GREATER MANCHESTER PATHOLOGY NETWORK SINGLE LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS)

Size: px
Start display at page:

Download "GREATER MANCHESTER PATHOLOGY NETWORK SINGLE LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS)"

Transcription

1 STRATEGIC OUTLINE CASE GREATER MANCHESTER PATHOLOGY NETWORK SINGLE LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS) Release: Version 1.0 Date: 9 th April 2010 Author: David Slater Healthcare Diagnostics Project Management Ltd 22 Heron Close Blackburn Lancashire BB1 8NU Tel: E.Mail: slater.david@virgin.net V1.0 9 th April 2010 Page 1 of 23

2 Table of Contents 1. STRATEGIC CONTEXT NATIONAL CONTEXT LOCAL CONTEXT PATHOLOGY Current Pathology laboratories Laboratory disciplines Background to Pathology LIMS in Greater Manchester Current Pathology IT systems and their links to other IT systems ORGANISATIONAL CONTEXT THE CASE FOR CHANGE SCOPE AND SERVICE REQUIREMENT OPTIONS Solution options SINGLE LIMS FUTURE STATE CONFIGURATION BUDGETRY COSTS FOR THE IMPLEMENTATION OF A SINGLE PATHOLOGY LIMS SYSTEM Greater Manchester Patient flows Background to Greater Manchester patient flows icats Demand Management Accident & Emergency Moving to a Single LIMS cost releasing benefits POTENTIAL FUTURE SERVICE REORGANISATION FINANCIAL BENEFITS BENEFITS RISKS IMPLEMENTATION TIMETABLE RECOMMENDATIONS... 3 V1.0 9 th April 2010 Page 2 of 23

3 1. STRATEGIC CONTEXT STRATEGIC OUTLINE CASE The Pathology Modernisation programme began in 1999 with a view to improving quality and efficiency. Since then a number of strategies have been developed culminating in the Independent Review of NHS Pathology Services chaired by Lord Carter of Coles. This review made 20 specific recommendations with IT being one of the main themes. It states IT connectivity should be put in place for NHS Pathology services as a matter of priority In response to this NHS Pathology Review, the GMPN has setup a feasibility study for the redesign of Pathology Services in Greater Manchester called the 20:20 The Emerging Vision. In this document, the Greater Manchester Chief Executives set the GMPN a challenging agenda for pathology The achievement of efficiency savings of 20% Measurement and improvement of quality by 20% Sustaining on-site presence of necessary personnel and services in each Trust Ensuring sustainability of future pathology services in Greater Manchester Over the years, pathology laboratories have been subject to cost improvements programmes to improve efficiency within their disciplines. To achieve the challenge stated above, the pathology laboratories may need to look at the feasibility of changing the configuration of pathology services to achieve these targets. In order to reconfigure pathology services, the requirement for a single Pathology LIMS system across Greater Manchester will provide the IT infrastructure to achieve pathology reconfiguration. This needs to be read in partnership with the GMPN document titled 20:20 The Emerging Vision A Feasibility Study for the Redesign of Pathology Services in Greater Manchester The objectives of this are: 1.1. To define the options for the replacement of Greater Manchester Pathology departments LIMS systems 1.2. To assess the costs, cost releasing savings, benefits and complexity associated with each option 1.3. To identify the preferred option V1.0 9 th April 2010 Page 3 of 23

4 2. NATIONAL CONTEXT Over the past 5 years, the delivery of Pathology services has been reviewed by a panel of experts, chaired by Lord Carter of Coles. Two reports have been published, the first in August 2006 followed by the latest, in 2008 called the Report of the second phase of the Independent Review of NHS Pathology Services. In the second report, Lord Carter details the need for the service to meet the growing and changing demands that will be placed on Pathology provision in England. His report focuses on three main themes: Improving quality and patient safety Improving efficiency Identifying the mechanisms for delivering change One of the areas for delivering a good consolidated service is IT connectivity and the efficient and effective use of resources. Lord Carter s report has a specific paragraph on IT connectivity which states: In our earlier report (August 2006), we emphasised the importance of IT connectivity. Good electronic communication for example, between the pathology service provider on one hand and the healthcare providers on the other is an essential element of any effective and efficient service. In Pathology it can help to address unnecessary and inappropriate demand and reduce the risk of errors (as identified by the Healthcare Commission report on March 2007). The collection and analysis of IT-based data can improve the way that pathology enables decisions about diagnosis and treatment to be made. We recommend therefore that IT connectivity be put in place for NHS pathology services as a matter of priority. We welcome the initiative taken by the Department of Health in piloting electronic order communications for primary care in two sites to complement the roll-out in secondary care, and look forward to them being rolled out across the country as soon as possible. Such IT links could be extended to cover other primary care settings such as pharmacies. A second main theme of Lord Carter s report is the improvement of standards, quality and patient safety. In his second report, he quotes the following paragraph: Everyone we have spoken to acknowledge the driving up standards, quality and patient safety, at the same time as reducing costs by between 250 and 500 million a year for reinvestment in the service, is a prize worth pursuing vigorously. In January 2010, the Department of Health published the 2009 update for their Pathology Programme. The document is their response to the report of the Independent Review of NHS Pathology Services (detailed above). This document includes specific detail of how the Department of Health intends to respond to the 20 recommendations. Under the section, IT developments, the following IT developments are specifically listed: National Laboratory Medicine Catalogue HL7 v3 messaging for GPs Lab2Lab Combining data Patient choice Decision support Interoperability Benchmarking for Primary Care V1.0 9 th April 2010 Page 4 of 23

5 3. LOCAL CONTEXT The Greater Manchester Single LIMS Outline Strategic Case focuses on two important areas that the project will improve. These are: The Pathology benefits of the implementation of a single LIMS across Greater Manchester Patient flows between NHS Trusts and the achievable cost releasing savings 3.1. PATHOLOGY Current Pathology laboratories Across Greater Manchester, there are different types of Pathology laboratories providing either local and/or regional services. The services provided and their locations are provided below: Laboratory disciplines The following laboratories provide local services for the following disciplines Clinical Chemistry Haematology Microbiology Cellular Pathology Blood Transfusion NHS Trusts where Pathology laboratories are sited: Royal Bolton Hospital NHS Foundation Trust Stockport NHS Foundation Trust Tameside General NHS Foundation Trust Wrightington, Wigan and Leigh NHS Foundation Trust Salford Royal NHS Foundation Trust University Hospital of South Manchester NHS Foundation Trust Trafford Healthcare NHS Trust Central Manchester University Hospitals NHS Foundation Trust Christie Hospital Foundation NHS Trust Pennine Acute Hospitals NHS Trust with the hub laboratory at the Royal Oldham Hospital and satellite laboratories (essential services laboratories (ESL)) at North Manchester General Hospital, Fairfield General Hospital and Rochdale Infirmary. Specialist Services are provided as follows: Immunology Services are provided by Central Manchester University Hospitals NHS Foundation Trust and Salford Royal NHS Foundation Trust Cytogenetics By Christie Hospital NHS Foundation Trust Ante Natal Screening (Downs) by Royal Bolton Hospital NHS Foundation Trust Metabolic Diseases by the Willink laboratory based in Central Manchester University Hospitals NHS Foundation Trust Microbiology, Serology and Virology by the Manchester Medical Microbiology Partnership (MMMP) based at Central Manchester University Hospitals NHS Foundation Trust Referral of patients for cancer treatment at Christie Hospital NHS Foundation Trust with specialist Cellular Pathology and Haematology laboratory services V1.0 9 th April 2010 Page 5 of 23

6 Background to Pathology LIMS in Greater Manchester Prior to 1992, no laboratories in Greater Manchester had installed Pathology IT systems across all the disciplines of Pathology. There were single discipline IT systems e.g. Ferranti Phoenix in Clinical Chemistry and Blood Transfusion IT systems. In , the North West Regional Health Authority funded the purchase and implementation of Pathology IT systems with the individual Trusts Pathology departments choosing an IT from a preferred supplier list. The original supplier list had a choice of 2 suppliers isoft Telepath and ACT Medisys. Due to difficulties with the implementation of ACT Medisys, this supplier was withdrawn from the preferred supplier list and replaced with Berkeley Computer Services Masterlab. Due to supplier takeover, the current situation with the supplier is as follows: ACT Medisys was taken over by isoft and is now known as isoft ilab (Apex) Berkeley Computer Services Masterlab has been owned by a number of companies but current is part of the Clinisys Group and their product is known as Labcentre Renaming of Pathology IT systems The Pathology IT systems software has been renamed over time as follows Original Pathology IT system name Interim Pathology IT system name Current Pathology IT system name isoft Telepath isoft Ilaboratory TP ACT Medisys isoft Apex isoft Ilaboratory AP BCS Masterlab Torex Labcentre Clinisys Labcentre Current Pathology IT systems The current Pathology IT systems across Greater Manchester NHS Trusts are as follows: Trust Royal Bolton Hospital NHS Foundation Trust Central Manchester University Hospitals NHS Foundation Trust Christie Hospital Foundation NHS Trust Health Protection Agency (MMMP) Pennine Acute Hospitals NHS Trust Salford Royal NHS Foundation Trust University Hospital of South Manchester NHS Foundation Trust Stockport NHS Foundation Trust Pathology IT system Version Clinisys Labcentre V1.6 All isoft ilaboratory AP Disciplines Chemistry Haematology Immunology Clinisys Labcentre V1.5 Histology Technidata V21.01A All isoft ilaboratory TP Cytology V1.9 Microbiology Clinisys Labcentre V1.6 All isoft ilaboratory TP isoft ilaboratory TP isoft ilaboratory TP V1.9 All V1.8 All V1.9 All Tameside Hospital NHS isoft ilaboratory V1.8 All V1.0 9 th April 2010 Page 6 of 23

