Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC.

Size: px
Start display at page:

Download "Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC."

Transcription

1 BIBLIOGRAPHY Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. Acres Consulting Services Limited, March 1983, Keating Channel Environmental Assessment, Main Report. Acres Consulting, March 1983, Keating Channel Environmental Assessment Appendix F Economic Studies. Acres International, March 2004, LDRW Remedial Flood Protection Works Geoenvironmental Information Gap Analysis West Bank Draft. Agra Earth & Environmental, June 10, 1996, Geotechnical Investigation for Proposed Restoration of the East Bank of the Don River between Lakeshore Boulevard and the CNR Bridge. Angus Environmental Ltd., March 1995, 1995 Assessment of the Environmental Data for the Ataratiri Lands prepared for: Waterfront Regeneration Trust. Archaeological Resource Management Unit, TRCA, January 2004, Draft Cultural Heritage Study for the Environmental Assessment for the Naturalization & Flood Protection for the Lower Don River. Archaeological Services Inc., April 2004, Stage 1 Archaeological Assessment of the East Bayfront, West Donlands and Portlands Areas, City of Toronto. Barrett, Suzanne, James Flagal, Beth Jefferson, Karlk Konze and Ed Mickiewicz, March 1990, Environmental Audit of the Port Industrial Lands and East Bayfront, Natural Heritage, Second Draft. Beak Consultants Ltd and Raven Beck Environmental Ltd., April 1994, Lower Don Lands Site Characterization and Remedial Options Study. C.K. Hurst, April 1978, Dredging and Disposal of Dredged Material from the Keating Channel, Toronto. CH2M Hill, MacViro, July 2003, City of Toronto, Wet Weather Flow Management Master Plan, Combine System Sewershed Final Report. City of Toronto, Bring Back the Don, City of Toronto, Obtained 10/16/03, Sustainability and Council s Strategic Plan, from: City of Toronto, Making Waves, Principles for Building Toronto s Waterfront (a summary), Central Waterfront, Part II Plan. City of Toronto, October 2002, Wet Weather Flow Management Policy. City of Toronto, Toronto and Region Conservation Authority, December 2001, City of Toronto Natural Heritage Study: Final Report. B-1

2 Conchrane Brook, January 2000, West Don Lands Redevelopment Framework. Conservation Ontario, January 2002, Class Environmental Assessment for Remedial Flood and Erosion Control Projects. Cumming-Cockburn & Associates Ltd., May 1985, Preliminary Engineering Study Don River at Bayview Extension. David Crombie, Commissioner, Royal Commission on the Future of the Toronto Waterfront-1992, Regeneration: Toronto s Waterfront and the Sustainable City: Final Report. Decommissioning Consulting Services Limited, May 28, 2001, Toronto Port Area Property Ownership. Earth Tech Canada Inc., June 2004, West Don Lands Precinct Plan Municipal Services Engineering, Municipal Services Plan. Earth Tech Canada Inc., January 2004, West Donlands Precinct Plan, Municipal Services Engineering, Working Paper #1, Background Review and Service Provides Requirements. EarthTech et al., July 22, 2004, West Don Lands Class Environmental Assessment Master Plan Draft Report. Environmental Assessment for the Naturalization and Flood Protection for the Lower Don River Appendices A to J. Environmental Task Force, City of Toronto, February 2000, Clean, Green and Healthy: A Plan for an Environmentally Sustainable Toronto. F. Ivan Lorant, Inquiry Officer, July 1981, Keating Channel Flood Inquiry Report. Friends of the Don East, Spring 2003, At the Forks. Golder Associates, November 1980, Investigation of Lower Don River Sediments. Golder Associates Ltd., September 9, 2004, Lower Don River West Project - Geotechnical & GeoEnvironmental Investigations & Analysis. Jonathan Kauffman Planning Consultant Ltd., Paul Rennick and Associates, Henry Regier, John Holmes, Gordon Wichert, Metropolitan Toronto Planning Department, April 1992, Metro Waterfront Environmental Study. Kleinfeldt Consultants Ltd., April 2000, West Don Lands Environmental Management Strategy/Action Plan. MacLarentech Inc., March 1989, St. Lawrence Square Redevelopment Project East Station Volume I Geotechnical Report. MacLarentech Inc., March 1989, St. Lawrence Square Redevelopment Project East Station, Volume II Boring Logs and Figures. B-2

