How To Plan A Flood Protection Project In Toronto

Size: px
Start display at page:

Download "How To Plan A Flood Protection Project In Toronto"

Transcription

1 Lower Don River West Remedial Flood Protection Project Public Open House and Meeting #3 Meeting Notes September 21,

2 PUBLIC OPEN HOUSE AND MEETING #3 1.0 Public Open House Tuesday, September 21, 2004 Metro Hall Room 308/ John Street, Toronto 6:30 9:30 p.m. SUMMARY NOTES The Open House opened at 6:30 p.m. Members of the public viewed display panels showing different aspects of the Lower Don River West Remedial Flood Protection Project (LDRW). Toronto and Region Conservation (TRCA), and members of the consulting team from Dillon Consulting Limited, Acres International and ENVision the Hough Group were on hand to answer questions during the Open House. All participants received the following information: Public Open House & Meeting No. 3: Summary of EA Process & Functional Design - Workbook Lower Don River West News newsletter, Edition Welcome and Introductions Adele Freeman (Acting Director of Watershed Management, TRCA) opened the meeting at 7:35 p.m. She thanked the members of the Community Liaison Committee for their ongoing advice and hard work, and Joe Puopolo (Dillon Consulting Limited) and the entire consulting team for their leadership and the design being presented. All those involved have tried to keep to the October 15, 2004 deadline the anniversary of Hurricane Hazel. The Lower Don River area has been a priority for many years. It is intended that there will be a draft document by mid-october. Later in the fall, it is likely that there will be a consultation initiative to discuss all activities related to the Precinct Planning initiative. All stakeholder names will be provided to the Toronto Waterfront Revitalization Corporation (TWRC) so information/notification can be circulated as it becomes available.. Appendix A contains a list of all those who signed in at the meeting. Appendix B contains a list of project team members who were at the meeting. 2

3 3.0 Project Presentation 3.1 Study Overview Joe Puopolo started the presentation by giving an overview of the study. He explained that under a storm event the size of Hurricane Hazel, the anticipated floodplain surrounding the lower Don River and Keating Channel would extend to the west, east and south of the river. This floodplain has been broken into three Spill Zones. This study covers Spill Zone 3 (210 hectares), which extends to the west of the Lower Don River and south of the CNR embankment along Toronto s central waterfront. The purpose of the study is to protect Spill Zone 3 should severe weather such as Hurricane Hazel ever occur again. This study is being conducted as a Conservation Authority Class EA (Class EA) at the provincial level. At the federal level, this project falls under the Canadian Environmental Assessment Act (CEAA). These pieces of legislation require public consultation and an evaluation of a range of alternatives. The West Don Lands Precinct Plan and the Master Servicing Class EA for the West Don Lands are also being undertaken by the TWRC. Two previous Public Information Centres have been held in January and April, Project-related information is posted on the TRCA website for anyone who is interested. 3.2 Study Process Joe Puopolo described the planning process followed in this study. First, a long list of 13 alternatives was developed that either alone or in combination could potentially provide the flood protection that is being sought in Spill Zone 3. Next, a screening process was carried out to determine if the alternatives satisfied each of the following three mandatory criteria: - Does the alternative achieve flood protection to the Regulatory Flood Level for the Lower Don River West Lands/Spill Zone 3? - Does the alternative comply with current provincial floodplain policies, including the technical requirements associated with a permanent solution? - Is the alternative technically feasible/proven? Once these screening criteria were applied, 8 of the 13 options were eliminated from further consideration. The remaining 5 alternatives met all screening criteria and were carried forward to a short list. These options were: A Flood Protection Landform (Berm) with East Dyke (Berm) and Culvert B Wedge with East Dyke (Berm) & Culvert C CNR Bridge & Channel Widening D Secondary Channel with Flood Protection Landform E River Dredging This information was presented at the second public information centre and is available on the TRCA website. 3

