Greenwich CCG Pandemic Flu Plan. Interim Governance Consultant. Greenwich Executive Group

Size: px
Start display at page:

Download "Greenwich CCG Pandemic Flu Plan. Interim Governance Consultant. Greenwich Executive Group"

Transcription

1 Greenwich CCG Pandemic Flu Plan Author(s) Interim Governance Consultant Version 1.0 Version Date September 2015 Approval Date September 2015 Review Date September 2016 Review Body Greenwich Executive Group Policy Reference Number 015 Equality and diversity are at the heart of the NHS strategy. Throughout the production of this document, due regard has been given to eliminate discrimination, harassment and victimisation, to advance equality of opportunity, and to foster good relations between people who share a relevant protected characteristic (as cited in under the Equality Act 2010) and those who do not share it. This document therefore abides by the Equality and Diversity Act 2010.

2 Version Control Version Author Date Reason for review 0.1 Interim Governance Consultant 1.0 Interim Governance Consultant 1.1 Interim Governance Consultant September 2015 September 2015 September 2015 New Plan. Statutory EPRR Requirement Approved Policy Updated with comments from NHS England Staff or Groups Consulted This is optional. Name Kerry Cleaver Ian Cheshire Lynette Russell David Wernick Jacqueline Lo Samantha Bennett Sarah Bryan Langley Gifford Alison Edgington Judy Durrant Gemma Battrum Carol Berry Job Title Communications and Engagement Manager Greenwich CCG Emergency Planning & Resilience Officer (RBG) Head of EPRR (RBG) EPRR Engagement Officer (NHS England) EPRR Officer (Oxleas NHS Foundation Trust) PHE Consultant (RBG) Surge and Resilience Manager (SEL) Associate Director of Integrated Commissioning Resilience Planning Greenwich CCG Interim Designated Nurse for Children and Adults Care Home Support Team Compliance Manager Greenwich CCG Pandemic Flu Plan Page 2 of 26

3 Contents Page 1. Contents 2. Summary Introduction Aims and Objectives Planning assumptions At Risk groups Associated Documents Declaration of Pandemic Influenza- DATER DATER Phases (UK Strategy) Triggers for DATER Phases CCG Roles and Responsibilities Before a pandemic During a pandemic After a pandemic Business Continuity NHS England Fig 1: London Pandemic Response Structure National Pandemic Flu Service Communications Table 2: Key agency messages Reporting Recovery Training and Exercises Review Sources of Evidence Appendix 1: Pandemic Flu Notification/ Alerting Process Appendix 2: Pandemic Flu Communications checklist Appendix 3: Pandemic Flu Group (PFG) Meeting Agenda Appendix 4: Pandemic Flu Lead Action Card Appendix 5: Communications Action Card Appendix 6: Directorate Leads Action Cards Appendix 7: Finance Officer Action Card Appendix 8: Loggist Action Card Appendix 10 - Equality & Equity Impact Assessment & EDS2 Checklist Greenwich CCG Pandemic Flu Plan Page 3 of 26

4 2. Summary As Category 2 responders under the CCA (2004) and in line with arrangements for other major incidents and emergencies, Clinical Commissioning Groups (CCGs) have a role in supporting NHS England and providers of NHS funded care in planning for and responding to an influenza pandemic. The threat and potential impact of a pandemic influenza is such that it remains the top risk of the UK Cabinet Office National Risk Register of civil emergencies and continues to direct significant amount of emergency preparedness activity on a global basis. Lessons identified during the response to the 2009/10 pandemic caused by the A (H1N1) pdm09 virus and subsequent 2010/11 winter seasonal influenza outbreaks have informed ongoing preparedness activity. 3. Introduction Pandemic influenza emerges as a result of a new flu virus which is markedly different from recently circulating strains. Few - if any - people will have any immunity to this new virus thus allowing it to spread easily and to cause more serious illness. With unpredictable frequency, novel influenza viruses emerge or re-emerge to cause an influenza pandemic. When this happens, it is likely that global spread will ensue rapidly, affecting large numbers of the population because there will be little or no immunity to this strain. Preparing successfully and responding effectively to a pandemic requires collaborative working between the NHS and other partner agencies. 4. Aims and Objectives The overall aims and objectives of this plan are: To outline Greenwich CCG s roles and responsibilities during pandemic influenza outbreak To assist Greenwich CCG in minimising the potential health impacts caused by a future influenza pandemic on society and economy by: a) Supporting the continuity of essential services b) Supporting the continuation of everyday activities as far as is practicable c) Promoting a return to normality and the restoration of disrupted services at the earliest opportunity Instil and maintain trust and confidence by ensuring that other health partners, the public and the media are engaged and well informed in advance of and throughout the pandemic period and that health and other professionals receive information and guidance in a timely way so that they can respond to the public appropriately 5. Planning assumptions Due to the uncertainty about the scale, severity and pattern of development of any future flu pandemic, the following 3 key principles underpin Greenwich CCG s plan Precautionary: This plan takes into account that a new virus may carry the risk of being severe in nature. This plan therefore takes into account that the pandemic will have potential to cause severe symptoms in individuals and widespread disruption to the society Greenwich CCG Pandemic Flu Plan Page 4 of 26

5 Proportionality: Greenwich CCG Plan will be applicable for both high impact pandemics and milder scenarios with the ability to adapt as new evidence emerges Flexibility: This plan will take into account local patterns of spread of infection and be flexible and agile as required/ dictated by the pandemic 5.1 At Risk groups The following groups have been identified as at increased risk of developing complications during a pandemic Older people over 65 years old Pregnant women Children under the age of 5 People who have relevant pre-existing medical conditions, e.g. neurological condition such as multiple sclerosis or cerebral palsy People with underlying chronic medical conditions especially renal and respiratory problems 6. Associated Documents Greenwich CCG Business Continuity Policy and Plan Greenwich CCG EPRR Policy SE London Director s on call handbook SE London Daily Surge process Royal Borough Greenwich (RBG) Pandemic Flu Plan 7. Declaration of Pandemic Influenza- DATER Although the World Health Organization (WHO) is responsible for identifying and declaring influenza pandemics, the UK was well into the first wave of infection when WHO declared a pandemic in The use of WHO phases to trigger different stages of the local response were considered confusing and inflexible and it was decided to develop a more flexible approach, not driven by the WHO phases and determined nationally was needed for the UK. The UK approach uses a series of phases: detection, assessment, treatment, escalation and recovery (DATER). It also incorporates indicators for moving from one phase to another. The rationale for this is described in detail in the UK Influenza Pandemic Preparedness Strategy The phases are not numbered as they are not linear, may not follow in strict order, and it is possible to move back and forth or jump phases. There will also be variation in the status of different parts of the country reflecting local attack rates, circumstances and resources. Greenwich CCG Pandemic Flu Plan Page 5 of 26

6 7.1 DATER Phases (UK Strategy) Detection The focus at this stage will be: intelligence gathering from countries already affected enhanced surveillance within the UK Led by the development of diagnostics specific to the new virus PHE information, specific advice, and communications to the public and professional the indicator for moving to the next stage would be the identification of the novel influenza virus in patients in the UK Assessment The focus at this stage will be: The collection and analysis of detailed clinical and epidemiological information on early cases on which to base early estimates of impact and severity in the UK (First Few Hundred (FF100) Led by PHE reducing the risk of transmission and infection with the virus within the local community by: actively finding case advising community voluntary self-isolation of cases and suspected cases advising on the treatment of cases/suspected cases and use of antiviral prophylaxis for close/vulnerable contacts, based on a risk assessment of the possible impact of the disease Treatment The focus at this stage will be: Advising on the treatment of individual cases and population treatment, if necessary, Led by NHS England Escalation Led by NHS England Recovery Led by Local Authority. Membership from other agencies using the National Pandemic Flu Service (NPFS) to consider enhancing public health measures to disrupt local transmission of the virus as appropriate, such as localised school closures based on public health risk assessment Depending upon the development of the pandemic, to prepare for targeted vaccinations with NHS as the vaccine becomes available (NB the vaccine will not be available for 5-6 months after the decision to order vaccine is given). Arrangements will be activated to ensure that necessary detailed surveillance activity continues in relation to samples of community cases, hospitalised cases and deaths. When demands for services start to exceed the available capacity, additional measures will need to be taken. This decision may be made at a regional or local level as not all parts of the UK will be affected at the same time or to the same degree of intensity The focus at this stage will be: The escalation of surge management arrangements in health and other sectors Prioritisation and triage of service delivery Resiliency measures This phase would not necessarily be activated in a mild to moderate pandemic such as that experienced in The normalisation of services, perhaps to a new definition of what constitutes normal service restoration of business as usual services, including an element of catching-up with activity that may have been scaled-down as part of the pandemic response eg reschedule routine operations post-incident review of response, and sharing information on what went well, what could be improved, and lessons learnt taking steps to address staff exhaustion planning and preparation for resurgence of influenza, including activities carried out in the detection phase Greenwich CCG Pandemic Flu Plan Page 6 of 26

