1 Design and installation recommendations August 2007

2

3 DESIGN AND INSTALLATION RECOMMENDATIONS 1 Contents Specification and installation Roofs 5 Lightning protection 7 Flashings information 7 Wall cladding 8 Curved profiles 9 Liner sheets 10 Fragility 11 Summary of non-fragility status 12 Cut edge protection 16 Cantilever 16 Penetrations 16 Weights and calculations (table) 17 Handling and storage 19 Guidance on breather membranes 19 Inspection and maintenance Wind loads 21 Cleaning of pre-finished steel 21 Washing 21 Annual inspection (table) 22 Removing mould 22 Touch-up painting 23 Suppliers of complementary products 23 Acoustic performance Research 25 What is noise? 25 Measurement 25 Double skin constructions 26 Mineral fibre density and system comparison (graph) 27 Perforation 28 Single and double skin system comparison (graph) 29 Trapezoidal acoustic performance (graph) 30 The building regulations Calculation of U-values 31 Thermal bridging 31 Air permeability 32 Corus Colorcoat Products and services 37 References Relevant publications 39

4

5 DESIGN AND INSTALLATION RECOMMENDATIONS 3 Introduction In the following pages we have attempted to outline some of the basic parameters for fixing Euroclad trapezoidal profiles successfully. For the most part, the advice given will be sufficient, however, there will always be a number of unusual requirements or problems The ones listed are those that have been found to be successful, others do exist. Please read the sections relevant to your particular needs carefully and if any questions arise do not hesitate to contact Euroclad where further clarification can be given. which arise and in those instances it would be wise to contact Euroclad for particular advice. In the same respect, when a method for fixing is listed below, it is not necessarily the only method of achieving a successful result. To list every possible permutation and combination would be impossible.

6

7 DESIGN AND INSTALLATION RECOMMENDATIONS 5 Specification and installation Roofs Euroclad s profiles are used extensively in the roofing of both new and refurbished buildings. Those identified in the sections on roofing profiles are ideally suited to this application, however, certain criteria must be adhered to if the profile is to achieve its full potential. The use of trapezoidal weather sheets should be avoided where the pitch is below 4. For pitches below this, Euroclad Euroseam or Secret fix should be considered. Please refer to product specific literature in these instances. The following summary refers to trapezoidal profiles only. Profiles: 914/38mm, MW5R and 1000/32mm Table 1. Size, shape and position of sealant(s) for typical 150mm End lap and Side lap details Built-up systems Profiled metal to metal combinations Profiled metal to GRP rooflight combinations Roof pitch Side lap End lap Less than 5 Not recommended Not recommended 5 to 10 Fixings at not greater than 450mm centres Two lines of sealant (central or asymmetric primary fixing position) The lap should also be sealed with a A single run of 6 x 5mm or 6mm ø bead sealant positioned 15mm from each continuous bead of mastic end of the lap Above 75 As above The sealing of the end laps may be omitted unless severe conditions are anticipated 10 to 15 Fixings as above, but the sealant may be As above omitted (dependent on local conditions) Less than 5 Not recommended Not recommended 5 to 10 Fixings at not greater than 450mm centres Two lines of sealant (central or asymmetric primary fixing position) The lap should also be sealed with a A single run of 6 x 5mm or 6mm ø bead sealant positioned approximately continuous bead of mastic 10 15mm either side of the primary fixing* Or alternatively: Three lines of sealant (central primary fixing position) A single run of 6 x 5mm, 6 x 8mm ø bead sealant positioned 15mm from each end of the lap with an 18 x 4 or 22 x 5mm U-section positioned beneath the line of the primary fixing Above 75 As above The sealing of the end laps may be omitted unless severe conditions are anticipated 10 to 15 Fixings as above, but the sealant may be As above omitted (dependent on local conditions) *Where a seal is required at the bottom of the lap to keep out dirt and trapped water a bead of premium quality neutral cure silicone sealant positioned approximately 15mm from the bottom of the lap is suggested. The silicone sealant should ideally conform to classification ISO F - 25 LM of BS EN ISO : 2003 and adhesion to the substrates involved verified. Figure 1. Typical end lap detail See MCRMA Technical Paper 16, for further details.

8 6 DESIGN AND INSTALLATION RECOMMENDATIONS 1. Pitch The pitch of the roof should be chosen to guarantee good drainage, taking into consideration the local conditions (i.e. maximum wind load and snow loadings). Whenever possible the pitch should exceed 15. When a pitch of less than 15 is specified the following fixing is recommended. 2. Primary fixing It is recommended that the profiles should be fixed with self-sealing, self-tapping screws from a reputable manufacturer. They can be positioned in the trough or crest of a profile, at a frequency of every trough or crest for end laps and every other trough or crest at intermediate purlins. 3. Secondary fixing It is recommended that all roof profiles are side stitched with the appropriate fixings at centres not greater than 450mm unless particularly severe conditions are anticipated. 4. Gauge Euroclad recommend the use of at least 0.7mm gauge in all roof situations. It will often be the case that reference to the load tables will reveal that 0.5mm material will satisfy the design load. However, where a gauge less than 0.7mm is specified, provision should be made to avoid damage during erection and subsequent roof traffic when point loadings may become more critical. 6. Drilling and cutting All holes must be drilled and not punched. It is imperative that the residue swarf be immediately swept off the sheet to avoid unsightly staining. All cutting of profiled sheet on site should be achieved with a nibbler tool or cladding saw. These tools are designed to impart the minimum of heat to the sheet. The sheet should not be cut with a carborundum disc or portable circular saw. Any slight surface damage which may have occurred during fixing should be made good with either touch-up paint or PVC paste which is supplied to match all pre-finished steel colours. 7. Translucent sheet Available in GRP to suit all Euroclad profiles. These can be supplied as single sheets, double skinned, or triple skinned. The double or triple skin can be achieved as a factory sealed unit, or when Euroclad liner is specified, as two or three independent sheets which can be constructed on site to achieve a satisfactory rooflight. It is essential to effectively seal against moisture, or condensation problems may arise. Each rooflight manufacturer has their own technical departments. Please refer to MCRMA Technical Paper 1 for further details. Figure 2. Direction of lay 5. Direction of lay Particular reference should be made to the underlap and overlap configuration of the particular profile specified. The sheets should then be laid as Figure 2. The side laps should, where possible, be laid away from the direction of the prevailing wind.

