1 Development of Capabilities for Seismic and GPS data integration, processing, storage, archival and dissemination at INCOIS and IMD Data Centers Addendum to Tender, INCOIS: PUR: 14//2010 (Note: Modification given under column is to be complied with, while Clarification, clarifies the points raised during pre-bid discussion on 11 th June 2010 and asked after. (Clarifications are given grouped under different Heads: Data acquisition, Error correction & processing, Database system, Storage &Archival, GPS related, General& Financial). Additional requirement(option): An additional component Requirements of Earthquake Risk Evaluation Center (EREC) data Center given as Annexure -1, is included as part of this tender. It is to be quoted as an Optional Item. The vendor is required to provide a technical solution, system architecture, generic specifications of hardware/software, supply of application software, software development/customization, system integration, installation and testing as per the requirements mentioned in Annexure-1. This additional component is required to be supplied and implemented at IMD Centre only. INCOIS/IMD will procure required hardware and software as per generic specification given by the vendor. Vendor is required to give a separate technical proposal and financial offer for this component viz., EREC Data Centre, under this present tender with all other purchase and other conditions remaining same. This optional requirement will be treated separately and will not be taken into the total price. Vendor cannot quote only for this part for this tender. Delivery period is one year. Details of the new requirement, delivery schedule is given in Annexure-1 of this addendum. Regarding clarification for this additional component only, vendor may forward their queries through before 10 th July 2010, to the same contact address which has already been mentioned in the tender document. The Addendum for this additional component, if necessary, will be placed in the website on 14/7/2010.

2 (A) Modifications of the clause Page No. 2 Clause Modification Clarification sought from vendor Date and Time for Submission of Tender: 1700Hrs of July 23, 2010 Clarification 6 vi Date of opening of Financial offer of Technically qualified Firm: 1600Hrs of August 18, 2010 Clause added: The data centre vendor, being an end application provider has to co-ordinate with VSAT communication link provider, respective co- coordinators of Regional seismic network, PIs (Principal Investigators) /providers who maintain the seismic/gps instrument to get continuous waveform data/gps data from field stations and Regional Seismic network centres as best possible in line with project objective xv Continuous waveform retrieval: Suitable S/W is to be designed and developed for storing continuous wave form data of all stations and later query & retrieval of such information in SEED or mseed format from the data base in the form of network/sub-network list in the denominations of year, month, day, hour and minute. The application software should have the option for decimating the higher sampling waveform data (requested in the query) to 20sps or 1sps and provide the waveform output file in mseed/seed format as mentioned above. - -

3 12 5 v The Data centre operation will be on 24x7 basis by the vendor. The vendor should make available at any time one system administrator /integrator for the round the clock operation& maintenance at each of the data Centre location of INCOIS and IMD. He should be a degree holder and should have been involved in the set-up of Data centre from beginning of the project. Please clarify the service coverage required at IMD. We need at data centre one person per shift on 24x7 basis. The vendor/ person at the Data centre has to co- ordinate with respective providers (given in clause vi, page 6 above) for any problem in receiving continuous seismic wave form data /GPS data. The vendor will be provided contact address with telephone No. address of these persons Time schedule for selection process: Submission of Technical &Financial Tenders in separate sealed covers: July 23, 2010 ( 1700Hrs) Technical presentations by Firms: July 26, 2010 Opening of Financial offers of Technically qualified firms: August 18, 2010( 1600Hrs)

4 (B) Clarifications Sl. No Clarification sought by the vendor Clarification Data acquisition,error correction & processing 1 2 Integration with existing data processing system; GPS data Application software: Apart from existing seismic data and processing Application software (Response Hydra, SEISCOM P) and for GPS data processing (RTnet/3D Tracker software, Bernese/GAMIT software mentioned in RFP), is there any other Application software required to integrate for data processing. Are we expected to interface with any instrumentation at any of The field location directly? In case we have to interface the devices directly can you provide the protocols? No. Even though, it is not the direct responsibility of the Data vendor to interface the instrument, the vendor has to co- ordinate with VSAT vendor (who provide communication solution in transfer of data) for any specific setting in the field instrument that may have to be done and ensuring end application at data centre acquire the continuous waveform data from Seismic / GPS data acquisition system on real time basis at each data centre. There must not be any data-gaps in the continuous waveform data being acquired. The list of available equipments (with make and model no.) at each filed site is enclosed with the tender document. The vendor may go through the web-sites of corresponding OEM for more details of the equipments. It is the responsibility of the vendor to understand the recording data formats and protocols being used by these data acquisition systems.

5 Will INCOIS provide all the required technical details and algorithms for processing of data as part of applications being proposed. Will there be any third party application other than GPS and Seismic data stations, for which interface is required. Is there any relation between seismic data and GPS data? Will there be any analysis involving both the data. How to read GPS wave form data? Is it fixed or variant? Is there any GPS toolkit for integration? How to connect and receive Data from VSAT What will be contents of data received from GPS stations It is expected that the vendor should understand the technical details and provide IT solution to achieve the objectives of the project. Seismic and GPS data: There is no relation with regard to data formats of GPS and Seismic. They are different from each other and hence required to be handled separately. At present, no analysis involving both the data. 7. GPS wave form should be in term of lat/long/height variation with time 8. No there any toolkit except mentioned software The contents of data received from GPS station are Lat/long/height and met data Is usage of SEISAN mandatory? If yes, will there be any specifications/ standards for interfacing SEISAN with the proposed data base. Please confirm that each data centre must acquire waveform, state---of---health, response and meta---data for each instrument for which data are acquired. The SEISAN software will be used for post-processing involving user-interaction for finalization of source parameters of earthquakes occurred and subsequently prepare the seismological bulletins. It is expected that Vendor may visit IMD to understand the requirements under this clause. The data centre must acquire the continuous waveform data. The remaining state-of-health, meta data is also required at data centre along with the waveform, if available and the field station seismic/ GPS equipment support the transmission of these parameters continuously over VSAT.

6 12 Please confirm that the successful vendor will be required to interact directly with the remote station Source device and that the software will be responsible for acquiring the real-- -time data, providing Error correction between the Remote and central site and for Acquiring any available SOH, response and meta---data. See clarification provided Sl.2 13 Please confirm that the central site software will only be required to support error correction in accordance with the protocols of the original digitiser or GPS manufacturer. Please further clarify that this support will be for the existing code installed and that any changes required to support future software versions installed on remote site equipment, will be an extra cost item. The Datacenter vendor will not be responsible for loss of data and increase in latency due to VSAT communication link and due to limitation of buffer memory in the field seismic recorder/gps receiver. However, it is expected from the data centre vendor to co ordinate with VSAT communication provider for best possible solution keeping project objective. (The VSAT is specified for UDP unicast and multicast routing as requirement. However, the vendor has to see whether this feature is supported by the end remote equipment.) We understood from discussions during the pre-bid meetings that the system should recover from Communications outages of at least 30 minutes. Please confirm that each of the Seismic digitisers and GPS receivers are configured with this length of data buffer for on---line data--re-request. If not please confirm that this data will be available from data buffered on the VSAT modem. Please confirm that any loss of data caused by insufficient bandwidth on the VSAT system which may result from flow control issues will not be the responsibility of the data center vendor. As given for Sl. No. 13 above