7 Foundation Trust Trafford Healthcare NHS Trust Wrightington, Wigan & Leigh NHS Foundation Trust TP isoft ilaboratory TP V1.6 All Clinisys Labcentre V1.7 All Current Pathology IT systems and their links to other IT systems Over the years, each Pathology laboratory has developed their system, both within the laboratory disciplines and to external systems. The current data flow diagrams show the current complexity of the existing systems by showing the links to other IT systems. Each Trust details are shown in the appendices as follows: Appendix A Royal Bolton Hospital NHS Foundation Trust Appendix B Central Manchester Univ. Hospitals NHS Foundation Trust Appendix C Christie Hospital Foundation NHS Trust Appendix D Health Protection Agency (MMMP) Appendix E Pennine Acute Hospitals NHS Trust Appendix F Salford Royal NHS Foundation Trust Appendix G Univ. Hospital of South Manchester NHS Foundation Trust Appendix H Stockport NHS Foundation Trust Appendix I Tameside Hospital NHS Foundation Trust Appendix J Trafford Healthcare NHS Trust Appendix K Wrightington, Wigan and Leigh NHS Foundation Trust 4. ORGANISATIONAL CONTEXT 4.1. GMPN staffing and workload figures for During , the Pathology laboratories of Greater Manchester had the following workload Discipline No of staff Total tests Total Requests Biochemistry ,053,336 2,094,299 Cytology 370 (inc Histology) 355,106 Haematology 370 5,318,737 3,767,528 Histology 370 (inc Cytology) 193,415 Immunology Microbiology ,150, THE CASE FOR CHANGE For nearly 20 years, the pathology departments in Greater Manchester have been operating on Pathology IT systems installed in the early to mid 1990 s. The only exceptions are: Manchester Children s Hospital who have merged with Manchester Royal Infirmary in The Pathology departments have merged and are using the existing IT systems i.e. Clinical Chemistry and Haematology are using the isoft Apex IT system whist Histopathology and Cervical Cytologyare using Clinisys Labcentre. Pennine Acute Hospitals NHS Trust which was formed in April 2002 as a merger of 4 previous Trusts, namely o North Manchester Healthcare Trust o Oldham NHS Trust o Bury NHS Trust o Rochdale NHS Trust V1.0 9 th April 2010 Page 7 of 23

8 The newly formed Trust reorganised the Pathology Services by have a Central laboratory at Royal Oldham Hospital with satellite labs at Fairfield Hospital, North Manchester General Hospital and Rochdale Infirmary. The satellite laboratories provide Clinical Chemistry, Haematology and Blood Transfusion services for in patients only. All GP and out patient samples are transported to the Royal Oldham Hospital. Cellular Pathology and Microbiology disciplines operate from the Royal Oldham Hospital central site only. There are other pathology services which operate on non proprietary IT software e.g. Willink laboratory at Manchester Royal Infirmary which provides laboratory services for metabolic diseases. Therefore, in most cases, the pathology IT systems are well established but operate internally for single NHS Trusts. Since the publication of the Report of the Second Phase of the Independent Review of NHS Pathology Services by Lord Carter of Coles in 2009, Pathology laboratories have been under pressure to find substantial financial savings. In order to achieve this level of savings, approx 20m for the Greater Manchester SHA, the type and location of pathology services provided needs to be reviewed. If pathology services are to change, expand, move then the bedrock for this change has to be a modern Pathology IT system. It is very difficult to change pathology services if an appropriate IT infra structure is not in place. (Please see the 20:20 Emerging Vision document regarding Greater Manchester Pathology reconfiguration) Patients are affected by pathology laboratories having their own pathology IT system. The current systems have records of patient s results that have been analysed locally. But the NHS is centralising specialist services in strategically placed NHS Trusts e.g. Children s services are being centralised at the Royal Bolton Hospital and Royal Oldham Hospital. If patient s are referred to these centres, their original investigations will be stored on their local pathology laboratory IT system. For these results to be available to the specialist service, the staff will have to contact the local pathology laboratory for their results or the tests will be repeated. In some cases, e.g. tissue biopsies, the tests are unrepeatable, therefore, the local pathology laboratory will have to be contacted, provided that the Trust receiving the patient knows that pathology tests have been performed previously. The contacting of other laboratories is a frequent exercise at Christie Hospital when patients are referred due to the original diagnosis at their local hospital and the need for specialist treatment. The provision of a single pathology LIMS system would allow 2 major benefits to be realised results to be available to clinicians and healthcare professionals for all patients who have had pathology tests performed in a pathology laboratory in Greater Manchester Pathology services to be reconfigured to provide a more cost effective pathology service 6. SCOPE AND SERVICE REQUIREMENT 6.1. Scope of Functionality The existing Pathology IT systems in Greater Manchester have been installed since the early/mid 1990 s with the exception of Pennine Acute Hospitals NHS Trust and Christie Hospital. If the project to fund a new single IT system is agreed, then the new system will need to have software which enhances existing functionality and includes: Connecting for Health compliant Uses the National Laboratory Medicine Catalogue SNOMED CT Decision support HL7 V3 messaging Duplicate test monitoring Interoperability with external systems Software allows separate site working V1.0 9 th April 2010 Page 8 of 23

9 Connection of Point of Care equipment Sample tracking Ability to link to multiple PAS systems Ability to link to multiple ward order communication systems Ability to send GP and/or OPD requests to nominated laboratory sites CfH GP requesting and reporting functionality 7. OPTIONS 7.1. Solution options The preferred solution must provide the pathology services across Greater Manchester with a system that will meet the strategic objectives and realise the benefits for patients, operational, managerial and financial outlined in Section 13. The following table lists the options available for consideration: Option Solution Positives Negatives 1 Do nothing - Unable to reconfigure services without a single pathology IT system for Greater Manchester. - Inability to share data - increase in repeat testing 2 Keep existing Pathology IT systems but provide a Greater Manchester wide pathology results data warehouse 3 Reconfigure pathology services on a NPfIT sector basis and use existing pathology IT systems 4 Procure separate pathology IT systems on a NPfIT sector basis Benefits the patient as all pathology results are available in one pathology results server Cheaper option than replacing with a single Pathology IT system across all laboratories - Old pathology IT systems are not replaced and pathology services cannot be reconfigured - clash of patient hospital numbers - multiple records for the same patient - different reference ranges for the same tests can lead to misinterpretation and clinical risk - Some current pathology IT systems use LIMS software which has not be updated over recent years and cannot be used for multi site working - reducing number of Pathology IT systems to one per sector will continue to be based on an old pathology IT system - data migration will be required from the Pathology IT systems that are shut down to the single pathology IT system in the sector - does not address the issue of cross sector patient flows - More expensive option - may have different suppliers per sector - does not address the V1.0 9 th April 2010 Page 9 of 23

10 5 Procure single fully supported networked pathology IT system for Greater Manchester - The service will be able to reconfigure pathology services as IT infra structure and a single Pathology IT system will be a available to all pathology services. - clinical users will see all pathology results for their patients - improved clinical management of patients - allows pathology to work towards one patient = one record - reduction in duplicate testing - patient flows between Trusts is not a concern issue of cross sector patient flows - extremely complex project 8. SINGLE LIMS FUTURE STATE CONFIGURATION 8.1. If a single Pathology LIMS is installed in the Greater Manchester area and all laboratories are connected to it, the following diagram shows one possible configuration. Royal Bolton Hospital NHS Foundation Trust Salford Royal NHS Foundation Trust University Hospital of South Manchester NHS Foundation Trust Central Manchester University Hospitals NHS Foundation Trust Christie Hospital Foundation NHS Trust Single Pathology LIMS System Stockport NHS Foundation Trust Tameside Hospital NHS Foundation Trust Health Protection Agency (MMMP) Trafford Healthcare NHS Trust Pennine Acute Hospitals NHS Trust PRIMARY CARE Wrightington, Wigan and Leigh NHS Foundation Trust V1.0 9 th April 2010 Page 10 of 23

11 8.2. The above diagram represents the simple links between the Trusts in Greater Manchester. The Single LIMS system will need to provide links for (list is not exhaustive): Individual Trust PAS systems Ward Order Communication systems GP Ordering and Reporting systems Analyser interfaces Accident and Emergency IT systems Infection Monitoring Systems Diabetes IT systems Point of Care testing requests and results Cancer reporting systems Anticoagulation Services National Chlamydia Screening Programme 9. BUDGETRY COSTS FOR THE IMPLEMENTATION OF A SINGLE PATHOLOGY LIMS SYSTEM 9.1. Current cost of support The Pathology laboratories across Greater Manchester have purchased IT systems from commercial suppliers. Their contracts with these suppliers include cost of support and maintenance. Some contracts provide cover Monday Friday only whilst others provide 24/7 cover. For reasons of confidentiality, individual Pathology laboratory IT support costs will not be published but an overall cost for all the laboratories in Greater Manchester will be published. The combined support costs for all laboratories in Greater Manchester is approximately 1,000, Predicted cost of replacing existing Pathology IT systems Most of the existing Pathology IT systems in Greater Manchester pathology laboratories were purchased in the early to mid 1990 s. Therefore, most of the systems are at least 15 years old. Under the NHS Supplies procurement rules, major equipment should be replaced in a 7-10 year time period. In the case of existing Pathology LIMS systems, their replacement on a like for like basis i.e. replacing existing Pathology LIMS with a new replacement by each Pathology laboratory would cost approx 500,000 with support costs of 25% ( 125,000). Procurement costs for each Trust will be approximately 100,000. Therefore, for Greater Manchester with 11 pathology laboratories, the total cost would be 6,600,000 with support costs of 1.375, Predicted cost of a new single Pathology LIMS Costs of All Wales LIMS system The for an All Wales Laboratory Information Management System has been published by the Welsh Assembly Government on the Welsh NHS website. In this document they state the following: The capital cost for the scheme is stated as million. It is expected that, business case approval not withstanding, this funding will be provided by the Health Departments All-Wales Capital Programme (AWCP) and the scheme is featured within the AWCP projections for future expenditure V1.0 9 th April 2010 Page 11 of 23

