1 Practical Transformers: Operation, Maintenance and Testing YOU WILL GAIN: 4 hour live, practical online course Saturday, 2 nd May, AM WST; 10.00AM AEST An understanding of the fundamental theory and principles of the operation of power transformers and transformer protection An insight into the identification and application of transformer types An understanding of power transformers, oil and oil tests and interpretation of results Skills in how to manage power transformer breakdowns to ensure minimum disruption WHAT S INCLUDED? Four 50 minute live, practical sessions with your instructor and attendees The full technical ebook manual for Practical Transformers: Operation, Maintenance and Testing which includes course slides, cases studies, calculations and practical exercises Four hours of additional in-depth video sessions covering many additional areas yours to keep and watch at your convenience TOTAL COST: Only $449 per person! SPECIAL OFFER TO YOU: Register by April 4 th and you will receive two ebooks each with hundreds of pages of engineering and knowledge: Safe Operation and Maintenance of Circuit Breakers and Switchgear Practical Power Distribution Total value to you = $124

2 THE COURSE Installation of high voltage distribution and transmission equipment has increased significantly over the years due to ongoing global demand for power. As a result, the need to ensure the reliability of operation of power systems is paramount. It is critical that all personnel operating and working with such equipment have a sound knowledge of their operational requirements and maintenance. This live Online course provides knowledge on both the theory and operation of power transformers. The course will develop and enhance an understanding of what is involved in the maintenance of these essential components of power systems, through the tips and tricks learnt and developed by some of the world s preeminent electrical engineers. ONLINE COURSE PRESENTER Behrouz Ghorbanian BSc, MSc, MIEAust Behrouz has completed degree courses in Telecommunications and Electrical Engineering overseas. He also completed his studies in Electrical Utility Engineering at Curtin University in Behrouz started his career in the oil and gas industry where his role got him involved in the maintenance and repair of electronic and navigational marine equipment (VHF and SSB radios, Sat Nav, engine control panels etc). He then moved to the power industry and was involved in the design, installation, and commissioning of substations mainly for consultancies and utilities. He has also established a good reputation in teaching power system protection over his long term services lecturing at Curtin University, and also over the period he worked as a Protection Engineer in New Zealand. Over the past years, Behrouz has been involved in many major projects across Australia (Port Hedland, Barrow Island, Tamar Valley, Karratha, and Newman for example). His most recent experience is related to cost estimation and risk assessment of major substation projects with a special focus on the secondary systems (Protection, COMMS, SCADA). He has also worked as an Engineering Manager and Senior Project Engineer on major copper mine projects overseas. Behrouz has also gained good knowledge in substation design, HV cables sizing and installation, transmission system design, earthing system design and applications, and power system protection design and applications. WHO SHOULD ATTEND? Consulting engineers Electrical contractors and inspectors Electrical engineers and technicians Power system engineers and technicians Project engineers Tradesman electricians Utility engineers PRE-REQUISITES: Some basic knowledge of electrical engineering and general knowledge of the nature and operation of transformers is required. However participants do not need specific knowledge on transformers and the course will start from the basic theory of transformers.

3 CONTENT SUMMARY INTRODUCTION This is an intensive four (4) hour presentation; we will be emphasising sections marked in BOLD below. Full recordings will be provided for the lower intensity sessions (another four hours of video as detailed below) to review after the course. LIVE SESSIONS SESSION ONE POWER TRANSFORMER OIL AND OIL QUALITY Oil contents: water, acidity and dissolved gas Oil tests: dielectric breakdown, moisture, resistivity, interfacial tension, specific gravity, power factor, furan analysis Recovery voltage measurement test POWER TRANSFORMER PROTECTION Surge protection Protective relaying (differential, over-current and earth fault) Buchholz relay and pressure relief relay Thermal devices and instruments (oil temperature alarm and trip, winding temperature alarm and trip) TRANSFORMERS MAIN FUNCTIONS AND CLASSIFICATION o Construction (shell type and core type) o Classification and type in relation to insulation, windings, core, cooling systems, voltage level, sizing, tank and breathing action Transformer parts SESSION TWO POWER TRANSFORMER ELECTRICAL TESTS AC tests: Power factor tests (insulation, oil and bushings) Single phase excitation current test Transformer turns ratio test DC tests: Insulation resistance test Dielectric absorption test Polarisation index test Step voltage test Hi-pot test AUTO-TRANSFORMERS GENERATOR TRANSFORMERS POWER TRANSFORMERS AND SAFETY o How to install, operate and work with high voltage power transformers safely o Earthing of HV transformers