4 Six different disciplines (physical, biological, cultural, socio-economic, technical/engineering, cost) evaluated this short list to devise a ranking. In total, there were 39 criteria considered across the disciplines. Each alternative was considered in terms of its impact both during construction and throughout the lifespan. Option A emerged as the preferred alternative. This option is composed of five elements. 1. Flood Protection Landform 2. Flood Protection Works for the East Bank (interim and may be altered as part of naturalization of the mouth of the don project) 3. Culverts under CNR Embankment 4. Continued Dredging of Keating Channel (to ensure proper hydraulic capacity) 5. Modification to the Utility Bridge Many elements have been harmonized with the Precinct Planning efforts that are going on. A computer rendering of the flood protection landform was shown. The flood protection landform will only result in a slight rise/roll on the topography. There is one final piece of work being completed: to provide guidance to the Precinct Planners on the kind of plantings that can go on in the flood protection zone. Five vegetation zones have been identified. Zone 1 is the most restrictive zone, which covers the western bank of the Don River and the eastern (riverside) slope of the landform. The consultants recommend that no heavy trees be planted here, only herbaceous species and shrubbery. In Zone 2 (at the apex of the landform), it is recommended that any plantings that may prevent future alterations to the landform be restricted (for example large trees may inhibit the expansion of the peak of the landform to address potential climate change issues). There are fewer restrictions as one moves west through Zones 3, 4 and 5. In Zone 5, there are very few restrictions on the types of planting. 3.3 Next steps: The project team would like to get feedback by October 6, 2004 on the materials presented at this meeting. The handout contains a number of discussion questions that participants were encouraged to give feedback on. Draft Class EA and CEAA documents are to be completed in October In November, geotechnical/geoenvironmental fieldwork for the CNR Crossing will take place. In December, the Functional Design will be completed. 4.0 Questions Regarding the Presentation: After the presentation, stakeholders were invited to ask questions of the project team. 1. Can you expand on how the wetland to the south deals with the flood problems in Zones 1 and 2? 4

5 Joe Puopolo explained that a separate project - the Don Mouth Naturalization and Port Lands Flood Protection Project - will address Spill Zones 1 and 2. This separate project will provide flood protection for Spill Zones 1 and 2 (to the south and east of the Don River), and will also explore potential naturalization options for the mouth of the Don River and the Don Narrows. Although the proposed flood protection works for the Lower Don River West Remedial Flood Protection Project do not address the issue of flooding through Spill Zones 1 and 2, a key criterion for the evaluation of the preferred alternative was that it would not aggravate flooding in these Spill Zones. In essence, the floodwaters that would be redirected by the landform will be conveyed south - through the CN Rail berm - by the proposed culverts. Adele Freeman added that the Don Mouth Naturalization and Port Lands Flood Protection Project is moving forward at this time. The consulting team, led by Gartner Lee Limited will be engaged in the upcoming months as the study moves forward. Public consultation will be an integral part of this project. 2. Have you done any hydraulic modeling? Joe Puopolo stated that hydraulic modeling has been completed to evaluate all flood protection options, to refine the Functional Design and to determine the size of the culverts. The computer model has been calibrated to a physical model. A two-dimensional modeling system was used to address the issues of water moving down the river and spilling over the banks on either side (water movement to the south, as well as east-west). This was the model carried forward and used to look at the long list of options for the project. A one-dimensional model is being used to evaluate the functional design and the configuration of the culverts under the CN Rail tracks. The water will be somewhat confined by the flood protection landform (no movement to the west, only south), and so a one-dimensional assessment should suffice for this stage of evaluation. 3. If you replace the concrete with wire mesh on the Utility Bridge, who will manage the debris once the water levels recede? Adele Freemen explained that some planning still needs to be done to address this. Sometimes the TRCA has maintenance agreements with other agencies to take care of these needs. There is a whole series of operational issues like this that need to be investigated and tied in to the final design. 4. What are the cost estimates for the design, landform, and remediation work? 5

