Load Assessment and Regulations

Size: px
Start display at page:

Download "Load Assessment and Regulations"

Transcription

1 MECH3005 Building Services Electrical Supply Load Assessment and Regulations Dr. Sam C M Hui Department of Mechanical Engineering The University of Hong Kong cmhui@hku.hk hk Sep 2010

2 Basic Terms Active power (useful or real power) Time average of instantaneous power when the average is taken over a complete cycle of an A/C waveform, expressed in Watt (W) For single phase, P = V I cos ø For balanced three-phase, P = 3 V ph-ph I cos ø Apparent power For single phase, AP = V I For three phase, AP = 3 V ph-ph I

3 Basic Terms Connected load Sum of all the loads connected to the electrical system, usually expressed in watts Demand factor = Maximum demand / Connection load Load factor: ratio of the average demand to the maximum demand over a defined interval In commercial buildings, between the hours 9:00 to 18:00 the load factor is usually close to unity

4 Typical load profile for an office building Max. Average Min.

5 Basic Terms Power factor The ratio of the apparent power in a circuit (V.A) to the useful power (W) if the voltage and current are sinusoidal Power factor = kw/ kv.a

6 Load Evaluation Tenant supply energy consumed by each tenant; monitored by separate energy meter Landlord dsupply: Non-essential supply: plumbing and drainage, passenger lifts, air-conditioning plant, public lighting g Essential supply: fire protection/detection system, fireman s lifts, essential lighting, PABX system, building management system, important computer room

7

8 Load Evaluation Objectives Ensure loading demands are estimated accurately What happens if they are under-estimated? What happens if they are over-estimated? Important factors Load research data (from power company) Design margin Checking & monitoring at each design stage Obtain info from the client (e.g. by questionnaire)

9 Load Evaluation Preliminary stage Estimate total loading so as to: Plan the transformer (Tx) & main switch room Apply to power company for supply Based on rough info or past experience Important t to know the loads of other BSE systems Detail design stage Update the estimate w/ more accurate info Detail design e.g. protective device & circuiting

10 Load Evaluation Load evaluation by power company Architect/Engineer/Developer submit application For typical categories, planning engineer of power company assesses the load estimation using the database Load Assessment Programme (LAST) Compare the declared load with assessed load If declared load > assessed load, justification is needed After finalising the total load, determine the nos. of transformer and transformer bays

11 Assessment Guidelines General Usable floor area (UFA) Follow Building (Planning) Regulations Development information Floor area usage, public services, any special loads Standard load estimation sheet (see handouts) Public services Assessed independently Public lighting, lift, water pump, fire services, lobby air g g,, p p,, y conditioning

12 Minimum design load capacities for lighting gand small power requirement for various types of building Building type Minimum load capacity (W/m 2 ) Office 60 School 30 Residential building 30 Hospital 25 Hotel 25 Church 15

13 Assessment Guidelines After diversity maximum demand (ADMD) Load densities derived by dividing the aggregate load by the corresponding UFA or flat nos. Cover most typical cases; for special situation, designer/planning engineer may exercise his own discretion to adjust the load estimates ADMD is for planning supply Tx capacity, it may not be suitable for designing customer raising mains and lateral mains

14 Assessment Guidelines Load assessment data (see handouts) Residential development Commercial development Industrial development Municipal development Mixed development diversity factor (MDDF) Central air conditioning load Other special loads Reference (from CLP Power) Code of Practice 215: Load Assessment Procedure

15 ADMD figures for Residential Development kva A/Flat ADMD for UFA < 50m2 ADMD for UFA m2 ADMD for UFA > 80m No. of Flats What is the effect of load diversity on the kva/flat data? (Source: CLP s COP 215 Load Assessment Procedure)

16 Assessment Guidelines Load assessment forms For central air conditioning load For general development Example of electrical load estimation Estimation of total electrical loading Estimation of essential loads Electrical supply arrangement

17 Assessment Guidelines Electrical load within most commercial buildings can be arranged into the following broad categories: Lighting Small power and special user equipment HVAC equipment Lifts and escalators

18 Legal Framework Typical legal system in Hong Kong (statutory) Ordinance (Laws of Hong Kong) Regulations Code of Practice Supporting documents (non-statutory) Technical Guidelines Technical Notes or Technical Memoranda Circular letters Reference standards (usually from other countries) Rules (from utilities companies)