4 SESSION THREE TAPPINGS AND TAP CHANGERS Uses of tap changers Impedance variation Tap changer mechanisms On-load tap changing by reactor transition Divertor resistor tap changers o In tank type tap changers o Externally mounted tap changers Off-circuit tap changers Construction of tap changers Control of on-load tap changers o Master/follower control o Circulating current control o Runaway prevention Moving coil regulator The Brentford linear regulating transformer Preventative maintenance guidelines Standards applicable to tap changers C Comparison between IEEE and IEC approaches TRANSFORMER THEORY o Electrical values and their definition in a power transformer - voltage, current, number of turns, impedance and their interrelation SESSION FOUR PREVENTATIVE MAINTENANCE ON POWER TRANSFORMERS Techniques to improve life expectancy UNIT TRANSFORMERS STATION TRANSFORMERS OPERATION OF POWER TRANSFORMERS IN A POWER SYSTEM o Thermal performance, loading, paralleling, tap-changing, connections and vector groups SUMMARY, OPEN FORUM CLOSING Registration form on next page!

5 REGISTRATION FORM Earthing of Utility and Industrial Distribution Systems 4 hour live, practical online course BOOKING CODE: EA-OD

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

Monitor electricity supply power network system

Monitor electricity supply power network system Page 1 of 5 Monitor electricity supply power network system Level 4 Credits 10 Purpose People credited with this unit standard are able to: continuously monitor power supply trends, communication, and

More information

Alstom Grid Services. Transformer lifecycle management GRID

Alstom Grid Services. Transformer lifecycle management GRID Alstom Grid Services Transformer lifecycle management GRID Transformer services A COMPLETE RANGE OF SOLUTIONS As a critical component of networks, the power transformer is essential to high voltage electrical

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

OPTIMIZE YOUR FLEET MANAGEMENT RESOURCES

OPTIMIZE YOUR FLEET MANAGEMENT RESOURCES OPTIMIZE YOUR FLEET MANAGEMENT RESOURCES PROACTIVE RISK MANAGEMENT Inside View DGA Diagnostic Software: Integrates Lab, On-line and Portable Data Continuous Data Interpretation Automated Alerts And Notifications

More information

On-line monitoring of substation condition a Romanian experience. V. ZAHARESCU, Vl. ROSCA Nova Industrial SA. CN Transelectrica SA Romania

On-line monitoring of substation condition a Romanian experience. V. ZAHARESCU, Vl. ROSCA Nova Industrial SA. CN Transelectrica SA Romania 21, rue d Artois, F-75008 PARIS http : //www.cigre.org B3_201 CIGRE 2012 On-line monitoring of substation condition a Romanian experience C. MOLDOVEANU*, V. BREZOIANU, S. GAL, V. METIU, A. VASILE, V. URSIANU,

More information

Enhance Power Equipment Reliability with Predictive Maintenance Technologies

Enhance Power Equipment Reliability with Predictive Maintenance Technologies Enhance Power Equipment Reliability with Predictive Maintenance Technologies November 2012/1910DB1208 by S. Frank Waterer, Electrical Engineerinig, Fellow Schneider Electric USA, Inc. Make the most of

More information

Root-Cause Analysis of Transformer Failure Scenario at Power Sub-Station

Root-Cause Analysis of Transformer Failure Scenario at Power Sub-Station Root-Cause Analysis of Transformer Failure Scenario at Power Sub-Station AMBUJ KUMAR Department of Electrical Engineering National Institute of Technology, Hamirpur (HP) India Email: ambujk940@gmail.com

More information

electrical services WWW.AU.SGS.COM/INDUSTRIAL

electrical services WWW.AU.SGS.COM/INDUSTRIAL electrical services WWW.AU.SGS.COM/INDUSTRIAL OUR PROFILE SGS offers a full range of electrical engineering services covering the commissioning test of new plant as well as the maintenance and continual

More information

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392 1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of

More information

HIGH VOLTAGE SHORE CONNECTION

HIGH VOLTAGE SHORE CONNECTION Guide for High Voltage Shore Connection GUIDE FOR HIGH VOLTAGE SHORE CONNECTION NOVEMBER 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011