7 Please confirm that any loss of data resulting from insufficient outbound bandwidth will not be the responsibility of the data centre vendor. Can we assume that where TCP/IP socket connections are used for data communications between the remote site digitiser and acquisition software, that the error correction provided by the underlying TCP/IP protocol will be fully satisfactory? Can we assume that where TCP/IP socket connections are used that two connections will be available in order to implement fully redundant acquisition systems at the central site locations? Can we assume that the VSAT will fully support multicast routing for those digitisers that use this protocol Will the VSAT system support IP fragmentation? Can we assume that the flow control between the remote site device and remote site VSAT terminal will be managed by the remote site VSAT terminal and that any loss of data or erratic performance of the error correction protocols caused by improper flow control management will not be the responsibility of the data centre vendor? Please confirm that the 10 second latency for real---time data will be waived following VSAT outages where TCP/IP sockets Connections are used. Please confirm if the Q330 Sites are equipped with Baler data storage systems or another model? Q330 are equipped with baler type storage (Model No. PB-14F)

8 Please confirm that all GPS Systems with Ethernet connectivity are capable of streaming RTCM data via TCP/IP or UDP connections. Please confirm whether the vendor is required to the cost of additional station licenses for the Existing Hydra installations. Please confirm that there is a requirement for software tools to check the waveform data for incorrect instrument response. We understand that data center operators must have an independent waveform quality tool to ensure the correct response for any station within the network The GPS receiver details are provided in Annexure-2 The vendor to see scope of work and deliverable as per RFP. Yes, However, the vendor may give as an optional item, which INCOIS may buy. 27 We understand that the response management system must automatically produce the various response data products required by the real-time processing and off-line processing systems, and that these systems should be updated at all times. Please confirm. The vendor may give this as part of architecture and design solution for the Data centre. 28 Please confirm that the response management system must be able to input and output response in SAC, SEED and the various formats required by the real-time and off line processing systems Output continuous data in mseed/seed format Please confirm that suitable security and quality control checks are required to access and change information in the response management system. Seismic data and GPS data format? Yes All the continuous seismic waveform data being received from various field stations should be converted to SEED/mSEED format for final storage and integration with suitable RDBMS for meeting the requirements. Similarly for GPS, the standard

9 31 32 Integration of incoming data stream format Seismic data recording Station equipment parameters format? All the incoming continuous raw waveform data in heterogeneous formats (as mentioned in clause viii at page no.6) required to be handled The details are given in Annexure-2 of the tender document. It is the responsibility of the vendor to understand the recording data formats and protocols being used by these data acquisition systems Points need to be clear RFP(section 4 viii, ix- Interfacing at Regional centre &Integration with Existing data processing system) SEISAN database Format? ED Database: SEISAN to be analyzed? Phase arrival measurement, hypo central solutions, fault plane solutions How to integrate with the existing seismic applications of INCOIS and IMD? The data centre vendor has to provide SEED link server at each of the Regional Data centres specified and interface with existing Regional network seismic data server and Customer End(CE) router of Terrestrial line(mpls) at respective locations and transport the seismic data including meta data to data centres of INCOIS and IMD. (Terrestrial link will be provided by INCOIS). INCOIS will provide also server hardware as per specification given by vendor. The CE router of MPLS link at INCOIS and IMD will be interfaced with seismic data acquisition/processing server at respective location. The phase-picks data is organized in a database like structure in the ASCII file system and consists of many sub-directories as per year and month. More details on SEISAN data base can be had from the website The vendor may visit IMD Centre to understand the details on the SEISAN. -do- Through SEED-link protocol. 37 Seismic centres and seismic digitizer type? The details of the seismic recorders are given in Annexure-2 of the tender document. (Some of the seismic instruments types are: Retek , CMG- 3T, CMG 40T, Trillium 240(Nanometrics), STS-2(Kinemetrics), Quandra Q330 (Kinemetrics)

10 It is the responsibility of the vendor to understand the recording data formats and protocols being used by these data acquisition systems. Database system, Storage &Archival Back end application. Is this application intranet(or) internet The storage specification mentioned is for current capacity of the seismic and GPS data or does the seismic and GPS data does include future expansion Storage requirements are given in 4.xxi. Is this inclusive of processed data? If not please specify? Please confirm that each data Centre should be configured with two fully redundant acquisition servers and that each Server should acquire data from the entire network. What is the Tier of data centre? ( Tier 1,2,3 or 4) What is the level of availability needed from the overall solution? Both The storage specifications mentioned, is the indicative storage size to meet the requirements of 300 seismic stations and 100 GPS stations. At present, the storage size does not include the future expansions. However, the proposed system should have the scalability option. The storage requirement given is inclusive of processed data. However the volume of the processed data (location, time and magnitude) is very small and the storage is mainly of storing continuous waveform seismic data and GPS data in a standard format. The data centre should be designed for 99.99% availability.

11 44 Redundancy levels=n+1 or 2(N+1) Seismic data centre standard-define? Do you need Database Server to provide active-active clustering for providing fault tolerance from hardware failures or planned outages and load balance across all clustered nodes for achieving availability level up to 99.99%? Is 99.99% availability includes routine maintenance and failover time mentioned in RFP? Are you expecting continuous access of data, even in case of any node of cluster go down, all the data should be available from surviving node without any downtime As given for Sl. No above Do you need database level storage management mechanism, which should enable the availability by means of creating redundancy, automatically balance the data files across the available disks, i/o balancing across the available disks for the database for performance, availability and management? Should the database server provide support for native spatial data formats within the database, co-located with the attribute data? Should it enable to preview the data by simple SQL queries, and still have underlying database strengths of scalability, manageability, availability and security? Do you need the database server to support full 3D Data Model (3D Geometrics, surfaces, TINS, Point Clouds), all geospatial data INCOIS already has RDBMS, ETL tools in a cluster configuration with all the capabilities. The vendor is required to build a solution based on existing RDBMS & tools only.

12 including vector and raster data, topology, and network models Do you need inbuilt functionalities like Linear referencing system, GeoRaster data type, Topology data model, spatial analytic functions, Geocoding engine, and Routing engine within the database. Do you need database support option of different partitioning schemes within the database (Range, List, Hash & combinations) to split large volumes of data into separate pieces or partitions, which can be managed independently? Are you looking database partitioning for enhance the performance, and help in managing huge volumes of data and should provide foundation for Information Life Cycle Management (ILM). Do you need database self-diagnostic engine (automatic database diagnostic monitor) inbuilt into core database? Do you need Option for Automated/manual identification and tuning of high load SQL Statements and provide details about dynamic tuning capability of the database depending on workloa d requirement, system resources etc. As given above GPS related Queries 55 Page4-1,3:Please advice what exactly meant by old data and what is the format and size, content 56 Page7-x: can the bidder/contractor provide alternate SW solutions instead of (GPSS) RT net and (geodesic) 3D tracker and Bernese or these software packages already in Seismic data, SEED format, size within the capacity of storage system Please see clarification provided in Sl.61

13 use by the contracting authority? 57 Page 8- xviie: Does this mean that SW developed for this project will be considered also as Free Ware? 58 Page9-xix: What exactly mean by Data Processing? ( In the context of GPS, are we talking about the reference station Software management or we are taking about baseline processing etc; please? 59 Section 1.3 Objective of the project, paragraph after section ix, o page4: If the selected contractor for the Project is subsidiary or related to a equipment manufacturer, will it be a conflicts of interest based on the above statement that the contractor should provide generic specification of the additional hardware/ software and application software required at each locations f INCOIS and IMD, please? 60 Section 4: Functional Requirement, Page7, x: Instead of transmitting in native binary format, will the Department accepts, BINEXT format, a public domain and independent binary format supported by major manufactures? The source code of all customized software developed under this project will be property of INCOIS and IMD, who will use this software in their own Projects and will not sell to anybody outside. The vendor should provide this software under no-disclosure guarantee as given in the Tender. It is about baseline processing etc We have asked selected vendor to give generic specifications, not proprietary specifications, of the hardware and system software. The specifications will be reviewed by INCOIS and IMD experts and will be procured as per project requirement. Some of the GPS manufactures provide processing software with more features specific to their native data format. Hence it is planned to provide facility to store also this native format of GPS receiver in the data centre other than RINEX format, to be useful to some users. However, BINEX format also additionally tried as an option for those receivers which support this format.