19 Legal Framework Electricity Ordinance & subsidiary regulations Electricity Ordinance (Cap. 406) * Electricity (Exemption) Regulations Electricity (Registration) Regulations Electricity Supply Regulations Most important Electricity (Wiring) Regulations Electricity Supply (Special Areas) Regulations Electrical l Products (Safety) Regulation Electricity Supply Lines (Protection) Regulation (* can be read from the website

20 Legal Framework Relevant codes and guides to statutory regulations Code of Practice for the Electricity (Wring) Regulations Code of Practice for Minimum Fire Services Installations and Equipments Non-statutory regulations/standards d IEE Regulations for Electrical Installation, 15th edition and/or 16th edition * Supply Rules (from power companies) British Standards Specifications & Codes of Practice or other equivalent e national a standards ds and publications (* IEE = Institution of Electrical Engineers, now IET)

21 Legal Framework Electrical Contractors and Workers Registered Electrical Contractors (REC) Registered Electrical Workers (REW) Grade A Electrical Work ( 400 A) Grade B Electrical Work ( 2500 A) Grade C Electrical Work (any capacity) Grade H Electrical Work (high voltage) Grade R Electrical Work (special, e.g. neon sign) NS: neon light; WH = water heaters; AC = air-conditioners In 2006, about 8,500 REC and 68,000 REW

22 Legal Framework Registered Electrical Workers (REW) Permitted work: code 0 = any categories 1 = only issue design certificate 2 = only perform installation & repair works 3 = only perform repair works Example: B0 means REW grade B ( 2500 A) who can design, install and repair electrical works

23 Legal Framework Certification (new work, alteration or addition) Completion of an installation Certification on the design Certification on the installation Work completion certificates Form WR1 a complete installation Form WR1(A) Part of an installation (e.g. for a repair) Periodic test certificates Form WR2 a complete installation Form WR2(A) Part of an installation (e.g. for a repair)

24 (Available from

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE Understanding Power Factor and How it Affects Your Electric Bill Presented by Scott Peele PE Understanding Power Factor Definitions kva, kvar, kw, Apparent Power vs. True Power Calculations Measurements

More information

Chapter 24. Three-Phase Voltage Generation

Chapter 24. Three-Phase Voltage Generation Chapter 24 Three-Phase Systems Three-Phase Voltage Generation Three-phase generators Three sets of windings and produce three ac voltages Windings are placed 120 apart Voltages are three identical sinusoidal

More information

Code of Practice for Building Energy Audit

Code of Practice for Building Energy Audit Code of Practice for Building Energy Audit 2012 Code of Practice for Building Energy Audit Table of Contents Page No. 1. Introduction 1 2. Interpretations 1 3. Application 4 4. Technical Compliance with

More information

BEC 2012 Vs BEC 2015 - Summary of Major Amendments

BEC 2012 Vs BEC 2015 - Summary of Major Amendments - Summary of Major Amendments Note: 1. The following summary table includes the major amendments, with requirements tightened in general for enhanced energy efficiency. Please refer to BEC 2015 for the

More information

A study of electricity use performance of Hong Kong office tenants

A study of electricity use performance of Hong Kong office tenants A study of electricity use performance of Hong Kong office tenants *William Chung Department of Management Sciences, City University of Hong Kong, Hong Kong william.chung@cityu.edu.hk ABSTRACT In 2010,

More information

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321) Lab 4: 3-phase circuits. Objective: to study voltage-current relationships in 3-phase circuits; to learn to make delta and Y connections; to calculate and measure real, apparent, and reactive powers. Equipment:

More information

RISH EM 3490 DS Dual Source Energy Meter RISH EM 3490 DS. Application : Product Features:

RISH EM 3490 DS Dual Source Energy Meter RISH EM 3490 DS. Application : Product Features: Application : RISH Master 3490 DS measures important electrical parameters of Utility (in normal mode) & Generators (in Power back up) in three phase and single phase Network & replaces the multiple analog

More information

Building Mechanical Inspector Senior Building Mechanical Inspector Principal Building Mechanical Inspector Chief Building Mechanical Inspector - 2

Building Mechanical Inspector Senior Building Mechanical Inspector Principal Building Mechanical Inspector Chief Building Mechanical Inspector - 2 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 10-25-85 BUILDING MECHANICAL INSPECTOR, 4251 SENIOR BUILDING MECHANICAL INSPECTOR, 4253 PRINCIPAL BUILDING MECHANICAL INSPECTOR, 4255