More information

Transformers. Special transformers Reactors products

Transformers. Special transformers Reactors products Transformers Special transformers Reactors products Reactors Custom designed, custom built ABB Oy Transformers has extensive experience and numerous references from different reactor applications, having

More information

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA Discussion on Class I & II Terminology IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA What is Class I & II? C57.12.00 2010 is the only document we have that defined these terms. 5.10 Insulation

More information

Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms

Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity

More information

Voltage Regulator SPAU 341 C. Product Guide

Voltage Regulator SPAU 341 C. Product Guide Issued: July 1998 Status: Updated Version: D/25.04.2006 Data subject to change without notice Features Comprehensive voltage regulation for power transformers with on-load tapchangers in distribution substations

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

THE OLTC AS AN "OIL ISOLATED SYSTEM" IN THE TRANSFORMER & OIL ANALYSIS IN OLTC. I Hr. Dr. Hurm, Hr. Dr. Schübel I 26.06.2014 I

THE OLTC AS AN OIL ISOLATED SYSTEM IN THE TRANSFORMER & OIL ANALYSIS IN OLTC. I Hr. Dr. Hurm, Hr. Dr. Schübel I 26.06.2014 I THE OLTC AS AN "OIL ISOLATED SYSTEM" IN THE TRANSFORMER & OIL ANALYSIS IN OLTC MR Hr. Dr. Hurm, MESSKO Hr. Dr. Schübel 26.06.2014 Seite 1 von 39 Table of contents Part 1: 1. Introduction: working principle

More information

ESCOM BY G.KALINDE SUBSTATIONS ENGINEER

ESCOM BY G.KALINDE SUBSTATIONS ENGINEER ESCOM BY G.KALINDE SUBSTATIONS ENGINEER Balance Shareholder and Customer Interests Balance Short and Long Term Serviceability Understand trade-offs between Value and Risk Apply Asset Management Tools Build

More information

ISIO 200. Binary Input/Output (I/O) Terminal with IEC 61850 Interface

ISIO 200. Binary Input/Output (I/O) Terminal with IEC 61850 Interface ISIO 200 Binary Input/Output (I/O) Terminal with IEC 61850 Interface Compact and Easy ISIO 200 Put your Binary I/Os where you need them ISIO 200 is a simple and versatile binary I/O terminal with IEC 61850

More information

Online Transformer Insulation Monitoring System BushingGard Product Focus. Maximizing Transformer Uptime and Reliability

Online Transformer Insulation Monitoring System BushingGard Product Focus. Maximizing Transformer Uptime and Reliability Online Transformer Insulation Monitoring System BushingGard Product Focus Maximizing Transformer Uptime and Reliability Critical Energy Transfer... Large power transformers are found around the world at

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values a) For 33/11 KV Power Transformer 2500 V megger is to be need. b) Power Transformer neutral Earthing is

More information

Transformer Fleet Management with e-terraassetcare

Transformer Fleet Management with e-terraassetcare Transformer Fleet Management with e-terraassetcare Jean-Michel AGNIER jean-michel.agnier@alstom.com Alstom-Grid - http://www.alstom.com/ Asset Management Development Director Alstom Group Thermal Power

More information

Transformer Thermal Overload Protection - What s It All About?

Transformer Thermal Overload Protection - What s It All About? Transformer Thermal Overload Protection - What s It All About? Glenn Swift, Dave Fedirchuk, Zhiying Zhang APT Power Technologies, Winnipeg, Canada Presented at the 25th Annual Western Protective Relay

More information

Circulating Current Relay. Type IRXm

Circulating Current Relay. Type IRXm Circulating Current Relay Type IRXm ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while lowering

More information

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application g Digital Energy ITI Instrument Transformer Basic Technical Information and Application Table of Contents DEFINITIONS AND FUNCTIONS CONSTRUCTION FEATURES MAGNETIC CIRCUITS RATING AND RATIO CURRENT TRANSFORMER

More information

Primary and Secondary Electrical Distribution Systems

Primary and Secondary Electrical Distribution Systems Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS Customer Handout Date Aug 2, 2010 Version 1.0 File Name Customer Requirements At Power Substations Document Id Outside Plant Engineering 1 Table Of Contents 1.0

More information

Substation Automation and Smart Grid

Substation Automation and Smart Grid GE Energy Substation Automation and Smart Grid John D. McDonald, P.E. GM, T&D Marketing IEEE PES Past President IEEE Division VII Director IEEE Fellow The Smart Grid POWERING POTENTIA L Current Situation

More information

Together we create reliable products, thus ensuring development of power industry of continents.