3 MacLarentech Inc., February 1989, St. Lawrence Square Redevelopment Project East Section, Site and Facility Environmental Investigations, Volume I Assessment and Volume II Methods and Results, Prepared for City of Toronto Dept. of Public Health Environmental Protection Office. Marshall Macklin and Monaghan Ltd. & MTRCA, Aug. 1987, Feb. 1988, + Nov. 1987, Lower Don River Flood Protection Meeting Minutes, + Report of Visual Structural Inspection of Steel Sheet Pile Floodwalls, Lower Don River. Marshall Macklin and Monaghan Ltd., December 1987, Flood Protection Dyking Lower Don River, Final Engineering Phase 1. Appendices I V. Marshall Macklin and Monaghan Ltd., February 1989, Flood Protection Alternatives for the St. Lawrence Square Development. Marshall Macklin and Monaghan Ltd., October 1989, Flood Protection Alternatives for the Ataratiri Development Report. Marshall Macklin and Monaghan Ltd., April 1990, Flood Protection Alternatives for the Ataratiri Development Addendum. Marshall Macklin and Monaghan Ltd., January 1991, Regional Storm Hydrology Update Lower Don River. Marshall Macklin and Monaghan Ltd., January 1991, Flood Protection Options for the Ataratiri Development. Marshall Macklin and Monaghan Ltd., December 1991, Engineering Feasibility Study Flood Protection Ataratiri. Marshall Macklin and Monaghan Ltd., July 1994, Lower Don Lands Strategy Flood Protection and River Regeneration Concepts. Marshall Macklin and Monaghan Ltd., December 1995, Further Study of Lower Don Lands Flooding Issues Final Report. Marshall Macklin and Monaghan, June 1995, Further Study of Lower Don Lands Flooding Issues, Draft Report. Marshall Macklin and Monaghan Ltd., February 1996, Conceptual Implementation Plan for Flood Protection Works on the West Don Lands. Marshall Macklin and Monaghan, May 2000, West Don Lands Flood Protection and Related Issues Study. Marshall Macklin and Monaghan, Dillon, Unterman McPhail Assoc., Miller Thomson, Envirometrex, May 2001, Union Station Second Platform Environmental Assessment. Marshall Macklin and Monaghan, January 2001, Toronto WWF Master Plan, Stage 2 Study Area 4 Don River Watershed DRAFT Existing Conditions Report. Marshall Macklin Monaghan, July 2003, City of Toronto, Wet Weather Flow Management Master Plan Stage 2 Don River Watershed, Study Area 4. Marshall Macklin Monaghan, June 2004, Don River Hydrology Update Draft Final Report. B-3

4 Metro Parks & Culture, December 1995, Lower Don River: Regeneration Strategy and Naturalization Plan, Pottery Road to the Forks. Metropolitan Toronto and Region Conservation Authority, A History of Flooding in the Metropolitan Toronto and Region Watersheds. Metropolitan Toronto and Region Conservation Authority, September, 1984, Addendum to the Keating Channel Environmental Assessment. Metropolitan Toronto and Region Conservation Authority, October 1985, Project for the Dredging of the Keating Channel Don River, Metropolitan Toronto and Region Conservation Authority, January 1992, Keating Channel Environmental Monitoring Program, Report. Metropolitan Toronto and Region Conservation Authority, November 1989, The 1988 Keating Channel Environmental Monitoring Program. Metropolitan Toronto and Region Conservation Authority, May 4, 1994, Forty Steps to a New Don. Metropolitan Toronto Planning Department, February 1994, Metropolitan Water Plan. Metropolitan Toronto Planning Department, Metropolitan Toronto, February 1994, Metropolitan Waterfront Plan, Metropolitan Waterfront Trail. Metropolitan Toronto Planning Department, Metropolitan Toronto, April 1992, Metropolitan Waterfront Plan, Metro Waterfront Environmental Study. Metropolitan Toronto and Region Conservation Authority, A History of Flooding in the Metropolitan Toronto. Ministry of Environment and Energy, April 1988, Don River Biological Inventory Past, Present and Future Evaluation. Mississaugas of the New Credit First Nation, Toronto Purchase Specific Claim, Arriving at an Agreement. Ontario MNR, April 2001, Rivers and Streams Performance Standards and Technical Guidelines, Lands and Waters Branch, MNR. Ontario Ministry of Natural Resources, 1990, Flood Damage Estimation Guide, Queen s Printer for Ontario. November 18-20, 1999, Obstacles and Opportunities Realizing the Potential of the West Don Lands - Workshop Final Report. Paragon Engineering Ltd., December 11, 1985, Development of Flood Depth-Damage Curves for Residential Homes in Ontario, Volume 1, Technical Report. Paragon Engineering Ltd., December 11, 1985, Development of Flood Depth-Damage Curves for Residential Homes in Ontario, Volume 2, Computer Software Documentation. B-4