6 Joe Puopolo explained that the Ontario Realty Corporation (ORC) and the TWRC are developing a strategy for the remediation work. This strategy will consider the bigger picture. In terms of individual elements of this project, the east bank will cost $250,000; the culverts and landform are estimated to cost approximately $14 million, however these figures still need to be refined. The landform itself is anticipated to cost roughly $2 million. Adele Freeman added that the TWRC still needs to develop a contribution agreement from all levels of government. Currently, this project isn t at this stage yet. It is at the point of finalizing the design. 5. What did the modeling show for the necessary flood protection for the east side? Joe Puopolo explained that the criteria used for this project was that flooding on the east side could not be worsened (i.e. a zero sum gain). Spill Zones 1 and 2 don t get altered by this project; they are taken care of by the next project Adele Freeman added that the TWRC now has the money for that additional study to go ahead. An individual Environmental Assessment (EA) will go ahead to deal with the other two Spill Zones. The large landform proposed by this project is permanent and will stay, independent of the outcome of the other study. 6. I understand that there is funding to do the studies, but no funding to actually do the implementation work. Will this project get part of the $330 million announced this summer? Adele Freeman explained that once the Functional Design has been refined and the EA reports completed, detailed cost estimates will be provided to TWRC. They may incorporate this into the West Don Lands Precinct Planning envelope. This will then be taken forward to the three levels of government for funding approval before the implementation of the final design. 7. What would naturalization look like for the mouth of the Don? Adele Freeman stated that TRCA has done some research on this. Additionally, during the consultant selection process for the Don Mouth Naturalization and Port Lands Flood Protection Project, consultant teams were asked to provide their own visions for the mouth of the Don. A naturalized mouth of the Don River may include: the presence of enhanced habitat for pike and walleye populations; an estuary; reconfiguration of some of the roads; The area may be lowered and blend with the New Commissioner s Park; and There may be some changes to the Keating Channel. 6

7 8. I am trying to envision the tunnel. How will this be made friendly for the public? Is there a budget item for public art projects? On the Gardiner East project, the public art budget helped to make the project more acceptable/ sustainable/ friendly. This budget line should be added now, so there is recognition that this is important. Adele Freeman explained that ENVision the Hough Group has been asked to provide some sketches to show what the entrances of the tunnel will look like. It is acknowledged that this is an important consideration. The TRCA also plans to work with the City of Toronto Parks Department. Some type of meshing could be incorporated into the design to narrow it down a bit. Lighting will be key. 9. What is the timing for the culvert? How long will it take to complete? Joe Puopolo stated that the planning for the culverts is currently underway. Ideally, the construction of the culverts will start in the spring of 2005 and take 2 or 3 months to complete. It will be necessary to coordinate the construction of the culverts with the schedules of CN Rail and GO Transit. The timing of the construction will be constrained by the need to maintain traffic along the rail lines most likely limiting work time to nights and long weekends. 10. How much fill will be needed for the landform? Joe Puopolo responded that although the landform covers a wide area, not much height will be added over the current grading due to its gentle slope. As a very rough estimate, the amount of fill needed is likely in the range of 200,000 cubic metres. 11. What is the average flow (cubic metres per second) on the Don? How about through the culverts? Don Haley responded that the average flow during regular flow conditions on the Don River is approximately 3 cubic metres per second. During normal spring flood conditions (when the banks are full), the flow is cubic metres per second. During Hurricane Hazel, the flow was 1600 cubic metres per second. Water is moving 6 metres per second. The capacity of the culvert will be approximately 1550 cubic metres per second. This will provide conveyance under the CN Rail berm for all of the floodwaters that have been redirected by the flood protection landform. The additional flow of 50 cubic metres per second (the regulatory flow to the east - into Spill Zones 1 and 2) will be addressed by the flood protection works associated with the Don Mouth Naturalization and Port Lands Flood Protection Project. 12. Spill Zones don t represent the original floodplains, aren t they man made? 7

