduction...1 Benefits...3 Link to Implementation Planning...4 Definitions...5

More information

The purpose of this course is to provide practical assistance for defining and managing project scope.

The purpose of this course is to provide practical assistance for defining and managing project scope. Scope Definition and Scope Management Purpose - To provide practical assistance for defining and managing project scope. This course will focus on tips for creating a scope statement rather than a step-by-step

More information

Applications & Operations - Resource Stewardship & Major Projects

Applications & Operations - Resource Stewardship & Major Projects Temporary GIS Technician (12 Months) BC Oil & Gas Commission, Fort St John Grid 18 - $55,294.14 - $62,886.67* * Posted salary includes a JFMM Allowance of 10% & a Location Allowance of 3% Applications

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

Development, Acquisition, Implementation, and Maintenance of Application Systems

Development, Acquisition, Implementation, and Maintenance of Application Systems Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of

More information

Facilities Portfolio Management Tool

Facilities Portfolio Management Tool 2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...

More information

MetroGIS Project Proposal Template Version 1.0

MetroGIS Project Proposal Template Version 1.0 MetroGIS Project Proposal Template Version 1.0 1 MetroGIS provides an on-going opportunity for collaborative projects among its stakeholders. Crucial to the success of collaborative projects are the identification

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

Project Knowledge Areas

Project Knowledge Areas From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.

More information

POLAR IT SERVICES. Business Intelligence Project Methodology

POLAR IT SERVICES. Business Intelligence Project Methodology POLAR IT SERVICES Business Intelligence Project Methodology Table of Contents 1. Overview... 2 2. Visualize... 3 3. Planning and Architecture... 4 3.1 Define Requirements... 4 3.1.1 Define Attributes...

More information

RFP Attachment C Classifications

RFP Attachment C Classifications RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships

More information

PROJECT MANAGEMENT PLAN <PROJECT NAME>

PROJECT MANAGEMENT PLAN <PROJECT NAME> PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

Fundamentals of Measurements

Fundamentals of Measurements Objective Software Project Measurements Slide 1 Fundamentals of Measurements Educational Objective: To review the fundamentals of software measurement, to illustrate that measurement plays a central role

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

<Company Name> <Project Name> Software Development Plan. Version <1.0>

<Company Name> <Project Name> Software Development Plan. Version <1.0> Version [Note: The following template is provided for use with the Rational Unified Process. Text enclosed in square brackets and displayed in blue italics (style=infoblue)

More information

Vector GIS Map Layers Metadata. Orthoimagery Site Photos, Forms, And Documents

Vector GIS Map Layers Metadata. Orthoimagery Site Photos, Forms, And Documents GIS DESIGN AND IMPLEMENTATION SERVICES Croswell-Schulte provides a full range of services for GIS design and implementation support. We are active in GIS industry research and standards initiatives, maintain

More information

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1

More information

Business Systems Analyst Job Family

Business Systems Analyst Job Family Promotion Criteria Entry level requires several years of work experience, either in a business area, or programmer with involvement in business systems. Demonstrated ability to learn and apply technology.

More information

INTERNAL SERVICES GROUP PMO

INTERNAL SERVICES GROUP PMO Ownership & Awareness Program 1 Program 3 Program 4 Program 5 Program 6 Program 7 Program 2 Cap ability Development Infra structure Program n INTERNAL SERVICES GROUP ESSENTIAL FUNCTIONS Act as an interface

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

(Refer Slide Time: 01:52)

(Refer Slide Time: 01:52) Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This

More information

MNLARS Project Audit Checklist

MNLARS Project Audit Checklist Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?

More information

U.S. Department of Education Federal Student Aid

U.S. Department of Education Federal Student Aid U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Stage Gate Review Process Description Version 1.3 06/30/2015 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Lifecycle

More information

Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development

Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development Project Planning and Management (PPM) V2.0 Project Type Guide Custom Development Version 1.1 January 2014 Last Revision: 1/22/2014 Page 1 Project Type Guide Summary: Custom Development Custom software

More information

AWWA/WEF Information Management & Technology Conference, March 4-7, 2007, Austin, TX

AWWA/WEF Information Management & Technology Conference, March 4-7, 2007, Austin, TX Management and Control Technology for Water/Waste Water Utility Programs Burcin Becerik 1, Gustavo Soto-Rosa 2 Abstract This paper discusses the implementation and use of management and control solutions

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

What is Project Scope Management? Project Scope Management Summary. Project Scope Management Processes

What is Project Scope Management? Project Scope Management Summary. Project Scope Management Processes What is Project Scope Management? Chapter 5 Project Scope Management October 27, 2008 Scope refers to all the work involved in creating the products of the project and the processes used to create them

More information

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>. Guide to Preparing the SOFTWARE PROJECT MANAGEMENT PLAN R. Buckley CSc 190 Senior Project Department of Computer Science - College of Engineering and Computer Science California State University, Sacramento

More information

CDC UNIFIED PROCESS PRACTICES GUIDE

CDC UNIFIED PROCESS PRACTICES GUIDE Purpose The purpose of this document is to provide guidance on the practice of Modeling and to describe the practice overview, requirements, best practices, activities, and key terms related to these requirements.