More information

New Section 135 Requirements for Electrical Distribution Systems

New Section 135 Requirements for Electrical Distribution Systems New Section 135 Requirements for Electrical Distribution Systems 2013 California Building Energy Efficiency Standards Architectural Energy Corp. Draft Final Report August 15 2011 James R Benya, PE Principal

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

The function of a power station is to deliver

The function of a power station is to deliver CHAPTER CHAPTER 3 Variable Load on Power Stations 3.1 Structure of Electric Power System 3.2 Variable Load on Power Station 3.3 Load Curves 3.4 Important Terms and Factors 3.5 Units Generated per Annum

More information

SECTION THREE CONSTRUCTION CODES

SECTION THREE CONSTRUCTION CODES SECTION THREE CONSTRUCTION CODES CHAPTER 36: Construction Codes in Michigan Purpose and Applicability of Regulations Manufacturing facilities and other businesses must be designed according to code in

More information

BUILDING PERMITS. Santa Rosa County Building Inspection

BUILDING PERMITS. Santa Rosa County Building Inspection BUILDING PERMITS Calculation Based on Under Roof Area New Construction First 5,000 sq. ft. Each additional hundred sq. ft. up to 10,000 sq. ft. Each additional hundred sq. ft. up to 25,000 sq. ft. Each

More information

REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS AIR-CONDITIONING INSTALLATIONS GOVERNMENT BUILDINGS

REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS AIR-CONDITIONING INSTALLATIONS GOVERNMENT BUILDINGS REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS IN AIR-CONDITIONING INSTALLATIONS IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION BUILDING SERVICES BRANCH

More information

UTILITY RATE STRUCTURE

UTILITY RATE STRUCTURE UTILITY RATE STRUCTURE Electricity and Natural Gas Service Residential Commercial Industrial Examples Electricity Use Characteristics Variety of customers with differing use patterns: residential- lighting,

More information

ALL ABOUT LOAD SERVICE APPLICATION HOW-TO QUICK GUIDE

ALL ABOUT LOAD SERVICE APPLICATION HOW-TO QUICK GUIDE ALL ABOUT LOAD SERVICE APPLICATION HOW-TO QUICK GUIDE New or expanded electrical connections: Getting power when and where you need it. To expedite your electricity service request, FortisAlberta has published

More information

SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES

SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES TABLE OF CONTENTS SECTION I SECTION II SECTION III SECTION IV SECTION V SECTION VI SECTION VII SECTION VIII SECTION IX SECTION X SECTION

More information

How To Get A Power Line Extension

How To Get A Power Line Extension GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs

More information

South African Distribution Code

South African Distribution Code South African Distribution Code Glossary and Definitions Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact:

More information

Understanding Power Factor, Crest Factor, and Surge Factor. White Paper #17

Understanding Power Factor, Crest Factor, and Surge Factor. White Paper #17 Understanding Power Factor, Crest Factor, and Surge Factor White Paper #17 Executive Summary This paper explains the technical terms of Power Factor, Crest Factor, and Surge Factor. The use of these terms

More information

AC Power. by Prof. Dr. Osman SEVAİOĞLU Electrical and Electronics Engineering Department

AC Power. by Prof. Dr. Osman SEVAİOĞLU Electrical and Electronics Engineering Department by Prof. Dr. Osman SEVAİOĞLU Electrical and Electronics Engineering Department EE 209 Fundamentals of Electrical and Electronics Engineering, Prof. Dr. O. SEVAİOĞLU, Page 1 Voltage Waveform Consider the

More information

The Toledo Edison Company Toledo, Ohio Page 1 of 1. P.U.C.O. No. 8 SCHEDULE OF RATES FOR ELECTRICITY SUPPLY

The Toledo Edison Company Toledo, Ohio Page 1 of 1. P.U.C.O. No. 8 SCHEDULE OF RATES FOR ELECTRICITY SUPPLY The Toledo Edison Company Toledo, Ohio Page 1 of 1 P.U.C.O. No. 8 SCHEDULE OF RATES FOR ELECTRICITY SUPPLY Filed pursuant to Order dated January 21, 2009, in Case No. 07-551-EL-AIR, before Issued by: Richard

More information

How To Wire A Three Phase, Single Phase, Wye Transformer

How To Wire A Three Phase, Single Phase, Wye Transformer Three-Phase Transformers When more power is needed - three transformers can be tied together. This is called three-phase. Here s a simple way of comparing single-phase to threephase power. Single-Phase