8 Don Haley responded that the entire Toronto waterfront is man-made. The original Ashbridges Bay marsh was filled in at the turn of the century, and much of the shoreline has experienced infilling as well. This is evidenced by the lack of valley walls in the lower Don, where the gentle topography exacerbates the flooding by allowing the water to spread out to the east and west. 13. Why isn t vegetation on the landform part of this design? Why were the option of upstream storage and other forms of remediation upstream discarded? Adele Freeman explained that the naturalization of the Don River is a key priority for TRCA. This study focuses strictly on providing flood protection for Spill Zone 3. The recommended vegetation zones developed by the consultant team relate to the hydraulic requirements of the floodplain underneath the landform. The Task Force to Bring Back the Don asked TWRC whether the naturalization of the Don Narrows could be considered as part of this project. The design is constrained by the Don Valley Parkway and the CN Rail lines, and there is not much that can be done with this area, as most alternatives are too costly. Naturalization alternatives for this stretch will be explored as part of the Don Mouth Naturalization and Port Lands Flood Protection Project, and have not been included in this Class EA. Joe Puopolo added that upstream storage was explained at a previous open house. Based on the volume of water associated with the regional flood, upstream storage sites would not provide adequate storage. It has been assessed that 25 to 30 major structures the size of G. Ross Lord Dam would be necessary to eliminate the flood risk for the river. Millions of cubic metres of storage would be necessary, and this cannot be achieved without a serious negative impact on the entire valley system. Achieving such flow reductions would not be technically feasible, and using upstream storage in a smaller capacity to simply mitigate flooding downstream would not make a significant difference on the high volume of flow. Adele Freeman added that the impact that upstream storage sites would have on the flow of water during an event the size of Hurricane Hazel would be negligible. Given this fact however, it should be noted that although TRCA will not be including upstream storage as part of this particular project, the Authority still actively pursues all opportunities to enhance the stormwater management capacity of the watershed outside of this flood protection work. TRCA will be working with the City of Toronto to implement the Wet Weather Flow Management Master Plan (WWFMMP) to achieve enhancements in quality/quantity storage on the Don River wherever possible. Unfortunately this is very difficult in such a built up, urban area. 14. What is the technical reason why you don t want vegetation in Zone 1? 8

9 Joe Puopolo explained that since Vegetation Zone 1 is the floodplain of the river, vegetation must be limited by the hydraulic requirements of the area. Larger vegetation would provide a rougher flow surface along the floodplain, which would slow down the flow of water, effectively backing up the river. In the case of a regulatory flood, the intent is to convey this high volume of water past the landform and through the culverts too much roughage would inhibit the effectiveness of the flood protection works, and cause problems upstream. For this reason, vegetation within zone 1 must be limited to herbaceous plants and shrubbery. In addition, large trees would present a risk to the function of the culverts and the stability of the landform. If such trees were dislodged during a flood event, they could get caught in the culverts, seriously impacting their ability to convey floodwater under the CN Rail berm. If trees with deep roots were uprooted by the force of the flood, they would expose the soil of the landform to intense erosive forces, which in turn could compromise the integrity of the structure. 15. This isn t really a floodplain. Who will manage this? There should be some consideration to planting some trees on the top of the landform. There is a mandatory 40 metre setback from the foot of the landform to allow sufficient hydraulic capacity, and this will act as the floodplain. There are operational considerations that still need to be worked out with the Precinct Plans to determine the management of the area after construction. 16. What is the rationale for stability of the landform? The landform is essentially fill with some grass and shrubbery on it. Is there some rubble material needed at the base of the construction? Don Haley explained that the flow velocity during a flood the size of Hurricane Hazel would drop from 6 metres per second in the centre of the river to 2 metres per second at the edges the landform will contain and redirect the floodwaters, but will not meet with the brunt of the force flowing downriver. These factors will be considered during the design phase. Joe Puopolo added that there are compaction specifications that will be met to ensure a stable and permanent landform. Rubble material is not needed. 17. In heavy rains, we hear about Combined Sewer Overflows (CSOs). To what extent do storm sewers emptying into the Don contribute to the flows? Joe Puopolo explained that the four CSOs that currently empty into the lower Don River will be eliminated through the Master Servicing Plan of the West Don Lands. They will be moved and empty to Cherry Street. 9

10 Adele Freeman added that there are many more CSOs upstream that have a greater impact on the Don River. When the WWFMMP is implemented, overflows should be reduced from overflows per year to 3 overflows per year. 18. It is the City s policy to increase tree cover, where possible. Should this be sent back to design so that they could consider flipping the current design to increase cover (i.e. put the playing field adjacent to the river)? Adele Freeman/Ken Dion responded that the park is to be an integrated use park. The vegetation restrictions on the landform were developed in January 2004, and the Precinct Planning group was aware of this when they developed their design. Joe Puopolo added that if there is grading above the 82 metre elevation mark (the minimum elevation of the landform), there is the opportunity to add more plantings. Most restrictions on vegetation are only for the first 60 metres of the landform there are few limitations on plantings west of the top of the landform. It is noted that the concepts presented tonight are open for comment, and feedback is welcomed on the recommended vegetation zones. 10