9 SPECIFICATION AND INSTALLATION 7 Lightning protection Lightning is formed as a result of a natural build-up of electrical charges within storm clouds that discharge to earth. The magnitude of the electric current can range from around 3,000 and 200,000 amps with potentials of 100 million volts. The calculated probability of structurally damaging lightning strikes is once in every 500 years. In general, a building with metal roof and wall cladding will provide the best overall protection against lightning, especially when taking account internal electronic equipment, which may be affected by the electro-magnetic effects of lightning. The main components of a lightning protection system comprises of: Air terminations Down conductors Earth terminations. Air terminations It is the air termination networks that have the greatest interface with the roofing and consist of conductors on a 10 x 20m grid. Metal roof cladding provides a good air termination network. Down conductors The air termination network must be securely fastened to the down conductors which should be at 20m centres around the perimeter of the building. Structural steelwork or a reinforced concrete structure can be used as the down conductors. Earth terminations These are connections between the down conductors and an earthing electrode driven into the ground. A detailed explanation of the above is given in BS6651 : 1999 Code of Practice for Protection of Structures against Lightning, the notes are intended to be for guidance only and it is recommended that a lightning systems engineer be consulted. Flashings information Euroclad manufacture flashings using some of the most up to date equipment in Europe. The flexibility of the manufacturing process allows the widest choice to the specifier. The computer controlled power presses and folders allow Euroclad to produce details with an accuracy and consistency which has been hitherto unachievable. These presses and the use of the best available materials guarantees the quality of the product to the customer. All flashings, unless otherwise specified, will be supplied in 0.7mm gauge for steel and 0.9mm for aluminum. These are available in colours and finishes which can match or contrast with the cladding dependent upon specification. The standard length is 3.658m (12 feet) with the extra length helping the client maintain a good line and minimising joints. The joints can be either lapped or butt jointed and, where required, the butt joints are 150mm in length. Where curved sheeting is specified, curved flashings can be manufactured to suit. The drawings are indicative of good practice for each of the details, but other methods may be equally effective. However the details are arranged, it is important to incorporate the following flashings requirements whenever possible mm spacing (or every other corrugation) between primary fixings. 2 For open shaped flashings, a minimum 150mm lap on roofs and minimum 100mm lap on walls is required. 3 For closed shaped flashings, butt straps should be used. 4 Butt straps should fit within the flashing, with an allowance for sealant thickness. 5 Never leave edges of flashings un-stiffened. Either return a short edge or fold it back flat on itself (welt). 6 Sealants should be placed as near to cut edges as possible. 7 Avoid any detail that can trap or dam water.

10 8 DESIGN AND INSTALLATION RECOMMENDATIONS 8 Arrange overlaps away from the prevailing wind. 9 Paint cut edges when there is a risk of water collecting on them. 10 Avoid large flat areas in the design (200mm 250mm). If necessary, incorporate a shadow line within the larger flat face. 11 Use factory pre-fabricated corners, rather than on-site cutting and bending. 12 Care should be taken in the design and installation to ensure air permeability is minimised, using profiled fillers where necessary. Further information can be found in the MCRMA Technical Paper No. 11: Flashings for Metal Roof and Wall Cladding. This publication includes extensive and comprehensive guidance for the design, installation and maintenance of flashings employed in the modern building envelope. Wall cladding Ideally suited to the cladding of the walls of developments including retail, educational, health service, commercial and industrial. All the trapezoidal profiles in the product range are suitable for use in vertical applications. Aesthetics are undoubtedly the main criteria upon which vertical cladding is chosen. The cladding may be fixed vertically, horizontally or even diagonally but the specification of reverse profile as depicted in the cladding section of the brochure imparts certain advantages to the aesthetics irrespective of the manner in which the sheets are laid. Advantages of the reverse profile a Reduces the shade effect, and with its narrower trough and wide crest the colour of the sheet is highlighted rather than the shadow. Horizontally laid wall cladding Without doubt this is one of the most difficult applications for profiled sheet. Aesthetics are obviously paramount and great care is needed to guarantee a successful result. One of the most common problems is the uneven effect resulting from careless fixings. The precise alignment of end laps is critical. However, with certain precautions observed the result can be very effective and several features can be incorporated to give a building a particularly pleasing appearance. One of the options open to horizontal cladding is to incorporate profiled mitred corners or curved profiled corners (either crimped or smooth). Several key points need to be observed to ensure a successful result: a Sheets are laid from the bottom up i.e. the first sheet laid is the one adjacent to the drip detail. b Cover width must be checked on each sheet as fixed. c d e f g h Alignment of end laps requires time and care. Sheets should be fixed in every trough. The inclusion of a feature band in the cladding must be approached with care, as any stretching or shrinking of the cover width by the fixer to accommodate such a feature will have an adverse affect upon the aesthetics of the elevation. Steelwork must be checked carefully since inaccuracies will be telegraphed through the cladding sheet. Do not use forward PVDF for horizontal cladding. Always use 0.7mm gauge for horizontal sheets. This effect is even more noticeable when cladding is laid horizontally. b c Effectively hides the fixings which are fixed in the trough. If horizontal cladding is used a very effective profiled corner piece can be incorporated successfully.