7 7.2 Triggers for DATER Phases Phase General Nature and Scale of Illness Potential impact to healthcare Delivery Detection Reports of sporadic influenza cases in the local community. And/or None business as usual Limited influenza local outbreaks in schools, care homes, prisons etc. Assessment As above As above Treatment Low impact event Similar numbers to moderate or severe seasonal influenza outbreaks. AND In the vast majority of cases mild to moderate clinical features Notable increase in pressures on services associated with respiratory illness with maximum effort. No significant deferral of usual activities Escalation (often happens simultaneously with Treatment Phase) Moderate Impact event Higher number of cases than large seasonal epidemic Young healthy people and those in atrisk groups severely affected AND/OR More severe illness High Impact Event Widespread disease in the UK Most age groups affected Severe debilitating illness with or without severe or frequent complications Health services no longer able to continuity all activity Local and regional decisions to cease some health care activity (Trust Essential/Non Essential Services List) Community Health staff fully stretched trying to support essential care within the community Consequential pressure on secondary care Recovery Once the number of cases of influenza infections have been confirmed as reducing on a weekly basis, it will be important to manage the reimplementation of services based on the availability of staff and resources and the impact the pandemic has had on the local population who may access these services. Recovery measures, including the provision of psychological counselling for both staff and the public may also be required. Potential backlog of routine services e.g. visits Greenwich CCG Pandemic Flu Plan Page 7 of 26

8 8. CCG Roles and Responsibilities As Category 2 responders (as defined by the CCA (2004)), the roles and responsibilities of CCGs are to support the NHS and other Category 1 responders in preparing for and responding to pandemic influenza. The CCG Accountable Emergency Officer (AEO) is responsible for ensuring that the organisation is properly prepared and resourced for dealing with a major incident or civil contingency event (Emergency Officers for Emergency Preparedness, Resilience and Response (EPRR) 2012). The following actions / activities will be undertaken by Greenwich CCG in response to Pandemic Flu. 8.1 Before a pandemic Greenwich CCG will: Identify a Pandemic Influenza Executive Lead (likely to be the AEO) to lead internal organisational pandemic planning activities in light of national and international developments, advice and guidance Undertake internal business continuity planning in the context of pandemic influenza Communicate plans with employees, contractors, and affiliated organisations Participate in relevant planning groups to discuss, plan, exercise and share best practice Ensure early engagement of communications professionals to devise, deliver and maintain internal, external and stakeholder/ cross-partnership communications before, during and after a pandemic Work with commissioned service providers, in planning for surge in relation to elective work and the possible financial implications if there is on-going disruption to normal service levels over the period of a pandemic and its recovery phase Participate in appropriate assurance processes regarding their arrangements and be assured that their commissioned services have adequate provisions in place for managing a pandemic Work with NHS England who will commission community pharmacies as antiviral collection points. 8.2 During a pandemic Greenwich CCG will be notified as detailed in Appendix 1 and complete the following actions: Support the national pandemic response arrangements as laid out in Department of Health and NHS England guidance issued prior to or during a pandemic occurring In line with other guidance, ensure 24/7 on-call arrangements remain robust and maintained, particularly with respect to surge and responding to major incidents. This will be done in line with the SEL Director on Call arrangements Lead the management of pressure surge arrangements with their commissioned services as a result of increased activity as part of the overall response Greenwich CCG Pandemic Flu Plan Page 8 of 26

9 Closely monitor the on-going ability of commissioned services to assess and accept referrals. Information on levels of infection, staffing status and other emerging issues will be regularly reviewed Support NHS England in the local coordination of the response, e.g. through tried and tested surge capacity arrangements, appropriate mutual aid of staff and facilities, and provision of support to the management of clinical queries As necessary share communications with locally commissioned healthcare providers through established routes Participate in the multi-agency response as appropriate and agreed with NHS England to ensure a comprehensive local response Maintain close liaison with local NHS England colleagues, particularly when considering changes to delivery levels of NHS commissioned services Enact business continuity arrangements as appropriate to the developing situation to ensure critical activities can be maintained Maintain local data collection processes to support the overall response to the pandemic, including completion and submission of relevant situation reports and participation in coordination teleconferences Throughout the pandemic, undertake and contribute to appropriate, timely and proportionate debriefs to ensure best practice is adopted through the response In particular, Greenwich CCG Medicines Management Team will: Provide telephone advice and answer any technical questions that GPs and pharmacies may have Cascade prescribing guidance to GPs within the Borough as per national guidance Cascade prescribing guidance for antivirals to pharmacies as per national guidance Maintain a stock pile of antivirals. The CCG will liaise with selected pharmacies in the locality to store these and will directly receive the anti-virals from NHS England on behalf of the CCG Deliver with partners, training to GPs, nursing homes and pharmacies on how to control the spread of pandemic flu 8.3 After a pandemic Greenwich CCG will: Contribute to local, regional and national health post-pandemic debriefs and consider the implementation of recommendations from any subsequent reports Acknowledge staff contributions Assess the impact of the pandemic on the provision of commissioned services and ensure that the ongoing service level is sufficient to meet the demands of the system Ensure the recovery of services to business-as-usual as soon as appropriate Review response update plans, contracts and other arrangements to reflect lessons identified, particularly where these have been commissioned locally Greenwich CCG Pandemic Flu Plan Page 9 of 26

10 Collect financial and contractual impact information from commissioned providers 9. Business Continuity Business Continuity Management is a holistic process that identifies potential threats to an organisation and the impacts to the business operations that those threats, if realized, may cause. Greenwich CCG must be able to continue its critical services as identified through the Business Impact Analysis. The level of staff absenteeism will depend significantly on the nature of the pandemic virus when it emerges and Greenwich CCG is prepared to this end for such an eventuality. When normal service is compromised at 30 %, the CCG will invoke its Business Continuity plan whilst implementing its contingency plans across all directorates. This may be invoked if the main supporting directorates such as Transformation and Service Delivery and Medicines Management are affected by staff absenteeism. 10. NHS England NHS England is responsible for leading the mobilisation of the NHS in the event of an emergency or incident and for ensuring it has the capability for NHS command, control, communication and coordination and leadership of all providers of NHS funded care. The Health and Social Care Act (2012) created a new set of responsibilities for the delivery of public health services. The department of Health is the lead government department for the pandemic preparedness and response. All other health partners will be directly or indirectly involved in the preparing and play an active role in informing and supporting contingency planning in their areas of responsibility. During a pandemic, it is likely that the Cabinet Office Briefing Room (COBR) will activate a Scientific Advisory Group of Emergencies (SAGE) to coordinate strategic scientific and technical advice to support UK cross government decision making. NHS England will monitor, manage and support the health community during a pandemic. Where possible and appropriate, existing arrangements and procedures will be used, underpinned by major incident coordination processes. NHS England London will establish a dedicated Pandemic Influenza Incident Response Team (PI-IRT) that will operate out of a dedicated Pandemic Influenza Incident Coordination Centre. In line with the national strategy, these will be flexed to meet demands, and some may not be relevant to all DATER (Detection; Assessment; Treatment; Escalation and Recovery) stages. These include (but not limited to): Overseeing and coordinating the response of the NHS England in London appropriate to the current and predicted impact Ensuring that the NHS and partners are kept appraised of the evolving situation Overseeing the most effective deployment of available resources through adapting the response according to capacity Ensuring that NHS England London Directorates and Teams enact their business continuity plans and mobilise resources appropriately as necessary Greenwich CCG Pandemic Flu Plan Page 10 of 26