14 61 Section 4, Page 7 xi It appears that the department already owns RT net and 3D Tracker software for real-time processing, will the Department willing to consider a better and integrated software which could operate in parallel with the Departments current two software, RT net and 3D Tracker software which ar proprietary are acceptable? INCOIS and IMD do not have this SW. RT net and 3D tracker were selected based on our requirement of real time processing for Tsunami warning system (as well as for earth crust movement) and being used elsewhere in the world ( Ex. In Geonet network in Japan) for such application. While the vendor provide solution with these SW as has been asked, the vendor could offer also any other proven SW for these applications and to give it as an option. These SW could as well be operated in parallel, if suitable. 62 Section 4, Page 7 Relating to GPS data, What is the real time display of wave forms, can the Department, please provide a graphical example? Alternatively, is the Department willing to consider other graphical forms of incoming GPS data display 63 Page 7 xvi: Kindly do advices the RDBMS used by the Department today? 64 Page7, xxix: Please do advice regarding the communication link, data bandwidth and speed used for linking INCOIS and IMD, please? Existing Real time Display system in Tsunami Warning system in INCOIS is to used. Real time display, lat/long/height/met data variation with time Oracle for seismic data acquisition and processing It is 2Mbps MPLS. However the speed will be increased higher, if required, with more number of stations added in future. 65 General Question: Some GPS/GNSS receivers do not appear to have inbuilt facility to store data hence an appropriate mechanism is required to store the data in case of outage for transmission We have not made any mandatory requirement in our Tender any specific storage in VSAT modem nor for any external storage medium outside the GPS receiver.

15 over VSAT or some VSAT modems have the capability to cache and store data directly without any storage media in between GPS/ GNSS receiver and VSAT modem which can be later transmitted further down the system. Please which of the arrangement is required? General Is there any need for large screen displays in house? Do we have to give our recommendations for the UPS, DG, and other related data centre components or do we have to quote them as well?. No The vendor should provide the details of UPS power, DG and other environmental details for implementing the project as per clause Section-4, ix, page no.6 of the tender document. INCOIS will arrange these facilities. Financial 68 Total cost specified in the Table shouldn t include the cost of optional items. In this case, the Table can be modified to identify the actual cost and the additional optional cost. Optional items specified and item specified as any other items including license fee etc will not be taken into total cost. However the vendor has to provide cost for the optional items without which the tender will be rejected. Also, the vendor may specify any other items, licenses etc, along with price and which are required for the project but not included in the Price bid format.

16 69 The Bank Guarantee format requires some additional clauses to be added as per the norms of the bank. This additional clause along with the BG format provided in the Tender could be used if the bank norms demands so. Notwithstanding anything contained herein above i) Our liability under this bank guarantee shall not exceed Rs /- (Rupees only). ii) This bank guarantee shall be valid upto iii) We are liable to pay the guaranteed amount or any part thereof under this bank guarantee only if you serve upon us a written claim or demand (and which should be received by us), on or before the Dt. before hours (Indian Standard Time) whereafter it ceases to be in effect in all respects whether or not the original bank guarantee is returned to us.

17 Annexure-1 Requirements of Earthquake Risk Evaluation Center (EREC) data Center 1. Introduction Earthquake Risk Evaluation Center (EREC), a multidisciplinary center of India Meteorological Department (IMD) is involved in generating knowledge products to help the national endeavor in mitigating the disastrous impacts of earthquakes and undertake/promote the specific tasks related to earthquake risk evaluation of cities vulnerable to earthquakes. The mandate of the centre includes generation of earthquake risk based knowledge products including seismic hazard and risk microzonation of high earthquake prone cities, develop information system and user interface. Presently, the data generated by EREC is being managed by a few small data collection and archival systems of EREC, which have become obsolete. The proposed requirements aims at setting up a state-of-the-art web based data center with the objective of multidisciplinary data management right from raw data to processed data at center, analytical capability, generation of end products and their accessibility to the end users through web page, data exchange and data security etc. 2. Data generation - Seismic hazard studies and Product generation: Study of seismic hazard and risk evaluation requires collection and generation of variety of data related to geology, geomorphology, seismotectonic, geotechnical, geophysical and built information etc to generate base map, geological map, seismotectonic map etc., and product maps such as peak ground acceleratio n, seismic hazard and risk map etc. EREC also aims to develop a state-of-art web based data / information collection and distribution system for earthquake risk hazard. The seismic hazard and risk microzonation study of metro city only, involves data generation of order of 300GB per city. The seismic microzonation of targeted cities will therefore generate about 1.5TB data. This will be followed by related application software(s) and products generation related to EREC, their availability on web, data sharing, data security and data management. 3. Requirement: The proposed database is multidisciplinary in nature with suitable hardware and software packages, with integrated design to meet the following objectives/capabilities:

18 3.1 Development analytical/computing capability integrating application software. 3.2 Development of distribution information system for ready collection of multithematic data, archival, storage, retrieval and also develop advance level interface with other related database. 3.3 Database is to be designed to incorporate tailored reporting and ad hoc query capabilities, which can support organizational decision making on the basis of product generated by application software and provide near real time view of risk information on occurrence of an earthquake. 3.4 Develop adequate printing facility of maps of different size 4. Salient features of Database: 4.1 The database should be designed based on industry standard H/w with high volume network storage, high speed network interconnect, high speed OS and automatic data management tools. 4.2 A key aspect of the data structure is the inclusion of Metadata according to NSDI (National Spatial Data Infrastructure) standards. Metadata about each feature class for each project study of various themes (e.g. seismicity/ seismic microzonation/ seismic hazard etc.) is stored in the RDBMS but is also exposed to standard geographic search engine. In addition to feature class metadata, each feature (record) also has key metadata elements that provide links back to the original sources. Access to the data can be geographic searches (e.g. what is here ), metadata bases (e.g. what data was prepared by EREC in 2005 ) or both. 4.3 Data and various products are subsequently retrieved by users through internet / VPN. Retrieval of data is transmitted using the TCP/IP protocol. 4.4 The project envisages the processed multi-disciplinary data to be expressed in geo referenced GIS presentation to be utilized for preparation of hazard maps, risk map, other type of related geo-scientific & geotechnical maps and decision support system. It is suggested that the core of this system will be a large Enterprise RDBMS type database containing all generated/ processed data content from various field studies with appropriate application server like Enterprise RDBMSAS to run various GIS middleware and applications and capable database manager.