11 5.0 Closing Adele Freeman thanked participants for their questions and input and encouraged people to mail in any additional comments they might have. Comments should be forwarded to: Alex Blasko Don Watershed Technical Clerk Toronto and Region Conservation 5 Shoreham Drive Downsview, ON M3N 1S4 ablasko@trca.on.ca Copies of the panels from the open house and the meeting summary from this evening will be posted on the TRCA website at: Comments are appreciated and taken seriously. The TRCA and the consulting team will be working towards incorporating stakeholder ideas into the final document. The meeting closed at 9:07 p.m. Participants were invited to remain and view the display boards and/or talk to project team members. Prepared by: Tracey Ehl, Principal (905) tracey@ehlharrison.com 11

12 Lower Don River West Remedial Flood Protection Project Public Open House and Meeting #3 Appendix A List of Participants September 21,

13 Appendix A: List of Participants Name Dennis Bartels Bryan Bertie Laurie Bruce Margaret Buchinger Carmela Canzonieri Peter Cely Angus Cranston John Crawford Tija Dirks Michael Giulioni Chris Holz Karine Jaovich Greg Lintern John MacMillan Peter Pfingst Richard Reinert Bill Snodgrass Kelly Snow David White John Wilson Paul Young Affiliation Citizen Task Force to Bring Back the Don Consultant to HRSDC Don Watershed Regeneration Council Don Watershed Regeneration Council Grace City of Toronto Resident Task Force to Bring Back the Don Citizen ORC/The Fettey Group Foodshare Field to Table City of Toronto Planning Citizen Self/Community Air and Vision (GWNA Newsletter) City of Toronto Water and Wastewater Services City Planning Resident Task Force to Bring Back the Don SRCHC 13

14 Lower Don River West Remedial Flood Protection Project Public Open House and Meeting #3 Appendix B List of Project Team Members September 21,

15 Appendix B: Project Team members Adele Freeman Don Haley Ken Dion Alex Blasko AmyThurston Joe Puopolo Don McKinnon Jennifer Harris Carl Bodimeade Caroline Marshall Tracey Ehl TRCA Project Manager TRCA Senior Hydrologist TRCA Watershed Resources Senior Planner TRCA Don Watershed Technical Clerk TRCA Don Watershed Resources Planner Dillon Consulting Limited Project Lead Dillon Consulting Limited Dillon Consulting Limited ACRES International Consultant Lead on Soil and Groundwater Contaminants ENVision the Hough Group Eh Harrison Consulting Inc. (Meeting Notes) 15

How To Protect A Floodplain From Flooding

How To Protect A Floodplain From Flooding EXECUTIVE SUMMARY This Class Environmental Assessment (Class EA) was undertaken to examine alternative flood protection systems, and their environmental effects, for the elimination of the flood risk on

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC.

Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. BIBLIOGRAPHY Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. Acres Consulting Services Limited, March 1983, Keating

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees Key issues Discussed Roads & Access Damaged roads. The Oil & Gas company access roads acted like dams Public

More information

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE 1.0 INTRODUCTION In early 2010, the Town of Ajax was provided with updated floodplain mapping for Carruthers Creek, based on a Regional Storm event (i.e., Hurricane Hazel), prepared by the Toronto and

More information

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON 22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:

More information

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts Floodplain Mapping 28 General Approaches to Reducing Flooding Risks Reducing Upstream

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

Greater Los Angeles County Region

Greater Los Angeles County Region Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

2D Modeling of Urban Flood Vulnerable Areas

2D Modeling of Urban Flood Vulnerable Areas 2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Risk Analysis, GIS and Arc Schematics: California Delta Levees

Risk Analysis, GIS and Arc Schematics: California Delta Levees Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

Swannanoa River Flood Risk Management Study

Swannanoa River Flood Risk Management Study Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners In recent years, multiple flood events in the New York City

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods. Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

K6- Report. Downtown Brampton Special Policy Area Comprehensive Flood Risk and Management Analysis and Downtown Etobicoke Creek Revitalization Study

K6- Report. Downtown Brampton Special Policy Area Comprehensive Flood Risk and Management Analysis and Downtown Etobicoke Creek Revitalization Study bramptonca BRAMPTON FlOWef City K6- Report Committee of Council Committee of the Council of The Corporation of the City of Brampton Date: March 25, 2013 COMMITTEE OF COUNCIL DATE: Apfi(3,2Qf3 File: P26SB

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

Scheduling Maintenance for Infiltration Basins and Trenches

Scheduling Maintenance for Infiltration Basins and Trenches Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010

More information

It s hard to avoid the word green these days.