11 Ensuring prompt and timely establishment of a Pandemic Influenza Recovery Working Group (PI- RWG) to run in parallel with the response Setting strategy for the PI-RWG Providing progress updates and assurance regarding the NHS response in London to the NHS England London Delivery Group Liaising with NHS England National, to support the local response, securing mutual aid if required Acting as a central point of contact for stakeholders and partners (e.g. London NHS provider and CCGs, NHS England National, the Department of Health, Public Health England (PHE), and wider multi-agency partnership through the London Resilience Team (LRT) Ensuring appropriate escalation and two way communication of relevant issues and decisions Overseeing the delivery of pandemic-specific aspects of the response; this includes, but is not limited to, antiviral distribution, pandemic specific vaccination campaign and Personal Protective Equipment (PPE) distribution Managing the NHS response to pandemic related surge; ensuring the commissioning of additional NHS capacity where required (e.g. intensive care capacity (through Clinical Commissioning Groups (CCGs) and extra corporeal membrane oxygenation (ECMO) capacity (through NHS England Specialised Commissioning) Overseeing the management of London-wide critical care resources and surge capacity demands through appropriate discussion, escalation and resource allocation With communication colleagues, coordinating London-wide NHS messages to ensure consistent, clear and timely dissemination of information and guidance to the NHS, partners, the public and media Collating information for submission to NHS England (National) and other bodies as appropriate related to pressures and capacity within the NHS in London Greenwich CCG Pandemic Flu Plan Page 11 of 26

12 Fig 1: London Pandemic Response Structure COBR Accountability/ coordination &reporting Specialist advice/ information exchnage/ liasion Wider impact reporting Department of Health DCLG Resilience & Emergencies Division (RED) Other Govt Departments Public Health England (National) NHS England National Strategic Coordination Group London Local Authority Gold (LLAG) (Multi-Agency LFB, LAS, MPS, ColP, BTP, NHS, PHE and sectors) Public Health England (London ) NHS England (London) London Local Authority Control Centre (LLACC) London Borough Emergency Control Centre x33 (BECC) All BRF based organisations coordinated information sharing for local situational awareness. Formal reporting conducted intra-agency to the SCG Clinical Commissioning Groups, London Ambulance Service, NHS Provider Organisations 11. National Pandemic Flu Service The Pandemic Flu service will be commissioned by NHS England. The purpose of the National Pandemic Flu Service (NPFS) is to enable antivirals to be distributed in a controlled and consistent manner to symptomatic individuals during an influenza pandemic. Anti-virals will come from national stock piles and distributed directly to antiviral collection points. NPFS would only be used at a time when the pressures in primary care have reached the point that a supplementary service is required for the assessment of symptomatic individuals and where appropriate, the authorisation and issuing of antivirals. There will be close monitoring of the number of consultations with GPs during a pandemic to inform this. The key aims of the service are to: Provide antiviral treatment promptly to those who need it Reduce the demands on front-line health services by providing a separate route to access and collect antivirals The NPFS involves an on line and telephony self-assessment service where individuals are not assessed by a clinician but follow a process of answering questions which determine whether the person who is ill is eligible for an antiviral or not. Greenwich CCG Pandemic Flu Plan Page 12 of 26

13 As part of the NPFS, antiviral collection points are required locally when the NPFS is operating so that friends or relatives (flu friends) can collect the antivirals on behalf of the person with flu, enabling them to stay at home and mitigate the risk of spreading infection. It takes at least three weeks for the necessary arrangements to be made for the NPFS to be able to operate. This includes the time required for the systems to be mobilised and for call centre staff to be identified and trained to deal with calls. Therefore, the NPFS would not be operating in the initial stages of the pandemic, but this is in line with the plan that it should only be considered as pressures increase. 12. Communications A robust communication strategy is an important part of a response to a pandemic. As a result, information relating to pandemic flu will be coordinated centrally by NHS England for consistency. The CCG will communicate with its commissioned providers, partners, stakeholders and the public during a pandemic and build on existing mechanisms and good practice (see appendix 2 for communications checklist). The CCG will maintain robust communication lines with the Local Authority as they deliver social services to the Greenwich population. The RBG Pandemic Flu plan details how they will support the wider population during Pandemic Flu and management of excess deaths. The CCG recognises that an effective 2 way communications strategy that positively engages the key groups, before and during a pandemic is essential. Nationally, this is outlined in the UK Pandemic Influenza Communications Strategy This communications strategy considers health-related communication in the UK in the stages leading up to a pandemic, during a pandemic, and during the recovery phase. The CCG has suitably qualified communications staff who will be responsible for cascading information out via the intranet/ internet between the hours of 9am to 5pm, in a timely manner. Other media channels such as social media including twitter will be utilised to reach out to the public. South East Commissioning Support Unit (SECSU) provides out of hours communication on behalf of the CCG from 5pm to 9am Monday to Friday and all weekend. Additionally, communications cascades will be used to ensure information reaches target audiences. Where appropriate, messages will be developed and delivered in partnership with other organisations, including PHE and the LHRP and LRF partners. Greenwich CCG Communications team will ensure that information will aim to: Explain the outbreak Establish confidence by reassuring the public Minimise the risk of infection by advising people how to protect themselves Advise the public on how to prepare in advance During a pandemic, each organisation will be required to supply situation reports to their host Government Department which will be fed to COBR. Additionally, each organisation will provide reports to LRT, as secretariat to the London Partnership Meeting, to produce an overall London picture. The London Common Recognised Information Picture (CRIP) will provide key information and data on the present situation in London. Greenwich CCG Pandemic Flu Plan Page 13 of 26

14 The Pandemic Flu Framework sets out examples of reportable intelligence as detailed below: Table 1: Key agency messages Agency Examples of possible reporting lines PHE Enhanced surveillance and epidemiology Transmission and spread, e.g. circulating strain and severity NHS surge, including primary care impacts on elective work critical care capacity mortality and morbidity data Local Authorities impacts on local critical services social care provision; impacts on cremation and burial services; community concerns; business issues; local support to the health service/voluntary and community inputs and mutual aid issues and solutions; public communication activity and media coverage; and requests for assistance. Other Agencies impacts on service delivery staff absenteeism public communication and media coverage requests for assistance 13. Reporting Incident reporting is fundamental to the identification of risk and response management and all staff are encouraged to use the CCG s existing incident reporting mechanisms. As the pandemic reaches the UK and number of cases increases, there will be a requirement for regular situation reports (SitReps) from all organisations including CCGs. The frequency of the Situation reports will be defined by the severity of the pandemic. Greenwich CCG will maintain the usual incident reporting mechanisms for non-flu related incidents to ensure these continue to be managed during a pandemic. Flu related incidents will report into the CCG Pandemic Response Team consisting of Senior Management Team, led by the CCG Pandemic Flu Lead. The CCG Pandemic Response Team will ensure that there are robust processes in place to document and record decisions and actions made during the pandemic. A decision log will be used to record all communications and activities, including time the decision was made, who made it and the rationale behind the action or decision. Greenwich CCG Pandemic Flu Plan Page 14 of 26

15 14. Recovery The Recovery phase in the Department of Health (DH) Strategy encompasses normalisation of services; restoration of business as usual services, evaluation of the pandemic, planning and preparation for a resurge in activity, and targeted vaccination, when available. The Department of Health will issue information to inform plans following a review of the first wave and the availability of countermeasures. Health and social care services may experience persistent secondary effects for some time, with increased demand for continuing care from: Patients whose existing illnesses have been exacerbated by influenza. Those who may continue to suffer potential medium or long term health complications. A backlog of work resulting from the postponement of treatment for less urgent conditions. The pace of recovery will depend on the residual impact of the pandemic, on-going demands, backlogs, staff and organisational fatigue and continuing supply difficulties in most organisations. The CCG will continue to support its commissioned providers during the recovery stage to restore services and to phase the return to new-normal in a managed and sustained way. 15. Training and Exercises This plan will be available on the CCG intranet for all staff to access. All directors receive training through the Director on call training and relevant training identified by NHS England. Greenwich CCG will work closely with the Borough Resilience Forum and participate in multiagency Pandemic Flu exercises. A Pandemic flu exercise or test informed by this plan will be conducted within the next 6 months (by end of March 2016) as required by NHS England EPRR Assurance Framework. 16. Review This plan will be reviewed annually as a statutory requirement or earlier should new information/ regulation come to light or as indicated by an incident. Greenwich CCG Pandemic Flu Plan Page 15 of 26