19 4.5 To provide a user friendly web accessible interface for users desiring to access data and various end produc ts like hazard map, risk map, earthquake event information, etc. from the data center system, the solution provider has to create the set of server applications and portions that run in a client web-browser. 4.6 Near-real time observational data such as intensities, etc. reported by agencies/ individuals for preparation of shake maps etc. as a tool for disaster management under GIS based decision Support System. 4.7 The EREC database is to be integrated with database of GPS/Seismic data centre for making use of the products generated by each other 5. Hardware requirement: State-of-art industry standard hardware including servers, terminals, storage system (about 2 TB for ten year period), scanners(a4 and A3 size), product display panel, LAN, printers(a4 and A3 size), plotter (A0 size) etc. as envisaged in schematic block diagram and other miscellaneous accessories required to meet actual requirements. 6.0 Software requirement: Basic OS for servers, terminals and other peripheral. Database: Enterprise Edition RDBMS Database with license, media, documentation and warranty. Application Server: AS compatible to RDBMS Enterprise Edition with license, media, documentation and warranty. GIS software: GIS (Latest version) Enterprise Edition with license, media, documentation and warranty. Application/Analysis software (licensed) required are as follows: o SHAKE, LIQUEPRO, FLAC-3D, LIQUEFAC, HAZUS99, ERDAS, ROCKWARE, SEISAN, DATAMINE, Zint Compatible with Digital Modelling capability, other software pertaining to hazard & Risk evaluation Software

20 Web Portal software: A web server with license, media, documentation and warranty. Firewall software: Industry standard dedicated Firewall 7. Requirements for Software Development (Deliverables) 7.1 Integration of databases: Project requirement would be integration of different databases, so that all information related to earthquake parameters in real time may be used for assessing input for actual hazard. Software provisions must be there for accessing/injecting satellite imagery, maps/charts and other processed information from other databases from similar organizations in near real time. 7.2 Earthquake Hazard Product generation: These are GIS based map products related to seismic hazard and risk which will be produced using various application softwares. 7.3 GIS and integration with map data base : Suitable S/W is required to be designed and developed for linking spatial data base engine with RDBMS to generate user defined dynamic and layered map products such as current as well as old earthquake information, catalogs, Intensity map, Site response map, Geological map, hazard map, etc. **************************** -x-

21 Table-1 Expected Deliverables S. No. Milestone Deliverable Timeline 1 Preliminary Design Review (PDR) 2 Critical design Review(CDR) 3 Installation and functional test Preliminary Design Review document: System Architecture Development Plan Integration Plan Operation maintenance Plan Tender Document for procurement hardware, system software & Application software by INCOIS/IMD Prototype development and demonstration. Critical Design Review document: Integration and testing of hardware & software. Deliverable software components as listed in Section 7.0 in Annexure 1 Installation of final software in the computing system. Functional test T + 1 Month T+6 Months T+9 months 4 Reliability Test and Acceptance ATP( Acceptance Test Plan) document and test T+12 months

22 Table-2 S.No Description of item Amount (Rs./USD) 1 System Architecture Hardware, system software and application software specification (Tender document) 2 Application Software development as envisaged. 3 Installation, System Integration & commissioning 4 Maintenance Charges during 1-year warranty period 5 Annual Maintenance Charges(comprehensive) during 2 nd year period 6 Annual Maintenance Charges(comprehensive) during 3 rd year period 7 On-site training to engineers at IMD 8 Statutory Levies and Taxes 9 Total Cost 10 Any other items, including license fee etc;

23

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest.

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest. Clarifications/Responses for Notice Inviting Tender From Companies/Agencies for Hiring Four Dedicated Servers (3 - Linux & 1 - Windows) Sr. No. Page No. Clause in Tender Clarification/Suggestion Sought

More information

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05 Corrigendum for the Tender for Web Based Project Monitoring Tool & MIS System Bidders Clarification Sl. Clause /Page no Tender Clause Clarification Sought Clarification No. 1 Page No:4 No consortium Consortium

More information

Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries

Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries The pre-bid meeting for clarifications on the Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA was held

More information

TERMS OF REFERENCE OF CONSULTANT- GIS AND VULNERABILITY ANALYSIS & RISK ASSESSMENT

TERMS OF REFERENCE OF CONSULTANT- GIS AND VULNERABILITY ANALYSIS & RISK ASSESSMENT TERMS OF REFERENCE OF CONSULTANT- GIS AND VULNERABILITY ANALYSIS & RISK ASSESSMENT Educational Qualifications and Experience: For Senior Consultant (GIS & Risk and Vulnerability Analysis) - Master of Engineering

More information

INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS

INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS Proposal for SERC Network Accessible Storage Tender No. SERC/2015/05 dt.29.1.2016 Supercomputer Education and Research Centre

More information

City s.R.P.A.S.R.A.R.A.R.C.A. A.C.B.B.B.A.C.B.A.C.C.A.

City s.R.P.A.S.R.A.R.A.R.C.A. A.C.B.B.B.A.C.B.A.C.C.A. CITY OF NOVI ARCGIS SERVER DEVELOPMENT & HOSTING SERVICES ADDENDUM #1 INTENT: This addendum has been issued to modify and/or interpret the original specifications for the RFP named above. Unless otherwise

More information

RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157

RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157 RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157 ADB/ICB/CGSP/2013/0157 No. Question or Clarification

More information

MIS PROJECT COST ESTIMATES. 8.1 Costs CHAPTER 8

MIS PROJECT COST ESTIMATES. 8.1 Costs CHAPTER 8 CHAPTER 8 MIS PROJECT COST ESTIMATES This chapter details the costs involved in implementation of the proposed IS and IT solution for UPID according to the implementation plan provided in chapter 7. These

More information

APPENDIX 8 TO SCHEDULE 3.3

APPENDIX 8 TO SCHEDULE 3.3 EHIBIT Q to Amendment No. 60 - APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT EHIBIT Q to Amendment No.

More information

APPENDIX 8 TO SCHEDULE 3.3

APPENDIX 8 TO SCHEDULE 3.3 APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE

More information

Managing Large Imagery Databases via the Web

Managing Large Imagery Databases via the Web 'Photogrammetric Week 01' D. Fritsch & R. Spiller, Eds. Wichmann Verlag, Heidelberg 2001. Meyer 309 Managing Large Imagery Databases via the Web UWE MEYER, Dortmund ABSTRACT The terramapserver system is

More information

Fusion Service Schedule Virtual Data Centre ( VDC ) Version FUS-VDC-7.1

Fusion Service Schedule Virtual Data Centre ( VDC ) Version FUS-VDC-7.1 Fusion Service Schedule Virtual Data Centre ( VDC ) Version FUS-VDC-7.1 1 DEFINITIONS AND INTERPRETATIONS 1.1. Words or phrases used with capital letters in this Service Schedule shall have the same meanings

More information

State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14

State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14 fcgkj ljdkj lllllljdkj State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14 NOTICE INVITING TENDER From Companies/Agencies for Hiring Four Dedicated Servers (1 Linux Application Server

More information

Powerful Management of Financial Big Data

Powerful Management of Financial Big Data Powerful Management of Financial Big Data TickSmith s solutions are the first to apply the processing power, speed, and capacity of cutting-edge Big Data technology to financial data. We combine open source

More information

1. Desktop Systems: Given below is the clarification and suggested changes.

1. Desktop Systems: Given below is the clarification and suggested changes. Haryana State Health Resource Centre Clarification for Tender Notice in reference to bid no. NIT 1 0f 2013-14 dated 14-12-13 and /Addendum dated 28-01-2014 and subsequent clarifications dated 14-02-14,

More information

Online Transaction Processing in SQL Server 2008

Online Transaction Processing in SQL Server 2008 Online Transaction Processing in SQL Server 2008 White Paper Published: August 2007 Updated: July 2008 Summary: Microsoft SQL Server 2008 provides a database platform that is optimized for today s applications,

More information

2015 FRCA Installation and Supply of Data Center Infrastructure TENDER 11/2015. Requirement Specification Document

2015 FRCA Installation and Supply of Data Center Infrastructure TENDER 11/2015. Requirement Specification Document 2015 FRCA Installation and Supply of Data Center Infrastructure TENDER 11/2015 Specification Document Tender Document Due Date: 25 September2015 Fiji Revenue and Customs Authority (FRCA) 2015 Installation

More information

REQUEST FOR PROPOSAL FOR IT ASSET MANAGEMENT SERVICES

REQUEST FOR PROPOSAL FOR IT ASSET MANAGEMENT SERVICES KENYA AIRWAYS TENDER NO. T/026/14 REQUEST FOR PROPOSAL FOR IT ASSET MANAGEMENT SERVICES Release Date: 25 th April 2014 Closing date: 23 rd May 2014 1 INVITATION TO TENDER TENDER NO.T/026/14: PROVISION

More information

Clarifications: 1) We are asking for a two week extension in order to provide a detailed response to the requirements outlined in the REI.