11 SPECIFICATION AND INSTALLATION 9 Curved profiles Vertically laid wall cladding The standard method of fixing wall cladding with the profiles running from eave to drip details. Although the profiled sheet lends itself to this application, care must be taken to ensure a successful result: a b c d Irrespective of profile, side laps, where possible, should be laid with the overlap away from the prevailing wind. End laps should be a minimum of 100mm. Irrespective of profile, the stitching of side laps is at the discretion of the cladding contractor. Where deemed necessary side laps should be fixed at 600mm centres. The primary fixing of the profile is generally accomplished in the trough using self-tapping, self drilling fixings, from a reputable manufacturer. When fixing curved profiles, certain basic rules should be followed to ensure a high quality appearance is achieved: a b c d Throughout the project the need for care is paramount since the curved profiles are extremely rigid and cannot be adjusted during fixing, as is possible with non-curved sheets. A complete tier of sheets must be completed before moving on to the next tier. When ordering, remember that most of Euroclad profiles are handed and therefore direction of lay should be indicated so that the sheets can be supplied with the correct underlap/overlap configuration. Where mitred corners are designed they should be fitted first, and cladding laid away from them (Figure 3). This then involves a slip flashing where the sheets meet (Figure 4). e Under normal UK urban conditions, fixing should be used in every trough for end laps and every other trough at intermediate purlins. e Curved profiles may be specified in either 0.5mm, 0.7mm or 0.9mm gauge Corus Colorcoat pre-finished steel. f All holes should be drilled, not punched. g 0.5mm gauge material is usually specified. Figure 3. Mitred corners and cladding lay-out direction Figure 4. Three alternative methods of incorporating a slip flashing

12 10 DESIGN AND INSTALLATION RECOMMENDATIONS Liner sheets 1 Euroclad liner sheets are usually specified with Euroclad outer sheet and hence are designed with a common cover width to minimise problems when fixing. They can, however, be used successfully in conjunction with a variety of systems. 2 In the over-rail system the liner sheet is laid first. Four primary fixings per panel are recommended which have the function of temporarily securing the sheets and helping to maintain cover width and position before the spacer system is fully secure. 3 The insulation quilt is laid from ridge to eave allowing generous side and end laps to prevent gaps. The rail and bracket system is used to trap the insulation and then is secured by the recommended fixings to the cladding rail. The use of the rail and bracket system in this manner overcomes the problems of the integrity of the system relying upon the compression of the insulation quilt and minimises the thermal bridge effect. 4 If the liner sheet is being employed as a vapour control layer, the side and end laps must be sealed and fixings with an integral sealed washer must be used. 5 The weather sheet is fixed to the spacer system with the appropriate fixings. 6 Because of the flexibility of the sheet, care should be taken not to spread the cover width of the liner sheet when the fixings are installed. 7 The maximum spans for the 19/20mm liner sheets are: 0.4mm 2.0m 0.5mm 2.1m 0.7mm 2.2m. 10 If large areas of liner sheets only are fixed lining out, damage may be caused because of the temporary nature of the primary fixing and the danger of traffic imposing loads that the panel is not designed to support. 11 Translucent sheets in either GRP or polycarbonate are available to suit Euroclad liner sheets. 12 With the new focus on air-tightness, the effective sealing of the liner in both built-up and composite constructions is fundamental to the system performance. Both in controlled small-scale tests and practical air permeability tests in actual buildings, a correctly sealed metal liner successfully passes Building Regulations criteria. The specification for sealing Euroclad liner sheets is as follows: a Side lap sealing b 50mm x 1mm butyl sealing strip (polybond or similar). End lap sealing 4mm butyl mastic bead, or a 6mm x 2mm, or a 9mm x 3mm rectangular section is recommended, fixed in each corrugation. Position the sealant in straight, unbroken lines covering the sheet laps. Place into corrugations or troughs. Do not stretch the sealant. Ensure continuity and effectiveness of seal, especially at corners of sheets and at all penetrations of pipes, ducts, rooflights etc. 8 Liner sheets should be laid in tiers with the insulation and outer sheet. 9 Liner sheets are to be treated as fragile, until correctly installed.

13 SPECIFICATION AND INSTALLATION 11 Fragility of Euroclad profiled sheets In summary ACR(CP)001 : 2003 Recommended Practice for Work on Profiled Sheeted Roofs states: That a non-fragile assembly should be specified. That a competent company is chosen to carry out roof work. That the classification of the roof assembly can be confirmed by the supplier and that test data can be provided to support the classification. That drawings are available which can be used to set out the sequence of operations to fit sheets to a non-fragile classification. That the conditions affecting guarantees of non-fragility should be clearly stated That special consideration should be given to Class C constructions That specific information relating to maintenance of the products and which is relevant to non-fragility is provided for inclusion in the Health and Safety file. That materials handling should be reduced wherever possible i.e. by ordering sheets to be packed in sequence as they will be used or by splitting packs on the ground before positioning on the roof. In addition the HSE Question and Answer brief for the Construction Industry on the Work at Height Regulations 2005 states that Collective control measures should always take priority over personal control measures. All of the above are provided for by Euroclad Elite Systems. During the construction phase The ability to use the fixed liner as a working platform during installation of the outer sheet can also speed the construction process and allow work under the lined out roof to progress. Sheets or rooflights which have not been fixed to achieve a non-fragile classification must be treated as fragile. The ACR(M)001 : 2005 test for non-fragility is a basic test to establish whether a roof assembly is fragile or non-fragile. It does not necessarily mean that walking on the roof will not damage the roofing product. Walkable is not recognised as a defined term by HSE and it should not be confused with non-fragile. However, in practice standard >30mm deep 0.7mm steel liner and deck profiles allow workers to walk on the sheets with less risk of causing foot traffic damage than shallower profiles or thinner gauges. 19/1000 profile in 0.7mm for example, although it can be fixed to achieve Class B, is still more prone to damage by foot traffic than profiles deeper than 30mm. More care is required when a 0.4mm liner or 0.7mm steel perforated liner is used. Additional fixing requirements also apply to achieve Class C, such as the use of crawl boards and additional sheet end lap length. 0.4mm steel liner and 0.7mm perforated liners are more prone to damage by foot traffic. Fixing requirements for Euroclad profiles to achieve non-fragile classification are given in a number of Euroclad drawings. These are available to download from the Euroclad website: After construction phase Sections of ACR(CP)001 : 2003 give guidance on maintenance requirements and minimum non-fragile classifications. Class C non-fragile assembly is acceptable for low maintenance roofs. Class B non-fragile assembly is required for both medium and high maintenance roofs. All Euroclad external roof sheets and 0.7mm liners (excluding perforated liners) can be fixed to achieve Class B. Euroclad profiles can be fixed to be non-fragile during the construction phase.