16 17. Sources of Evidence Civil Contingencies Act (2004) 9/dh_ pdf 8/dh_ pdf 9/Pandemic_Influenza_LRF_Guidance.pdf anagementinterimguidance_jun2013.pdf 8/UK-Pandemic-Influenza-Communications-Strategy-2012.pdf Greenwich CCG Pandemic Flu Plan Page 16 of 26

17 Appendix 1: Pandemic Flu Notification/ Alerting Process WHO declares Pandemic Department of Health Cabinet Office Public Health England & NHS England NHS Trusts and CCGs Greenwich CCG Pandemic Flu Plan Page 17 of 26

18 Appendix 2: Pandemic Flu Communications checklist The following will be considered by Greenwich CCG during a pandemic to ensure that information cascaded from NHS England is shared in a timely and consistent manner to partners and members of the public. 1 Methods of communicating with the public have been identified and are appropriate for individuals with hearing, visual and other disabilities or limited English speaking. 2 The message has been tailored for different audiences (internal or external audiences, stakeholders, public, the media, business, and the vulnerable). 3 Local media have been engaged, and the channels of communication have been considered (web, social media, in-house productions, local newsletters). 4 A list has been created of health care entities, including points of contact, within the LRF locality (e.g. hospitals, long-term care and residential facilities, clinics, GPs) with which it could be necessary to maintain communication and be able to report information in a timely and accurate manner during a pandemic. (The Medicines Management Team have the list of all GPs and Clinics and the Care Home Support Team have a list of the long term care and residential facilities) 5 Local arrangements to support central and devolved Government in communicating advice to the local population and public messages have been established. 6 Individuals have been identified within organisations with responsibility for coordinating the information. Greenwich CCG Pandemic Flu Plan Page 18 of 26

19 Appendix 3: Pandemic Flu Group (PFG) Meeting Agenda The following draft agenda topics have been outlined as a guide for potential PFG meetings during a pandemic. A series of action cards have also been produced to guide the PFG through various alert levels. This meeting will be chaired by the AEO or designated deputy. Meeting agenda for PFG in response to a Pandemic or Outbreak Item Number Topic 1 Introduction 2 Matters arising 3 Reports from borough level or information received from NHS England or PHE 4 Issues from providers eg surge 5 Staff welfare 6 CCG Situation Report (SitRep) 7 Financial arrangements 8 Issues that require escalating to other stakeholders e.g. NHS England /PHE 9 Communications 10 Any Other Business (AOB) 11 Date / Time/ Venue of next meeting Greenwich CCG Pandemic Flu Plan Page 19 of 26

20 Appendix 4: Pandemic Flu Lead Action Card CCG Pandemic Flu Lead (AEO or delegated officer) Role: Cascade information from NHS England Coordinate planning efforts across the CCG Represent the CCG in multi-agency pandemic flu meetings across boroughs Detection and Assessment Phase Cascade all information about Pandemic Flu to other Directorate Leads Ensure Greenwich CCG is represented at local Borough Pandemic Flu Response meetings. Treatment phase Continued monitoring of the pandemic and brief senior staff with most up to date information Ensure Greenwich CCG is represented at local Borough Pandemic Flu Response Groups Liaise with the Medicines Management Team to ensure that there are adequate stock piles for local supplies Escalation phase Provide NHS England with regular updates Ensure Greenwich CCG is represented at local Borough Pandemic Flu Response Groups Recovery Phase Attend debrief when requested Post pandemic actions Review CCG Pandemic Flu Plan post pandemic Review Business Continuity plans with services following the pandemic to ensure lessons learnt are incorporated into future plans Greenwich CCG Pandemic Flu Plan Page 20 of 26

21 Appendix 5: Communications Action Card CCG Associate Director of Communications Role: Coordinate internal and external communication activity Put in place communication arrangements to make information available to the public about civil protection matters and maintain arrangements to warn, inform, advise the public throughout the course of the pandemic Liaise with other partners and link in with LON01 to ensure there is a controlled and consistent message for staff, members of the public visitors within the CCG and any communications are made in a timely manner Engage with local media where necessary Detection and Assessment Phase Link in with LON01 if necessary Liaise with the CCG Pandemic Flu Lead at the early stages of a pandemic to ensure consistent messages are delivered to staff and the public Warn and inform the public of the potential of a pandemic Treatment phase Handle any media enquiries Maintain updates on the pandemic on Greenwich CCG website for staff and the public Escalation phase Engage with the media as appropriate Recovery Phase Attend debrief when requested Post pandemic actions Review communication strategy to ensure lessons learnt are incorporated Greenwich CCG Pandemic Flu Plan Page 21 of 26

22 Appendix 6: Directorate Leads Action Cards Directorate Leads Role: Lead any response to pandemic as directed by Senior Management Ensure Directorate Business Continuity arrangements are implemented Ensure adequate staffing resources Ensure relevant information is cascaded to staff Ensure continuation of all essential services as dictated in Business Continuity Plans Detection and Assessment Phase Ensure all staff are aware of any new guidance as required Treatment phase Keep staff updated with new information Monitor staff absence/ sickness and report for PFG SitRep Escalation phase Maintain communications with staff Monitor and report issues in staff sickness and absence (capacity) Recovery Phase Attend debrief when requested Acknowledge staff efforts Post pandemic actions Review Business Continuity plans with services following the pandemic to ensure lessons learnt are incorporated into future plans Acknowledge staff efforts during the Pandemic Greenwich CCG Pandemic Flu Plan Page 22 of 26

23 Appendix 7: Finance Officer Action Card Finance Officer Role: Ensure funding is available to cover additional costs incurred during a pandemic Ensure arrangements are in place to minimise problems to the supply chain during the pandemic Detection and Assessment Phase Ensure sufficient funding is available to cover any additional costs incurred during a pandemic Ensure there is a clear audit trail of all costs associated with the pandemic for record following pandemic, should the DoH request for information Ensure the continued provision of key services such as Payroll throughout pandemic Treatment phase Ensure the continued provision of key services such as Payroll throughout pandemic Escalation phase Ensure funding is available to cover additional costs as required Recovery Phase Attend debrief when requested Post pandemic actions Review Business Continuity Plan following pandemic to ensure lessons learnt are incorporated Greenwich CCG Pandemic Flu Plan Page 23 of 26

24 Appendix 8: Loggist Action Card Your role Loggist Your Base Your responsibility Your immediate actions On-going management Stand down Greenwich Park Street, SE10 9LR You support the Incident Control Team (Pandemic Flu) and ensure a record or log of the incident is maintained 1. Proceed to the Incident Control Room as directed 2. Report to the Incident Manager - Pandemic Flu Lead for briefing 3. Maintain a log of decisions taken, communications and actions taken by the Incident Control Team NB: The record must be in permanent black ink, clearly written, dated and initialled by the loggist at the start of the shift. All persons in attendance to be recorded in the log. The log must be a complete and continuous (chronological record of all issues/ options considered/ decisions along with the reasoning behind those decisions/ actions. Timings have to be accurate and recorded each time information is received or transmitted. If individuals are tasked with a function or role, this must be documented and when the task is completed this must also be documented. All documentation is to be kept safe and retained for evidence for any future proceedings. Participate in a hot debrief immediately after the incident and any subsequent structured debrief. Following stand down evaluate admin effectiveness and any lessons learned and report these to the Incident Manager for inclusion in the report to the Chief Officer. Greenwich CCG Pandemic Flu Plan Page 24 of 26

25 Appendix 10 - Equality & Equity Impact Assessment & EDS2 Checklist This is a checklist to ensure relevant equality and equity aspects of proposals have been addressed either in the main body of the document or in a separate equality & equity impact assessment (EEIA)/ equality analysis. It is not a substitute for an EEIA which is required unless it can be shown that a proposal has no capacity to influence equality. The checklist is to enable the policy lead and the relevant committee to see whether an EEIA is required and to give assurance that the proposals will be legal, fair and equitable. The word proposal is a generic term for any policy, procedure or strategy that requires assessment. Challenge questions Yes/No What positive or negative impact do you assess there may be? 1. Does the proposal affect one group more or less favorably than another on the basis of: Race No Pregnancy and Maternity Yes Identified as vulnerable group Sex No Gender and Gender Re-Assignment No Marriage or Civil Partnership No Religion or belief No Sexual orientation (including lesbian, gay bisexual and transgender people) No Age Yes Identified as vulnerable group Disability (including learning disabilities, physical disability, sensory impairment and mental health problems) Yes 2. Will the proposal have an impact on lifestyle? (e.g. diet and nutrition, exercise, physical activity, substance use, risk taking behaviour, education and learning) 3. Will the proposal have an impact on social environment? (e.g. social status, employment (whether paid or not), social/family support, stress, income) 4. Will the proposal have an impact on physical environment? (e.g. living conditions, working conditions, pollution or climate change, accidental injury, public safety, transmission of infectious disease) 5. Will the proposal affect access to or experience of services? (e.g. Health Care, Transport, Social Services, Housing Services, Education) No No Yes Yes Limitation of pandemic influenza spread in work and public areas Identified vulnerable population during access to health. Possible disruption to education centres during influenza pandemic Greenwich CCG Pandemic Flu Plan Page 25 of 26