Together we create reliable products, thus ensuring development of power industry of continents. PRODUCT CATALOGUE Together we create reliable products, thus ensuring development of power industry of continents. By continuous improvement we transform our knowledge, energy and experience of the generations

More information

SECTION 16999 ELECTRICAL ACCEPTANCE TESTS

SECTION 16999 ELECTRICAL ACCEPTANCE TESTS SECTION 16999 ELECTRICAL ACCEPTANCE TESTS PART 1 2. AND 3. COMBINED 1.1 SUMMARY A. Description of Systems 1. Furnish all labor, materials, test equipment, and technical supervision to perform and record

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

World Leader in HV Testing Technology

World Leader in HV Testing Technology World Leader in HV Testing Technology Cable Fault Locators w/tdr Oil/Fluid Dielectric Testers Very Low Frequency AC Technology W/TD & PD Diagnostics Portable AC Hipots ---------------------------------

More information

CAPACITOR BANK TESTING SWP

CAPACITOR BANK TESTING SWP 1. PURPOSE AND SCOPE The purpose of this Standard Work Practice (SWP) is to standardise and prescribe the method for testing Capacitor Banks including capacitors, tuning reactors and inrush limiting reactors.

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

Table of Contents. TransformerIQ FAQs 1

Table of Contents. TransformerIQ FAQs 1 [12/12] FAQs Table of Contents FAQ 1. What size transformer will TransformerIQ monitor?... 2 FAQ 2. Are there different TransformerIQ versions?... 2 FAQ 3. How are the units powered?... 2 FAQ 4. What is

More information

Primary Test Manager (PTM) Testing and management software for primary assets

Primary Test Manager (PTM) Testing and management software for primary assets Primary Test Manager (PTM) Testing and management software for primary assets The ideal tool for diagnostic testing and condition assessment The Primary Test Manager TM (PTM) is the ideal software tool

More information

AMSC s Superconductor Cable Technologies for Electric Utilities

AMSC s Superconductor Cable Technologies for Electric Utilities International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,

More information

T 3000. Substation Maintenance and Commissioning Test Equipment

T 3000. Substation Maintenance and Commissioning Test Equipment T 3000 Substation Maintenance and Commissioning Test Equipment Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy

More information

Basic Load Tap Changer Operation

Basic Load Tap Changer Operation Basic Load Tap Changer Operation Topics Basic Transformer Theory Differences from LTC s to DETC s LTC Definitions Transformer Nameplates Purpose of a Tap Changer How Does an LTC Work? Topics Reactance

More information

Distribution Voltage Regulators

Distribution Voltage Regulators Distribution Voltage Regulators Type JFR Single Phase 2.5 to 19.9 kv Type SFR Three Phase 13.2 to 34.5 kv Power Transmission & Distribution Siemens JFR & SFR Voltage Regulators Improving Quality of Service

More information

Power transformers. Special transformers Railway

Power transformers. Special transformers Railway Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together

More information

Instrument Transformers Application Guide

Instrument Transformers Application Guide Instrument Transformers Application Guide Edited by ABB AB High Voltage Products Department: Marketing & Sales Text: Knut Sjövall, ABB Layout, 3D and images: Mats Findell, ABB SE-771 80 LUDVIKA, Sweden

More information

21 st Century Facilities

21 st Century Facilities Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer

More information

Step Voltage Regulators

Step Voltage Regulators Step Voltage Regulators Don Wareham Field Application Engineer Today s Agenda Introduction Voltage Regulator theory Voltage Regulator application considerations Installation and proper bypassing Wrap-up/questions

More information

Technical Electrical Field Service Support. Knowledge + Experience = Power. Field Service

Technical Electrical Field Service Support. Knowledge + Experience = Power. Field Service Technical Electrical Field Service Support Knowledge + Experience = Power Field Service WRE Field Service Wismer & Rawlings Electric Ltd. Substation Testing and Commissioning Mission Statement To be recognized