12 Costs for a Greater Manchester Single LIMS 2 major Pathology LIMS suppliers have been contacted and they have provided indicative costs based on the following requirements Requirement Hardware requirements - The system must be available 24/7 - There should be no down time for system software or application upgrades - The system should be fully fault tolerant Number of NHS Trusts - Royal Bolton Hospital NHS Foundation Trust - Stockport NHS Foundation Trust - Tameside General NHS Foundation Trust - Wrightington, Wigan and Leigh NHS Foundation Trust - Salford Royal NHS Foundation Trust - University Hospital of South Manchester NHS Foundation Trust - Trafford Healthcare NHS Trust - Central Manchester University Hospitals NHS Foundation Trust - Christie Hospital Foundation NHS Trust - Pennine Acute Hospitals NHS Trust with the hub laboratory at the Royal Oldham Hospital and satellite laboratories (essential services laboratories (ESL)) at North Manchester General Hospital, Fairfield General Hospital and Rochdale Infirmary. No of users - The number of pathology staff using the system will be approximately 1800 Patient Administration System interfaces Ward Order Communications systems GP requesting/reporting - The number of external users who will be allocated passwords to access pathology results will be over 5,000. Currently there are 10 NHS Trusts in Greater Manchester, each requiring an interface into the Single LIMS IT system including Admissions, Discharge Transfers (ADT) functionality Each Trust will require a request pathology tests interface and a results interface to their Trust Order Communications system Currently, the Pathology laboratories across Greater Manchester are providing electronic links from GPs to their Pathology laboratory for electronic requesting of pathology tests. For the purposes of this costing exercise, 2 request interfaces are required. Analyser interfaces All Pathology laboratories in Greater Manchester report their GP results via PMIP across the Data Transfer Service (DTS). This will continue but there will be a consolidation of PMIP reporting systems. Therefore, for the purposes of this exercise, 2 GP reporting interfaces are required Each laboratory will be interfacing their analysers into the Single LIMS IT system. It is V1.0 9 th April 2010 Page 12 of 23

13 Other interfaces assumed that the analysers interfaces will be consolidated through software which manages each analyser interface. For example, some laboratories use Instrument Manager to provide a single interface point from their current Pathology IT system to their analysers sited across the various disciplines in Pathology. Therefore, for the purposes of this exercise, the number of data managers required will be 20 (average of 2 per Trust) and the supplier must provide an average cost of an analyser interface into their data manager solution. Diabetic Registers Each laboratory will send results through to their local Diabetic Service. The Single LIMS will require 10 interfaces or a single interface which will distribute results to the correct Trust diabetic service. - ICNet Each Trust has an ICNet team who require information from their local laboratory. Therefore, there is a requirement for 10 interfaces to this product. CoServ A single CoServ interface will be required Data Migration Anticoagulant Services Each laboratory will send results through to their local Anticoagulation Services. The Single LIMS will require 10 interfaces or a single interface which will distribute results to the correct Trust anticoagulation service. Data will need to be migrated from the existing Pathology IT systems. The disciplines requiring data migration will be - Blood Transfusion - Cervical Cytology - Non Gyn Cytology - Histopathology All the data from the above disciplines needs to be migrated, either to the next GM Single LIMS system or to a separate database with secure access to the data by all appropriate users V1.0 9 th April 2010 Page 13 of 23

14 Single LIMS Financial Summary Financial indicative costs have been received from 2 major Pathology IT suppliers as follows: Supplier A Supplier B Average cost Hardware 1,000,000 1,000,000 1,000,000 Software 3,889,363 2,370,000 3,129,682 Professional Services* 3,470,637 2,400,000** 2,935,319 Total Network Price 8,360,000 5,770,000** 7,065,000 Annual Maintenance 1,500,000 Not provided * The professional services include staff training and project management ** Supplier B did not provide a figure for Professional Services. The figure given assumes that the professional Services will be a % of the total hardware and software costs. This figure has been added to the Total Network price. Annual Maintenance Supplier B has been contacted to provide the Professional Services and Annual Maintenance costs The above costs will be subject to VAT. The final price will be subject to detailed system specification and supplier negotiation. V1.0 9 th April 2010 Page 14 of 23

15 10. COST RELEASING SAVINGS ANALYSIS Greater Manchester Patient flows Background to Greater Manchester patient flows Secondary Care NHS Trusts across Greater Manchester refer patients between themselves for different specialties. The following table shows the number of patients referred between NHS Trusts for each Specialty and the Pathology disciplines where tests will be performed for each Specialty. Specialty Volume of Pathology tests requested for Clinical specialty patient transfers between Trusts in Greater Manchester Clinical Chemistry Haematology Microbiology Cellular Pathology Oncology 4900 Yes Yes Yes Yes Oral Surgery 1360 Yes Yes Yes Yes Ophthalmology 1260 Yes Yes Yes Gynaecology 1070 Yes Yes Yes Dermatology 860 Yes Yes Yes Yes Orthopaedics 610 Yes Yes Yes Yes General 510 Yes Yes Yes Yes Surgery ENT 470 Yes Yes Yes Thoracic 390 Yes Yes Yes Surgery Urology 330 Yes Yes Yes Yes Plastic Surgery 320 Yes Yes Yes General 310 Yes Yes Yes Medicine Thoracic 240 Yes Yes Yes Medicine Physiotherapy 230 No No No Nephrology 110 Yes Yes Yes Palliative Care 110 Yes Yes No Paediatrics 90 Yes Yes Yes A&E 50 Yes Yes Yes Elderly 10 Yes Yes Yes Medicine Haematology 10 Yes Yes No Pain 10 No No No Management Expected % of 90% 90% 70% 60% repeat requests No of Patients tested per discipline Total In , there were 13,230 patients who were transferred from one Trust to another for a Consultant or Healthcare professional appointment. When the Consultant or Healthcare professional sees the patient, a part of the preparation for the consultation will be to review the patient s clinical history including diagnostic tests performed. V1.0 9 th April 2010 Page 15 of 23

16 During the patient s assessment at the originating NHS Trust, pathology diagnostic tests will have been performed. The number of pathology requests performed will be dependent on the specialty but, in general, tests will be performed in Clinical Chemistry and Haematology on 90% of patients whilst 70% of patients will have Microbiology tests and 60% will have their Cellular Pathology tests repeated. In Cellular Pathology, the tests are repeated on the same samples but by a different laboratory. Alternatively, if the Consultant at the receiving Trust does not wish to repeat the pathology tests and use the most recent pathology results available, contact will be made by telephone to either the Pathology laboratory or the referring Consultant s medical secretary. In this case, staff time will be used to obtain the pathology results which can be avoided by the results being available on a Single LIMS. Using these figures, the following table gives volumes of repeat requests performed and cost savings: Pathology discipline Volume of repeat requests Cost per repeat request Total savings per discipline Clinical Chemistry ,450 Haematology ,550 Microbiology ,786 Cellular Pathology ,250 Total Savings per year Total , icats icats (Independent Clinical Assessment and Treatment Service) are being setup across across Greater Manchester using mobile icat medical units. Their purpose is to provide fast and convenient assessment, diagnostic tests and treatment (if appropriate) for NHS patients. The mobile clinics will be sited at Denton, Longsite, Stretford, Salford, Bolton, Rochdale and Oldham. The diagnostic tests requested by icats are performed using a contract with a Pathology provider, either private or a contract with a NHS Pathology laboratory. If the icat uses a private laboratory then the pathology results are not available to the NHS unless the results are written into documentation sent from the icat to the NHS Trust receiving the patient. The planned activity is expected to be in the region of 70,000 cases per year and it is expected that approximately 40% of cases will be referred for hospital treatment. The expected number of repeat tests for icats for 28,000 patients treated in the NHS will be as follows: Pathology % retesting Number of Cost per Cost per year Discipline repeat requests request Clinical Chemistry 90% 25, ,840 Haematology 90% 25, ,448 Microbiology 70% 19, ,796 Total 455,084 V1.0 9 th April 2010 Page 16 of 23

17 Demand Management In Pathology laboratories, some tests are performed within a timescale where its interpretation is not different from the previous time the test was performed. This is called duplicate testing. This situation occurs in most pathology disciplines but it occurs most frequently in Clinical Chemistry and Haematology. An analysis has been made of a number of frequently requested tests and two examples from Clinical Chemistry and Haematology are shown as examples where savings can be achieved. Discipline Test Frequency Total Number performed Clinical Chemistry Clinical Chemistry No of duplicate tests Cost per test Overall cost Haemoglobin A1C 8.3% 311, ,709 TSH 1.8% 963,500 17, ,015 Haematology Factor V Leiden 14.8% ,250 Haematology Haemoglobinopathy 8.7% ,570 Studies It can be expected that a minimum of 2% savings can be found by using IT software either in the hospital ward ordering software or in the Pathology IT software that flags duplicate tests at the time of request to prevent the test being performed. The Greater Manchester Pathology budget is 120,000,000. This can be broken down into staffing equipment and consumables/reagents. Consumables and reagents will account for 25% of this budget i.e. 30,000,000 The following table shows the expected saving at various % duplicate testing assuming the savings are made from the consumable portion of the overall pathology budget. % reduction in duplicate testing Yearly saving across Greater Manchester 2 600, , ,200,000 These figures could be achieved if Pathology across Greater Manchester used the same duplicate identification criteria either using hospital ward ordering or pathology software to identify duplicate tests. The other area where cost savings could be achieved are: Accident & Emergency In Accident and Emergency departments, a high percentage of patients have pathology tests requested but, in some cases, there isn t a standard set of tests requested for a clinical condition. This inconsistency is being addresses in some Trusts by the Pathology laboratory working with A&E Consultants to produce a standard set of tests for each clinical condition presented. For example, if a patient attends with chest pain, then the standard pathology requests will be: - Full Blood Count, Renal profile, Glucose and Cardiac enzymes. This removes the possibility of locum staff from requesting inappropriate tests and, therefore, cost savings could be achieved by standardisation across Greater Manchester V1.0 9 th April 2010 Page 17 of 23