It s hard to avoid the word green these days. Going green : Environmental jobs for scientists and engineers Alice Ramey Alice Ramey is an economist in the Office of Occupational Statistics and Employment Projections, BLS. She is available at (202)

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Notice of Study Commencement and Invitation to Participate

Notice of Study Commencement and Invitation to Participate REGION OF WATERLOO Wastewater Treatment Master Plan Class Environmental Assessment Notice of Study Commencement and Invitation to Participate Background The Regional Municipality of Waterloo is responsible

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

4 SPADINA SUBWAY EXTENSION UPDATE

4 SPADINA SUBWAY EXTENSION UPDATE 4 SPADINA SUBWAY EXTENSION UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained in the following report June 13, 2006, from the

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

Climate Adaptation and Preparedness

Climate Adaptation and Preparedness Climate Adaptation and Preparedness Aaron Durnbaugh, Adaptation Coordinator & Deputy Commissioner, City of Chicago Department of Environment Rahm Emanuel, Mayor Climate Impact: Lake Michigan Decreased

More information

SECTION 3.2 CLIMATE AND PRECIPITATION

SECTION 3.2 CLIMATE AND PRECIPITATION SECTION 3.2 CLIMATE AND PRECIPITATION Ulster County Climate Data A preliminary analysis of the Preserve s weather data shows that the average temperature has risen about two degrees over the past 114 years.

More information

Challenges. Estimated Damages from 100-Year Flood

Challenges. Estimated Damages from 100-Year Flood Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Waterway Technote Planning

Waterway Technote Planning Waterway Technote Planning Contents Benefits to planning your waterway management 1 Prioritising waterway management where to start? 1 What are your priorities? 1 Start with the best areas or those at

More information

Chapter 6: Mitigation Strategies

Chapter 6: Mitigation Strategies Chapter 6: Mitigation Strategies This section of the Plan describes the most challenging part of any such planning effort the development of a Mitigation Strategy. It is a process of: 1. Setting mitigation

More information

Muddy River Restoration Project Project Description

Muddy River Restoration Project Project Description Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in

More information

CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW

CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW A U C K L A N D C O U N C I L Decision following the hearing of an application for resource consent SUBJECT: Application for resource consent under section 88 of the Resource Management Act 1991 by D C

More information

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12) Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach

More information

1. City Council confirm the following principles for watercourse management in Toronto:

1. City Council confirm the following principles for watercourse management in Toronto: STAFF REPORT ACTION REQUIRED Coordinated Watercourse Management Plan Date: April 29, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Toronto Water All

More information

Land Conservation in the Floodplain

Land Conservation in the Floodplain Land Conservation in the Floodplain Assessing the Benefits and Costs of Green Infrastructure Investments Margaret Walls Resources for the Future What is green infrastructure? Green infrastructure is strategically

More information

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Alterna ves Development & Evalua on

Alterna ves Development & Evalua on Spring 2015 Newsletter Issue III WHERE ARE WE IN THE PROCESS? Since the NLSD Phase I Study kickoff in 2013, numerous meetings have been held with the public, the existing conditions and transportation

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table. The Hydrologic Cycle Page 1 of 1 Name Directions: The hydrologic cycle consists of the processes that change and move water through the earth s system. Use the terms below to label the hydrologic cycle.

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Beseck Switching Station Inspection

Beseck Switching Station Inspection Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV

More information

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Why should communities invest in resiliency? What are the steps communities can take to become more resilient? Community Preparedness for Flood Resiliency Nina Peek, AICP New York Planning Federation Board of Directors Senior Technical Director AKRF, Inc. Focus of Today s Presentation Why should communities invest

More information

Adaptation to a Changing Climate

Adaptation to a Changing Climate Adaptation to a Changing Climate City Infrastructure Preparedness David MacLeod City of Toronto Environment Office March 3, 2011 WHAT IS CITY INFRASTRUCTURE? Physical (Hard) Infrastructure Buildings Municipal

More information