More information

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM BY AUTHORISED PERSONS Effective from 1 October 2011 to 30 September

More information

Building Design to Foster a Quality and Sustainable Built Environment

Building Design to Foster a Quality and Sustainable Built Environment Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-151 Building Design to Foster a Quality and Sustainable Built Environment

More information

Hong Kong, China. 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments. (1) Building Energy Codes

Hong Kong, China. 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments. (1) Building Energy Codes 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments Hong Kong, China (1) Building Energy Codes The Electrical and Mechanical Services Department of the Hong Kong Government

More information

Session 2: Hot Water Supply

Session 2: Hot Water Supply MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire. AVAILABLE: Within established City Limits. AUSTIN UTILITIES Schedule (110) Issued 11/12/13 Supersedes (110) Issued 11/13/12 Sheet No. 1 of 1 RESIDENTIAL SERVICE APPLICABLE: To single-family residences

More information

Gibraltar Electricity Authority ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010

Gibraltar Electricity Authority ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010 Legislation made under s. 10 and 14. ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010 (LN. ) Commencement 1.7.2010 Amending enactments None Relevant current provisions Commencement date EU Legislation/International

More information

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S Including: 1. Heating, Ventilating and Air Conditioning (HVAC) 2. Irrigation Systems 3. Oil and Gas Burning Equipment 4. Signs and

More information

Three phase circuits

Three phase circuits Three phase circuits THREE PHASE CIRCUITS THREE-PHASE ADVANTAGES 1. The horsepower rating of three-phase motors and the kva rating of three-phase transformers are 150% greater than single-phase motors

More information

SASO 2663 :2014 ENERGY LABELLING AND MINIMUM ENERGY PERFORMANCE REQUIREMENTS FOR AIR-CONDITIONERS

SASO 2663 :2014 ENERGY LABELLING AND MINIMUM ENERGY PERFORMANCE REQUIREMENTS FOR AIR-CONDITIONERS SASO 2663 :2014 (SASO 2663/2012 including the modifications approved in Saudi Council Board No../2014) ENERGY LABELLING AND MINIMUM ENERGY PERFORMANCE REQUIREMENTS FOR AIR-CONDITIONERS ENERGY LABELLING

More information

Series and Parallel Circuits

Series and Parallel Circuits Series and Parallel Circuits Components in a circuit can be connected in series or parallel. A series arrangement of components is where they are inline with each other, i.e. connected end-to-end. A parallel

More information

Energy Efficiency Programs for Business Customers

Energy Efficiency Programs for Business Customers Energy Efficiency Programs for Business Customers Conservation & Load Management Connecticut Light & Power and Yankee Gas Energize Connecticut: New name, same great programs Energize Connecticut is the

More information

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service

More information

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA

More information

2 April - 11 June 2016. 29 August - 31 October 2015

2 April - 11 June 2016. 29 August - 31 October 2015 2 April - 11 June 2016 29 August - 31 October 2015 9 January - 12 March 2016 CERTIFICATE COURSE ON COMPANY SECRETARIAL PRACTICE 公 司 秘 書 證 書 課 程 PART I - COMPANY SECRETARIAL PRACTICE 第 一 部 份 : 公 司 秘 書 實

More information

USE OF A SINGLE ELEMENT WATTMETER OR WATT TRANSDUCER ON A BALANCED THREE-PHASE THREE-WIRE LOAD WILL NOT WORK. HERE'S WHY.

USE OF A SINGLE ELEMENT WATTMETER OR WATT TRANSDUCER ON A BALANCED THREE-PHASE THREE-WIRE LOAD WILL NOT WORK. HERE'S WHY. USE OF A SINGLE ELEMENT WATTMETER OR WATT TRANSDUCER ON A BALANCED THREE-PHASE THREE-WIRE LOAD WILL NOT WORK. HERE'S WHY. INTRODUCTION Frequently customers wish to save money by monitoring a three-phase,

More information

BUILDING DIVISION CONSTRUCTION PERMIT FEES

BUILDING DIVISION CONSTRUCTION PERMIT FEES www.polk-county.net BUILDING DIVISION CONSTRUCTION PERMIT FEES Growth Management Department Building Division 330 W. Church St. Bartow, Florida 33881-9005 863-534-6080 Fax 863-534-6016 All Construction