18 Moving to a Single LIMS cost releasing benefits Cost releasing saving Number Cost saved Common GP electronic requesting to all GP practices in Greater Manchester There are 10 GP requesting software packages, each implemented differently, which can be reduced to 1 10,000 per site and assume a single system will have support costs of 20,000. Cost saving = Reduction in the number of PMIP reporting systems ICNet is a software package for reporting positive infections. Reduction in the number of analyser interfaces due to consolidation of services Reduction in Lab2Lab interfaces (project currently in progress) There are 10 PMIP software packages that can be reduced to 1 Moving to a single LIMS will reduce this from 10 to 1 If Microbiology was consolidated from 10 departments to 3, there will be a saving of 7 analyser interfaces if new analysers were leased/purchased Each Pathology IT system has a Lab2Lab interface to send and receive requests and reports between labs in Greater Manchester. A single LIMS will reduce this from 11 to 1 80,000 10,000 per site and assume a single system will have support costs of 20,000. Cost saving = 80,000 The average cost of an analyser interface is 15,000, resulting in an overall saving of 105,000. The overall savings will depend on the restructuring of the pathology disciplines and the lease/purchase of new equipment but a rough estimate will be approx 500,000 over 2 years Support costs for Lab2Lab will be 88,000 per year and interface support will be 30,000. This will be reduced to 20,000 Cost saving = 98, POTENTIAL FUTURE SERVICE REORGANISATION Service Confederation In order to become more financially efficient, Secondary Care Trusts in Greater Manchester may need to consider service rationalisation of smaller specialisations e.g. Urology, ENT and Gynaecology. These services may be performed in 3 NHS Trusts across Greater Manchester but out patient clinics will be held in each Trust. The diagnostic tests requested in the Out Patient clinics will be analysed in the laboratory in the Trust where the clinic has been held. If this is the case, then the patient s diagnostic results will not be available on the host Trust Pathology or Order Communications systems. The Consultant or Healthcare professional will need to either, access the remote Pathology IT system, contact the sending Trust Pathology department for the most recent pathology results or repeat the diagnostic tests when the patient arrives in the host Trust. The following data for a single Trust broadly represents the expected cases for for three specialties Urology ENT Gynaecology Elective in patients Day Cases First Out patient Out patient follow up V1.0 9 th April 2010 Page 18 of 23

19 From the 4 categories above, it is assumed that the elective in patients and day cases will have their pathology tests performed in the pathology laboratory at the specialty host Trust. The first out patient and out patient follow up appointments will be held in the patient s locality. Therefore, in these 2 categories, the pathology results will be held on a different pathology IT system that the host Trust, unless a Single Pathology IT system is available. Access to the most recent pathology results will require contact between the 2 Trusts either by letter, telephone call or remote pathology results access between the 2 Trusts. In any of these cases, it will use staff time to obtain the pathology results. From the above example, the interaction between confederated services which are provided on behalf of multiple Trusts or within Sectors of Greater Manchester will be considerable. The provision of a Single Pathology LIMS will provide pathology results at the required time and location and improve the patient s journey through their personal pathway Further ore, it will reduce the potential for the 18 week journey being exceeded and Trusts incurring fines. 12. FINANCIAL BENEFITS Using the financial benefits from the sections above, the expected yearly financial benefits are as follows: Financial benefit Yearly cost improvement Greater Manchester patient 801,036 flows icats 455,084 Demand management 600,000 Reduction of GP requesting 80,000 software packages Reduction of PMIP reporting 80,000 packages Reduction of ICNet packages Reduction in analyser 250,000 interfaces Lab2Lab interfaces 98,000 Total 2,364,120 Discussions have taken place with the All Wales Single IT Programme Manager and they have estimated that there will be a 1% cost benefit saving which is 1.40m but up to 5% could be achieved which is 7.0m 13. PAYMENT SCHEDULE If this project was approved by the Greater Manchester ICT Programme Board, then the amount of finance required per financial year would be dependent on the Payment schedule agreed at the outset of the contract with the supplier. Assuming that the project was approved with the above financial figures and the contract was awarded on 6 th April 2011, then the following finance would be required: Payment Milestone Payment percentage Payment value Financial Year Award of contract 20% 1,413, Hardware on award 100% 1,000, of contract Installation of software 30% 2,119, First site go live 25% 1,766, Last site go live 20% 1,413, Final Acceptance 5% 353, Total 7,065,000 V1.0 9 th April 2010 Page 19 of 23

20 14. BENEFITS The benefits of implementing a Single Pathology IT system across Greater Manchester have, for the purposes of this, been categorised as Patient, Operational, Managerial and Financial. The benefits identified are set out in the table below. Table: Benefits of Implementing a Single Pathology LIMS for Greater Manchester Patient Benefits Contributes to the 18 week journey reducing possibility of Trusts exceeding this timescale and incurring fines An integral part of a patient s pathway as pathology results contribute to a patient s diagnosis in 70% of cases Single database of patient results Improved clinical management of patients e.g. in Cervical Cytology Point of Care results stored on single database for Greater Manchester Improved treatment due to availability of results to clinicians independent of patient s home address or hospital visit Improved turnaround of samples if previous results are required for interpretation Reduction in duplicate testing Ability to include images into patient reports The CfH Choose and Book project allows patients to choose their preferred NHS Trust for treatment. If the patient lives in Greater Manchester and chooses a Greater Manchester Trust, the patient s previous results will be available to the clinician. The NHS forward planning includes the opening of referral centres for specialist treatment. Patient pathology results will be available to the clinicians across Greater Manchester Currently, when a patient moves their registered GP, their GP record will be transferred to their new GP practice using GP-to-GP record transfer. This new system has highlighted the difference in reference ranges and units for the same tests between different laboratories. The use of a single Pathology LIMS across Greater Manchester will harmonise reference ranges. The IT system will be CfH compliant allowing the system to be linked to the Personal Demographics Service (PDS) and the Spine In the future, patients will be allowed to access their own results and the harmonisation of reference ranges and units across Greater Manchester laboratories will be a pre-requisite for patient access. All patient results will be transmitted electronically to GP surgeries Operational Benefits Supports a more flexible organisation of pathology services across Greater Manchester Fully supported networked LIMS allows reconfiguration of pathology services Single IT supplier Modern IT system using current software and hardware technologies More resilience built into hardware specification Improved service resilience and disaster recovery facilities Standardisation of working practices and reporting Staff flexibility as working practices are standardised Single Pathology IT system allows multi-site working Standardisation of test units and reference ranges Disciplines can include images into their reports e.g. Cellular Pathology Reduction in number of interfaces due to single interface for multiple analysers thereby reducing support and maintenance costs Use of National Laboratory Medicine Catalogue in all disciplines Initial system setup based on the National Laboratory Medicine Catalogue allowing transfer of results between interoperable systems e.g. Primary and Secondary care systems Regional services may be included in the use of the IT system V1.0 9 th April 2010 Page 20 of 23

21 Reduction in phone calls between laboratories and users for sample results Reduction in time spent chasing results for patients who have been referred to a different hospital Referral of tests to specialist laboratories with Greater Manchester will be internal to a single LIMS system in place of a Laboratory2Laboratory software system All test results will be held on a single database Point of Care testing is a new pathology growth area and patient s results generated using point of care devices can be stored on the single LIMS with new interface technology If a major incident occurs, using standard working practices, staff could be transferred from nearby laboratories to assist. If a major analyser fails and work needs to be transferred to another laboratory, using a single IT system makes this possible as the requests will be on the IT system Blood Transfusion departments will be able to check blood stocks in other laboratories in Greater Manchester The Cervical Cytology service will use the same database thereby allowing work to be transferred between laboratories having access to historical records Use of data recognition software for data input Standardise structured reporting of Pathology reports e.g. Cancer Minimum Datasets Managerial Benefits In the current financial climate, the financing for the replacement of individual Trust pathology IT systems will be extremely difficult. The installation of a single Pathology IT system across Greater Manchester may be the only option available. Statistics for all laboratories will be produced from a single database Workload statistics will be calculated using the same interpretation of tests and requests and will be comparable between laboratories Dedicated IT staff with a formal IT management structure Able to modernise and reconfigure pathology services with a single IT system Managers will be able to move staff between laboratories due to same Pathology LIMS system and working practices Data quality for all laboratories can be standardised at the same high level Benchmarking data will be comparable Financial Benefits Expected lower maintenance costs for a single IT system Reduced maintenance costs for interfaces compared to existing systems Financial information for each laboratory in Greater Manchester available from the same IT system Ability to drive down costs by using a single supplier If equipment is standardised across the same discipline in all Pathology laboratories, interface costs will be substantially reduced Costs reduced by lowering duplicate testing 15. RISKS If the project is given approval, the project manager will maintain a Risk and Issues log throughout the life of the project. The risks already identified are included in the following table: Patient Risks Previous results will not be integrated if data migration onto new IT systems does not occur Operational Risks If a single LIMS is installed, the hardware specification needs to include a second, fail over server so that the system is available 100% of the time New releases of software need to be installed into a testing account prior to being installed onto the live system. The software upgrade must be installed with zero down time. The siting of the Pathology IT hardware will need to determined Harmonisation of reference ranges will be required but the system will be required to V1.0 9 th April 2010 Page 21 of 23