5 Paragon Engineering Ltd., November 1990, Ataritiri Hydraulic Model Study. Planning and Development, City of Toronto, April 1, 1992, East and Central Bayfront Principles Report. Sarah Kalff, Gord MacPherson and Gavin Miller, April 1991, Environmental Audit of the East Bayfront/Port Industrial Area Phase II, Natural Heritage. SENES Consultants Limited, March 2003, Waterfront Scan and Environmental Improvement Strategy Study. Terrapex Environmental Ltd./Terraprobe, September 2004, Proposal to Provide Lower Don River West Project Geotechnical / Geo-Environmental Investigations. The Don Watershed Regeneration Council, 2000, A Time for Bold Steps: The Don Watershed Report Card. The East Bayfront Working Committee, August 14, 1996, Report of The East Bayfront Working Committee. The Toronto Port Authority, 2001, Land Use Plan. Toronto and Region Conservation Authority, Toronto Waterfront Revitalization Hydraulic Modelling Component for the Lower Don River West. Toronto and Region Conservation Authority, October 10, 2003, Request for Proposals for the Don Mouth Naturalization and Port Lands Flood Protection Plan. Toronto and Region Conservation Authority, July 17, 2003, Request for Proposals for the Lower Don River West. Toronto and Region Conservation Authority, April 18, 2003, Request for Expressions of Interest for the Lower Don River West -. Toronto Waterfront Design Initiative, Fall 2002, Urban Design Report 1, Report of the Results. Toronto Waterfront Revitalization Corporation, November 1999, Our Toronto Waterfront: Gateway to the new Canada. Toronto Waterfront Revitalization Corporation, Precinct Planning, Toronto Waterfront Revitalization Corporation, October 17, 2002, The Development Plan and Business Strategy for the Revitalization of the Toronto Waterfront Summary. Toronto Waterfront Revitalization Corporation, The Development Plan and Business Strategy for the Revitalization of the Toronto Waterfront Appendices. TRCA Environmental Services, June 2004, Lower Don River Environmental Assessment Aquatic Investigations and Data Summary, Draft Report. Trow, Dames & Moore, May 1990, Ataratiri Groundwater Management Report prepared for City of Toronto Housing Department. B-5

6 Trow, Dames & Moore, August 1991, Ataratiri Groundwater Management Report, Volume 1 Text, prepared for City of Toronto Housing Dept. Urban Development Services, City of Toronto, November 2002, Toronto Official Plan. Urban Development Services, City of Toronto, 2001, Making Waves, Principles for Building Toronto s Waterfront, Central Waterfront Part II Plan. Urban Development Services, City of Toronto, 2000, Toronto Plan Directions Report - Toronto at the Crossroads: Shaping Our Future. Urban Strategies Inc. for the TWRC, June 2003, Central Waterfront Public Space Framework. Urban Strategies Inc. et al., June 2004, West Don Lands Precinct Plan. K. Walters, April 1998, The Don River Ship Channel: Floodproofing for the Lower Don River. Waterfront Regeneration Trust, December 1995, The West Don Lands. Waterfront Regeneration Trust, December 1995, The West Don Lands. West Don Lands Committee, November 1999, Obstacles and Opportunities, Realizing the Potential of the West Don Lands November 18-20, Workshop Final Report. West Don Lands Committee, November 18-20, 1999, Realizing the Potential of the West Don Lands, Workshop Final Report. West Don Lands Soil and Groundwater Quality. B-6