More information

TRANSFORMER LOSS COMPENSATION FOR METERMEN PRESENTED BY: MICHAEL K. BEARDEN

TRANSFORMER LOSS COMPENSATION FOR METERMEN PRESENTED BY: MICHAEL K. BEARDEN TRANSFORMER LOSS COMPENSATION FOR METERMEN PRESENTED BY: MICHAEL K. BEARDEN WHAT are transformer losses? TRANSFORMER LOSS COMPENSATION THE WHAT, WHEN, WHO, WHERE AND HOW Transformer losses can be viewed

More information

2016 BUILDING PERMIT FEES*

2016 BUILDING PERMIT FEES* 2016 PERMIT FEES* Fees are based on the cost of construction and shall be based on a value not less than the value determined using the Building Valuation Data Report published by ICC. Application Fee

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA MERCEDES M. MÁRQUEZ GENERAL MANAGER PUBLIC COUNTERS 3550 WILSHIRE BOULEVARD, 15 TH FLOOR LOS ANGELES, CA 90010 3415 SOUTH SEPULVEDA BOULEVARD, SUITE 150 LOS ANGELES, CA 90034 8475 SOUTH VERMONT AVENUE

More information

CONTINUING CONNECTED TRANSACTIONS AND ANNUAL CAPS FOR TENANCY AGREEMENT AND RELATED AGREEMENTS

CONTINUING CONNECTED TRANSACTIONS AND ANNUAL CAPS FOR TENANCY AGREEMENT AND RELATED AGREEMENTS Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Energy Conservation Measure implemented in 2011-12 (To be filled up separately for each Energy Conservation Measure)

Energy Conservation Measure implemented in 2011-12 (To be filled up separately for each Energy Conservation Measure) Annexure - E Energy Conservation Measure implemented in (To be filled up separately for each Energy Conservation Measure) ID to be filled by BEE Title of the measure Sector. Year to be filled by BEE Technology

More information

MELBOURNE ENTERPRISES LIMITED 萬 邦 投 資 有 限 公 司

MELBOURNE ENTERPRISES LIMITED 萬 邦 投 資 有 限 公 司 Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland

Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland Subtropical Cities September 2006 Design for Energy Efficiency in Commercial Buildings in Queensland Contents Typical Building Constraints & Requirements Understanding Energy Consumption in Buildings HVAC

More information

ELECTRIC RATE SCHEDULES

ELECTRIC RATE SCHEDULES LITTLETON WATER & LIGHT DEPARTMENT 65 LAFAYETTE AVENUE LITTLETON, NH 03561 ELECTRIC RATE SCHEDULES 1. Table of Contents 2. Residential Service Rate 3. Special Service Rate a. Churches b. Municipal Public

More information

Design Guide. Managing Peak Energy Demand In Live Performance Venues

Design Guide. Managing Peak Energy Demand In Live Performance Venues Design Guide Managing Peak Energy Demand In Live Performance Venues Peak demand; the highest amount of electricity consumed at any one time, has a major impact on network charges and has a considerable

More information

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries. In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List

More information

(Incorporated in Hong Kong with limited liability) (Stock Code: 0270) CONTINUING CONNECTED TRANSACTIONS REVISION OF ANNUAL CAPS FOR TENANCY AGREEMENTS

(Incorporated in Hong Kong with limited liability) (Stock Code: 0270) CONTINUING CONNECTED TRANSACTIONS REVISION OF ANNUAL CAPS FOR TENANCY AGREEMENTS Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

How To Get A Fire Alarm Permit In Vail

How To Get A Fire Alarm Permit In Vail Fire and Emergency Services 2399 N. Frontage Road W. Vail, Colorado 81657 Tel: 970-479-2252 www.vailgov.com Fire Marshal FIRE ALARM PERMIT Commercial and Residential Fire Alarm shop drawings are required

More information

CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES

CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES BUILDING DIVISION FEE SCHEDULE Approved by the Board of Trustees May 19, 2011 CHARTER TOWNSHIP OF NORTHVILLE BUILDING DIVISION FEES TABLE OF

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Grapevine Mills is located at the interchange of SR 121 and Grapevine Mills Parkway. It is centrally located just 20 miles northwest of Dallas and

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Net Metering Customer, Agricultural Net Metering Customer, Agricultural Business, Customer, Person(s), Time-of-Use

More information

WATER INDUSTRY ACT 2012. South Australian Water Heater Installation Requirements. Prepared by the Technical Regulator