22 have different reference ranges for different analysis methodologies Secondary Care Trusts across Greater Manchester use similar number structures for District/Case numbers. Managerial Risks The single LIMS project may not be accepted by some Pathology laboratories or individual disciplines or Clinical/laboratory staff Centralised Pathology IT staff may result in the restructuring of the current Trust Pathology IT staff There will be transitional period of dual working for patients, operational and managerial staff Data migration from current systems will be expensive and, therefore, may not be taken over to a Single LIMS system. Previous results and statistics may not be easily accessible If previous patient results are not migrated onto the Single LIMS system, the pathology service may be at risk in cases of litigation Financial Risks There may be no financial savings from the changeover Initial capital outlay 16. IMPLEMENTATION TIMETABLE The specification, procurement and implementation of a Single LIMS system into the laboratories of Greater Manchester will be an extremely complex project. The author has looked at the specification, procurement and implementation of the Clinisys Labcentre pathology LIMS project at Pennine Acute Hospitals NHS Trust. This project replaced 4 Pathology IT systems, namely isoft Telepath (North Manchester General Hospital) Mysis (Royal Oldham Hospital) Clinisys Labcentre (at Bury General Hospital and Rochdale Infirmary/Birch Hill Hospital) The timescale for this project was 2 years and 6 months to complete the installation with all disciplines using the system. This did not include data migration of Cellular Pathology and Blood Transfusion data from the previous systems. This was a rapid implementation as the Pathology laboratory had considerable expertise in the setup and daily operation of Clinisys Labcentre. For a single LIMS to be installed across Greater Manchester, the timetable would be as follows: Process Write and agree specification Procurement process invitation to tender Short list preferred suppliers Select Supplier of choice Sign contract with Supplier Project Initiation Common application setup and user testing Software setup and user testing 1 st Lab (all disciplines) Rollout to other labs in Greater Manchester (will require significant parallel implementation) Total Time line 3 months 2 months 2 months 1 months 1 month 3 months 6 months 6 months 18 months 42 months (3 years and 6 months) V1.0 9 th April 2010 Page 22 of 23

23 In the All Wales Single LIMS project, they commenced their project in 2006 and do not expect it to be completed until A full project plan will be developed with the chosen supplier. To achieve the timetable detailed above, the IT system will need to be implemented in at least 2 laboratories simultaneously. 17. RECOMMENDATIONS The GMPN Board are requested to consider the benefits provided by the move across from existing Pathology IT systems to a single IT system for all pathology laboratories across Greater Manchester. This recommends that the case is approved due to financial benefits from moving to a single Pathology LIMS and it provides a basis for the Greater Manchester Pathology laboratories to reconfigure their services across all disciplines to provide major cost savings in line with the case made by Lord Carter of Coles. If this is approved, a full business case will need to be developed followed by a full system specification. V1.0 9 th April 2010 Page 23 of 23

CASE STUDY. NHS Board. Contact. Email. Title. Category. Background/ context. NHS Tayside

CASE STUDY. NHS Board. Contact. Email. Title. Category. Background/ context. NHS Tayside NHS Board Contact Email NHS Tayside Dr Bill Bartlett (Consultant Clinical Scientist), Tejinder Chima (Clinical Services Manager) bill.bartlett@nhs.net, tchima@nhs.net Title Category Background/ context

More information

National Clinical Programmes

National Clinical Programmes National Clinical Programmes Section 3 Background information on the National Clinical Programmes Mission, Vision and Objectives July 2011 V0. 6_ 4 th July, 2011 1 National Clinical Programmes: Mission

More information

Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary)

Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary) Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary) Together we are better Foreword by the Director of Nursing

More information

South Eastern Health and Social Care Trust

South Eastern Health and Social Care Trust South Eastern Health and Social Care Trust JOB DESCRIPTION TITLE OF POST: Consultant General Surgeon LOCATION: This post is part of the South Eastern Trust and will be based at the Ulster Hospital. However,

More information

REPLACEMENT OF LABORATORY INFORMATION MANAGEMENT SYSTEM WITHIN NHS HIGHLAND

REPLACEMENT OF LABORATORY INFORMATION MANAGEMENT SYSTEM WITHIN NHS HIGHLAND Highland NHS Board 5 February 2013 Item 5.6 REPLACEMENT OF LABORATORY INFORMATION MANAGEMENT SYSTEM WITHIN NHS HIGHLAND Report by Alex Javed, Service Manager Laboratories and Radiology on behalf Deborah

More information

External Audit: Annual Audit Letter 2005-06

External Audit: Annual Audit Letter 2005-06 INFRASTRUCTURE, GOVERNMENT AND HEALTHCARE External Audit: Annual Audit Letter 2005-06 Wrightington, Wigan and Leigh NHS Trust 28 September 2006 AUDIT Content The contacts at KPMG in connection with this

More information

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST STATEMENT OF PURPOSE

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST STATEMENT OF PURPOSE NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST STATEMENT OF PURPOSE Legal status of the Trust University Hospitals NHS Trust (NUH) came into being on 1st April 2006 and assumed responsibility for the services

More information

Report to Trust Board 31 st January 2013. Executive summary

Report to Trust Board 31 st January 2013. Executive summary Report to Trust Board 31 st January 2013 Title Sponsoring Executive Director Author(s) Purpose Previously considered by Transforming our Booking and Scheduling Systems Steve Peak - Director of Transformation

More information

Medical and Other Staff Pay and Grading Structures

Medical and Other Staff Pay and Grading Structures Medical and Other Staff Pay and Grading Structures Associate Specialist Associate Specialist 36,769.00 to 79,756.00 Locum Associate Specialist Associate Specialist - Disc Pnts 36,769.00 to 79,756.00 Consultant

More information

Improving Emergency Care in England

Improving Emergency Care in England Improving Emergency Care in England REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1075 Session 2003-2004: 13 October 2004 LONDON: The Stationery Office 11.25 Ordered by the House of Commons to be printed

More information

MID STAFFORDSHIRE NHS FOUNDATION TRUST

MID STAFFORDSHIRE NHS FOUNDATION TRUST MID STAFFORDSHIRE NHS FOUNDATION TRUST Report to: Report of: Joint Health Scrutiny Accountability Session Antony Sumara Chief Executive Date: 20 April 2011 Subject: Mid Staffordshire NHS Foundation Trust

More information

NHS TRAFFORD CLINICAL COMMISSIONING GROUP GOVERNING BODY 29 th October 2013

NHS TRAFFORD CLINICAL COMMISSIONING GROUP GOVERNING BODY 29 th October 2013 Agenda Item No. 6.0 Part 1 X Part 2 NHS TRAFFORD CLINICAL COMMISSIONING GROUP GOVERNING BODY 29 th October 2013 Title of Report Purpose of the Report RADAR This report provides the background to the RADAR

More information

North Middlesex University Hospital NHS Trust. Annual Audit Letter 2005/06. Report to the Directors of the Board

North Middlesex University Hospital NHS Trust. Annual Audit Letter 2005/06. Report to the Directors of the Board North Middlesex University Hospital NHS Trust Annual Audit Letter 2005/06 Report to the Directors of the Board 1 Introduction The Purpose of this Letter 1.1 The purpose of this Annual Audit Letter (letter)

More information

SECTION 2: TRUST PROFILE

SECTION 2: TRUST PROFILE SECTION 2: TRUST PROFILE Section Summary??? 2. TRUST PROFILE 2.1 Overview Hereford Hospitals NHS Trust (HHT) operates within two distinct health economies Herefordshire (England) and Powys (Wales) although

More information

Patient Choice at the Point of GP Referral

Patient Choice at the Point of GP Referral DEPARTMENT OF HEALTH Patient Choice at the Point of GP Referral LONDON: The Stationery Office 9.25 Ordered by the House of Commons to be printed on 17 January 2005 REPORT BY THE COMPTROLLER AND AUDITOR

More information

GP Systems of Choice (GPSoC)

GP Systems of Choice (GPSoC) GP Systems of Choice (GPSoC) Update October 2006 Contents 1 Introduction 3 2 Scheme status 4 3 Overview of the scheme 5 4 Funding 4.1 IT infrastructure 6 4.2 Annual service charges 6 4.3 Migration 6 5

More information

Greater Manchester and Cheshire HPB Unit Guidelines for the Assessment & Management of Hepatobiliary and Pancreatic Disease Chapter 4

Greater Manchester and Cheshire HPB Unit Guidelines for the Assessment & Management of Hepatobiliary and Pancreatic Disease Chapter 4 Greater Manchester and Cheshire HPB Unit Guidelines for the Assessment & Management of Hepatobiliary and Pancreatic Disease Chapter 4 Contents 4. Manchester Cancer Pathways 32 4.1. Manchester Cancer 33

More information

Department of Health/ Royal College of General Practitioners. Implementing a scheme for General Practitioners with Special Interests

Department of Health/ Royal College of General Practitioners. Implementing a scheme for General Practitioners with Special Interests Department of Health/ Royal College of General Practitioners Implementing a scheme for General Practitioners with Special Interests April 2002 Foreword Improved access and consistently high quality services