How To Protect A Floodplain From Flooding

How To Protect A Floodplain From Flooding EXECUTIVE SUMMARY This Class Environmental Assessment (Class EA) was undertaken to examine alternative flood protection systems, and their environmental effects, for the elimination of the flood risk on

More information

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE 1.0 INTRODUCTION In early 2010, the Town of Ajax was provided with updated floodplain mapping for Carruthers Creek, based on a Regional Storm event (i.e., Hurricane Hazel), prepared by the Toronto and

More information

Latornell. Experiments in Climate Change Response in a Rapidly Urbanizing Region. November 20, 2008. By Brian Denney Chief Administrative Officer

Latornell. Experiments in Climate Change Response in a Rapidly Urbanizing Region. November 20, 2008. By Brian Denney Chief Administrative Officer Latornell Experiments in Climate Change Response in a Rapidly Urbanizing Region November 20, 2008 By Brian Denney Chief Administrative Officer Toronto has an ecological footprint 280 times its Eric Krause

More information

How To Plan A Flood Protection Project In Toronto

How To Plan A Flood Protection Project In Toronto Lower Don River West Remedial Flood Protection Project Public Open House and Meeting #3 Meeting Notes September 21, 2004 1 PUBLIC OPEN HOUSE AND MEETING #3 1.0 Public Open House Tuesday, September 21,

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

K6- Report. Downtown Brampton Special Policy Area Comprehensive Flood Risk and Management Analysis and Downtown Etobicoke Creek Revitalization Study

K6- Report. Downtown Brampton Special Policy Area Comprehensive Flood Risk and Management Analysis and Downtown Etobicoke Creek Revitalization Study bramptonca BRAMPTON FlOWef City K6- Report Committee of Council Committee of the Council of The Corporation of the City of Brampton Date: March 25, 2013 COMMITTEE OF COUNCIL DATE: Apfi(3,2Qf3 File: P26SB

More information

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey Monitoring at Credit Valley Conservation Presented by Jackie Thomas and Luke Harvey Where are we? WHAT IS MONITORING? Long-term sampling of the same point or reach to track changes over time/space Short

More information

Hydrology & Hydraulics

Hydrology & Hydraulics Hydrology & Hydraulics ADAPTING TO NEW WEATHER REALITIES Presentation to Technical Committee of Lake Ontario Integrated Sub watershed Study March 24, 2014 Neelam Gupta Manager, Hydrology & Hydraulics Credit

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

West London Dyke Flood Control Structure Master Plan Appendix A

West London Dyke Flood Control Structure Master Plan Appendix A West London Dyke Flood Control Structure Master Plan Appendix A Introduction The West London Dyke runs along the west bank of the North Branch of the Thames River from Oxford Street to the forks of the

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Prepared by. Drew Davidge

Prepared by. Drew Davidge Flood Damage Estimation in the Upper Thames River Watershed CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions Project Report VII. August 2005 Prepared

More information

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Appendix F Benefit-Cost Analysis of Flood Protection Measures Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual

More information

GENERAL OBLIGATION BONDS

GENERAL OBLIGATION BONDS DESCRIPTIONS GENERAL OBLIGATION BONDS Appendix C, page 2 GENERAL OBLIGATION BONDS State Transportation Bonds --- 1968 An amount of $640,000,000 was authorized to improve the public transportation system.

More information

Capital Construction and Debt Service

Capital Construction and Debt Service Capital Construction and Debt Service This section includes an overview and summary of appropriations and expenditures for the design, construction, and repair of major capital assets such as roads, bridges,

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

North Branch Chicago River Watershed-Based Plan

North Branch Chicago River Watershed-Based Plan North Branch Chicago River Watershed-Based Plan EXECUTIVE SUMMARY In Lake County, the Lake County Stormwater Management Commission (SMC) is responsible for managing Lake County s water resources. The North

More information

2D Modeling of Urban Flood Vulnerable Areas

2D Modeling of Urban Flood Vulnerable Areas 2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management