26 By using evidence and insight to assess and grade our equality performance, NHS Greenwich can generate much of the information we will require to demonstrate compliance with the PSED. The checklist is to enable the policy lead and the relevant committee to see if a particular policy or project will provide the relevant evidence to assist NHS Greenwich CCG meet the set out EDS goals to achieve better outcomes for patients and staff. Please assess your policy, project or service against the following: The goals and outcomes of EDS2 Description of outcome Yes/ No Better health outcomes 1.1 Services are commissioned, procured, designed and delivered to meet the health YES needs of local communities 1.2 Individual people s health needs are assessed and met in appropriate and YES effective ways 1.3 Transitions from one service to another, for people on care pathways, are made YES smoothly with everyone well-informed 1.4 When people use NHS services their safety is prioritised and they are free from YES mistakes, mistreatment and abuse 1.5 Screening, vaccination and other health promotion services reach and benefit all YES local communities Improved patient 2.1 People, carers and communities can readily access hospital, community health or No access and experience primary care services and should not be denied access on unreasonable grounds 2.2 People are informed and supported to be as involved as they wish to be in No decisions about their care 2.3 People report positive experiences of the NHS No 2.4 People s complaints about services are handled respectfully and efficiently No A representative and 3.1 Fair NHS recruitment and selection processes lead to a more representative No supported workforce workforce at all levels 3.2 The NHS is committed to equal pay for work of equal value and expects No employers to use equal pay audits to help fulfil their legal obligations 3.3 Training and development opportunities are taken up and positively evaluated by No all staff 3.4 When at work, staff are free from abuse, harassment, bullying and violence from No any source 3.5 Flexible working options are available to all staff consistent with the needs of the No service and the way people lead their lives 3.6 Staff report positive experiences of their membership of the workforce No Inclusive leadership 4.1 Boards and senior leaders routinely demonstrate their commitment to promoting No equality within and beyond their organisations 4.2 Papers that come before the Board and other major Committees identify equalityrelated No impacts including risks, and say how these risks are to be managed 4.3 Middle managers and other line managers support their staff to work in culturally No competent ways within a work environment free from discrimination Policy Author Signature: H MAKAMURE Date: 25/08/2015 Equalities Lead Signature: Date: Greenwich CCG Pandemic Flu Plan Page 26 of 26

Pandemic Influenza Plan 2015/2016

Pandemic Influenza Plan 2015/2016 NOT PROTECTIVELY MARKED Pandemic Influenza Plan 2015/2016 Policy number: N/A Version 1.5 Approved by Name of author/originator Owner (director) Executive Management Team Mark Twomey, Deputy Director of

More information

REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY

REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 28 May 2015 Agenda No: 6.5 Attachment: 10 Title of Document: Merton CCG Pandemic Flu Plan v2 March 2015 Report Author: Josh

More information

Information Communication and Technology Management. Framework

Information Communication and Technology Management. Framework Information Communication and Technology Management Framework Author(s) Andrew Thomas Version 1.0 Version Date 24 September 2013 Implementation/approval Date 25 September 2013 Review Date September 2014

More information

London Resilience Partnership. Pandemic Influenza Framework

London Resilience Partnership. Pandemic Influenza Framework London Resilience Partnership Pandemic Influenza Framework Version 6.0 NOT PROTECTIVELY MARKED February 2014 London Resilience Partnership Pandemic Influenza Framework Version 6.0 (February 2014) Lead

More information

39 GB Guidance for the Development of Business Continuity Plans

39 GB Guidance for the Development of Business Continuity Plans 39 GB Guidance for the Development of Business Continuity Plans Policy number: Version 2.2 Approved by Name of author/originator Owner (director) 39 GB Executive Committee Date of approval August 2014

More information

Pandemic Influenza. NHS guidance on the current and future preparedness in support of an outbreak. October 2013 Gateway reference 00560

Pandemic Influenza. NHS guidance on the current and future preparedness in support of an outbreak. October 2013 Gateway reference 00560 Pandemic Influenza NHS guidance on the current and future preparedness in support of an outbreak October 2013 Gateway reference 00560 Purpose of Guidance To provide an update to EPRR Accountable Emergency

More information

BUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF

BUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF BUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF 4 COMMITTEE & DATE APPROVED: GOVERNING BODY, 5 MARCH

More information

FIFE COUNCIL EMERGENCY PLANNING AND BUSINESS CONTINUITY PANDEMIC INFLUENZA PLAN

FIFE COUNCIL EMERGENCY PLANNING AND BUSINESS CONTINUITY PANDEMIC INFLUENZA PLAN FIFE COUNCIL EMERGENCY PLANNING AND BUSINESS CONTINUITY PANDEMIC INFLUENZA PLAN Issued by: Emergency Planning and Business Continuity Team, CONTENTS Page No. Foreword 4 Distribution 5 Review Dates/Record

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version BUSINESS CONTINUITY MANAGEMENT POLICY DOCUMENT CONTROL Type of Document Document Title

More information

Incident Management Plan

Incident Management Plan Incident Management Plan Document Control Version 1 Name of Document NHS Guildford and Waverley CCG Incident Management Plan Version Date 1st December 2015 Owner Director of Governance and Compliance [Accountable

More information

Type of change. V02 Review Feb 13. V02.1 Update Jun 14 Section 6 NPSAS Alerts

Type of change. V02 Review Feb 13. V02.1 Update Jun 14 Section 6 NPSAS Alerts Document Title Reference Number Lead Officer Author(s) (name and designation) Ratified By Central Alerting System (CAS) Policy NTW(O)17 Medical Director Tony Gray Head of Safety and Patient Experience

More information

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Page 1 of 15 Business Continuity Policy First published: Amendment record Version Date Reviewer Comment 1.0 07/01/2014 Debbie Campbell 2.0 11/07/14 Vicky Ryan Updated to include

More information

NHS Lancashire North CCG Business Continuity Management Policy and Plan

NHS Lancashire North CCG Business Continuity Management Policy and Plan Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee

More information

NHS Hardwick Clinical Commissioning Group. Business Continuity Policy

NHS Hardwick Clinical Commissioning Group. Business Continuity Policy NHS Hardwick Clinical Commissioning Group Business Continuity Policy Version Date: 26 January 2016 Version Number: 2.0 Status: Approved Next Revision Due: January 2017 Gordon Stevens MBCI Corporate Assurance

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications

More information

INFORMATION GOVERNANCE OPERATING POLICY & FRAMEWORK

INFORMATION GOVERNANCE OPERATING POLICY & FRAMEWORK INFORMATION GOVERNANCE OPERATING POLICY & FRAMEWORK Log / Control Sheet Responsible Officer: Chief Finance Officer Clinical Lead: Dr J Parker, Caldicott Guardian Author: Associate IG Specialist, Yorkshire

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities

More information

NHS Commissioning Board Business Continuity Management Framework (service resilience)

NHS Commissioning Board Business Continuity Management Framework (service resilience) NHS Commissioning Board Business Continuity Management Framework (service resilience) 1 P a g e NHS Commissioning Board Business Continuity Management Framework Date 7 January 2013 Audience NHS Commissioning

More information

Business Continuity Policy

Business Continuity Policy Page 1 of 16 Business Continuity Policy Issue Date: Aug 2013 Document Number: 00241 Prepared by: Business Management and Continuity Senior Manager Next Review Date: April 2014 Page 2 of 16 NHS England

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Reference Number: 243 Author & Title: Siân Dyson Resilience Manager Responsible Director: Chief Operating Officer Review Date: 29 May 2018 Ratified by: Francesca Thompson Chief