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010

Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010 Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning

More information

SACWIS PLANNING FOR DEPARTMENT OF HUMAN SERVICES DRAFT - STRATEGIC IMPLEMENTATION PLAN: MILESTONES & TIMELINES FOR A FULL IMPLEMENTATION

SACWIS PLANNING FOR DEPARTMENT OF HUMAN SERVICES DRAFT - STRATEGIC IMPLEMENTATION PLAN: MILESTONES & TIMELINES FOR A FULL IMPLEMENTATION STATE OF MICHIGAN SACWIS PLANNING FOR DEPARTMENT OF HUMAN SERVICES DRAFT - STRATEGIC IMPLEMENTATION PLAN: MILESTONES & TIMELINES FOR A FULL IMPLEMENTATION September 13, 2010 DRAFT -Strategic Plan: Key

More information

Answers to Review Questions

Answers to Review Questions Tutorial 2 The Database Design Life Cycle Reference: MONASH UNIVERSITY AUSTRALIA Faculty of Information Technology FIT1004 Database Rob, P. & Coronel, C. Database Systems: Design, Implementation & Management,

More information

Project Management Certificate (IT Professionals)

Project Management Certificate (IT Professionals) Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.

More information

Request for Proposal for Application Development and Maintenance Services for XML Store platforms

Request for Proposal for Application Development and Maintenance Services for XML Store platforms Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...

More information

Standards for Developing and Implementing Administrative Systems at UC Davis

Standards for Developing and Implementing Administrative Systems at UC Davis Page 1 of 7 Standards for Developing and Implementing Administrative Systems at UC Davis Introduction The purpose of this document is to describe Standards for Developing and Implementing Administrative

More information

SOFTWARE PROJECT MANAGEMENT

SOFTWARE PROJECT MANAGEMENT SOFTWARE PROJECT MANAGEMENT http://www.tutorialspoint.com/software_engineering/software_project_management.htm Copyright tutorialspoint.com The job pattern of an IT company engaged in software development

More information

Systems Analysis and Design in a Changing World, Fifth Edition

Systems Analysis and Design in a Changing World, Fifth Edition Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and

More information

Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions

Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage

More information

Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy>

Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy> DEPARTMENT OF HEALTH AND HUMAN SERVICES ENTERPRISE PERFORMANCE LIFE CYCLE FRAMEWORK PRACTIICES GUIIDE REQUIREMENTS DEFINITION Issue Date: Revision Date: Document

More information

State of California Department of Transportation. Transportation System Data Business Plan

State of California Department of Transportation. Transportation System Data Business Plan DRAFT Page i State of California Department of Transportation Transportation System Data Business Plan RFO# TSI DPA-0003 September 29, 2011 DRAFT Page ii Table of Contents Executive Summary... 4 Chapter

More information

Quality Assurance. Ministry of Community Development and Ministry of Tourism, Culture and the Arts

Quality Assurance. Ministry of Community Development and Ministry of Tourism, Culture and the Arts Ministry of Community Development and Ministry of Date: August 2006 Prepared By: Fredo Vanlierop Project: CAWS Standards Documentation Harvest Package Name: Harvest Version: Contract: N/A 1 Document Revision

More information

Data Migration Plan for MIRPS Data and Reference Table Data

Data Migration Plan for MIRPS Data and Reference Table Data Resource Ordering and Status System (ROSS) Program Professional Development Services Data Migration Plan for MIRPS Data and Reference Table Data August 16, 1999 Contract: GS-35F-4863G Delivery Order Number:

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

Infra to Celebrate 10 th Anniversary and Launch Infra 5.0

Infra to Celebrate 10 th Anniversary and Launch Infra 5.0 Infra to Celebrate 10 th Anniversary and Launch Infra 5.0 Claudine Bodin Marketing and Communication Geospatial Applications Infra Washington Office Engineering In 2002 Infra celebrates its 10 th anniversary.

