w
|
|
|
- Sharleen Davidson
- 10 years ago
- Views:
Transcription
1 w A collaborative project of AIA Kentucky, Kentucky School Boards Association, Kentucky Association of School Superintendents, Kentucky Association of School Administrators Name of School: Highlands High School Location: Ft. Thomas, Kentucky Grades Served: 9-12 Completion Date: January 2008 Architectural Firm: Tate.Hill.Jacobs: Architects, Inc.
2 School Information School Name: Highlands High School School District: Ft. Thomas Independent School District Web Site Link: KDE Rated Student Capacity: 950 Grades Served: 9-12 Gross building area by floor: N/A Gross building area total: 229,154 SF Total (132,456 SF Renovated + 96,698 SF Unrenovated) Gross area per student: 241 SF Site area (acres): 10 acres Site amenities included in project: Site Lighting; New Entry Plaza; ADA Accessibility to Major Entrances; Protection of Existing Trees + New Landscaping Special Considerations/Descriptive Info: High Performance Features: Historic Renovation of existing 1936 WPA era Highlands High School in urban context. Auditorium renovated for New Performing Arts Center. Natural Daylighting; Energy-Efficient HVAC + Lighting; New Roof Insulation; New High Performance Windows + Glazing; Low VOC Materials + Terrazo Flooring. ENTRY LOBBY - Renovation with view into new Art Education Classroom.
3 Construction Information Final Construction Contract Cost (total amount): $15,167, Final Construction Contract Cost (per square foot): $141/SF Original BG-1 Date: 5/14/2004 Bid Date: 3/7/2006 Completion Date: 1/31/2008 Construction Type: IIB, Noncombustible, Unprotected Roof Design/Materials: Flat (1/4" MIN slope) / 4-Ply Built-up with gravel ballast Number of Floors: 4 Heating Fuel Type: Natural Gas Heating & A/C System Type: Water Source Heat Pumps REAR ELEVATION - New Backstage and Dining Terrace Addition.
4 Team Information Architecture Firm Name: Tate.Hill.Jacobs: Architects, Inc. Contact: Susan Stokes Hill, LEED AP, Principal Address: 346 East Main Street Lexington, KY Phone: FAX: Web Site Address/Link: thjarch.com Project Team Info Structural Engineer: Poage Engineers & Assoc. Inc., Lexington, KY Mechanical/Electrical Engineer: Shrout Tate Wilson Consulting Engineers, Lexington, KY Civil Engineer: CARMAN, Lexington, KY General Contractor: Danis Building Construction Company, Miamisburg, OH Construction Manager: N/A Landscape Architect: CARMAN, Lexington, KY PERFORMING ARTS CENTER - Interior Renovation with Backstage Addition.
5 Site Plan
6 First Floor Plan
7 Second Floor Plan
8 CHEMISTRY ROOM / LECTURE CLASSROOM - Renovation CAFETERIA - Renovation with view onto new Dining Terrace.
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
Schools Under Construction for N.I.S.D.
October 2009 NORTHSIDE INDEPENDENT SCHOOL DISTRICT Schools Under Construction for N.I.S.D. Facilities Construction Vernon Dunagin, AIA Assist. Superintendent of Facilities & Operations Leroy San Miguel
FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505.
FOR SALE FOR MORE INFORMATION PLEASE CONTACT: The Friedman Building 1701 18th Avenue South, Seattle 98144 PRICE: $4,800,000 FEATURES: LAND SF: 40,000 SF + Fantastic Large Townhome Site BUILDING SF: 33,332
GREEN SCHOOLS CASE STUDY. West Wing Elementary
GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of
University of Washington Foster School of Business. Seattle, Washington
University of Washington Foster School of Business Seattle, Washington University of Washington Foster School of Business LMN PACCAR Hall Phase I of the University of Washington Michael G. Foster School
Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
AVAILABLE - FORMER FIRST NIAGARA 100 MOHAWK STREET, COHOES, NEW YORK TRAFFIC COUNT
property Cohoes Local Development Corporation 97 Mohawk Street Cohoes, NY 12047 518.233.2117 * Fax: 518.233.2168 Email: [email protected] www.cohoesldc.org. AVAILABLE - FORMER FIRST NIAGARA 100
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Commercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes
New Haven, Connecticut 1 2 Yale University s Rudolph Building formerly known as the Art and Architecture Building was designed in 1963 by the modern master and then chair of the School of Architecture,
Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement
Guideline for Construction Reimbursement Rates 160-5-4-.16 (a) 7 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 NEW CONSTRUCTION REIMBURSEMENT
Gloria Marshall Elementary School. Spring Independent School District Houston, TX
Gloria Marshall Elementary School Spring Independent School District Houston, TX Gloria Marshall Elementary School Spring Independent School District Houston, TX Size: 105,390SF Cost: 15.6 million Completed:
Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
Deep Energy Savings in Existing Buildings
Case Study Deep Energy Savings in Existing Buildings Overview Site Details Owner: Alliance for Sustainable Colorado Location: Denver, CO Building Type: Office Project Description: Major Renovation Size
Commercial Building Valuation Report
INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location
School Facilities COST CALCULATOR
School COST CALCULATOR A Joint-Use Tool for Fair Fees USER GUIDE EXCEL VERSION STEPS 1 Enter Basic District Data 2 Enter - Related Costs 3 Set Joint-Use Policies 4 Apply Fee Structure SPONSORS Active Living
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009
FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
We know what brings schools together.