More information

TRUST POLICY FOR EMERGENCY PLANNING

TRUST POLICY FOR EMERGENCY PLANNING TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy Document Status Draft Version: V2.1 DOCUMENT CHANGE HISTORY Initiated by Date Author Information Governance Requirements September 2007 Information Governance Group Version

More information

A refreshed Equality Delivery System for the NHS EDS2. Making sure that everyone counts. November 2013

A refreshed Equality Delivery System for the NHS EDS2. Making sure that everyone counts. November 2013 A refreshed Equality Delivery System for the NHS EDS2 Making sure that everyone counts November 2013 Publication Category Reference Number: 00518 2 A refreshed Equality Delivery System for the NHS Contents

More information

NHS Waltham Forest Clinical Commissioning Group Information Governance Strategy

NHS Waltham Forest Clinical Commissioning Group Information Governance Strategy NHS Waltham Forest Clinical Commissioning Group Governance Strategy Author: Zeb Alam, CCG IG Lead, (NELCSU) David Pearce, Head of Governance, WFCCG Version 3.0 Amendments to Version 2.1 Annual Review Reference

More information

DRAFT DRADDDDDFT. NHS Commissioning Board Incident Response Plan (National)

DRAFT DRADDDDDFT. NHS Commissioning Board Incident Response Plan (National) DRAFT DRADDDDDFT NHS Commissioning Board Incident Response Plan (National) NHS Commissioning Board Incident Response Plan (National) Date 22 March 2013 Audience Copy NHS Commissioning Board (NHS CB) director

More information

Business Continuity Policy & Plans

Business Continuity Policy & Plans Agenda Item 8.3a SNCCG Governing Body 11.03.2014 Business Continuity Policy & Plans Ref Number: Version: 1 Status: Pending Approval Author: A Brown Approval body Governing Body Date Approved Date Issued

More information

NHS NEWCASTLE GATESHEAD CLINICAL COMMISSIONING GROUP

NHS NEWCASTLE GATESHEAD CLINICAL COMMISSIONING GROUP NHS Newcastle Gateshead Clinical Commissioning Group NHS NEWCASTLE GATESHEAD CLINICAL COMMISSIONING GROUP Business Continuity Plan (including Emergency Planning Response and Resilience, Surge Management

More information

Interpreting and Translation Policy

Interpreting and Translation Policy Interpreting and Translation Policy Exec Director lead Author/ lead Feedback on implementation to Karen Tomlinson Liz Johnson Tina Ball Date of draft February 2009 Consultation period February April 2009

More information

Equality and Diversity Policy. Deputy Director of HR Version Number: V.2.00 Date: 27/01/11

Equality and Diversity Policy. Deputy Director of HR Version Number: V.2.00 Date: 27/01/11 Equality and Diversity Policy Author: Deputy Director of HR Version Number: V.2.00 Date: 27/01/11 Approval and Authorisation Completion of the following signature blocks signifies the review and approval

More information

Information Governance Policy

Information Governance Policy Author: Susan Hall, Information Governance Manager Owner: Fiona Jamieson, Assistant Director of Healthcare Governance Publisher: Compliance Unit Date of first issue: February 2005 Version: 5 Date of version

More information

Hart First Response. Business Continuity Policy

Hart First Response. Business Continuity Policy Title: Filename: Iss2_24apr14 Pages: 5 Author: Graham Brown Approved by: HFR Executive Committee Issue 1: 06/01/2011 Issue 2: 24/04/14 Review Date: 24/04/17 1. Introduction 1.1. Hart First Response (HFR)

More information

Royal Bournemouth & Christchurch Hospitals NHS Foundation Trust Meeting the Public Sector Equality Duties Summary Statement May 2015

Royal Bournemouth & Christchurch Hospitals NHS Foundation Trust Meeting the Public Sector Equality Duties Summary Statement May 2015 Royal Bournemouth & Christchurch Hospitals NHS Foundation Trust Meeting the Public Sector Equality Duties Summary Statement May 2015 1.0 Introduction 1.1 At RBCH, we recognise that equality means treating

More information

DIRECTOR OF PUBLIC HEALTH ROLE PROFILE

DIRECTOR OF PUBLIC HEALTH ROLE PROFILE Appendix A DIRECTOR OF PUBLIC HEALTH ROLE PROFILE Title: Employing Organisation: Accountable to: Hours: Work base: Key Relationships Director of Public Health London Borough of Tower Hamlets Professionally

More information

Ontario Pandemic Influenza Plan for Continuity of Electricity Operations

Ontario Pandemic Influenza Plan for Continuity of Electricity Operations Planning Guideline GDE-162 Ontario Pandemic Influenza Plan for Continuity of Electricity Operations Planning Guideline Issue 4.0 October 13, 2015 Emergency Preparedness Task Force This planning guide provides

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust

The Newcastle upon Tyne Hospitals NHS Foundation Trust The Newcastle upon Tyne Hospitals NHS Foundation Trust Procedure for Joint Management of Complaints and Safeguarding Concerns within the Newcastle upon Tyne Hospitals NHS Foundation Trust Version No.:

More information

THE ROYAL WOLVEHRAMPTON HOSPITALS NHS TRUST. Head of Planning/Emergency Preparedness

THE ROYAL WOLVEHRAMPTON HOSPITALS NHS TRUST. Head of Planning/Emergency Preparedness THE ROYAL WOLVEHRAMPTON HOSPITALS NHS TRUST Report To: Trust Board 12 April 2010 Report of: Subject: Author: Chief Operating Officer Emergency Preparedness Head of Planning/Emergency Preparedness Purpose

More information

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public FUNCTIONS OF THE LOCAL PUBLIC HEALTH SYSTEM Introduction This document sets out the local PH function in England. It was originally drafted by a working group led by Maggie Rae, FPH Local Board Member

More information

Commissioning fact sheet for clinical commissioning groups

Commissioning fact sheet for clinical commissioning groups Commissioning fact sheet for clinical groups July 2012 This fact sheet sets out the services to be commissioned by clinical groups (CCGs) from April 2013. It also sets out the complementary services to

More information

National Standards for Safer Better Healthcare

National Standards for Safer Better Healthcare National Standards for Safer Better Healthcare June 2012 About the Health Information and Quality Authority The (HIQA) is the independent Authority established to drive continuous improvement in Ireland

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility

More information

National Standards for the Protection and Welfare of Children

National Standards for the Protection and Welfare of Children National Standards for the Protection and Welfare of Children For Health Service Executive Children and Family Services July 2012 About the Health Information and Quality Authority The (HIQA) is the independent

More information

Equality and Diversity Strategy

Equality and Diversity Strategy Equality and Diversity Strategy If you require this document in another format or language please contact: Telephone: 023 9282 2444 E-mail: enquiries@portsmouthccg.nhs.uk Write: NHS Portsmouth Clinical

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Status: Final Next Review Date: Apr 2014 Page 1 of 16 NHS England Health and Safety: Policy & Corporate Procedures Health and Safety Policy Policy & Corporate Procedures Issue

More information

Guidance for NHS commissioners on equality and health inequalities legal duties

Guidance for NHS commissioners on equality and health inequalities legal duties Guidance for NHS commissioners on equality and health inequalities legal duties NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. &

More information

NOTTINGHAM UNIVERSITY HOSPITALS NHS TRUST POLICIES AND PROCEDURES MANAGEMENT OF ATTENDANCE AND SICKNESS ABSENCE POLICY. Documentation Control

NOTTINGHAM UNIVERSITY HOSPITALS NHS TRUST POLICIES AND PROCEDURES MANAGEMENT OF ATTENDANCE AND SICKNESS ABSENCE POLICY. Documentation Control NOTTINGHAM UNIVERSITY HOSPITALS NHS TRUST POLICIES AND PROCEDURES MANAGEMENT OF ATTENDANCE AND SICKNESS ABSENCE POLICY Documentation Control Reference HR/P&C/003 Date approved 4 Approving Body Trust Board

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN MEETING DATE: 10 April 2014 AGENDA ITEM NUMBER: Item 7.6.2 AUTHOR: JOB TITLE: DEPARTMENT: Julie Killingbeck/Catherine Wylie Relationship Manager Commissioning/Director Quality and Assurance NHS North Lincolnshire

More information

Emergency Preparedness, Resilience and Response (EPRR)

Emergency Preparedness, Resilience and Response (EPRR) GB 15/135 Emergency Preparedness, Resilience and Response (EPRR) Introduction The NHS needs to plan for and respond to a wide range of emergencies and business continuity incidents that could affect the

More information

Job Description. Line Management of a small team of staff administrating and managing patient and professional feedback and incidents.