Clarifications: 1) We are asking for a two week extension in order to provide a detailed response to the requirements outlined in the REI. ADDENDUM # 02 Thursday, February 06, 2014 REI# 60147031 Request for Expressions of Interest for Audit & Enforcement Replacement of Nova Scotia Indian Fuel Tax Exemption (NSIFTE) System The following clarifications

More information

Purpose... 3. Computer Hardware Configurations... 6 Single Computer Configuration... 6 Multiple Server Configurations... 7. Data Encryption...

Purpose... 3. Computer Hardware Configurations... 6 Single Computer Configuration... 6 Multiple Server Configurations... 7. Data Encryption... Contents Purpose... 3 Background on Keyscan Software... 3 Client... 4 Communication Service... 4 SQL Server 2012 Express... 4 Aurora Optional Software Modules... 5 Computer Hardware Configurations... 6

More information

Tender Document for Procurement of Internet Bandwidth

Tender Document for Procurement of Internet Bandwidth Tender Document for Procurement of Internet Bandwidth Ramanujan Computing Centre Anna University, Chennai - 600 025. REQUEST FOR PROPOSAL OBJECTIVE OF THIS RFP This RFP (Request for Proposal) is issued

More information

SAP HANA SPS 09 - What s New? SAP HANA Scalability

SAP HANA SPS 09 - What s New? SAP HANA Scalability SAP HANA SPS 09 - What s New? SAP HANA Scalability (Delta from SPS08 to SPS09) SAP HANA Product Management November, 2014 2014 SAP AG or an SAP affiliate company. All rights reserved. 1 Disclaimer This

More information

Microsoft Azure ExpressRoute

Microsoft Azure ExpressRoute Microsoft Azure ExpressRoute Michael Washam Summary: Microsoft Azure ExpressRoute makes it easy to establish dedicated and private circuits between your data center and Microsoft Azure. ExpressRoute connections

More information

SAN Conceptual and Design Basics

SAN Conceptual and Design Basics TECHNICAL NOTE VMware Infrastructure 3 SAN Conceptual and Design Basics VMware ESX Server can be used in conjunction with a SAN (storage area network), a specialized high speed network that connects computer

More information

Tender for 30Mbps (1:1) Internet Leased Line on RF for Translational Health Science an Technology Institute, Faridabad

Tender for 30Mbps (1:1) Internet Leased Line on RF for Translational Health Science an Technology Institute, Faridabad Translational Health Science and Technology Institute, NCR-Biotech Science Cluster, 3rd Mile Stone, Faridabad-Gurgaon Expressway, Faridabad 121001 Phone: +91-129-2876444 Tender for 30Mbps (1:1) Internet

More information

Title of the Paper: ACQUISITION OF VIRTUAL INFRASTRUCTURE FOR EGOVERNANCE. Theme: TECHNOLOGIES FOR REDEFINING INDIA. Keywords:

Title of the Paper: ACQUISITION OF VIRTUAL INFRASTRUCTURE FOR EGOVERNANCE. Theme: TECHNOLOGIES FOR REDEFINING INDIA. Keywords: Title of the Paper: ACQUISITION OF VIRTUAL INFRASTRUCTURE FOR EGOVERNANCE Theme: TECHNOLOGIES FOR REDEFINING INDIA Keywords: 5 R's of Procurement, IaaS PaaS &SaaS, Digital India, NeGP Abstract: Government

More information

Enterprise GIS Architecture Deployment Options. Andrew Sakowicz

Enterprise GIS Architecture Deployment Options. Andrew Sakowicz Enterprise GIS Architecture Deployment Options Andrew Sakowicz Audience Audience - Architects - Developers - Administrators - Project Managers Level: - Beginner / Intermediate Introduction Andrew Sakowicz

More information

NOS for Network Support (903)

NOS for Network Support (903) NOS for Network Support (903) November 2014 V1.1 NOS Reference ESKITP903301 ESKITP903401 ESKITP903501 ESKITP903601 NOS Title Assist with Installation, Implementation and Handover of Network Infrastructure

More information

Contingency Planning and Disaster Recovery

Contingency Planning and Disaster Recovery Contingency Planning and Disaster Recovery Best Practices Guide Perceptive Content Version: 7.0.x Written by: Product Knowledge Date: October 2014 2014 Perceptive Software. All rights reserved Perceptive

More information

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM PROPOSALS REQUESTED BY THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM The Town of Old Orchard Beach will receive sealed bids for an IP based phone system. The project

More information

CounselorMax and ORS Managed Hosting RFP 15-NW-0016

CounselorMax and ORS Managed Hosting RFP 15-NW-0016 CounselorMax and ORS Managed Hosting RFP 15-NW-0016 Posting Date 4/22/2015 Proposal submission deadline 5/15/2015, 5:00 PM ET Purpose of the RFP NeighborWorks America has a requirement for managed hosting

More information

City of Coral Gables

City of Coral Gables City of Coral Gables Information Technology Department IT TECHNICAL SUPPORT DIVISION Infrastructure Upgrade Plan Systems, Applications, Network, and Telecommunications Infrastructure OVERVIEW Last revision:

More information

Addendum 1 RFP #154D-16F CityWorks System Cloud Hosting

Addendum 1 RFP #154D-16F CityWorks System Cloud Hosting Addendum 1 CityWorks System Cloud Hosting This addendum is issued to answer questions submitted via email and to make the following revisions to this solicitation. All information provided herein is hereby

More information

ANNEXURE - I MPD/EPC/TIC/201-15 NR logo web application development dated: 20.03.2014 Page 1

ANNEXURE - I MPD/EPC/TIC/201-15 NR logo web application development dated: 20.03.2014 Page 1 MPD/EPC/TIC/201-15 NR logo web application development dated: 20.03.2014 Page 1 PREFACE The Rubber Board a statutory Body under the Ministry of Commerce & Industry, Govt. of India, for the development

More information

CASE STUDY: Oracle TimesTen In-Memory Database and Shared Disk HA Implementation at Instance level. -ORACLE TIMESTEN 11gR1

CASE STUDY: Oracle TimesTen In-Memory Database and Shared Disk HA Implementation at Instance level. -ORACLE TIMESTEN 11gR1 CASE STUDY: Oracle TimesTen In-Memory Database and Shared Disk HA Implementation at Instance level -ORACLE TIMESTEN 11gR1 CASE STUDY Oracle TimesTen In-Memory Database and Shared Disk HA Implementation

More information

Request for Proposal RFP No. IT-2015-101. Phone System Replacement

Request for Proposal RFP No. IT-2015-101. Phone System Replacement Request for Proposal RFP No. IT-2015-101 November 23 rd 2015 Phone System Replacement Deadline for Receipt of Proposals: January 18 th, 2016 at 4:30pm Proposals to be submitted by e-mail to Morgan Calvert

More information

Fusion Service Schedule Virtual Data Centre ( VDC ) Version FUS-VDC-7.1

Fusion Service Schedule Virtual Data Centre ( VDC ) Version FUS-VDC-7.1 Fusion Service Schedule Virtual Data Centre ( VDC ) Version FUS-VDC-7.1 1 DEFINITIONS AND INTERPRETATIONS 1.1. Words or phrases used with capital letters in this Service Schedule shall have the same meanings