14 12 DESIGN AND INSTALLATION RECOMMENDATIONS Summary of non-fragility status Classification: Fragile: If the bag passes through an assembly it is classified as fragile. Class C non-fragile: if the assembly retains the sandbag after one drop it is classified Class C non-fragile. Class B non-fragile: if the assembly retains the bag after a second round of impacts the assembly is classified Class B non-fragile. Class A non-fragile: on inspection of the assembly after the second round of impacts by a competent person. If the assembly shows no signs of damage that will affect the long term strength or weatherability of the assembly, then the assembly may be classified Class A, non-fragile. The following recommendations, which have been generated from the test programme, have taken into account known variables and allow for a very good degree of confidence. For instance, wherever results were felt to be marginal or may be affected by poor site practice tests were repeated, if necessary, until a good degree of confidence was present. No items which may have assisted the performance of the systems and are subject to site conditions were used in the test programme ie no sealants or spacer brackets assisting the liner profile performance. Consult the Euroclad Technical Department if any assistance is required or the application is unusual. Incorrect installation, total failure of associated components, abuse and exceptional circumstances could all still jeopardise non-fragility within the 25 year period. Long term non-fragility can therefore not be guaranteed. All elements should be regarded as fragile until fixed to the specified standards 0.4mm steel liner profiles 19/1000 liner 0.4mm steel 19/ mm thick steel liner profile, fixed as shown in Euroclad Ltd Drawing FR4, can be classified C non-fragile on any span up to and including 1.8m, for both in plane and curved roofs, and for spans up to 1.8m on hips with any angle. Also see ACR (CP)001 : 2003 Recommended Practice for Work on Profiled Sheeted Roofs Annex B, which gives recommendations re the use of crawl boards and gives a great deal of guidance re: the usage of Class C Assemblies and the potential risks which need to be managed and considered. The document recognises the potential risk from elements which may be engineered to pass Class C being close to the boundary between fragile and non-fragile. Euroclad did not engineer the system to pass, allowed a good margin for site error and normal site practice and this was confirmed by an independent consultant. The same profile used in 0.7mm gauge can be fitted to achieve Class B using normal methods see below. However, we still recommend >30mm deep profiles in the majority of cases as these are more resistant to foot traffic damage. 20/914 and 20/1066 liner 0.4mm steel 20/914 and 20/ mm steel liner profiles, fixed as shown in Euroclad Ltd Drawing FR6, can be classified C non-fragile on any span up to and including 1.8m, for both in plane and naturally curved roofs, and for spans up to 1.8m on hips with any angle. 0.7mm steel liner profiles 19/1000 liner 0.7mm steel 19/ mm thick steel liner profile, fixed as shown in Euroclad Ltd Drawing FR2, can be classified C non-fragile on any span up to and including 1.8m, for both in plane and naturally curved roofs, and for spans up to 1.8m on hips with any angle.

15 SPECIFICATION AND INSTALLATION 13 MW5 Liner 0.7mm steel MW5 0.7mm thick steel liner profile, fixed as shown in Euroclad Ltd Drawing FR3, can be classified B non-fragile on any span up to and including 2.1m, for both in plane and curved roofs, and for spans up to 1.8m on hips with any angle. MW5 liner 0.7mm steel fully or pan perforated MW5 0.7mm thick steel liner profile, fully or pan perforated, fixed as shown in Euroclad Ltd Drawing FR7, can be classified C non-fragile on any span up to and including 2.1m, for both in plane and curved roofs, and for spans up to 1.8m on hips with any angle. Also see ACR (CP)001 : 2003 Recommended Practice for Work on Profiled Sheeted Roofs Annex B, which gives recommendations re the use of crawl boards and gives a great deal of guidance re the usage of Class C Assemblies and the potential risks which need to be managed and considered. The document recognises the potential risk from elements which may be engineered to pass Class C being close to the boundary between fragile and non-fragile. Euroclad did not engineer the system to pass, allowed a good margin for site error and normal site practice and this was confirmed by an independent consultant. 32/1000 liner 0.7mm steel 32/ mm steel liner profile, fixed as shown in Euroclad Ltd Drawing FR1, can be classified B non-fragile on any span up to and including 2.1m, for both in plane and naturally curved roofs, and for spans up to 1.8m on hips with any angle. 20/1066 & 20/914 liner 0.7mm steel 20/1066 and 20/ mm steel liner profiles, fixed as shown in Euroclad Ltd Drawing FR5 can be classified B non-fragile on any span up to and including 2.1m, for both in plane and naturally curved roofs, and for spans up to 1.8m on hips with any angle. MW5 deck 0.7mm steel MW5 0.7mm thick steel deck profile, fixed as shown in Euroclad Ltd Drawing FR10, can be classified B non-fragile on any span up to and including 2.1m, for both in plane and naturally curved roofs, and for spans up to 1.8m on hips with any angle. 38/914 deck 0.7mm steel MW5 0.7mm thick steel deck profile, fixed as shown in Euroclad Ltd Drawing FR9 can be classified B non-fragile on any span up to and including 2.1m, for both in plane and naturally curved roofs, and for spans up to 1.8m on hips with any angle. MW5 roof profile 0.7mm steel MW5 0.7mm thick steel roof profile, fixed as shown in Euroclad Ltd Drawing FR14, can be classified B non-fragile on any span up to and including 2.1m, for both in plane and curved roofs, and for spans up to 1.8m on hips with any angle. 32/1000 roof profile 0.7mm steel 32/ mm thick steel roof profile, fixed as shown in Euroclad Ltd Drawing FR15, can be classified B non-fragile on any span up to and including 2.1m, for both in plane and curved roofs, and for spans up to 1.8m on hips with any angle. 38/914 roof profile 0.7mm steel 38/ mm thick steel roof profile, fixed as shown in Euroclad Ltd Drawing FR8, can be classified B non-fragile on any span up to and including 2.1m, for both in plane and curved roofs, and for spans up to 1.8m on hips with any angle. Euroseam roof profile 0.9mm aluminium Euroseam 0.9mm thick aluminium profile, fixed as shown in Euroclad Ltd Drawing FR16 can be classified B non-fragile on any span up to and including 2.1m, for both in-plane and curved roofs and for spans up to 1.8m on hips with any angle. SF500 profile 0.7mm steel SF mm steel profile, fixed as shown in Euroclad Ltd Drawing FR17 can be classified B non-fragile on any span up to and including 2.1m, for both in-plane and curved roofs and for spans up to 1.8m on hips with any angle. Trapezoidal profiles in aluminium These should be considered fragile until further notice.