Job Description. Line Management of a small team of staff administrating and managing patient and professional feedback and incidents. Job Description Job Title Pay Band Base Dept./Team Responsible to Accountable to Responsible for Complaints, Incidents and Governance Manager New Alderley House, Macclesfield Eastern Cheshire Clinical

More information

The Planning Process of Staff Services

The Planning Process of Staff Services BUSINESS CONTINUITY PLAN FOR PAN-DEMIC FLU Service Name Objectives. The Service will continue to see urgent cases where there is a threat to life or high anxiety about the mental health of a young person

More information

How To Manage Risk In Ancient Health Trust

How To Manage Risk In Ancient Health Trust SharePoint Location Non-clinical Policies and Guidelines SharePoint Index Directory 3.0 Corporate Sub Area 3.1 Risk and Health & Safety Documents Key words (for search purposes) Risk, Risk Management,

More information

Supporting staff involved in a stressful or traumatic incident, complaint or claim.

Supporting staff involved in a stressful or traumatic incident, complaint or claim. Supporting staff involved in a stressful or traumatic incident, complaint or claim. Version: V2.00 Ratified by: Date ratified: October 2010 Name of originator/author/job title Name of responsible committee

More information

INFORMATION GOVERNANCE POLICY

INFORMATION GOVERNANCE POLICY INFORMATION GOVERNANCE POLICY Issued by: Senior Information Risk Owner Policy Classification: Policy No: POLIG001 Information Governance Issue No: 1 Date Issued: 18/11/2013 Page No: 1 of 16 Review Date:

More information

University of Ottawa Pandemic Plan

University of Ottawa Pandemic Plan University of Ottawa Pandemic Plan August 2009 Introduction A disease epidemic occurs when there are more cases of a disease than normal. A pandemic is a worldwide disease epidemic. A pandemic may occur

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY A GUIDE TO BUSINESS CONTINUITY AND SERVICE RECOVERY PLANNING Version 1.1 Ratified by BHR CCGs Governing Bodies Date ratified September 2013 Name of Director Lead Marie

More information

EQUALITY IMPACT ASSESSMENT TEMPLATE - TRAFFORD COUNCIL

EQUALITY IMPACT ASSESSMENT TEMPLATE - TRAFFORD COUNCIL A. Summary Details EQUALITY IMPACT ASSESSMENT TEMPLATE - TRAFFORD COUNCIL 1 Title of EIA: To remodel building based day services 2 Person responsible for the assessment: Christine Warner 3 Contact details:

More information

NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)

NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy

More information

The Royal Wolverhampton NHS Trust

The Royal Wolverhampton NHS Trust The Royal Wolverhampton NHS Trust Trust Board Report Meeting Date: 22 April 2013 Title: Emergency Preparedness Annual Report 2012/2013 Executive Summary: Action Requested: Report of: Author: Contact Details:

More information

Corporate Business Continuity Plan

Corporate Business Continuity Plan Corporate Business Continuity Plan Prepared and Emergency Resilience Team Version: 5.0 issued by: Date: June 2015 Review Date: April 2018 CONTENTS Page No Foreword 3 Distribution 4 Revision History 5 Record

More information

DRAFT. CUNY Pandemic Influenza Response Plan Incident Level Responsibilities

DRAFT. CUNY Pandemic Influenza Response Plan Incident Level Responsibilities CUNY Incident Criteria Situation Characteristics No current hazard to students, faculty and staff. Requires internal CUNY preparedness, but no outside agency assistance. Human infections with a new subtype,

More information

Equality with Human Rights Analysis Toolkit

Equality with Human Rights Analysis Toolkit Equality with Human Rights Analysis Toolkit The Equality Act 2010 and Human Rights Act 1998 require us to consider the impact of our policies and practices in respect of equality and human rights. We should

More information

NHS England Equality Information Patient and Public Focus First published January 2014 Updated May 2014 Publication Gateway Reference Number: 01704

NHS England Equality Information Patient and Public Focus First published January 2014 Updated May 2014 Publication Gateway Reference Number: 01704 NHS England Equality Information Patient and Public Focus First published January 2014 Updated May 2014 Publication Gateway Reference Number: 01704 NHS England INFORMATION READER BOX Directorate Medical

More information

PREPARING FOR A PANDEMIC. Lessons from the Past Plans for the Present and Future

PREPARING FOR A PANDEMIC. Lessons from the Past Plans for the Present and Future PREPARING FOR A PANDEMIC Lessons from the Past Plans for the Present and Future Pandemics Are Inevitable TM And their impact can be devastating 1918 Spanish Flu 20-100 million deaths worldwide 600,000

More information

Rachael Shimmin, Corporate Director of Adults, Wellbeing and Health. Councillor Morris Nicholls, Portfolio Holder for Adult Services

Rachael Shimmin, Corporate Director of Adults, Wellbeing and Health. Councillor Morris Nicholls, Portfolio Holder for Adult Services Cabinet 24 July 2012 Local HealthWatch Transition Plan including NHS Complaints Advocacy Service [Key Decision AWH 03/12] Report of Corporate Management Team Rachael Shimmin, Corporate Director of Adults,

More information

BUSINESS CONTINUITY MANAGEMENT PLAN

BUSINESS CONTINUITY MANAGEMENT PLAN BUSINESS CONTINUITY MANAGEMENT PLAN For Thistley Hough Academy Detailing arrangements for Recovery and Resumption of Normal Academy Activity Table of Contents Section Content 1.0 About this Plan 1.1 Document

More information

CCG: IG06: Records Management Policy and Strategy

CCG: IG06: Records Management Policy and Strategy Corporate CCG: IG06: Records Management Policy and Strategy Version Number Date Issued Review Date V3 08/01/2016 01/01/2018 Prepared By: Consultation Process: Senior Governance Manager, NECS CCG Head of

More information

Business Continuity Policy and Plan

Business Continuity Policy and Plan Business Continuity Policy and Plan Policy Number: 040 Version: 2 Ratified by: V1 Approved by GB 2013 V2 update approved by OLT 26 Sept 2014 Name of originator/author: Robert Kirton Interim CFO 2013 Executive

More information

Incident reporting policy National Chlamydia Screening Programme

Incident reporting policy National Chlamydia Screening Programme Incident reporting policy National Chlamydia Screening Programme Date of publication: November 2014 Date for review: November 2016 About Public Health England Public Health England exists to protect and

More information

Risk Management Policy and Process Guide

Risk Management Policy and Process Guide Risk Management Policy and Process Guide Status: pending Next review date: December 2015 Page 1 Information Reader Box Directorate Medical Nursing Patients & Information Commissioning Operations (including

More information

Skanska Utilities South. Business Continuity Plan Swine Flu

Skanska Utilities South. Business Continuity Plan Swine Flu Skanska Utilities South Business Continuity Plan Swine Flu Produced by: Reviewed by: Approved by: Date: Revision No. A Crossley P Thompson J Shelvey 1 Contents Review/Revision log 1.0 Introduction 2.0

More information

Business Continuity Management Policy

Business Continuity Management Policy Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3

More information

MANAGEMENT OF PERSONAL FILES POLICY

MANAGEMENT OF PERSONAL FILES POLICY MANAGEMENT OF PERSONAL FILES POLICY Executive Director lead Author/ lead Feedback on implementation to Andrew Avery (Interim Director of HR) Liz Thompson (HR Manager) Liz Thompson (HR Manager) Date of

More information

3 Aims. 4 Duties (Roles and responsibilities)

3 Aims. 4 Duties (Roles and responsibilities) The Newcastle upon Tyne Hospitals NHS Foundation Trust Centralised Room Booking Policy Version No.: 3.1 Effective From: 31 March 2015 Expiry Date: 31 March 2018 Date Ratified: 3 March 2015 Ratified By:

More information

Building Equality, Diversity and Inclusion into the NHS Board Selection Process for Non Executives and Independent Directors March 2012 Edition

Building Equality, Diversity and Inclusion into the NHS Board Selection Process for Non Executives and Independent Directors March 2012 Edition Building Equality, Diversity and Inclusion into the NHS Board Selection Process for Non Executives and Independent Directors March 2012 Edition The NHS Leadership Academy s purpose is to develop outstanding

More information

Major Incident COMMUNICATIONS STRATEGY AND PLAN

Major Incident COMMUNICATIONS STRATEGY AND PLAN Major Incident COMMUNICATIONS STRATEGY AND PLAN ELFT staff must use the version published on the Trust Intranet for managing an incident response or training purposes. Version 2.2 8 th September 2014 Revision

More information

INFORMATION GOVERNANCE STRATEGIC VISION, POLICY AND FRAMEWORK

INFORMATION GOVERNANCE STRATEGIC VISION, POLICY AND FRAMEWORK INFORMATION GOVERNANCE STRATEGIC VISION, POLICY AND FRAMEWORK Policy approved by: Assurance Committee Date: 3 December 2014 Next Review Date: December 2016 Version: 1.0 Information Governance Strategic

More information

All CCG staff. This policy is due for review on the latest date shown above. After this date, policy and process documents may become invalid.