More information

211 LA County. Technology Infrastructure Assessment. Request for Proposals. August 2012 Request for Proposals- 211 LA County 1

211 LA County. Technology Infrastructure Assessment. Request for Proposals. August 2012 Request for Proposals- 211 LA County 1 211 LA County Technology Infrastructure Assessment Request for Proposals August 2012 Request for Proposals- 211 LA County 1 1. General conditions and proposers directions 1.1. Overview 1.1.1. 211 LA County

More information

MANAGED COLOCATION SERVICES TERMS AND CONDITIONS

MANAGED COLOCATION SERVICES TERMS AND CONDITIONS MANAGED COLOCATION SERVICES TERMS AND CONDITIONS In addition to the General Terms and Conditions, your use of the Managed Colocation Services is subject to the following additional terms and conditions:

More information

SAN TECHNICAL - DETAILS/ SPECIFICATIONS

SAN TECHNICAL - DETAILS/ SPECIFICATIONS SAN TECHNICAL - DETAILS/ SPECIFICATIONS Technical Details / Specifications for 25 -TB Usable capacity SAN Solution Item 1) SAN STORAGE HARDWARE : One No. S.N. Features Description Technical Compliance

More information

Wherever there is a conflict, the Addenda to the RFP document and the RFP document (in that order) override the explanations that are provided here.

Wherever there is a conflict, the Addenda to the RFP document and the RFP document (in that order) override the explanations that are provided here. Procurement of Services to Design, Develop, Implement and Maintain Centralized e-governance Application for Urban Local Bodies in Tamil Nadu Explanatory Notes 2 / Dated 17-December--2013 Explanatory Notes

More information

TARRANT COUNTY PURCHASING DEPARTMENT

TARRANT COUNTY PURCHASING DEPARTMENT JACK BEACHAM, C.P.M., A.P.P. PURCHASING AGENT TARRANT COUNTY PURCHASING DEPARTMENT AUGUST 4, 2010 RFP NO. 2010-103 ROB COX, C.P.M., A.P.P. ASSISTANT PURCHASING AGENT RFP FOR DIGITAL ASSET MANAGEMENT SYSTEM

More information

Archiving and Managing Remote Sensing Data Using State of the Art Storage Technologies

Archiving and Managing Remote Sensing Data Using State of the Art Storage Technologies Archiving and Managing Remote Sensing Data Using State of the Art Storage Technologies Ms B Lakshmi C Chandrasekhar Reddy SVSRK Kishore SDAPSA, NRSC, Hyderabad NRSC Functions Remote Sensing Data Acquisition

More information

Infor Web UI Sizing and Deployment for a Thin Client Solution

Infor Web UI Sizing and Deployment for a Thin Client Solution Infor Web UI Sizing and Deployment for a Thin Client Solution Copyright 2012 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and

More information

Managed Colocation Service Terms and Conditions for CLOUDHPT.COM

Managed Colocation Service Terms and Conditions for CLOUDHPT.COM Managed Colocation Service Terms and Conditions for CLOUDHPT.COM PRODUCT TERMS (Managed Colocation Service) In addition to the General Terms and Conditions, your use of the Managed Colocation Services

More information

TERMS OF REFERENCE. I. Rationale. Scope of Work

TERMS OF REFERENCE. I. Rationale. Scope of Work TERMS OF REFERENCE Provision Secondary Internet Connection Service to the Public-Private Partnership Center of the Philippines (PPPCP) I. Rationale One of the major requirements of the new media is the

More information

High Availability Database Solutions. for PostgreSQL & Postgres Plus

High Availability Database Solutions. for PostgreSQL & Postgres Plus High Availability Database Solutions for PostgreSQL & Postgres Plus An EnterpriseDB White Paper for DBAs, Application Developers and Enterprise Architects November, 2008 High Availability Database Solutions

More information

FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW

FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW I/A Series SOFTWARE Product Specifications Logo I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 The I/A Series Intelligent SCADA Platform takes the traditional SCADA Master Station to a new

More information

Response of bidders' queries for RFP for Hosting of Website(s) of PNB on Dedicated Server

Response of bidders' queries for RFP for Hosting of Website(s) of PNB on Dedicated Server Response of bidders' queries for RFP for Hosting of Website(s) of PNB on Dedicated Server Srno 1 Current RFP clause Clause Details Bidder Query Our Response 2.2 (Eligibilty Criteria), Page Parent company

More information

Amendment 1 - Annexure 5 (C) Technical Criteria

Amendment 1 - Annexure 5 (C) Technical Criteria 1 - Annexure 5 (C) Technical Criteria S. Eligibility Criteria Documents required Complied Y/N Formatted: Heading 2, Indent: Left: 0", Hanging: 0.4" C) Technical Criteria (Experience and other Technical

More information

Big Data and Analytics: Getting Started with ArcGIS. Mike Park Erik Hoel

Big Data and Analytics: Getting Started with ArcGIS. Mike Park Erik Hoel Big Data and Analytics: Getting Started with ArcGIS Mike Park Erik Hoel Agenda Overview of big data Distributed computation User experience Data management Big data What is it? Big Data is a loosely defined

More information

REQUEST FOR PROPOSAL FOR DATA CENTRE CO-LOCATION AND NETWORK CONNECTIVITY SOLUTION Pre-Bid Meeting Held On : May 18, 2010, 15:30 Hrs

REQUEST FOR PROPOSAL FOR DATA CENTRE CO-LOCATION AND NETWORK CONNECTIVITY SOLUTION Pre-Bid Meeting Held On : May 18, 2010, 15:30 Hrs REQUEST FOR PROPOSAL FOR DATA CETRE CO-LOCATIO AD ETWORK COECTIVITY SOLUTIO Pre-Bid Meeting Held On : May 18, 2010, 15:30 Hrs S. Section o Description 1 Present Setup 2.2.1 The servers are under AMC with

More information

Incorporated Research Institutions for Seismology. Request for Proposal. IRIS Data Management System Data Product Development.

Incorporated Research Institutions for Seismology. Request for Proposal. IRIS Data Management System Data Product Development. Incorporated Research Institutions for Seismology Request for Proposal IRIS Data Management System Data Product Development February 9, 2011 RFP IRIS Data Management System Data Product Development Table

More information

Testing Big data is one of the biggest

Testing Big data is one of the biggest Infosys Labs Briefings VOL 11 NO 1 2013 Big Data: Testing Approach to Overcome Quality Challenges By Mahesh Gudipati, Shanthi Rao, Naju D. Mohan and Naveen Kumar Gajja Validate data quality by employing

More information

Using EonStor FC-host Storage Systems in VMware Infrastructure 3 and vsphere 4

Using EonStor FC-host Storage Systems in VMware Infrastructure 3 and vsphere 4 Using EonStor FC-host Storage Systems in VMware Infrastructure 3 and vsphere 4 Application Note Abstract This application note explains the configure details of using Infortrend FC-host storage systems

More information

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES The City of Palmer, AK (hereinafter City) is issuing a Request for Proposal (hereinafter RFP) to obtain the services of a qualified firm to

More information

Tender document. for. Providing Managed Internet Leased Line Network. at Chandigarh Police Headquarters, Sector 9, Chandigarh

Tender document. for. Providing Managed Internet Leased Line Network. at Chandigarh Police Headquarters, Sector 9, Chandigarh Tender document for Providing Managed Internet Leased Line Network at Chandigarh Police Headquarters, Sector 9, Chandigarh TENDER FOR MANAGED INTERNET LEASED LINE AT PHQ-9, CHANDIGARH 1 INDEX TENDER FOR