WATER INDUSTRY ACT 2012. South Australian Water Heater Installation Requirements. Prepared by the Technical Regulator WATER INDUSTRY ACT 2012 South Australian Water Heater Installation Requirements Prepared by the Technical Regulator Installation requirements for water heaters serving established Class 1A buildings, established

More information

Standards of Power Quality with reference to the Code of Practice for Energy Efficiency of Electrical Installations

Standards of Power Quality with reference to the Code of Practice for Energy Efficiency of Electrical Installations Standards of Power Quality with reference to the Code of Practice for Energy Efficiency of Electrical Installations Ir. Martin WU Kwok-tin, Energy Efficiency Office, Electrical & Mechanical Services Department

More information

Motor Efficiency and Power Factor ME 416/516

Motor Efficiency and Power Factor ME 416/516 Motor Efficiency and Power Factor Motivation More than half of all electric energy generated goes to power electric motors. Electric motor converts electric power into shaft power. In thermodynamics terms,

More information

Terms of Service Annex Colocation

Terms of Service Annex Colocation Terms of Service 1. Rackspace 1.1. NE hereby licenses Rackspace to CUSTOMER, and CUSTOMER hereby licenses Rackspace from NE upon and subject to the terms and conditions herein, for the purpose of installing,

More information

Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL

Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Connexus Energy Section III - Business Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Availability Available to non-residential customers for either single-phase

More information

FLORIDA LIFE-CYCLE COST ANALYSIS PROGRAM For Sustainable State Agencies

FLORIDA LIFE-CYCLE COST ANALYSIS PROGRAM For Sustainable State Agencies FLORIDA LIFE-CYCLE COST ANALYSIS PROGRAM For Sustainable State Agencies REQUIREMENTS & INSTRUCTIONS FORM #AE16(A) INCORPORATED BY REFERENCE IN RULE 60D-4.006, F.A.C. CONTENTS SECTION 1 FLCCA PROGRAM REQUIREMENTS...

More information

Power measurement in balanced 3 phase circuits and power factor improvement. 1 Power in Single Phase Circuits. Experiment no 1

Power measurement in balanced 3 phase circuits and power factor improvement. 1 Power in Single Phase Circuits. Experiment no 1 Experiment no 1 Power measurement in balanced 3 phase circuits and power factor improvement 1 Power in Single Phase Circuits Let v = m cos(ωt) = cos(ωt) is the voltage applied to a R-L circuit and i =

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

Tech Report 2: Electrical System Existing Conditions

Tech Report 2: Electrical System Existing Conditions , Tech Report 2: Electrical System Existing Conditions Oct 12, 2013 Yucheng Lu Lighting/Electrical AE Faculty Consultant: Dr. Shawn Good Executive Summary This report is a summary of my study about the

More information

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only ATTACHMENT F CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category

More information

Three-phase AC circuits

Three-phase AC circuits Three-phase AC circuits This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,

More information

43/F Immigration Tower, 7 Gloucester Road, Hong Kong. (for official use) Tel : 2824 5000 Fax : 2802 7333 email : wsdinfo@wsd.gov.

43/F Immigration Tower, 7 Gloucester Road, Hong Kong. (for official use) Tel : 2824 5000 Fax : 2802 7333 email : wsdinfo@wsd.gov. APPLICATION FOR CONSTRUCTING, INSTALLING, ALTERING OR REMOVING AN INSIDE SERVICE OR FIRE SERVICE Under Section 14 of the Waterworks Ordinance (Cap. 102) and Reg. 3 / 5 of the Waterworks Regulations (Cap.

More information

WEST VIRGINIA CODE CHAPTER 21. LABOR ARTICLE 16. REGULATION OF HEATING, VENTILATING AND COOLING WORK.

WEST VIRGINIA CODE CHAPTER 21. LABOR ARTICLE 16. REGULATION OF HEATING, VENTILATING AND COOLING WORK. WEST VIRGINIA CODE CHAPTER 21. LABOR ARTICLE 16. REGULATION OF HEATING, VENTILATING AND COOLING WORK. 21-16-1. Declaration of purpose. The provisions of this article are intended to protect the health,

More information

Code of Practice for Energy Efficiency of Building Services Installation

Code of Practice for Energy Efficiency of Building Services Installation Contents Code of Practice for Energy Efficiency of Building Services Installation Table of Contents Page No. 1. Introduction 1 2. Interpretations and Abbreviations 2 2.1 Interpretations 2 2.2 Abbreviations

More information

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted.