16 14 DESIGN AND INSTALLATION RECOMMENDATIONS Rooflights The National Association of Rooflight Manufacturers guidance note 2006/1, clearly sets out the requirements for rooflights where profiled metal or fibre cement roofs have been separately demonstrated to be non-fragile without rooflights and is based on a large number of tests carried out by rooflight manufacturers. Rooflights should never be walked on even if fixed to a non-fragile standard. Appendix ACR(CP)002 : 2005 gives guidance on Safe Working on Fragile Roofs. Test method The test method used was the ACR(M)001 : 2005 Test for Non-Fragility of Profiled Sheeted Roofing Assemblies, which is recognised by HSE as an acceptable way of determining the non-fragility of a roof construction. The test involves dropping a 45kg sand bag from a height of 1.2m, onto the roof cladding assembly, which has to be supported by a standard test frame. Provided the bag does not fall through the construction, the cladding assembly can be classed as non-fragile. To warrant this classification, the roof must be able to withstand the test in any location. Tests were carried out by Mr Peter Roberts, an independent consultant and Mr Paul Clayton, Euroclad Technical Manager. Based on previous experience, dropping the bag near the underlapping side lap of the sheets at midspan between purlins was expected to be the most likely worst case, for all purlin spacings, and any failure was expected to occur at the nearest end lap (downslope or upslope) or sheet end position of a multi-spanning sheet. Testing was carried out to verify the worst case. Additional testing was carried out on profile variants to establish the most effective solution, i.e. the end lap and sheet end fixing edge distance was varied, as was the size of washer and number of fixings if necessary. The length of the end lap, the number and location of the fasteners at both sheet ends and intermediate supports and the fastener edge distance, are the usual critical variables. In some cases the washer size is also a critical factor. All tests used 5.5mm diameter fixings. No seals were used at end or side laps in any of the tests, as any contribution they made to the strength could not necessarily be relied upon on site, e.g. if the sheets were damp. No spacer system was fitted as any contribution to liner performance made by additional fixings through the liner sheet may not always be present on site e.g. if the spacer brackets were fitted later. In the case of external sheets the spacer system would have improved performance so was not used to allow the worst case to be assessed. Drawings for Euroclad non-fragile installations, can be found at: Test rig The test rig was made available by Brett Martin Daylight Systems and was generally in compliance with the rig defined in ACR(M)001 : The purlins were 175/160, which have the necessary minimum I xx value of 235mm 4. Purlins were braced as required. Constructions tested Tests were carried out over a range of profiles and a range of purlin centres from 0.600m up to 2.1m, on simulated hips and on simulated curved roof arrangements.

17 SPECIFICATION AND INSTALLATION 15 Table 2. Fixing specification of typical construction (carbon steel) SFS fixings Purpose Gauge Description Fixing frequency Fixing of liner sheet ends 1.2mm - 3.0mm SFS code SD3 - T x 25 1 per valley (for end laps) 3.0mm mm SFS code SD14 - T x 32 every other valley (for intermediate purlins) Fixing of spacer bracket to sheeting rail 1.2mm - 3.0mm SFS code SD3-5.5 x 25 Typically 2 per 1m centres 3.0mm mm SFS code SD x 32 (see note 5 below) Fixing of weathersheet to rail SFS code SDP3 - T16 (or T19) x 25 1 per valley (for end laps) every other valley (for intermediate purlins) Side stitching of outer sheet 1.2mm - 3.5mm SFS code SLP2 - T - A x mm centres EJOT fixings Purpose Gauge Description Fixing frequency Fixing of liner 1.2mm - 3.0mm EJOT code LS25 1 per valley (for end laps) 3.0mm mm EJOT code HS38 every other valley (for intermediate purlins) Fixing of spacer bracket to sheeting rail 1.2mm - 3.0mm EJOT code LS25 2 per 1m centres 3.0mm mm EJOT code HS38 (see note 5 below) Fixing of weathersheet to rail EJOT code JT2 x 25 1 per valley (for end laps) every other valley (for intermediate purlins) Side stitching of outer sheet 0.5mm - 2.0mm EJOT code SF25 G16 450mm centres Notes: 1. The above assumes normal U.K. urban conditions. If a more severe environment is anticipated, please refer to Euroclad, or the fixing manufacturer. 2. All fixings must have a sealed washer and external fixings should also have a colour coded cap. 3. Equivalent products are available from several fixing manufacturers. 4. If aluminium sheets are used all fixings should be stainless steel. 5. Position bracket in first valley that forms the underlapping side of the lap. 8/3, 13/3, Sinusoidal profile fasteners 1, 2 3mm Carbon steel fasteners Austenitic stainless steel fasteners Purlins (roof) Rails (wall) SD3 - T15-5, 5 x 60 - Hex head. Plus M6 x 28 x colour SX3/ S16-5, 5 x 52 - Hex head. Plus M6 x 28 x colour Selawasher and 28 x colour deep Selacover cap Selawasher and 28 x colour deep Selacover cap Rails (wall) Wall (valley fix) SDP3 - T16-5, 5 x 25 x colour 5 x 3/10 - L12 - A12-5, 5 x 28 x colour 4 14mm Carbon steel fasteners Austenitic stainless steel fasteners Purlins (roof) Rails (wall) SD14 - T15-5, 5 x 66 - Hex head. Plus M6 x 28 x colour SX14/38 - S16-5, 5 x 61 - Hex head. Plus M6 x 28 x colour Selawasher and 28 x colour deep Selacover cap Selawasher and 28 x colour deep Selacover cap Rails (wall) Wall (valley fix) SDP14 - T16-5, 5 x 36 x colour - Sela moulded head SX14/12 - L12 - A12-5, 5 x 38 x col-irius powder coated head Timber Carbon steel fasteners Austenitic stainless steel fasteners Purlins (roof) Roof (crown fix) TDA - T - T x 76. Plus M6 x 28 x colour Selawasher TDA - S - S16-6, 5 x 76. Plus M8 x 28 x colour Selawasher and 28 x colour deep Selacover and 28 x colour deep Selacover Rails (wall) Wall (valley fix) TPC - T T16-6, 3 x 38 x colour - Sela moulded head TPC - S - S16-6, 3 x 38 x colour - Sela moulded head Stitching fasteners general fixing of flashings SLP2 - A14-4, 8 x 20 x col SDL3 - L12 -T15-5, 5 x 25 x col SLP2 - S - A14-4, 8 x 20 x col SXL2 - L12 - A14-5, 5 x 22 x col Sela moulded head Irius powder coated head Sela moulded head Irius powder coated head