More information

Transformers: Basics, Maintenance, and Diagnostics

Transformers: Basics, Maintenance, and Diagnostics Basics, Maintenance, and Diagnostics U.S. Department of the Interior Bureau of Reclamation April 2005 Basics, Maintenance, and Diagnostics U.S. Department of the Interior Bureau of Reclamation Technical

More information

Electrical Maintenance Workshop

Electrical Maintenance Workshop Electrical Maintenance Workshop Transformer Maintenance & Testing Thursday, November 6, 2003 Transformer Maintenance & Testing Purpose This presentation provides an overview of the major considerations

More information

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE Closing date for submission of representations: 30 th Sep 2014, 5 pm 18 AUG 2014 ENERGY MARKET AUTHORITY 991G Alexandra Road #01-29

More information

TRANSFORMERS AFTERMARKET SPARES, SERVICE & REPAIR

TRANSFORMERS AFTERMARKET SPARES, SERVICE & REPAIR TRANSFORMERS SPARES, SERVICE & REPAIR 02 TRANSFORMERS ENERGY SOLUTIONS FOR THE GLOBAL POWER INDUSTRY BRUSH Transformers is globally renowned for the quality of its products, innovation and service. Our

More information

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID Tension (kv) Impedance (Ohms) EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID frequency (Hz) Simon DESCHANVRES Yannick VERNAY RTE, CNER, Substations Department t (ms) EMTP-RV Users Group

More information

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet ABB Instruction Leaflet 41-161J Effective: May 1997 Supersedes I.L. 41-161H Dated July 1984 ( ) Denotes Change Since Previous Issue Type COQ Negative Sequence Generator Relay (50/60 Hertz)! CAUTION Before

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 AORC Technical meeting 2014 http : //www.cigre.org C4-1012 Alarm System Improvement in the Northern Region Dispatching Center of Thailand Mr. Manu PONGKAEW, Mr. Phathom TIPSUWAN Electricity Generating

More information

How To Understand The Electrical Power Supply Of A Power Supply System

How To Understand The Electrical Power Supply Of A Power Supply System 17 Circuit diagram symbols E 18 CIRCUIT DIAGRAM SYMBOLS electrical network elements three-phase line or cable single-phase line or cable short circuit earth electrode outgoing feeder supply incoming feeder

More information

HIGH VOLTAGE CALCULATIONS / EVALUATIONS. West Virginia Office of Miners Health, Safety & Training

HIGH VOLTAGE CALCULATIONS / EVALUATIONS. West Virginia Office of Miners Health, Safety & Training HIGH VOLTAGE CALCULATIONS / EVALUATIONS West Virginia Office of Miners Health, Safety & Training Helping You To Work More Safely In The Mining Industry DISCLAIMER The West Virginia Office of Miners Health,

More information

Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services

Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services Paul Ammann, Pierre Lorin, Anders Grano ABB Power Products - Transformer Service ABSTRACT Transformers are indispensable

More information

Protection and Substation Automation. Training Programmes

Protection and Substation Automation. Training Programmes Protection and Substation Automation Training Programmes Protection and Substation Automation Training Programme Overview The objective of the Training Program is to provide education and training to make

More information

Tasarım ve Baskı: AJANSBRAND A 15.09.2014

Tasarım ve Baskı: AJANSBRAND A 15.09.2014 www.kosgeb.gov.tr Tasarım ve Baskı: AJANSBRAND A 15.09.2014 THE ENERGY TRANSFERRED TO NATURE www.atstrafo.com ABOUT Having been founded in Adıyaman Organized Industrial District in 2003, ATS Trafo carries

More information

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE Appendix B-2 - Electrical Safety In Design Final Report TECHNOLOGIES THAT REDUCE LIKELIHOOD OF INJURY FROM ELECTRICAL HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE The following are technologies that reduce

More information

HI TECH TRANSFORMER MAINTENANCE (PTY) LTD. COMPANY PROFILE AND OVERVIEW 19 March 2012

HI TECH TRANSFORMER MAINTENANCE (PTY) LTD. COMPANY PROFILE AND OVERVIEW 19 March 2012 HI TECH TRANSFORMER MAINTENANCE (PTY) LTD COMPANY PROFILE AND OVERVIEW 19 March 2012 COMPANY BACKGROUND The company was founded in 1996. Ownership changed in 2005. Mainly provided site transformer maintenance