More information

ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT

ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT OVERVIEW The New Jersey Statewide Voter Registration System (SVRS) was purchased from Covansys, Inc in 2005 based on their ElectioNet application. While the core

More information

White Paper. Requirements of Network Virtualization

White Paper. Requirements of Network Virtualization White Paper on Requirements of Network Virtualization INDEX 1. Introduction 2. Architecture of Network Virtualization 3. Requirements for Network virtualization 3.1. Isolation 3.2. Network abstraction

More information

Request for Information PM07212011 CONTRACT MANAGEMENT SOLUTION

Request for Information PM07212011 CONTRACT MANAGEMENT SOLUTION Request for Information PM07212011 CONTRACT MANAGEMENT SOLUTION July 21, 2011 1 Table of Contents I. Introduction and Purpose of Request For Information... 1 II. Background... 2 III. Description of Information

More information

Designing a Cloud Storage System

Designing a Cloud Storage System Designing a Cloud Storage System End to End Cloud Storage When designing a cloud storage system, there is value in decoupling the system s archival capacity (its ability to persistently store large volumes

More information

The Methodology Behind the Dell SQL Server Advisor Tool

The Methodology Behind the Dell SQL Server Advisor Tool The Methodology Behind the Dell SQL Server Advisor Tool Database Solutions Engineering By Phani MV Dell Product Group October 2009 Executive Summary The Dell SQL Server Advisor is intended to perform capacity

More information

STATUS OF IMPLEMENTATION AT RTH NEW DELHI. Summary and purpose of document

STATUS OF IMPLEMENTATION AT RTH NEW DELHI. Summary and purpose of document WORLD METEOROLOGICAL ORGANIZATION REGIONAL ASSOCIATION II RA II/ICM-GTS 2002/Doc. 2(3) (30.XII.2001) ITEM 2.1-2.3 IMPLEMENTATION - CO-ORDINATION MEETING ON THE GTS IN RA II (SOUTHERN PART) NEW DELHI, 7-10

More information

MARINE PRODUCTS EXPORT DEVELOPMENT AUTHORITY Panampilly Nagar, Kochi-682036 Ph: 0484-2310160, e-mail: ho@mpeda.gov.in

MARINE PRODUCTS EXPORT DEVELOPMENT AUTHORITY Panampilly Nagar, Kochi-682036 Ph: 0484-2310160, e-mail: ho@mpeda.gov.in MARINE PRODUCTS EXPORT DEVELOPMENT AUTHORITY Panampilly Nagar, Kochi-682036 Ph: 0484-2310160, e-mail: ho@mpeda.gov.in 5/26/2014/EDP-HO 19/01/2015 Sub: Quotation for dedicated Leased Line Internet connection

More information

School of Open Learning University of Delhi

School of Open Learning University of Delhi School of Open Learning University of Delhi LIMITED TENDER FOR CONFIGURATION & MAINTENANCE OF ORACLE RAC SERVICES Tender No. Dated: Cost: Rs.500/- Submission of tender 25/06/2015 (extended date) Limited

More information

Converged, Real-time Analytics Enabling Faster Decision Making and New Business Opportunities

Converged, Real-time Analytics Enabling Faster Decision Making and New Business Opportunities Technology Insight Paper Converged, Real-time Analytics Enabling Faster Decision Making and New Business Opportunities By John Webster February 2015 Enabling you to make the best technology decisions Enabling

More information

Chapter 6 Essentials of Design and the Design Activities

Chapter 6 Essentials of Design and the Design Activities Systems Analysis and Design in a Changing World, sixth edition 6-1 Chapter 6 Essentials of Design and the Design Activities Chapter Overview There are two major themes in this chapter. The first major

More information

All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-751 019

All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-751 019 All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-75 09 Corrigendum II for Tender for Hospital Information System Date: 0/0/203 In reference to tender No.200(002)/203/S&P

More information

REQUEST FOR PROPOSAL SUPPLY, INSTALLATION AND CUSTOMIZATION OF HELPDESK SOFTWARE. Tender No. ECIL / CSD / 10-3053 dated 27.05.2011

REQUEST FOR PROPOSAL SUPPLY, INSTALLATION AND CUSTOMIZATION OF HELPDESK SOFTWARE. Tender No. ECIL / CSD / 10-3053 dated 27.05.2011 REQUEST FOR PROPOSAL FOR SUPPLY, INSTALLATION AND CUSTOMIZATION OF HELPDESK SOFTWARE Tender No. ECIL / CSD / 10-3053 dated 27.05.2011 ELECTRONICS CORPORATION OF INDIA LTD ( A Government of India Enterprise

More information

Database Configuration: SAN or NAS

Database Configuration: SAN or NAS Database Configuration: SAN or NAS Discussion of Fibre Channel SAN and NAS Version:.0 Greg Schulz DBSANNAS.DOC Preface This publication is for general guidance and informational purposes only. The information

More information

Information Security Assessment and Testing Services RFQ # 28873 Questions and Answers September 8, 2014

Information Security Assessment and Testing Services RFQ # 28873 Questions and Answers September 8, 2014 QUESTIONS ANSWERS Q1 How many locations and can all locations be tested from a A1 5 locations and not all tests can be performed from a central location? central location. Q2 Connection type between location

More information

Developing Fleet and Asset Tracking Solutions with Web Maps

Developing Fleet and Asset Tracking Solutions with Web Maps Developing Fleet and Asset Tracking Solutions with Web Maps Introduction Many organizations have mobile field staff that perform business processes away from the office which include sales, service, maintenance,

More information

Expression of Interest (EOI) For. End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank

Expression of Interest (EOI) For. End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank Expression of Interest (EOI) For End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank PUNJAB NATIONAL BANK INFORMATION TECHNOLOGY DIVISION HEAD OFFICE, 5 SANSAD MARG, NEW

More information

Town of Needham Document Management Storage and Retrieval Solution RFP14NEE272G

Town of Needham Document Management Storage and Retrieval Solution RFP14NEE272G Notice to All Prospective Bidder Deadline for written questions 4:00 p.m. Friday, May 9, 2014 ADDENDUM #2 RELEASED (WEDNESDAY, MAY 14, 2014) We are issuing this addendum to provide more information with

More information

Sl. No. Ref Sections/Clause requiring Clarification. RFP (Page No.)

Sl. No. Ref Sections/Clause requiring Clarification. RFP (Page No.) Sl. No. RFP (Page No.) Ref Sections/Clause requiring Clarification Pre-Bid Queries for RFP Reference No: OBC/HO/DIT/RFP/SECURITY EQUIPMENTS/47/2014 Points of clarification given in the RFP Clarification

More information

Microsoft SQL Server 2008 R2 Enterprise Edition and Microsoft SharePoint Server 2010

Microsoft SQL Server 2008 R2 Enterprise Edition and Microsoft SharePoint Server 2010 Microsoft SQL Server 2008 R2 Enterprise Edition and Microsoft SharePoint Server 2010 Better Together Writer: Bill Baer, Technical Product Manager, SharePoint Product Group Technical Reviewers: Steve Peschka,

More information

Integration Guide. EMC Data Domain and Silver Peak VXOA 4.4.10 Integration Guide

Integration Guide. EMC Data Domain and Silver Peak VXOA 4.4.10 Integration Guide Integration Guide EMC Data Domain and Silver Peak VXOA 4.4.10 Integration Guide August 2013 Copyright 2013 EMC Corporation. All Rights Reserved. EMC believes the information in this publication is accurate