More information

Clear Water Projects in Cooksville Creek Watershed

Clear Water Projects in Cooksville Creek Watershed Clear Water Projects in Cooksville Creek Watershed Armstrong Manufacturing Inc. What is a Watershed? No matter where you are, you are in a watershed. A watershed is the area of land that catches rain and

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

Planning and Policy Development. Sustainable Energy Business Plan

Planning and Policy Development. Sustainable Energy Business Plan Planning and Policy Development Sustainable Energy Business Plan As the City's representative with government, stakeholder and non-government organizations on energy issues, the EEO developed and maintains

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,

More information

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 6, 2014. Goal 2: To ensure sustainable development and redevelopment

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 6, 2014. Goal 2: To ensure sustainable development and redevelopment CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 6, 2014 Item 30, Report No. 18, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on May

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

PORT LANDS ACCELERATION INITIATIVE

PORT LANDS ACCELERATION INITIATIVE PORT LANDS ACCELERATION INITIATIVE Appendix 10 Port Lands Planning Summary Photo of Cirque du Soleil Tents courtesy of Waterfront Toronto PORT LANDS ACCELERATION INITIATIVE The Planning and Infrastructure

More information

FLOOD RISK ASSESSMENT REPORT EXISTING CONDITIONS (DRAFT)

FLOOD RISK ASSESSMENT REPORT EXISTING CONDITIONS (DRAFT) Bolton Special Policy Area (SPA) Study FLOOD RISK ASSESSMENT REPORT EXISTING CONDITIONS (DRAFT) June 213 Table of Contents 1. Introduction... 1 2. Purpose and Scope of the SPA Study... 3 2.1 Study Purpose...

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9

October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 October 15, 2013 Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 RE: Business Plan Advancing a Collaborative, Regional Approach to Flood Management in BC s Lower

More information

Appendix C Related Studies

Appendix C Related Studies Appendix C Related Studies Intermodal Transit Village Concept Plan Appendix C Related Studies This appendix summarizes studies that are current at the time of this Plan. Intermodal Transit Village Concept

More information

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an

More information

MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT

MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT The Mid-Atlantic Federal Partnership for the Environment ( MAFPE ) and the City of Baltimore

More information

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation

More information

BEYOND THE STORM: Toronto s Climate Change Adaptation Program. Its about Risk and Cost Management. David MacLeod Toronto Environment Office

BEYOND THE STORM: Toronto s Climate Change Adaptation Program. Its about Risk and Cost Management. David MacLeod Toronto Environment Office BEYOND THE STORM: Toronto s Climate Change Adaptation Program Its about Risk and Cost Management David MacLeod Toronto Environment Office June 16, 2011 Agenda Mitigation & Adaptation: Both are needed Impacts

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Waterfront Toronto Strategic Business Plan 2014-2023

Waterfront Toronto Strategic Business Plan 2014-2023 Waterfront Toronto Strategic Business Plan 2014-2023 December 18, 2013 Table of Contents Introduction... 1 Half-way to Realizing the Waterfront Vision... 6 Waterfront Toronto s Strategic Priorities...

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

GRAND RIVER BASIN WATER MANAGEMENT STUDY TECHNICAL REPORT SERIES

GRAND RIVER BASIN WATER MANAGEMENT STUDY TECHNICAL REPORT SERIES 1983 GRAND RIVER BASIN WATER MANAGEMENT STUDY TECHNICAL REPORT SERIES FLOOD DAMAGES IN THE GRAND RIVER BASIN TECHNICAL REPORT No. 39 GRAND RIVER IMPLEMENTATION COMMITTEE Copyright Provisions and Restrictions

More information

E&SC Training & Certification

E&SC Training & Certification E&SC Training & Certification 5 Chapter E&SC training involves educating, training and certifying individuals involved with managing stormwater, erosion and sediment on NCDOT construction projects. The

More information

It s hard to avoid the word green these days.