More information

ArcSDE Spatial Data Management Roles and Responsibilities

ArcSDE Spatial Data Management Roles and Responsibilities ArcSDE Spatial Data Management Roles and The following discussion outlines the major roles and responsibilities involved in deploying your spatial data and geographic information system (GIS) applications

More information

Internal Audit Report. Enterprise Geographic Information System Phase 1. October 7, 2002. To:

Internal Audit Report. Enterprise Geographic Information System Phase 1. October 7, 2002. To: October 7, 2002 To: D.G. Geisheimer L.B. Coghlan I.N. Block E. Hong R. Threlkeld G.N. Sherlock B.G. Elton M. Costello L.I. Bell Audit and Risk Management Committee Internal Audit Report Enterprise Geographic

More information

CDC UNIFIED PROCESS JOB AID

CDC UNIFIED PROCESS JOB AID CDC UNIFIED PROCESS JOB AID Independent Verification & Validation Activities Document Purpose This Job Aid is a brief document listing the items to be noted, checked, remembered, and delivered when completing

More information

Project Management Process

Project Management Process Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project

More information

COMP 354 Introduction to Software Engineering

COMP 354 Introduction to Software Engineering COMP 354 Introduction to Software Engineering Greg Butler Office: EV 3.219 Computer Science and Software Engineering Concordia University, Montreal, Canada Email: gregb@cs.concordia.ca Winter 2015 Course

More information

Chapter 10. Practical Database Design Methodology. The Role of Information Systems in Organizations. Practical Database Design Methodology

Chapter 10. Practical Database Design Methodology. The Role of Information Systems in Organizations. Practical Database Design Methodology Chapter 10 Practical Database Design Methodology Practical Database Design Methodology Design methodology Target database managed by some type of database management system Various design methodologies

More information

PM Planning Configuration Management

PM Planning Configuration Management : a Project Support Function As stated throughout the Project Planning section, there are fundamental components that are started during the pre-performance stage of the project management life cycle in

More information

Senior Design Project Management Skills

Senior Design Project Management Skills Learning Project Management Skills in Senior Design Courses James M. Conrad 1 and Yesim Sireli 2 University of North Carolina at Charlotte, College of Engineering, 9201 University City Blvd, Charlotte,

More information

How To Build A New System For A College

How To Build A New System For A College Application Development Methodology The main objective of Enterprise Applications is to design, develop, and maintain quality software. This document out lines the requirements for requesting new systems,

More information

TEMPLATE. U.S. Department of Energy. Project Name. Feasibility Study Report. September 2002 U. S. DEPARTMENT OF ENERGY

TEMPLATE. U.S. Department of Energy. Project Name. Feasibility Study Report. September 2002 U. S. DEPARTMENT OF ENERGY U.S. Department of Energy Project Name Feasibility Study Report September 2002 TEMPLATE U. S. DEPARTMENT OF ENERGY Organization Title 1 Organization Title 2 Change Control Page The following information

More information

GIS DESIGN AND IMPLEMENTATION SERVICES

GIS DESIGN AND IMPLEMENTATION SERVICES 22-1 21 24 23 22 30 32 25 33 29 34 28 35 28 GIS DESIGN AND IMPLEMENTATION SERVICES Croswell-Schulte provides a full range of services for GIS design and implementation support. We are active in GIS industry

More information

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria Characteristic Best Practice Estimate Package Component / GAO Audit Criteria Comprehensive Step 2: Develop the estimating plan Documented in BOE or Separate Appendix to BOE. An analytic approach to cost

More information

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES 1. ROLE DEFINITIONS ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES The purpose of this section is to distinguish among the roles interacting with the SPM obtained through

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Systems Development Life Cycle (SDLC)

Systems Development Life Cycle (SDLC) DEPARTMENT OF BUDGET & MANAGEMENT (SDLC) Volume 1 Introduction to the SDLC August 2006 Table of Contents Introduction... 3 Overview... 4 Page 2 of 17 INTRODUCTION 1.0 STRUCTURE The SDLC Manual consists

More information

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Position Description. DEPARTMENT: Technology Services SALARY: Range 13 Salary Schedule A

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Position Description. DEPARTMENT: Technology Services SALARY: Range 13 Salary Schedule A SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Position Description TITLE: Database Administrator CLASSIFICATION: Non-Represented Management, Classified SERIES: Coordinator III FLSA: Exempt JOB CLASS CODE: 1972

More information

IT Project Management Methodology. Project Scope Management Support Guide

IT Project Management Methodology. Project Scope Management Support Guide NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald

More information

How To Implement An Enterprise Resource Planning Program

How To Implement An Enterprise Resource Planning Program ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing

More information

CS 389 Software Engineering. Lecture 2 Chapter 2 Software Processes. Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed.