School Work We know what brings schools together. About Us Martin Gardner Architecture, P.C. has been providing excellence in design and building consulting services in eastern Iowa for nearly 30 years.
Renaissance Academy. Virginia Educational Facility Planners 2010 Architectural Exhibit
CIVIC PRESENCE It might appear more profitable to sell the highly valuable in-town property for remote location green-field development. However, the Virginia Beach City Public School Board made a decision
New Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP
Tysons Sustainability Summit Evidence Based Urban Design 2013 Autodesk Roger E. Frechette III, PE, LEED-AP Live in Harmony with Nature Transit Community Energy Waste Air Quality Water Yujiapu Financial
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Angelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
Exhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
Columbia Theological Seminary to Celebrate Ground-blessing for New, Green Residence Hall
FOR IMMEDIATE RELEASE News Release Contact: Anne Taylor Lord, Aeck & Sargent 404-253-6710 [email protected] or Ann Kohut Kohut Communications Consulting 770-913-9747 [email protected] Columbia
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Richardsville Elementary The First Net Zero Energy Public School in the U.S. Installations Conference
Richardsville Elementary The First Net Zero Energy Public School in the U.S. Presented to: ARMY Net Zero Energy Installations Conference Kenneth L. Seibert, PE, LEED AP Kenny Stanfield, AIA, LEED AP January
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
City of Mandeville. Guidelines for Construction and Development
City of Mandeville Guidelines for Construction and Development 1 Application for Permitting Requirements The following items must accompany any application for a permit for the construction of single family
KLARMAN HALL/ G2 PAVILION AT HARVARD BUSINESS SCHOOL
KLARMAN HALL/ G2 PAVILION AT HARVARD BUSINESS SCHOOL BRIEFING PACKAGE SEPTEMBER 30, 2015 TABLE OF CONTENTS PAGE I. PROJECT INFORMATION II. PROJECT TEAM III. PROJECT BACKGROUND IV. COMMUNITY REVIEW V. KLARMAN
the muse on ruth 1704 Ruth St Houston, TX 77004 S T O V A L L SD+A DEVELOPMENT + ARCHITECTURE
1704 Ruth St Houston, TX 77004 S T O V A L L SD+A DEVELOPMENT + ARCHITECTURE MIDTOWN & DOWNTOWN MUSEUM DISTRICT 1704 RUTH LOCATION MATTERS The Museum District is geographically centered between the Downtown
RETAIL DESIGN NEWSLETTER BUILT ON THE BOARDS
VOa RETAIL DESIGN NEWSLETTER BUILT SEE EYEWEAR, NEW YORK, NY TOP SHOP TOP MAN, MULTIPLE LOCATIONS COLE HAAN, VARIOUS LOCATIONS POSMAN BOOKS, NEW YORK, NY DKNY DONNA KARAN, MULTIPLE LOCATIONS ON THE BOARDS
BUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture
Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture Thanks to the generous support of the NCMA Foundation, a team of architecture students from
DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
PROGRAMMING RESPONSE. Flat Rock Elementary
Flat Rock Elementary PROGRAMMING RESPONSE Powhatan County s last new elementary school was designed and built over 10 years ago. So, before designing their newest elementary, Flat Rock, a broad-based group
How To Improve A Building
SUSTAINABILITY TRIFECTA Three Approaches to Campus Sustainability Mike Reca Associate VP Facilities & Auxiliary Services Rider University Frank Sherman Director of Sustainability Spiezle Architectural
A history of shaping the
LIVING A history of shaping the PLACES where families, seniors, and children will live, play, and grow. As a storied firm, Holabird & Root is proud of the many ways we have transformed living environments.
SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight
100% outside air intake Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight Smoke evacuation Natural convection exhaust Atrium skylight Phase change material
HARFIELD GARDENS GROVE LANE LONDON SE5 385,000 FREEHOLD
HARFIELD GARDENS GROVE LANE LONDON SE5 385,000 FREEHOLD Viewing by appointment with The Modern House Tel +44 (0)1420 520805 [email protected] www.themodernhouse.co.uk The kitchen and bathroom have
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES. PARKVIEW ELEMENTARY SCHOOL October 2014
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES PARKVIEW ELEMENTARY SCHOOL October 2014 I. PROJECT INFORMATION A. Name: Bellingham School District Parkview Elementary School B. Location: 3033 Coolidge
john jay college of criminal justice
AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the
Design and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
Get Rid of Roof Problems for Good. How spray foam roofing can protect your building and make you money
Get Rid of Roof Problems for Good How spray foam roofing can protect your building and make you money What is a Spray Foam Roofing System? 300 MILLION Board feet of roofing spray foam installed annually
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW
QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW Slide 2: Quick Update Slides 3-4: Project Timeline Slides 5-19: Project Photographs Slides 20-29: Roof Photographs Slides 30-32: Budget Summary
34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory
HARVARD UNIVERSITY FACULTY OF ARTS AND SCIENCES LEED-CI V3.0 STUBBS LABORATORY GORDON MCKAY LABS BUILDING Gordon McKay Building, 9 Oxford Street, Cambridge, MA 02138 GOLD The Stubbs Laboratory is a 2,035
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero
Riverside Community College District / Renaissance Block
Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary
Energy Analysis and Design
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Energy Analysis and Design Donald Prowler, FAIA Architects who can offer combined expertise in energy-related design factors
Firestone Warranty Program
EPDM Warranty Pricing ***For Red Shield Contractors Only*** Red Shield 20 Years $0.10 $500.00 No Dollar Limit 15 Years $0.07 $400.00 No Dollar Limit 10 Years $0.04 $350.00 No Dollar Limit When Firestone
City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT
City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT PLANNING AND ZONING BOARD STAFF REPORT TO: Planning and Zoning Board FROM: Carlos M. Rivero, City Planner DATE: May 11, 2015 RE: International
For Sale - $11,000,000 - Negotiable Excellent User Opportunity -
4770 White Plains Road Bronx, New York For Sale - $11,000,000 - Negotiable Excellent User Opportunity - Jerry Houlihan GHP Office Realty One West Red Oak Lane White Plains, New York 10604 Phone: 914.642.9300
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
Step 2: Define Project Objectives
Why GREEN Small-scale renovations to large-scale new construction and master planning, owners are embracing sustainable practices in order to lessen their environmental impact and to reduce their operating
Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE
FOR SALE RETAIL/OFFICE BUILDING Portland s Financial District Overview 6-8 City Center is a well know 4-story retail and office building with a mix of granite and brick architecture and interesting interior
Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN. 1980 Festival Plaza Drive, Las Vegas, Nevada 89135
Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN 1980 Festival Plaza Drive, Las Vegas, Nevada 89135 PROPERTY HIGHLIGHTS LEED Certified Silver, core and shell. Green building initiatives
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL
Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL 6800-6880 N. Broadway, Denver CO 80221 Lease rates & terms 6870 AVAILABLE 6860 6850 3.1 Acre Build-To-Suit Site 8 High-quality buildings
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Public Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
Estimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
Reed College Environmental Policy Statement. Ecoroof Terrace Description. Maintenance and Monitoring. Roof Assembly and Details
PERFORMING ARTS ECOROOF NOVEMBER 26, 2013 2 TABLE OF CONTENTS 3 Project Summary 4 Project Team 5 Project Introduction Reed College Environmental Policy Statement 6 Sustainable Features 7 Ecoroof Terrace
Executive Flight Office & Hangar
ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE
Office Profile. Ariel Greis Design
Office Profile About Us is a design focused and award winning architecture and planning practice based in London. We have a diverse range of skills and abilities with a proven record in residential, cultural,
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing
The Harold J. Becker Company, Inc.
The Harold J. Becker Company, Inc. It is the mission of The Harold J. Becker Company, Inc. to deliver the absolute best possible quality product at the most efficient cost to our clients, while providing
The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect
The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect Form follows PerFormance FKI Headquarters Tower Exterior Wall FKI Headquarters Tower Exterior Wall Energy Collection FKI Headquarters
Energy Benchmarking Report for Lakeside Middle School. Millville, NJ
Energy Benchmarking Report for Lakeside Middle School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP) developed
AIA Chicago 2030 Working Group 2012 Case Studies
AIA Chicago 2030 Working Group 2012 Case Studies The following case studies are compiled from top performing projects as identified through data shared by participating Chicago offices. These are projects
DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: July 13, 2015
I. Purpose DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT To provide a standard for a reasonable A/E fee structure on State of Utah Projects II. Background The State Procurement Code requires that