More information

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012 INTRODUCTION TO SYSTEM PROTECTION Hands-On Relay School 2012 CONGRATULATIONS On choosing the field of system protection. It is an exciting, challenging profession. System protection has changed considerably

More information

Superconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions

Superconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions Superconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions Dr. Detlev Kirsten & Herbert Piereder Solid State SSFCL

More information

ABB Brasil. Power Transformers: Life Cycle and Operational Cost Optimization From Purchase to Minimum Maintenance

ABB Brasil. Power Transformers: Life Cycle and Operational Cost Optimization From Purchase to Minimum Maintenance SANTIAGO CL Jornadas Técnicas 2015 2015Abr14&15 Dr. José Carlos Mendes Gte Tecnologia Transmissão e Produtos de Potência Gte Desenvolvimento & Engenharia Engenheiro Corporativo Executivo Global ABB Asea

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60076-11 First edition 2004-05 Power transformers Part 11: Dry-type transformers This English-language version is derived from the original bilingual publication by leaving out

More information

About us. Eugensa is an ISO 9001:2008 certified company. CERT

About us. Eugensa is an ISO 9001:2008 certified company. CERT About us CERT Eugensa JSC was established in Lithuania in 1996 and since then has become one of the regions largest electrical contractors specialising in the design, installation and maintenance of electrical,

More information

Pilot-wire differential relay for lines with two or more terminals

Pilot-wire differential relay for lines with two or more terminals Pilot-wire differential relay for lines with two or more terminals Page 1 Issued: March 2003 Revision: A Data subject to change without notice Pilot-wire differential relay with RXHL 401 Features Phase

More information

TA Kahraman Yumak ELK412 - Distribution of Electrical Energy Lab. Notes v1.0 2013 Spring web.itu.edu.tr/yumakk. Distance Protection

TA Kahraman Yumak ELK412 - Distribution of Electrical Energy Lab. Notes v1.0 2013 Spring web.itu.edu.tr/yumakk. Distance Protection Distance Protection Announcement: You are not supposed to prepare a pre-report. But there will be an oral examination, so you are strongly advised to study this note regarding to the pre-study questions

More information

Reyrolle Protection Devices. 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy

Reyrolle Protection Devices. 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy Reyrolle Protection Devices 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy Siemens Protection Devices Limited 2 7PG17 XR101 & XR102 Intertripping Relay

More information

Energy Transmission and Distribution Services

Energy Transmission and Distribution Services Energy Transmission and Distribution Services Business segment presentation Asset Services Energy is an essential part of our daily lives Industry Education Mobility Workplace Entertainment Homes Healthcare

More information

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime Containerized Infrastructure for Business-Critical Continuity Are you deploying a remote site faster than you can

More information

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China ELECTRIC POWER DISTRIBUTION SYSTEMS F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China Keywords: Distribution system planning, Load characteristics, Subtransmission Lines, Distribution

More information

TRANSFORMING THE UTILITY INDUSTRY

TRANSFORMING THE UTILITY INDUSTRY TRANSFORMING THE UTILITY INDUSTRY WITH POWER WHEN AND WHERE YOU NEED IT Emerald Transformer offers nationwide services covering every phase of the transformer life cycle. Focused exclusively on the needs

More information

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Mark Siira ComRent International 1 8/1/2013 Agenda Introduction Overview of Load Bank Testing Benefits

More information

Permissible ambient temperature Operation Storage, transport

Permissible ambient temperature Operation Storage, transport The Sitras PRO combined DC protective unit and controller is used in the power supply for DC railways in mass transit and main-line systems up 3,000 V DC. It protects DC switch gear and contact line systems

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... ..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com

More information

Current and voltage measuring relays

Current and voltage measuring relays Current and voltage measuring relays RXIK 1, RXEEB 1 and Page 1 Issued June 1999 Changed since July 1998 Data subject to change without notice RXIK 1 RXEEB 1 (SE980082) (SE980081) (SE970869) Features Application

More information

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 Achieving Operational Efficiencies through On-Line Substation Monitoring Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 1 Agenda Maintenance Monitoring Equipment CMMS Data Historian

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60076-1 Edition 2.1 2000-04 Edition 2:1993 consolidated with amendment 1:1999 Power transformers Part 1: General This English-language version is derived from the original bilingual