18 16 DESIGN AND INSTALLATION RECOMMENDATIONS Cut edge protection Discussing the prospect of using pre-finished steel sheets for cladding buildings will invariably raise the question of cut edge corrosion, it is a natural concern. A fear that many architects and design engineers have experienced is that a sheared edge of a pre-finished steel sheet will corrode when exposed to the atmosphere. It is a chemical fact that when steel and zinc are in contact in the presence of moisture there is an automatic electro-chemical action which slows down the corrosion. Cut edge protection is further enhanced by using a Galvalloy metalic coating instead of zinc. Corus Colorcoat HPS200 and Colorcoat Prisma are manufactured with Galvalloy metalic coatings as standard. Because of this, Corus are able to include cover for cut edge protection for the life of the guarantee. It is usually necessary during the course of cladding a structure that either the pre-finished steel sheet or the flashings will be cut on site. To ensure that the ability of the zinc to protect the steel is not impaired, these cuts must be achieved with the correct tools. Above all, heat must not be created during the process because of the risk of damage to the zinc and therefore a corresponding reduction in the life expectancy of the roof or cladding. However, the exposed edge may be treated with an approved edge protection paint system to enhance its resistance to atmospheric pollution. The edge referred to here is that defined by the profile shape in cross section i.e. the cut end of the sheet. Painting the edges will considerably enhance the durability of the paint coating and the substrate in the region of the cut edge and will also reduce the possibility of pattern staining. Suppliers who offer paint systems approved by Corus for use with their products are listed below: Becker Industrial Coatings Limited Goodlass Road Speke Liverpool L24 9HJ Telephone: +44 (0) Akzo Nobel Coatings Limited PO Box 37 Crown House Hollins Road Darwen Lancashire BB3 0BG Telephone: +44 (0) Covac Limited Eagle House Bilton Way Lutterworth Leicestershire LE17 4JA Telephone: +44 (0) The paint systems from these companies can be applied to the area of the cut edge with a brush or other suitable means. Cantilever Projecting cantilevers should be restricted to 400mm. Penetrations Maximum size of penetration without additional structural support is 300mm.

19 SPECIFICATION AND INSTALLATION 17 Table 3. Weights of profiled sheets and their calculations Density kgs/m 2 Steel Mill finish aluminium One side coated aluminium Gauge m 2 tonne m 2 tonne m 2 tonne Typical fixing layout Typical arrangement for Euroclad 32/1000 and 19/1000 liner sheets, using a rail and bracket spacer system. Gauge Profile Cover width Coil width Corus Colorcoat Steel pre-finished steel product kgs/m 2 kgs/linear metre L/m per 2 tonne bundle L/m per 1 tonne bundle 0.4mm 1000/ Liner mm 1000/ Liner mm 1000/ Liner mm MM HPS200 /Prisma /PVDF/Liner mm MM HPS200 /Prisma /PVDF/Liner mm 914/ Liner mm 1066/ Liner mm 1066/ HPS200 /Prisma /PVDF/Liner mm 1066/ HPS200 /Prisma /PVDF/Liner mm 1066/ HPS200 /Prisma /PVDF/Liner mm 1000/ HPS200 /Prisma /PVDF/Liner mm 1000/ HPS200 /Prisma /PVDF/Liner mm 1000/ HPS200 /Prisma /PVDF/Liner mm MW HPS200 /Prisma /PVDF/Liner mm MW HPS200 /Prisma /PVDF/Liner mm MW HPS200 /Prisma /PVDF/Liner mm 914/ HPS200 /Prisma /PVDF/Liner mm 914/ HPS200 /Prisma /PVDF/Liner mm 914/ HPS200 /Prisma /PVDF/Liner mm SF HPS200 /Prisma /PVDF mm Euroseam HPS200 /Prisma /PVDF mm 13 1 /2/ HPS200 /Prisma /PVDF mm 13 1 /2/ HPS200 /Prisma /PVDF mm 13 1 /2/ HPS200 /Prisma /PVDF