More information

Patient Choice Strategy

Patient Choice Strategy Patient Choice Strategy Page 1 of 14 Contents Page 1 Background 4 2 Putting Patients and the Public at the Heart of Health and 5 Healthcare in West Lancashire 3 Where are we now and where do we need to

More information

Status Issued Version 3 Author NHS CFH Version Date 16/12/2010

Status Issued Version 3 Author NHS CFH Version Date 16/12/2010 Bowel Cancer Screening Programme Electronic Results Communication Frequently Asked Questions and Lesson Learned from pilots and roll out. Programme NPFIT Status Issued Version 3 Author NHS CFH Version

More information

Summary Strategic Plan 2014-2019

Summary Strategic Plan 2014-2019 Summary Strategic Plan 2014-2019 NTWFT Summary Strategic Plan 2014-2019 1 Contents Page No. Introduction 3 The Trust 3 Market Assessment 3 The Key Factors Influencing this Strategy 4 The impact of a do

More information

Reconfiguration of Surgical, Accident and Emergency and Trauma Services in the UK

Reconfiguration of Surgical, Accident and Emergency and Trauma Services in the UK Reconfiguration of Surgical, Accident and Emergency and Trauma Services in the UK K Reconfiguration of Surgical, Accident and Emergency and Trauma Services in the UK Summary Our aim is to provide an excellent

More information

Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS

Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS CITY OF WESTMINSTER MINUTES Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS Minutes of a meeting of the Health Policy & Scrutiny Urgency Sub-Committee Committee held on Thursday 7th

More information

How To Prepare A Meeting For A Health Care Conference

How To Prepare A Meeting For A Health Care Conference THORACIC ONCOLOGY MULTIDISCIPLINARY TEAM MEETINGS: OPERATIONAL POLICY EXECUTIVE SUMMARY 1. All patients in Lothian with thoracic malignancies should be discussed at designated times in pathway (see App

More information

Healthcare Science Programme Guide

Healthcare Science Programme Guide Healthcare Science Programme Guide BSc. (HONS) Healthcare Science (Life Sciences) BSc. (HONS) Healthcare Science (Physiological Sciences) This guide has been compiled to give an overview of the Healthcare

More information

An integrated IT approach to Chronic Disease Management

An integrated IT approach to Chronic Disease Management An integrated IT approach to Chronic Disease Management Presented by: Steve Courtney Chief Executive Officer Health Information Systems (UK) Ltd March 2011 Who are Health Information Systems (UK) Ltd Company

More information

Review of Stroke Services in Tameside. Personal and Health Services Scrutiny Panel

Review of Stroke Services in Tameside. Personal and Health Services Scrutiny Panel Review of Stroke Services in Tameside Personal and Health Services Scrutiny Panel July 2012 Contents Paragraph Page No. Introduction by the Chair Summary 1 2 2 4 Membership of the Scrutiny Panel 3 4 Terms

More information

The Royal College of Pathologists response to Lord Carter s report on operational productivity, February 2016

The Royal College of Pathologists response to Lord Carter s report on operational productivity, February 2016 The Royal College of Pathologists response to Lord Carter s report on operational productivity, February 2016 Executive summary Background Lord Carter s independent report, Operational productivity and

More information

Patients First. Better, safer care for local people. Public consultation on surgery reconfiguration Help us develop our services to meet local need

Patients First. Better, safer care for local people. Public consultation on surgery reconfiguration Help us develop our services to meet local need Patients First Better, safer care for local people Public consultation on surgery reconfiguration Help us develop our services to meet local need View from our stakeholders The Heart of England NHS Foundation

More information

ADULT HEALTH AND WELLBEING LONG-TERM NEUROLOGICAL CONDITIONS

ADULT HEALTH AND WELLBEING LONG-TERM NEUROLOGICAL CONDITIONS ADULT HEALTH AND WELLBEING LONG-TERM NEUROLOGICAL CONDITIONS i. Summary The National Service Framework for long-term neurological conditions categorises neurological conditions as: Sudden-onset conditions

More information

Pharmacy Department. Rotational Pharmacy Technician. Information Pack

Pharmacy Department. Rotational Pharmacy Technician. Information Pack Pharmacy Department Rotational Pharmacy Technician Information Pack 1 Contents 1. Chelsea and Westminster Healthcare NHS Foundation Trust 3 2. The Pharmacy 4 3. Services 4 3.1. Clinical Services 4 3.2.

More information

Date: 31st July 2014. Tel: Tel: 01706 924328. Section 151 Officer Monitoring Officer

Date: 31st July 2014. Tel: Tel: 01706 924328. Section 151 Officer Monitoring Officer Subject: Coroners Hosted Service Status: For Publication Report to: Overview and Scrutiny Committee Date: 31st July 2014 Cabinet Member: Cecile Biant Report of: Chris Sheader Author: Mark Dalzell Author

More information

Review of Information Technology Expenditure Summary 16 November 2011. Dr John Hogan. Registrar

Review of Information Technology Expenditure Summary 16 November 2011. Dr John Hogan. Registrar Review of Information Technology Expenditure Summary 16 November 2011 Dr John Hogan Registrar Recap on scope The objective of the review was to recommend ways to improve the University s value for money

More information

Patient Administration Systems A National Approach. Alan Price IPMS Programme Manager

Patient Administration Systems A National Approach. Alan Price IPMS Programme Manager Patient Administration Systems A National Approach Alan Price IPMS Programme Manager Presentation Overview Brief History of PAS in Ireland The Current Status and Context Where we want to go The Key Principles

More information

Board of Directors Meeting

Board of Directors Meeting Board of Directors Meeting 23 rd July 2014 (BDA/14/26) part Performance Report Monitor Key Indicators Status: A Paper for Information History: Amanda Pritchard Chief Operating Officer Page 1 of 10 Performance

More information

How To Manage A Cancer Oncology Clinic

How To Manage A Cancer Oncology Clinic GYNAECOLOGICAL ONCOLOGY MULTIDISCIPLINARY TEAM MEETINGS: OPERATIONAL POLICY Version 3 Policy agreed Sept 2009 (updated Jan/Feb 2013) Agreed by: SCAN gynae group 2009 Update agreed SCAN gynae group May

More information

National Assembly for Wales: Health and Social Care Committee

National Assembly for Wales: Health and Social Care Committee 2 Ashtree Court, Woodsy Close Cardiff Gate Business Park Cardiff CF23 8RW Tel: 029 2073 0310 wales@rpharms.com www.rpharms.com 18 th October 2011 Submission to: Call for Evidence: Response from: National

More information

HARINGEY CLINICAL COMMISSIONING GROUP MAY 2013 GOVERNING BODY 2013/14 FINANCIAL PLAN

HARINGEY CLINICAL COMMISSIONING GROUP MAY 2013 GOVERNING BODY 2013/14 FINANCIAL PLAN HARINGEY CLINICAL COMMISSIONING GROUP MAY 2013 GOVERNING BODY 2013/14 FINANCIAL PLAN 1. Introduction The purpose of this paper is to provide an update to the Governing Body of the CCGs 2013/14 financial

More information

RE: Australian Safety and Quality Goals for Health Care: Consultation paper

RE: Australian Safety and Quality Goals for Health Care: Consultation paper 10 February 2012 Mr Bill Lawrence AM Acting CEO Australian Commission on Safety and Quality in Health Care GPO Box 5480 Sydney NSW 2001 Email: goals@safetyandquality.gov.au Dear Mr Lawrence RE: Australian

More information

Nursing and Midwifery Registered

Nursing and Midwifery Registered Nursing and Midwifery Registered Organisation Directorate 9 Alcohol Treatment Nurse (0050) 9 Cardiology, Gastro & Thoracics Directorate 9 Anaesthetics And Recovery - UHND (58) 9 Theatres Directorate 9

More information

Faversham Network Meeting your community s health and social care needs

Faversham Network Meeting your community s health and social care needs Faversham Network Meeting your community s health and social care needs Your CCG The CCG is the practices and the practices are the CCG. There is no separate CCG to the member practices. - Dame Barbara

More information

You take care of your patients. We ll take care of the documents.

You take care of your patients. We ll take care of the documents. You take care of your patients. We ll take care of the documents. Our passion is electronic document management. Docman is the leading supplier of advanced electronic document management, workflow and

More information

Progress on the System Sustainability Programme. Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014

Progress on the System Sustainability Programme. Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014 Agenda Item: 9.1 Subject: Presented by: Progress on the System Sustainability Programme Dr Sue Crossman, Chief Officer Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014 Purpose of Paper:

More information

The Scottish Ambulance Service Improving Care, Reducing Costs. Working together for better patient care

The Scottish Ambulance Service Improving Care, Reducing Costs. Working together for better patient care The Scottish Ambulance Service Improving Care, Reducing Costs Working together for better patient care Key points The Scottish Ambulance Service is seeing more people, faster, and offering better quality

More information

Manchester City Council Report for Information. Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011

Manchester City Council Report for Information. Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011 Manchester City Council Report for Information Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011 Subject: Report of: Data Centre Provisioning Project City Treasurer

More information

Treating you well CORPORATE PROFILE

Treating you well CORPORATE PROFILE Treating you well CORPORATE PROFILE Welcome to Southern Cross Hospitals Limited. We operate New Zealand s largest network of private surgical hospitals, and our focus is on delivering quality care and

More information

Patient Electronic Alert to Key-worker System (PEAKS) Guidelines

Patient Electronic Alert to Key-worker System (PEAKS) Guidelines Patient Electronic Alert to Key-worker System (PEAKS) Guidelines This procedural document supersedes: PAT/EC 4 v.1 Guidelines for Patient Electronic Alert to Key-worker systems (PEAKS). Did you print this

More information

Clinical Audit Procedure for NHS-LA and CNST Casenote Audit

Clinical Audit Procedure for NHS-LA and CNST Casenote Audit Clinical Audit Procedure for NHS-LA and CNST Casenote Audit NHS Litigation Authority (NHS-LA) Risk Management Standards for Acute Trusts Pilot Clinical Negligence Scheme for Trusts (CNST) Maternity Clinical

More information

ICT in HSE Where are we now. Fran Thompson

ICT in HSE Where are we now. Fran Thompson ICT in HSE Where are we now Fran Thompson HSE Overview The HSE is responsible for managing and delivering health and personal social services in Ireland. Employs in excess of 108,000 staff - largest employer

More information

The practice of medicine comprises prevention, diagnosis and treatment of disease.