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still

More information

A project to optimise quality and energy efficiency must include metering

A project to optimise quality and energy efficiency must include metering EMDX 3 : Energy Metering A project to optimise quality and energy efficiency must include metering Metering upstream identifies the critical points and ensures optimum targeting of the actions to be taken,

More information

1116, Suenaga, Takatsu-ku, Kawasaki 213-8502, Japan http://www.fujitsu-general.com/

1116, Suenaga, Takatsu-ku, Kawasaki 213-8502, Japan http://www.fujitsu-general.com/ 1116, Suenaga, Takatsu-ku, Kawasaki 213-8502, Japan http://www.fujitsu-general.com/ ISO 9001 ISO 14001 Certified number : 01 100 89394 Certified number : 01 104 9245101 Fujitsu General (Thailand) Co.,

More information

B-1 Buildings & Service Maintenance

B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is

More information

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:

More information

Requirement of Office Space (4000 sq. ft.) for REC Transmission Projects Company Limited

Requirement of Office Space (4000 sq. ft.) for REC Transmission Projects Company Limited Requirement of Office Space (4000 sq. ft.) for REC Transmission Projects Company Limited 1. INTRODUCTION REC Transmission Projects Company Limited (RECTPCL) is a wholly owned subsidiary company of Rural

More information

Fire Alarm Systems Permit Packet. City of Greer Fire Department

Fire Alarm Systems Permit Packet. City of Greer Fire Department Fire Alarm Systems Permit Packet City of Greer Fire Department Updated July 2004 If you have any questions or comments regarding the information contained within; or of you need assistance interpreting

More information

LC1D65AM7 TeSys D contactor - 3P(3 NO) - AC-3 - <= 440 V 65 A - 220 V AC coil

LC1D65AM7 TeSys D contactor - 3P(3 NO) - AC-3 - <= 440 V 65 A - 220 V AC coil Product data sheet Characteristics LC1D65AM7 TeSys D contactor - 3P(3 NO) - AC-3 -

More information

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

Owner: Phone # Mailing Address: Contractor: Phone # Fax # CITY OF EASTON BUREAU OF CODES AND INSPECTIONS 2 nd Floor, 123 South Third Street, Easton, PA 18042 phone (610) 250-6724 - fax (610) 250-6607 email codes@easton-pa.gov PERMIT APPLICATION Owner: Phone #

More information

Starting Current Reduction of Residential HVAC System and Peak-Load Impact of Power System: A Case Study

Starting Current Reduction of Residential HVAC System and Peak-Load Impact of Power System: A Case Study Starting Current Reduction of Residential HVAC System and Peak-Load Impact of Power System: A Case Study By Paul I-Hai Lin Professor of Electrical and Computer Engineering Technology P.E. (State of Indiana

More information

Schedule GS-1 SMALL GENERAL SERVICE

Schedule GS-1 SMALL GENERAL SERVICE I. APPLICABILITY AND AVAILABILITY A. Except as modified herein, this schedule is applicable only to a non-residential Customer (1) who elects (a) to receive Electricity Supply Service and Electric Delivery

More information

BRIGHT SMART SECURITIES & COMMODITIES GROUP LIMITED

BRIGHT SMART SECURITIES & COMMODITIES GROUP LIMITED Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

Applying For New or Revised Electric Service

Applying For New or Revised Electric Service Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service

More information

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC #145 106.4 Article 3 04-01-14 Page 1 of 7 PLUMBING FIXTURE REPLACEMENT ISSUE:

More information

Measurement of Power in single and 3-Phase Circuits. by : N.K.Bhati

Measurement of Power in single and 3-Phase Circuits. by : N.K.Bhati Measurement of Power in single and 3-Phase Circuits by : N.K.Bhati A specifically designed programme for Da Afghanistan Breshna Sherkat (DABS) Afghanistan 1 Areas Covered Under this Module 1. Power in

More information

Application Guide. Power Factor Correction (PFC) Basics

Application Guide. Power Factor Correction (PFC) Basics Power Factor Correction (PFC) Basics Introduction Power Factor, in simple terms, is a number between zero and one that represents the ratio of the real power to apparent power. Real power (P), measured

More information

monitoring High Energy Usage Rate

monitoring High Energy Usage Rate We help businesses get more value from their business energy contracts, reduce their energy consumption, and lower their carbon footprint. To do this we have built a range of tools that help us monitor