More information

Transformer Design & Design Parameters

Transformer Design & Design Parameters Transformer Design & Design Parameters - Ronnie Minhaz, P.Eng. Power Transmission + Distribution GENERATION TRANSMISSION SUB-TRANSMISSION DISTRIBUTION DISTRIBUTED POWER 115/10 or 20 kv 500/230 230/13.8

More information

www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy.

www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy. s www.siemens.com/energy High Voltage Circuit Breakers AP Type 7.5 kv to 800 kv Answers for energy. The AP High Voltage Circuit Breakers Available up to 800 kv Decades of our experience in high voltage

More information

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects

More information

Fundamentals of Power

Fundamentals of Power Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At

More information

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska February 10, 2014 QUESTIONS AND ANSWERS TO: Prospective Proposers FROM: Chugach Electric Association, Inc. 5601 Electron Drive Anchorage, Alaska SUBJECT:

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Current Limiting Protector For Systems rated 2.8-38kV and continuous currents through 5000A.

Current Limiting Protector For Systems rated 2.8-38kV and continuous currents through 5000A. Current Limiting Protector For Systems rated 2.8-38kV and continuous currents through 5000A. Arc Flash and Arc Blast reduction Network protection SCADA adaptable Indoor/outdoor application Professional

More information

Investor day. November 17, 2010. Energy business Michel Crochon Executive Vice President

Investor day. November 17, 2010. Energy business Michel Crochon Executive Vice President Investor day November 17, 2010 Energy business Michel Crochon Executive Vice President We built a global leadership in medium voltage and grid automation with Areva Distribution MV switchgears & systems

More information

1 General Responsibility. 1.1 Participants. 1.2 Documentation. 1.3 Lockout/Tagout

1 General Responsibility. 1.1 Participants. 1.2 Documentation. 1.3 Lockout/Tagout Electrical Safety Plan This plan establishes rules for both the design and operation of the LPRDS. These rules are intended to enhance the safety of the participants in the initial project and future users

More information

Using battery test equipment with asset management software. Megger is a registered trademark

Using battery test equipment with asset management software. Megger is a registered trademark WWW.MEGGER.COM Using battery test equipment with asset management software Megger is a registered trademark Subject Author Andrew Sagl Product Marketing Engineer Date April 2010 Keywords Abstract BITE,

More information

2013 RESIBLOC transformers Product presentation. ABB Group October 2, 2013 Slide 1

2013 RESIBLOC transformers Product presentation. ABB Group October 2, 2013 Slide 1 2013 RESIBLOC transformers Product presentation October 2, 2013 Slide 1 Dry-type transformers For customers with high requirements Does your transformer application requires one of the following characteristic?

More information

Trip circuit supervision relay. Type RXTCS

Trip circuit supervision relay. Type RXTCS Trip circuit supervision relay Type RXTCS ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while

More information

ABB PSPS Erich Steinmann; Generator control-2013

ABB PSPS Erich Steinmann; Generator control-2013 ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise

More information

ABB Inc. April 19, 2011 Slide 1

ABB Inc. April 19, 2011 Slide 1 ABB Automation & Power World: April 18-21, 2011 Allen Austin - Solar Segment Manager North America, Low Voltage Products WLP-123-1-CEU Solar applications for low voltage products ABB Inc. April 19, 2011

More information

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays are smarter,

More information

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13 Interfacing electrification and system reliability Roger White Professional Head of Electrification and Plant Rail Abstract Integration is the term given to ensuring that the different elements of an electrified

More information

Power products and systems. Intelligent solutions for power distribution Zone concept

Power products and systems. Intelligent solutions for power distribution Zone concept Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,

More information

(PREVIEW) Indian Standard COMMON SPECIFICATION FOR HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR STANDARDS

(PREVIEW) Indian Standard COMMON SPECIFICATION FOR HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR STANDARDS (PREVIEW) Indian Standard COMMON SPECIFICATION FOR HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR STANDARDS IS 12729:2004 IEC 60694(2002) 1.1 Scope This International Standard applies to a.c. switchgear and controlgear,

More information

Electric Power Distribution

Electric Power Distribution Electric Power Distribution A S Pabla Consulting Engineer and Former Chief Engineer Punjab State Electricity Board McGraw-Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New

More information