More information

NET ACCESS VOICE PRIVATE CLOUD

NET ACCESS VOICE PRIVATE CLOUD Page 0 2015 SOLUTION BRIEF NET ACCESS VOICE PRIVATE CLOUD A Cloud and Connectivity Solution for Hosted Voice Applications NET ACCESS LLC 9 Wing Drive Cedar Knolls, NJ 07927 www.nac.net Page 1 Table of

More information

Revised Policy for Backup and Cluster Server Software Pricing

Revised Policy for Backup and Cluster Server Software Pricing Date: June 15, 2004 Product Bulletin: 565 Page 1 of 11 Revised Policy for Backup and Cluster Software Pricing This new policy eliminates the need for cluster channel license fees, provides order samples,

More information

Building Reliable, Scalable AR System Solutions. High-Availability. White Paper

Building Reliable, Scalable AR System Solutions. High-Availability. White Paper Building Reliable, Scalable Solutions High-Availability White Paper Introduction This paper will discuss the products, tools and strategies available for building reliable and scalable Action Request System

More information

Office of the Competition Commission of India 18-20 Hindustan Times House, K.G. Marg, New Delhi - 110001

Office of the Competition Commission of India 18-20 Hindustan Times House, K.G. Marg, New Delhi - 110001 Office of the Competition Commission of India 18-20 Hindustan Times House, K.G. Marg, New Delhi - 110001 F.No- D-33011/1/2010-CCI (42) Dated: 11/02/2015 Limited Tender Enquiry To ---------------------------

More information

Highly Available Mobile Services Infrastructure Using Oracle Berkeley DB

Highly Available Mobile Services Infrastructure Using Oracle Berkeley DB Highly Available Mobile Services Infrastructure Using Oracle Berkeley DB Executive Summary Oracle Berkeley DB is used in a wide variety of carrier-grade mobile infrastructure systems. Berkeley DB provides

More information

Generally the topology of the required VSAT network will be star as all applications are located in Abidjan.

Generally the topology of the required VSAT network will be star as all applications are located in Abidjan. SECOND SET OF RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY- ADB/ICB/CGSP/2013/0157 No Question or Clarification Requested.

More information

Customized Cloud Solution

Customized Cloud Solution Customized Cloud Solution (Overall Cloud Performance Expectations) Last Updated: June 5, 2012 Prepared by: Polleo Systems, Inc. Notice of Confidentiality: The enclosed material is proprietary to Polleo

More information

EMC CENTERA VIRTUAL ARCHIVE

EMC CENTERA VIRTUAL ARCHIVE White Paper EMC CENTERA VIRTUAL ARCHIVE Planning and Configuration Guide Abstract This white paper provides best practices for using EMC Centera Virtual Archive in a customer environment. The guide starts

More information

Tushar Joshi Turtle Networks Ltd

Tushar Joshi Turtle Networks Ltd MySQL Database for High Availability Web Applications Tushar Joshi Turtle Networks Ltd www.turtle.net Overview What is High Availability? Web/Network Architecture Applications MySQL Replication MySQL Clustering

More information

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 TENDER NOTICE FOR INTERNET CONNECTIVITY

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 TENDER NOTICE FOR INTERNET CONNECTIVITY Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 No. RSTV/TKSA/Technical/2014 Admn 07 April, 2014 TENDER NOTICE FOR INTERNET CONNECTIVITY Sealed tenders

More information

Request for Information (RFI) for Managed Hosting Service

Request for Information (RFI) for Managed Hosting Service FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS ORGANISATION DES NATIONS UNIES POUR L ALIMENTATION ET L AGRICULTURE ORGANIZACION DE LAS NACIONES UNIDAS PARA LA AGRICULTURA Y LA ALIMENTACION Viale

More information

Introduction to Database as a Service

Introduction to Database as a Service Introduction to Database as a Service Exadata Platform Revised 8/1/13 Database as a Service (DBaaS) Starts With The Business Needs Establish an IT delivery model that reduces costs, meets demand, and fulfills

More information

REQUEST FOR PROPOSAL. #9-11-13 Storage Solution RFP

REQUEST FOR PROPOSAL. #9-11-13 Storage Solution RFP REQUEST FOR PROPOSAL #9-11-13 Storage Solution RFP Issue Date: September 11, 2013 Due Date: Friday, October 11, 2013, 4:00pm Anticipated Award Date: January 1, 2014 Issued by Jackson County Information

More information

Building Highly Available Database Servers Using Oracle Real Application Clusters. An Oracle White Paper May, 2002

Building Highly Available Database Servers Using Oracle Real Application Clusters. An Oracle White Paper May, 2002 Building Highly Available Database Servers Using Oracle Real Application Clusters An Oracle White Paper May, 2002 Building Highly Available Database Servers Using Oracle Real Application Clusters EXECUTIVE

More information

Exhibit B5b South Dakota. Vendor Questions COTS Software Set

Exhibit B5b South Dakota. Vendor Questions COTS Software Set Appendix C Vendor Questions Anything t Applicable should be marked NA. Vendor Questions COTS Software Set Infrastructure 1. Typically the State of South Dakota prefers to host all systems. In the event

More information

INVITATION OF TENDERS

INVITATION OF TENDERS Cost of Tender Document Fee Rs.500/ NATIONAL INSTITUTE OF TECHNOLOGY (Under the Ministry of HRD Govt. of India) KURUKSHETRA-136119 (Haryana) INVITATION OF TENDERS Procurement of 155 Mbps (1:1) Leased Line

More information

How To Improve The Humano-Uganda Satellite Network

How To Improve The Humano-Uganda Satellite Network Regarding manner of submission: an original and 5 copies of the proposal are requested. Is this just for the technical component or for the pricing component as well? A) Both Who are the persons we have

More information

F. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India

F. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India F. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India (A Statutory Authority established under the Food Safety & Standards Act, 2006) Establishment Division FDA Bhawan, Kotla Road, Near

More information

IDBI Bank Ltd. value which should be sized on this appliance second for 2048 Bit SSL encryption." appliance/hardware and should be upgrade to 15 Gbps

IDBI Bank Ltd. value which should be sized on this appliance second for 2048 Bit SSL encryption. appliance/hardware and should be upgrade to 15 Gbps 1 2 3 4 Point 1-Hardware Specifications Setup A: Point C 1-Hardware Specifications Setup A: Point E 2-Hardware Specifications Setup B: point B 2-Hardware Specifications Setup B: point E The Solution should

More information

MDM Solution subscription period starts from the date of Go- Live 4. 15 D4.1 Document sharing and management Clause - Deleted

MDM Solution subscription period starts from the date of Go- Live 4. 15 D4.1 Document sharing and management Clause - Deleted apts Andhra Pradesh Technology Services Limited 4 th Floor, B-Block, BRKR Bhavan, Tankbund Road, Hyderabad 500063, India Phone: (40) 2322 4935, 23221760; Fax: 23227458 Email:mdapts@apts.gov.inWebsite:

More information

DCADLEC RFP Clarifications

DCADLEC RFP Clarifications Referenced RFP Section 1 Section 2.07 2 Section 2.03, Item C 3 4 Section 1.04 5 6 DCADLEC RFP Clarifications Question Answer The Cisco phones are all Gigabit where specified. Since the Cisco phones are

More information

Final Report - HydrometDB Belize s Climatic Database Management System. Executive Summary

Final Report - HydrometDB Belize s Climatic Database Management System. Executive Summary Executive Summary Belize s HydrometDB is a Climatic Database Management System (CDMS) that allows easy integration of multiple sources of automatic and manual stations, data quality control procedures,

More information