20 18 DESIGN AND INSTALLATION RECOMMENDATIONS Gauge Profile Cover width Coil Aluminium width Coating kgs/m 2 kgs/linear metre L/m per 2 tonne bundle L/m per 1 tonne bundle 0.9mm 914/ Stucco mm 1000/ Stucco mm MW5R Stucco mm Euroseam Stucco mm Euroseam Stucco mm Euroseam Stucco mm Euroseam Stucco Gauge Profile Cover width Coil Aluminium width Coating kgs/m 2 kgs/linear metre L/m per 2 tonne bundle L/m per 1 tonne bundle 0.5mm MM ARS / PVDF mm MM ARS / PVDF mm MM ARS / PVDF mm 914/ ARS / PVDF mm 1066/ ARS / PVDF mm 1000/ ARS / PVDF mm 1000/ ARS / PVDF mm 1000/ ARS / PVDF mm MW ARS / PVDF mm Euroseam ARS / PVDF mm Euroseam ARS / PVDF mm Euroseam ARS / PVDF Rail and bracket systems Gauge System Component Weight Unit 1.6mm Eurobar Rail kgs Per metre 1.2mm Eurobar Bracket 83mm kgs Each 1.2mm Eurobar Bracket 120mm kgs Each 1.2mm Eurobar Bracket 150mm kgs Each 1.2mm Eurobar Bracket 170mm kgs Each Gauge System Component Weight Unit 1.5mm Eurobar Extra 1.2m Bar kgs Each 1.5mm Eurobar Extra 2.4m Bar kgs Each 1.5mm Eurobar Extra 3.6m Bar kgs Each 1.5mm Eurobar Extra Bracket 135mm kgs Each 1.5mm Eurobar Extra Bracket 185mm kgs Each 1.5mm Eurobar Extra Bracket 200mm kgs Each 1.5mm Eurobar Extra Mast 135mm kgs Each 1.5mm Eurobar Extra Mast 220mm kgs Each 1.5mm Eurobar Extra Mast 240mm kgs Each 1.5mm Eurobar Extra Mast 280mm kgs Each

21 SPECIFICATION AND INSTALLATION 19 Handling and storage The following comments refer to the trapezoidal profiles and not to Secret fix or Euroseam, which have particular packing/handling notes in the relevant section. Every profiled sheet and flashing is carefully inspected before despatch and consignments are packed in edge wrapped strapped bundles. It must be emphasised that these sheets and flashings are quality products and should be handled accordingly. On arrival at the site, care should be taken in the offloading; avoid unnecessary handling of the sheets, lifting (not dragging) them directly off the bundles. When hoisting bundles and sheets into position, protect the edges and ensure that the pressure across the sheets and flashings does not cause distortion. Use rope, not chains, for hoisting. Note: Euroclad pallets are not suitable for crane off-load. If a protective, strippable film has been applied to the coating, this should be removed from the underlap edge prior to fixing and the remainder removed within two weeks. Failure to observe simple but essential precautions when storing and handling galvanised and pre-finished steel roofing and cladding sheets on site, leads to repeated complaints of corroding and damage. Investigation shows that in almost every case damage is due to negligence prior to use. The most common fault is exposing stacked sheets to the weather for weeks, even months often lying in long grass. Avoid careless handling. To ensure that sheets do not deteriorate when stored on building sites, the following precautions are essential: Do not leave uncovered stacks lying in the open. Store under cover and away from open doorways. If stacks cannot be kept under cover, erect a simple scaffolding around them and cover with a waterproof sheet, tarpaulin or polythene, but leave space between cover and sheets to allow air to circulate. Store stacks off the ground and on a slope, so that should rain penetrate the covering, the water will drain away. Inspect the storage site regularly to ensure that moisture, despite the above precautions, has not penetrated the stock. Do not store sheets where people will walk across them. Observe these precautions and they will save you trouble, time and money. Guidance on breather membranes It is no longer necessary to install a breather membrane in the majority of twin skin metal roofing cladding applications. This is the latest advice from the Metal Cladding and Roofing Manufacturers Association (MCRMA) and is the result of work which has recently been carried out by the Building Research Establishment (BRE), in collaboration with the MCRMA, to examine in detail the factors that determine the risk of condensation within twin skin metal roofs. This work has demonstrated that, if a well sealed liner is used in conjunction with vented fillers for the outer sheet, only small amounts of condensation may occur on the external sheet over the winter and there will not be sufficient accumulation to cause dripping or running. Therefore, so long as the cladding is installed with a high standard of workmanship with appropriate detailing, especially a well sealed liner, it is not necessary to install a breather membrane except in cases where there is likely to be an unusually high internal moisture load. Previously, the best practice advice contained in the second edition of the BRE publication Thermal insulation: avoiding risk (BR 262) published in 1994, suggested that a breather membrane be placed between the insulation and the outer skin of a twin skin metal roof, in order to prevent any dripping or running of condensed water onto the insulation. This was based on the best information available at the time, which suggested that although the primary means of preventing condensation problems was a well sealed liner sheet or vapour check below the insulation, a breather membrane would provide a second line of defence. This would be especially important in the case of buildings with high internal moisture loads such as swimming pools. This latest work will be taken into account in the new version of Thermal Insulation: Avoiding Risks which has been prepared to accompany the new edition of Approved Document L2 of the Building Regulations. Building designers and building control officers may well like to take this latest guidance into account in both current and future projects.