It s hard to avoid the word green these days. Going green : Environmental jobs for scientists and engineers Alice Ramey Alice Ramey is an economist in the Office of Occupational Statistics and Employment Projections, BLS. She is available at (202)

More information

Ponds and Waterways Committee. Master Plan Appendix 5 Environmental Studies

Ponds and Waterways Committee. Master Plan Appendix 5 Environmental Studies Ponds and Waterways Committee Master Plan Appendix 5 Environmental Studies ENVIRONMENTAL STUDIES OF SUDBURY S WATER RESOURCES Inventory 1 prepared by Susan Crane Sudbury Ponds and Waterways Committee July

More information

Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study

Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study OCCIAR and Northern Conservation Authorities March 26-27, 2012 Mike Garraway, MNR Centre of Excellence for Water Quantity

More information

City Planning Heritage Preservation

City Planning Heritage Preservation 1. Planning and Heritage This theme is examining the current built form, policy framework and zoning in the Study Area to help inform the larger Revitalization Initiative. Staff will bring forward recommendations

More information

cardno Phu My Bridge Queensland s first light rail system Creative Village Redevelopment Marine Corps environmental reviews

cardno Phu My Bridge Queensland s first light rail system Creative Village Redevelopment Marine Corps environmental reviews shaping the future www.cardno.com cardno shapes the future for communities around the world Cardno s vision is to be a world leader in the provision of professional services to improve the physical and

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Water Security Agency. Plan for 2015-16. saskatchewan.ca

Water Security Agency. Plan for 2015-16. saskatchewan.ca Water Security Agency Plan for 2015-16 saskatchewan.ca Statement from the Minister I am pleased to present the Water Security Agency s Plan for 2015-16. The Honourable Scott Moe Minister Responsible for

More information

City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events

City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering

More information

TOWN-WIDE FLOOD STUDY TOWN OF OAKVILLE. April 2008 PHILIPS ENGINEERING LTD. P.O. BOX 220, 3215 NORTH SERVICE ROAD BURLINGTON, ON L7R 3Y2

TOWN-WIDE FLOOD STUDY TOWN OF OAKVILLE. April 2008 PHILIPS ENGINEERING LTD. P.O. BOX 220, 3215 NORTH SERVICE ROAD BURLINGTON, ON L7R 3Y2 TOWN-WIDE FLOOD STUDY TOWN OF OAKVILLE April 2008 PHILIPS ENGINEERING LTD. P.O. BOX 220, 3215 NORTH SERVICE ROAD BURLINGTON, ON L7R 3Y2 TEL: 905-335-2353 FAX: 905-335-1414 E-Mail Address: admin@philipseng.com

More information

WATER: ENVIRONMENTAL SCIENCE Syllabus

WATER: ENVIRONMENTAL SCIENCE Syllabus WATER: ENVIRONMENTAL SCIENCE Syllabus Course Title Water: Environmental Science Course Description Central to all ecosystems, water is essential to life as we know it. It shapes our planet on every level,

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

ENTRY ORDER SUPREME COURT DOCKET NO. 2015-185 JANUARY TERM, 2016. } Superior Court, v. } Environmental Division

ENTRY ORDER SUPREME COURT DOCKET NO. 2015-185 JANUARY TERM, 2016. } Superior Court, v. } Environmental Division Note: Decisions of a three-justice panel are not to be considered as precedent before any tribunal. ENTRY ORDER SUPREME COURT DOCKET NO. 2015-185 JANUARY TERM, 2016 State of Vermont, Agency of Natural

More information

M I N U T E S BOARD OF DIRECTORS. Thursday, April 9, 2009. Ausable Bayfield Conservation Authority Boardroom Morrison Dam Conservation Area

M I N U T E S BOARD OF DIRECTORS. Thursday, April 9, 2009. Ausable Bayfield Conservation Authority Boardroom Morrison Dam Conservation Area M I N U T E S BOARD OF DIRECTORS Thursday, April 9, 2009 Ausable Bayfield Conservation Authority Boardroom Morrison Dam Conservation Area DIRECTORS PRESENT David Bolton, Dave Frayne, Jim Ginn, Lawrence

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

Towards sustainable and strategic management of water resources

Towards sustainable and strategic management of water resources European Union Regional Policy ntrum fur -^t- 111/ Towards sustainable and strategic management of water resources European Commission Bibliothek Wasser und Umwelt (TU Darm stadt) Contents EXECUTIVE SUMMARY

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

FOUR RIVERS RESTORATION PROJECT

FOUR RIVERS RESTORATION PROJECT MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea

More information

INTEGRATED WASTE MANAGEMENT SERVICES

INTEGRATED WASTE MANAGEMENT SERVICES INTEGRATED WASTE MANAGEMENT SERVICES ENGINEERED SOLUTIONS GRO Golder Associates is a respected, employee-owned, global company providing consulting, design and construction services in our specialist areas

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Short-term. Action items that fall into this category need to take place over the next one to two years.