More information

SIM Technology Group Limited ( ) * (Incorporated in Bermuda with limited liability) (Stock Code: 2000)

SIM Technology Group Limited ( ) * (Incorporated in Bermuda with limited liability) (Stock Code: 2000) THIS CIRCULAR IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION If you are in any doubt as to any aspect of this circular or as to the action you should take, you should consult a stockbroker or other

More information

TENDER FOR TECHNICAL BUILDING MAINTENANCE SERVICES TERMS OF REFERENCE. April 2013 OVERALL PURPOSE

TENDER FOR TECHNICAL BUILDING MAINTENANCE SERVICES TERMS OF REFERENCE. April 2013 OVERALL PURPOSE ANNEX 3 EUROPEAN UNION DELEGATION TO GEORGIA ADMINISTRATION TENDER FOR TECHNICAL BUILDING MAINTENANCE SERVICES TERMS OF REFERENCE April 2013 OVERALL PURPOSE Offices of the EU Delegation The Contractor

More information

QUESTIONNAIRE ON TRADING HALTS

QUESTIONNAIRE ON TRADING HALTS QUESTIONNAIRE ON TRADING HALTS We invite interested parties to respond to the Consultation Paper on Trading Halts, which can be downloaded from the HKEx website at: http://www.hkex.com.hk/eng/newsconsul/mktconsul/documents/cp201207.pdf

More information

Product Data Bulletin

Product Data Bulletin Product Data Bulletin Power System Harmonics Causes and Effects of Variable Frequency Drives Relative to the IEEE 519-1992 Standard Raleigh, NC, U.S.A. INTRODUCTION This document describes power system

More information

Photovoltaic Incentive Program

Photovoltaic Incentive Program Incentive type: Utility Rebate Program Eligible Technologies: Photovoltaic (PV) Photovoltaic Incentive Program Applicable Sector: Residential/Commercial/Industrial/Municipal System Maximum capacity: 20

More information

Questions and Answers for Heating and A/C Contractors

Questions and Answers for Heating and A/C Contractors 1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded

More information

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference CHAPTER 150: BUILDING REGULATIONS Section Adoption of Regulatory Codes by Reference 150.01 Scope 150.02 Commercial Construction Code 150.03 Commercial Plumbing Code 150.04 Heating, Air Conditioning, Refrigeration

More information

SECTION 271525 OPTICAL FIBER CABLES AND ACCESSORIES. A. Interior Raceways, Fittings, and Accessories: Section 260532.

SECTION 271525 OPTICAL FIBER CABLES AND ACCESSORIES. A. Interior Raceways, Fittings, and Accessories: Section 260532. SECTION 271525 OPTICAL FIBER CABLES AND ACCESSORIES PART 1 GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE A. Interior Raceways, Fittings, and Accessories: Section 260532. B. Wiring, General - 600 Volts

More information

J. Classifications of Service

J. Classifications of Service J. Classifications of Service The Cooperative offers a variety of rate classes to its members. The appropriate class for you will depend on your current electric usage and system requirements. Refer to

More information

ZHONG FA ZHAN HOLDINGS LIMITED

ZHONG FA ZHAN HOLDINGS LIMITED Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Requirements to Obtain a Building Permit for a NEW HOME. 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I)

Requirements to Obtain a Building Permit for a NEW HOME. 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I) Requirements to Obtain a Building Permit for a NEW HOME 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I) 2. Proof of Ownership (New Development Only, Copy of Deed or Tax Bill)

More information

Programmes Elegible for CCD Points for Contractor Registration - 2015. Construction Industry Development Authority (CIDA)

Programmes Elegible for CCD Points for Contractor Registration - 2015. Construction Industry Development Authority (CIDA) Programmes Elegible for CCD Points for Contractor Registration - 5 Construction Industry Development Authority (CIDA) -January TITLE Lighting & Surge Protection System / TRG 0 27/0/5 Officers, Senior Supervisors

More information

PROPERTY Fact Finder

PROPERTY Fact Finder PROPERTY Fact Finder In completing this form, please tick the appropriate boxes and answer all questions in BLOCK CAPITALS Important note The information submitted in this form is used by your insurance

More information

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE PEND OREILLE COUNTY PUD Quality Service at Low Cost RATES FOR ELECTRIC SERVICE Effective July 1, 2015 Contents What Is a Public Utility District... 2 Services Offered By The District... 3 Residential Service...

More information