The practice of medicine comprises prevention, diagnosis and treatment of disease. English for Medical Students aktualizované texty o systému zdravotnictví ve Velké Británii MUDr Sylva Dolenská Lesson 16 Hospital Care The practice of medicine comprises prevention, diagnosis and treatment

More information

Big Chat 4. Strategy into action. NHS Southport and Formby CCG

Big Chat 4. Strategy into action. NHS Southport and Formby CCG Big Chat 4 Strategy into action NHS Southport and Formby CCG Royal Clifton Hotel, Southport, 19 November 2014 Contents What is the Big Chat? 3 About Big Chat 4 4 How the event worked 4 Presentations 5

More information

National Pathology Programme

National Pathology Programme National Pathology Programme Digital First: Clinical Transformation through Pathology Innovation National Pathology Programme Digital First and the Call to Action Digital First comes at a key time for

More information

Lean principles and their supporting tools are widely acknowledged to provide an effective framework for

Lean principles and their supporting tools are widely acknowledged to provide an effective framework for Performance improvement through the application of Lean principles and change management methodology Introduction Lean principles and their supporting tools are widely acknowledged to provide an effective

More information

Financial Strategy 5 year strategy 2015/16 2019/20

Financial Strategy 5 year strategy 2015/16 2019/20 Item 4.3 Paper 15 Financial Strategy 5 year strategy 2015/16 2019/20 NHS Guildford and Waverley Clinical Commissioning Group Medium Term Financial Strategy / Finance and Performance Committee May 2015

More information

Primary Care & Provider Services Directorate. Business Plan. April 2009 March 2010

Primary Care & Provider Services Directorate. Business Plan. April 2009 March 2010 Agenda Item: 2.12 Primary Care & Provider Services Directorate Business Plan April 2009 March 2010 Primary Care & Provider Services Business Plan 2009/10: Formal Board 9 June 2009 1/16 CONTENTS Page No.

More information

Cardiff and Vale University Health Board. Organisational Structures. Updated July 2012

Cardiff and Vale University Health Board. Organisational Structures. Updated July 2012 Cardiff and Vale University Health Board Organisational Structures Updated July 2012 1 CONTENTS Executive Structure 3 Divisional Structure Overall 5 Clinical Diagnostics & Therapeutics 8 Medicine 9 Specialist

More information

The Royal Wolverhampton NHS Trust

The Royal Wolverhampton NHS Trust The Royal Wolverhampton NHS Trust Trust Board Report Meeting Date: 28 th September 2015 Title: ICT & Patient Access Cannock Position Report Executive Summary: Action Requested: The ICT & Patient Access

More information

Visiting Students Elective Programme Handbook

Visiting Students Elective Programme Handbook Visiting Students Elective Programme Handbook CONTENTS PAGE Introduction page 3 Criteria for applying for a medical elective at Barts and The London page 6 General Administrative information page 7 Application

More information

Fife NHS Board Activity NHS FIFE. Report to the Board 24 February 2015 ACTIVITY REPORT

Fife NHS Board Activity NHS FIFE. Report to the Board 24 February 2015 ACTIVITY REPORT 1 AIM OF THE REPORT NHS FIFE Report to the Board 24 February 2015 ACTIVITY REPORT This report provides a snapshot of the range of activity that underpins the achievement of key National Targets and National

More information

The Blood Budget: how can we reduce costs and influence best practice? Sue Redfearn Blood Transfusion Manager Poole Hospital NHS Foundation Trust

The Blood Budget: how can we reduce costs and influence best practice? Sue Redfearn Blood Transfusion Manager Poole Hospital NHS Foundation Trust The Blood Budget: how can we reduce costs and influence best practice? Sue Redfearn Blood Transfusion Manager Poole Hospital NHS Foundation Trust Poole Hospital vital statistics 680 beds 2011 (reduced

More information

Northern Ireland Waiting Time Statistics:

Northern Ireland Waiting Time Statistics: Northern Ireland Waiting Time Statistics: Inpatient Waiting Times Quarter Ending September 2014 Reader Information Purpose Authors This publication presents information on waiting times for inpatient treatment

More information

The purpose of this report is to provide an update on the progress of the development of business continuity plans in the Trust

The purpose of this report is to provide an update on the progress of the development of business continuity plans in the Trust Meeting / Committee: Board of Directors Meeting Date: 31 July 2012 This paper is for: (Only 1 column to be marked with as appropriate) Action/Decision Assurance Information Title: Business Continuity Update

More information

Excellence & Choice A Consultation on Older People s Services January 2009

Excellence & Choice A Consultation on Older People s Services January 2009 Excellence & Choice A Consultation on Older People s Services January 2009 CONTENTS 1. Introduction...3 2. Guiding principles for the delivery of services for older people...5 3. How are services for older

More information

ehr Sharable Data - Encounter Record Jun 2013 HKSAR Government Page 1 of 13

ehr Sharable Data - Encounter Record Jun 2013 HKSAR Government Page 1 of 13 ehr Sharable - Record Form Entity Name Entity ID Definition Type (Code) Type Validation rule (description) Repeated Code Table Type in IAMS requirement Example healthcare provider identifier 1003803 [Healthcare

More information

Project Closure. 04012 - EDI for Blood Stocks Management Scheme

Project Closure. 04012 - EDI for Blood Stocks Management Scheme Project Closure 04012 - EDI for Blood Stocks Management Scheme Author: Sam Bolton Issue Date: 28 JUL 2007 Version: 0.1 File Ref.: 04012_PCR_20070728 Page 1 of 11 Table of Contents TABLE OF CONTENTS 2 AUTHORISATION

More information

Overview and Scrutiny Forum Resources

Overview and Scrutiny Forum Resources Overview and Scrutiny Forum Resources Part 1 17 th December 2004 Item No 4 Subject Purpose Author Ward Summary Implementation of Oracle iprocurement Suite The purpose of this report is to update members

More information

Clinical Governance Development Committee October 2007 Dr Foster RTM Alerts Progress Report

Clinical Governance Development Committee October 2007 Dr Foster RTM Alerts Progress Report Clinical Governance Development Committee October 2007 Dr Foster RTM Alerts Progress Report 1. Background Information 1.1. Initial review of the tool in November 2006, and subsequent queries in January

More information

Developments to the NHAIS System

Developments to the NHAIS System Developments to the NHAIS System FHS Day - 3 rd March 2010 Graham Ambrose NHAIS and FHS Services GP Payments Total payments for 07/08 of 7.2b Cervical Cancer Screening 3.4m women called for screening Labs

More information

King s College Hospital ICT Strategy 2014

King s College Hospital ICT Strategy 2014 King s College Hospital ICT Strategy 2014 Contents Contents... 1 ICT for King's College Hospital... 1 Introduction... 1 Key elements of a paperless hospital... 2 Research... 7 Reporting... 8 New EPR...

More information

consultant link Too many unnecessary referrals and hospital admissions?

consultant link Too many unnecessary referrals and hospital admissions? consultant link Too many unnecessary referrals and hospital admissions? Working with networks of local hospital consultants we provide GPs with fast, efficient and high quality advice and guidance GP Care

More information

Introducing. MEDITECH's Electronic Health Record. Here are the components comprising. MEDITECH's Electronic Health Record...

Introducing. MEDITECH's Electronic Health Record. Here are the components comprising. MEDITECH's Electronic Health Record... Introducing MEDITECH's Electronic Health Record MEDITECH s Electronic Health Record is a well-crafted suite of integrated applications including EPR and PAS designed to support the delivery of safe, cost-effective

More information

THE LEAN EXPERIENCE AT NEWCASTLE HOSPITALS CELLULAR PATHOLOGY DEPARTMENT

THE LEAN EXPERIENCE AT NEWCASTLE HOSPITALS CELLULAR PATHOLOGY DEPARTMENT THE LEAN EXPERIENCE AT NEWCASTLE HOSPITALS CELLULAR PATHOLOGY DEPARTMENT Background For around 12 years, Newcastle Hospitals Royal Victoria Infirmary (RVI) cellular pathology department has been working

More information

Board of Directors 26 th June 2015

Board of Directors 26 th June 2015 Board of Directors 26 th June 2015 AGENDA ITEM: 19 PRESENTED BY: PREPARED BY: Craig Black Helen Beck DATE PREPARED: 17/06/2015 SUBJECT: PURPOSE: E Care Update To provide The Trust Board with an update

More information

Patient Access Policy

Patient Access Policy Patient Access Policy NON-CLINICAL POLICY ACE 522 Version Number: 2 Policy Owner: Lead Director: Assistant Director of Operations Director of Operations Date Approved: Approved By: Management Executive

More information

HEALTHCARE SECTOR. Delivering exceptional FM in healthcare. Exceptional Service, Exceptional People