Short-term. Action items that fall into this category need to take place over the next one to two years. Implementation Plan Building Momentum Through Incrementalism Queensbury s vision for its future, which emerged from public discussion over the past year, is as a vibrant regional center for living, working,

More information

2015 Capital Works Program

2015 Capital Works Program Jeffrey S. Climans Director, Major Capital Infrastructure Coordination City Hall 100 Queen Street West 4th Floor, East Tower Toronto, Ontario M5H 2N2 Tel: 416 397 4649 Fax: 416 338 0808 jcliman@toronto.ca

More information

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section: Click here to access definitions SECTION 12 FLOODPLAIN LANDS 12.1 INTERPRETATION In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes

More information

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Burnt River Black River and Gull River Flood Contingency Plan

Burnt River Black River and Gull River Flood Contingency Plan Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study

More information

Guideline for Stress Testing the Climate Resilience of Urban Areas

Guideline for Stress Testing the Climate Resilience of Urban Areas Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0

More information

Green Spaces to Improve Waterways and Communities

Green Spaces to Improve Waterways and Communities Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015

More information

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document A1-1 ATTACHMENT A1 Great Lakes Shipyard Expansion

More information

Cooksville Creek Flood Evaluation Master Plan EA Final Report

Cooksville Creek Flood Evaluation Master Plan EA Final Report Cooksville Creek Flood Evaluation Final Report A report prepared for: The City of Mississauga Prepared by: Aquafor Beech Ltd. www.aquaforbeech.com In Association with: LimnoTech July 2012 Aquafor Beech

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

2012 Program Report. Agricultural Group Drainage Program

2012 Program Report. Agricultural Group Drainage Program 2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout

More information

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014 Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council July 8, 2014 TRCA AUTHORITY MEETING #6/13: THAT the draft Bolton Resource Management Tract Management Plan dated

More information

MONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009

MONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009 MONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009 Karin Patrick, Aquatic Bioassay & Consulting, Inc.

More information

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation

More information

Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.

Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea. WATER QUALITY MANAGEMENT FOR ECOLOGICAL RESTORATION IN ANYANG STREAM Yu, M.J., Cho, Y.M. 2, Lee, S.K. 3 Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea. 2 Department

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Brownfields. Technical Report # 7

Brownfields. Technical Report # 7 Brownfields Technical Report # 7 Gateway Action Plan Task #7 Adirondack Gateway Council Saratoga, Warren and Washington County, New York Brownfields May 2015 The work that provided the basis for this publication

More information

2. BENEFIT:COST ECONOMIC ANALYSIS

2. BENEFIT:COST ECONOMIC ANALYSIS 2. BENEFIT:COST ECONOMIC ANALYSIS 2.1 Riverine and Coastal A-Zone Flood Model Overview The Riverine and Coastal A-Zone Flood model (RCAZF) (Version 1.0, January 1995), a spreadsheetbased model developed

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

Georgia Coastal Stormwater Supplement April 2009

Georgia Coastal Stormwater Supplement April 2009 9.0 Local Post-Construction Stormwater Management Programs 9.1 Overview Prior to the 1980s, stormwater management was synonymous with flood control. Postconstruction stormwater management systems consisted

More information

City of Toronto Wet Weather Flow Monitoring Network: Baseline Conditions 2008 2011

City of Toronto Wet Weather Flow Monitoring Network: Baseline Conditions 2008 2011 City of Toronto Wet Weather Flow Monitoring Network: Baseline Conditions 2008 2011 Sharing Loading Estimation Experiences Workshop Tuesday, January 20, 2015 Presented By: Derek Smith City of Toronto Flood

More information