CS 389 Software Engineering. Lecture 2 Chapter 2 Software Processes. Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed. CS 389 Software Engineering Lecture 2 Chapter 2 Software Processes Adapted from: Chap 1. Sommerville 9 th ed. Chap 1. Pressman 6 th ed. Topics covered Software process models Process activities Coping

More information

City of Portland Job Code: 30000560. Systems Accountant GENERAL PURPOSE DISTINGUISHING CHARACTERISTICS ESSENTIAL DUTIES AND RESPONSIBILITIES

City of Portland Job Code: 30000560. Systems Accountant GENERAL PURPOSE DISTINGUISHING CHARACTERISTICS ESSENTIAL DUTIES AND RESPONSIBILITIES City of Portland Job Code: 30000560 Systems Accountant FLSA Status: Union Representation: Exempt Nonrepresented GENERAL PURPOSE Under general supervision, performs difficult and responsible accounting

More information

INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page.

INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page. What This Is INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page. First of a series of guidelines for project

More information

How To Develop Software

How To Develop Software Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual

More information

LABOR CATEGORY DESCRIPTIONS & QUALIFICATIONS

LABOR CATEGORY DESCRIPTIONS & QUALIFICATIONS KEY LABOR CATEGORY DESCRIPTIONS PROGRAM MANAGER Description: The Program Manager is responsible for coordinating the management of all work performed under the overall contract and shall be capable of

More information

CHANGE NOTICE NO. 4 to CONTRACT NO. 071B3200088 between THE STATE OF MICHIGAN and

CHANGE NOTICE NO. 4 to CONTRACT NO. 071B3200088 between THE STATE OF MICHIGAN and Form No. DTMB-3521 (Rev. 7/2015) AUTHORITY: Act 431 of 1984 COMPLETION: Required PENALTY: Contract change will not be executed unless form is filed STATE OF MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT

More information

Software Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010)

Software Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010) Software Development & Education Center Microsoft Office 2010 (Microsoft Project 2010) Mastering Microsoft Project 2010 About This Course This three-day instructor-led course provides students with the

More information

OFFICE OF THE CITY AUDITOR

OFFICE OF THE CITY AUDITOR OFFICE OF THE CITY AUDITOR PERFORMANCE AUDIT OF THE CITIZEN REQUEST MANAGEMENT SYSTEM Thomas M. Taylor, CPA City Auditor Prepared by: Paul T. Garner, CCP, CSP Senior Audit Manager David Henley, CPA Auditor

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

Report of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge

Report of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge OFFICE OF INSPECTOR GENERAL Report of Audit Information Technology Infrastructure Project Management A-07-02 Tammy Rapp Auditor-in-Charge FARM CREDIT ADMINISTRATION Memorandum Office of Inspector General

More information

2.1 The RAD life cycle composes of four stages:

2.1 The RAD life cycle composes of four stages: 2.1 The RAD life cycle composes of four stages: A typical RAD life cycle is composed of the following Stages 2.1.1. Requirements Planning; 2.1.2 User Design; 2.1.3 Rapid Construction; 2.1.4 Transition.

More information

ArcGIS Data Models Practical Templates for Implementing GIS Projects

ArcGIS Data Models Practical Templates for Implementing GIS Projects ArcGIS Data Models Practical Templates for Implementing GIS Projects GIS Database Design According to C.J. Date (1995), database design deals with the logical representation of data in a database. The

More information

LOS ANGELES COUNTY SHERIFF S DEPARTMENT

LOS ANGELES COUNTY SHERIFF S DEPARTMENT LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 567 SH AUTOMATED LICENSE PLATE RECOGNITION SERVICE APRIL 2015 Table of Contents 1.0 INTRODUCTION... 1 2.0 SYSTEM OVERVIEW AND

More information

2. What contract vehicle will the work be on? We re establishing a new contract for the services. 3. Is there an incumbent already doing this work?

2. What contract vehicle will the work be on? We re establishing a new contract for the services. 3. Is there an incumbent already doing this work? RFP # 0025983 Addendum 1 1. Your group is currently utilizing Oracle EPM, are there any particular reasons you are moving way from Oracle EPM besides the support ending? Our EPM is licensed on a per user

More information

PHASE 6: DEVELOPMENT PHASE

PHASE 6: DEVELOPMENT PHASE PHASE 6: DEVELOPMENT PHASE The Phase features a key step in the project: system construction. The previous phases lay the foundation for system development; the following phases ensure that the product

More information

CDC UNIFIED PROCESS PRACTICES GUIDE

CDC UNIFIED PROCESS PRACTICES GUIDE Document Purpose The purpose of this document is to provide guidance on the practice of Requirements Definition and to describe the practice overview, requirements, best practices, activities, and key

More information

Manag. Roles. Novemb. ber 20122

Manag. Roles. Novemb. ber 20122 Information Technology Manag gement Framework Roles and Respo onsibilities Version 1.2 Novemb ber 20122 ITM Roles and Version History Version ed By Revision Date Approved By Approval Date Description of

More information

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 - ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 About this document this is a detailed description of typical Project Manager (PM) duties, responsibilities, and

More information