HEALTHCARE SECTOR. Delivering exceptional FM in healthcare. Exceptional Service, Exceptional People HEALTHCARE SECTOR Delivering exceptional FM in healthcare Exceptional Service, Exceptional People Norland in healthcare Norland works with leading NHS Foundation Trusts and acute hospitals complete with

More information

Bath & North East Somerset Council

Bath & North East Somerset Council Bath & North East Somerset Council MEETING/ DECISION MAKER: MEETING/ DECISION DATE: Health & Wellbeing Select Committee 29 th July 2015 EXECUTIVE FORWARD PLAN REFERENCE: TITLE: Royal United Hospitals Bath

More information

PRESENT: Mr M Hill Modernisation Director (Chair) Mr J Anning Chair, North Lanarkshire CHP Mr P K Corsar Chair, NHS Board

PRESENT: Mr M Hill Modernisation Director (Chair) Mr J Anning Chair, North Lanarkshire CHP Mr P K Corsar Chair, NHS Board MINUTE OF THE SECOND MEETING OF THE PERFORMANCE MANAGEMENT GROUP HELD ON THURSDAY 25 JANUARY 2007 AT 9.00AM IN THE BOARD ROOM, NHS BOARD OFFICES, BECKFORD STREET, HAMILTON. PRESENT: Mr M Hill Modernisation

More information

STRATEGIC OUTLINE CASE. e-prescribing SYSTEM PROJECT DOCUMENTATION. Release: Draft vs. 0.3. Date: 20 th May 2008

STRATEGIC OUTLINE CASE. e-prescribing SYSTEM PROJECT DOCUMENTATION. Release: Draft vs. 0.3. Date: 20 th May 2008 PROJECT DOCUMENTATION STRATEGIC OUTLINE CASE e-prescribing SYSTEM Release: Draft vs. 0.3 Date: 20 th May 2008 Author: Liz Boylan Noy Scott House RDEH(Wonford) Barrack Road Exeter EX2 5DW Tel: 01392 402365

More information

Lung Cancer Multidisciplinary Meeting Toolkit. National Lung Cancer Working Group

Lung Cancer Multidisciplinary Meeting Toolkit. National Lung Cancer Working Group Lung Cancer Multidisciplinary Meeting Toolkit National Lung Cancer Working Group September 2014 Contents Introduction 1 Multidisciplinary meetings 1 Toolkit for implementing high-quality lung cancer MDMs

More information

Securing excellence in GP IT Services

Securing excellence in GP IT Services Securing excellence in GP IT Services Operating Model December 2012 Table of Contents 01 Glossary of terms 02 Preface 03 Introduction Background Purpose 04 GP IT services commissioning 05 06 07 GP IT scope

More information

BMI Werndale Hospital Quality Accounts April 2013 to March 2014

BMI Werndale Hospital Quality Accounts April 2013 to March 2014 BMI Werndale Hospital Quality Accounts April 2013 to March 2014 Chief Executive s Statement Welcome to our Quality Accounts 2014, the fifth year we have published this data. The information presented here

More information

PROMOTING BUSINESS CONTINUITY. Greater Manchester Local Authority Business Continuity Group

PROMOTING BUSINESS CONTINUITY. Greater Manchester Local Authority Business Continuity Group PROMOTING BUSINESS CONTINUITY Greater Manchester Local Authority Business Continuity Group What is Business Continuity? Business Continuity is a planning process, which provides a framework for ensuring

More information

Central Hosting. Case Study

Central Hosting. Case Study Central Hosting Case Study October, 2014 Central Hosting Case Study Background An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes

More information

The MBBS/BSc programme of study is an integrated programme extending over 6 years.

The MBBS/BSc programme of study is an integrated programme extending over 6 years. Regulations for the award of the Degrees of MBBS/BSc 1 General Information 1.1 The degrees of Bachelor of Medicine, Bachelor of Surgery and Bachelor of Science in Medical Sciences will be awarded to any

More information

Receive the July 2015 report of the Chief Clinical Officer

Receive the July 2015 report of the Chief Clinical Officer Governing Body Meeting Agenda Item: 8 Date: 7 July 2015 Author: Clinical Lead: CCG Director/Manager: Dr Mary Backhouse Chief Clinical Officer Chief Clinical Officer s Report to Governing Body Recommendations

More information

Agenda Item No: 6.1 Enclosure: 3 17 January 2012 Intended Outcome:

Agenda Item No: 6.1 Enclosure: 3 17 January 2012 Intended Outcome: TRUST BOARD Date of Meeting: Agenda Item No: 6.1 Enclosure: 3 17 January 2012 Intended Outcome: For noting For information For decision Title of Report: Progress Report for the Acquisition of North Cumbria

More information

EASTER ROSS ORTHOPAEDIC TRIAGE PILOT

EASTER ROSS ORTHOPAEDIC TRIAGE PILOT EASTER ROSS ORTHOPAEDIC TRIAGE PILOT SUE KING EXTENDED SCOPE PRACTITIONER PHYSIOTHERAPIST COUNTY COMMUNITY HOSPITAL INVERGORDON AUGUST 2009 INTRODUCTION A 12 month pilot project to test out a model of

More information

How To Manage A Hospital Emergency

How To Manage A Hospital Emergency ENHANCED SERVICE SPECIFICATION RISK PROFILING AND CARE MANAGEMENT SCHEME Introduction 1. This enhanced service has been designed by the NHS Commissioning Board (NHS CB) to reward GP practices 1 for the

More information

THE ROYAL WOLVERHAMPTON HOSPITALS NHS TRUST. Note The progress against the objectives within the Marketing Plan

THE ROYAL WOLVERHAMPTON HOSPITALS NHS TRUST. Note The progress against the objectives within the Marketing Plan THE ROYAL WOLVERHAMPTON HOSPITALS NHS TRUST REPORT TO: Board 7 July 009 AGENDA ITEM NO: 8a REPORT OF: SUBJECT: AUTHOR: Chief Operating Officer Marketing Plan RECOMMENDATION: The Board is asked to Note

More information

NORTHERN IRELAND WAITING TIME STATISTICS: INPATIENT WAITING TIMES QUARTER ENDING SEPTEMBER 2012

NORTHERN IRELAND WAITING TIME STATISTICS: INPATIENT WAITING TIMES QUARTER ENDING SEPTEMBER 2012 NORTHERN IRELAND WAITING TIME STATISTICS: INPATIENT WAITING TIMES QUARTER ENDING SEPTEMBER 2012 This publication presents information on waiting times for inpatient treatment in Northern Ireland at 30

More information

In Attendance: Mrs D Currie (Minutes) Mr K Walsh (representing Mr Throp) Mrs M Pointon, PPI Forum

In Attendance: Mrs D Currie (Minutes) Mr K Walsh (representing Mr Throp) Mrs M Pointon, PPI Forum Southport & Ormskirk Hospital NHS Trust Minutes of the Trust Board Meeting held on Wednesday 13 th September 2006 at 2.00pm In the Boardroom, Southport & Formby District General Hospital Present: Mr A

More information

A Health and Wellbeing Strategy for Bexley Listening to you, working for you

A Health and Wellbeing Strategy for Bexley Listening to you, working for you A Health and Wellbeing Strategy for Bexley Listening to you, working for you www.bexley.gov.uk Introduction FOREWORD Health and wellbeing is everybody s business, and our joint aim is to improve the health

More information

Modernising Scientific Careers. Scientist Training Programme (STP) Recruitment 2012. Frequently Asked Questions

Modernising Scientific Careers. Scientist Training Programme (STP) Recruitment 2012. Frequently Asked Questions Modernising Scientific Careers Scientist Training Programme (STP) Recruitment 2012 Frequently sked Questions 1 Contents General Questions Page 1 Which Universities will be offering the accredited Masters

More information

Delivering Local Health Care

Delivering Local Health Care Delivering Local Health Care Accelerating the pace of change Delivering Local Integrated Care Accelerating the Pace of Change WG 17711 Digital ISBN 978 1 0496 0 Crown copyright 2013 2 Contents Joint foreword

More information

REMOVING THE POLICY BARRIERS TO INTEGRATED CARE

REMOVING THE POLICY BARRIERS TO INTEGRATED CARE REMOVING THE POLICY BARRIERS TO INTEGRATED CARE THINKING THROUGH AN INTEGRATED CARE SYSTEM IN THE NHS: THE TRAFFORD EXPERIENCE Dr Martin Connor, Programme Director, Trafford ICO and Dr George Kissen, Medical

More information

We Believe the Possibilities. Delphic AP

We Believe the Possibilities. Delphic AP We Believe the Possibilities. Delphic AP Designer Software for your pathology workflow. Delphic AP Tracks the specimen process cycle Labels cassettes and slides Enables sophisticated report creation Send

More information

TRUST BOARD. Date of Meeting: 05/04/2011 Enclosure: 5

TRUST BOARD. Date of Meeting: 05/04/2011 Enclosure: 5 TRUST BOARD Date of Meeting: 05/04/2011 Enclosure: 5 Title of Report: Merger and Acquisition Update Agenda Item No: 7.1 Aims: This report informs and updates the Board on the development of the process

More information

IAAS Recommendation Report

IAAS Recommendation Report Standardisation Committee for Care Information (SCCI) 30 April 2014 Agenda Item:09 For: (insert action/decision/info) IAAS Recommendation Report ISB 1513 Maternity Services Data Set (Amd 45/2012) IAAS

More information

Whole Site Master Planning Excercise

Whole Site Master Planning Excercise Whole Site Master Planning Excercise 2008 2018 Consultant Briefing Paper Delivering the best in care www.uhb.nhs.uk/wholesitemasterplanning Queen Elizabeth Medical Centre Multistorey Car Park Birmingham

More information