All CCG staff. This policy is due for review on the latest date shown above. After this date, policy and process documents may become invalid. Policy Type Information Governance Corporate Standing Operating Procedure Human Resources X Policy Name CCG IG03 Information Governance & Information Risk Policy Status Committee approved by Final Governance,

More information

SOCIAL MEDIA POLICY. Senior Governance Officer, NHS North of England Commissioning Support Unit Reference No

SOCIAL MEDIA POLICY. Senior Governance Officer, NHS North of England Commissioning Support Unit Reference No SOCIAL MEDIA POLICY Ratified Governance & Risk Committee 08/2015 Status Final Issued August 2015 Approved By Governance and Risk Committee Consultation Governance and Risk Committee Equality Impact Assessment

More information

Solihull Clinical Commissioning Group

Solihull Clinical Commissioning Group Solihull Clinical Commissioning Group Business Continuity Policy Version v1 Ratified by SMT Date ratified 24 February 2014 Name of originator / author CSU Corporate Services Review date Annual Target audience

More information

INFORMATION GOVERNANCE STRATEGY

INFORMATION GOVERNANCE STRATEGY INFORMATION GOVERNANCE STRATEGY Page 1 of 10 Strategy Owner Valerie Penn, Head of Governance Strategy Author Caroline Law, Information Governance Project Manager Directorate Corporate Governance Ratifying

More information

RECORD KEEPING IN HEALTHCARE RECORDS POLICY

RECORD KEEPING IN HEALTHCARE RECORDS POLICY RECORD KEEPING IN HEALTHCARE RECORDS POLICY Version 6.0 Key Points The Policy provides a framework for the quality of the clinical record facilitates high quality, safe patient care and that subsequently

More information

Planning for an Influenza Pandemic

Planning for an Influenza Pandemic Overview It is unlikely that a new pandemic influenza strain will first emerge within Elgin County. The World Health Organization (WHO) uses a series of six phases, as outlined below, of pandemic alert

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust. IT Change Management Policy and Process

The Newcastle upon Tyne Hospitals NHS Foundation Trust. IT Change Management Policy and Process The Newcastle upon Tyne Hospitals NHS Foundation Trust Version No.: 2.0 Effective From: 16 July 2015 Expiry Date: 16 July 2018 Date Ratified: 5 June 2015 Ratified By: Director of IT 1 Introduction IT Change

More information

POLICY FOR ALCOHOL, DRUG AND OTHER SUBSTANCE ABUSE IN EMPLOYMENT

POLICY FOR ALCOHOL, DRUG AND OTHER SUBSTANCE ABUSE IN EMPLOYMENT POLICY FOR ALCOHOL, DRUG AND OTHER SUBSTANCE ABUSE IN EMPLOYMENT Approved By: Trust Executive Date Approved: 10 March 2004 Trust Reference: B6/2004 Version: V2 Supersedes: V1 (Approved by Trust Executive

More information

Central Alert System (CAS) Policy and Procedure Document Summary

Central Alert System (CAS) Policy and Procedure Document Summary Central Alert System (CAS) Policy and Procedure Document Summary To manage the distribution and response to internal and externally generated Safety Alerts, DOCUMENT NUMBER POL/002/053 DATE RATIFIED November

More information

CONTRACTS REVIEW FOR INFORMATION GOVERNANCE COMPLIANCE PROCEDURE

CONTRACTS REVIEW FOR INFORMATION GOVERNANCE COMPLIANCE PROCEDURE This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version CONTRACTS REVIEW FOR INFORMATION GOVERNANCE COMPLIANCE PROCEDURE Document Title: Contracts

More information

and Entry to Premises by Local

and Entry to Premises by Local : the new health protection duty of local authorities under the Local Authorities (Public Health Functions and Entry to Premises by Local Healthwatch Representatives) Regulations 2013 1 Purpose of this

More information

BUSINESS CONTINUITY PLANNING

BUSINESS CONTINUITY PLANNING BUSINESS CONTINUITY PLANNING INDEX Description Page Index 1 Template 1 - Plan Version Control 2 Background 3 Purpose of Business Continuity Plan 3 Roles and Responsibilities 3 Complimentary Links 4 Service/

More information

CONCLUSIONS AND RECOMMENDATIONS

CONCLUSIONS AND RECOMMENDATIONS CONCLUSIONS AND RECOMMENDATIONS XVII. CONCLUSIONS 17.1 The Committee has studied the chronology of events during the SARS epidemic in Hong Kong in considerable detail, and heard a great deal of evidence

More information

Thanks to Jim Goble, National City Corporation, for providing the resource material contained in this guide.

Thanks to Jim Goble, National City Corporation, for providing the resource material contained in this guide. Pandemic Planning for Business Thanks to Jim Goble, National City Corporation, for providing the resource material contained in this guide. CHARACTERISTICS AND CHALLENGES OF A PANDEMIC Source: http://www.pandemicflu.gov/general/whatis.html

More information

The policy applies to all members of staff employed within the Trust who are involved in any aspect of alert dissemination, action, and /or review.

The policy applies to all members of staff employed within the Trust who are involved in any aspect of alert dissemination, action, and /or review. The Newcastle upon Tyne Hospitals NHS Foundation Trust Central Alert System (CAS) Policy and Procedure Version No.: 4.2 Effective From: 26 th May 2015 Expiry Date: 26 th May 2018 Date Ratified: 11 th May

More information

Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy

Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy Birmingham CrossCity Clinical Commissioning Group Business Continuity Management Policy Version V1.0 Ratified by Operational Development Group Date ratified 6 th November 2014 Name of originator / author

More information

Independent Assurance External evidence that risks are being effectively managed (e.g. planned or received audit reviews)

Independent Assurance External evidence that risks are being effectively managed (e.g. planned or received audit reviews) Total Risk Score Total Risk Score SHA Risk Matrix Risk Matrix Trust Details Name of Trust: NHS Address: Francis Crick House Post Code: NN3 6BF Name of Chief Executive: John Parkes Name of Person to contact

More information

PROTOCOL FOR DUAL DIAGNOSIS WORKING

PROTOCOL FOR DUAL DIAGNOSIS WORKING PROTOCOL FOR DUAL DIAGNOSIS WORKING Protocol Details NHFT document reference CLPr021 Version Version 2 March 2015 Date Ratified 19.03.15 Ratified by Trust Protocol Board Implementation Date 20.03.15 Responsible

More information

Information Governance Policy

Information Governance Policy Information Governance Policy Information Governance Policy Issue Date: June 2014 Document Number: POL_1008 Prepared by: Information Governance Senior Manager Insert heading depending on Insert line heading

More information

CCG Social Media Policy

CCG Social Media Policy Corporate CCG Social Media Policy Version Number Date Issued Review Date 2 25/03/2015 25/03/2017 Prepared By: Consultation Process: Formally Approved: Governance Manager, North of England Commissioning

More information

Pandemic Planning Framework

Pandemic Planning Framework Pandemic Planning Framework ACT Government December 2007 Chief Minister's Department (CMD) Mail Address: Chief Minister's Department Policy Division GPO Box 158 Canberra ACT 2601 Telephone: 13 22 81 (AUS)

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy

Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Scope and Policy Policy Author: Daniel Hale - Head of Emergency Planning Version: 1.0 Date

More information