22

23 DESIGN AND INSTALLATION RECOMMENDATIONS MR 21 Inspection and maintenance Wind loads (BS 6399 : Part 2) The wind load affecting a particular construction may be calculated with careful reference to the above standard. At critical points in a structure the suction loads created often exceed all other imposed loads. In these circumstances it is a combination of the profiles strength and the number and strength of the fasteners which become critical. It is often necessary to increase the specification of the fasteners in the high load areas. Cleaning of pre-finished steel There are stages during its life cycle that a pre-finished steel clad building may need cleaning. It is often the case that during the construction, building debris of various types will be deposited both on the roof and walls. For the pre-finished steel to achieve its anticipated life to first maintenance all debris must be cleared as soon as possible. If the building is in a particularly dirty environment it may need cleaning during its life. There is a requirement for many pre-finished steels to have annual inspections and maintenance to maintain the validity of the guarantee. However, Corus Colorcoat HPS200 does not require this and is maintenance free for the lifetime of its guarantee. Swarf It is imperative that all swarf is removed from the prefinished surfaces. The heat imparted to the swarf could have melted the paint and zinc and the remaining cold reduced mild steel will rut very quickly upon exposure to the elements. In any case, if the swarf is not removed it rusts and gives the effect that the sheet itself is deteriorating. All surfaces must be cleaned and particular attention paid to surfaces where the swarf could accumulate, such as drip detail. Cement on pre-finished steel Often deposits of cement are inadvertently left on the prefinished steel cladding. Wet cement/mortar mixes are very alkaline during the wet/curing stage, and may leave residual staining on the surface, and more particularly attack the exposed, sheared edge. Immediate removal is essential. Thick deposits should be removed carefully with a blunt wooden scraper, taking care not to damage the surface. Removal of residual mortar stains should be accomplished with neat vinegar and a soft scrubbing brush. Finally, all areas should be rinsed off with cold clean water. General debris Often left on roofs, their danger is that the damage caused prevents drainage and encourages ponding. Continued ponding will have a detrimental effect on the life expectancy of the pre-finished steel finishes. Once the roof/walls are fixed all should be rinsed with cold clean water and all debris removed. Other deposits No matter what, solvents and abrasive type cleaners should be avoided in cleaning any pre-finished steel surface. Caulking compounds, tar and similar substances may be removed with mineral spirits. Always clean surfaces down from top to bottom and follow immediately with a thorough rinsing with clean fresh water. It must be pointed out that over cleaning or scrubbing can do more harm than good. Repair to the surface If scratches are made in the pre-finished steel surface these are easily repaired with the application of air drying plastisol, polyurethane or PVDF touch-up paint, available from Euroclad. It must be emphasised that these paints are only for touching in small areas and are not suitable for application over large areas. There are few exterior materials whose appearance and performance will not benefit from regular inspection, together with any maintenance that might be necessary at the time. Such activities will repay the careful building owner and the occupier by giving them the best possible performance from the product. Washing Regularly wash away dirt and debris that have not been removed by natural rainfall. Areas of cladding that lie beneath overhanging building details, such as those beneath gutters, for example, are particularly susceptible to a build-up of dirt. Such accumulations may hold water and pollutants, which can lead to 'wet poultice' corrosion. Wash cladding with fresh water, using a hose and a soft cloth. In areas where heavy industrial deposits dull the surface, use a good quality household detergent (10% solution in water) or a proprietary cleaner (follow manufacturer's instructions). Always rinse thoroughly with clean water.

Construction details. Technical specifications

Construction details. Technical specifications Construction details Technical specifications Construction details CONTENTS Introduction 3 Typical building 7 Thermal performance of built-up systems 8 Built-up roof constructions 14 Built-up wall constructions

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

White rust on galvanized and galvanized pre-painted steel. Technical Information

White rust on galvanized and galvanized pre-painted steel. Technical Information Technical Information White rust on galvanised steel Prevention It is easier to prevent white rust than to cure it! Reasonable precautions to protect steel during both transport and storage can considerably

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

When considering Roof drainage design the following should be taken into account:

When considering Roof drainage design the following should be taken into account: Roof Drainage Design The primary objective of a gutter or spouting system is to remove water from the roof catchment area and channel that water to the ground drainage. Water ingress can have detrimental

More information

Rooflight INSTALLATION INSTRUCTIONS

Rooflight INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

A. Work on this project shall consist of, but is not limited to, the following:

A. Work on this project shall consist of, but is not limited to, the following: PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural

More information

Rockwool Cladding Roll

Rockwool Cladding Roll Rockwool Cladding Roll High performance industrial insulation has been specifically developed for use in lightweight cladding applications to commercial or industrial framed buildings. Cladding Roll U/F

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 8: Building Envelope

STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 8: Building Envelope STEEL BUILDINGS IN EUROPE Single-Storey Steel Buildings Part 8: Building Envelope Single-Storey Steel Buildings Part 8: Building Envelope 2 - ii Part 8: Building Envelope emissions

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01 Section Built-up Metal Roofs Rail and bracket system Product: Earthwool FactoryClad range Bu01 Standing seam system Product: Earthwool FactoryClad range and Earthwool Universal Slab Bu02 Built-up Metal

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Your guide to home maintenance. Flat Roofs

Your guide to home maintenance. Flat Roofs Your guide to home maintenance Flat Roofs Your guide to home maintenance is a series of information leaflets that gives you all the information you need to keep your home in tiptop condition. Flat Roofs

More information

PROFILED METAL ROOFING DESIGN GUIDE

PROFILED METAL ROOFING DESIGN GUIDE MCRMA Technical Paper No. 6 CI/SfB (23) Nh2 JUNE 2004 PROFILED METAL ROOFING DESIGN GUIDE THE METAL CLADDING & ROOFING MANUFACTURERS ASSOCIATION LIMITED Contents Page 1.0 Typical construction and assemblies

More information

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW Insulated Roof & Wall Panels Trapezoidal Insulated Roof Panels KS1000 RW Overview Kingspan roof panel systems present a superior system compared to conventional multi-part site assembled systems. They

More information

Rooflighting and Glazing

Rooflighting and Glazing POLYESTER SHEET Rooflighting and Glazing safelight ultra standard economy 02 Rooflighting and Glazing Trilite is a range of translucent fibre glass reinforced polyester rooflighting and glazing sheet,

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

ABSeam Panel Overview and Installation Instructions

ABSeam Panel Overview and Installation Instructions 82 Garden Spot Road Ephrata, PA 17522 717-445-6885 35 Ridge Road Newville, PA 17241 717-776-5951 ABSeam Panel Overview and Installation Instructions Applications: The ABSeam panel is an architectural panel

More information

BLACK JACK ALL WEATHER ROOF COATING

BLACK JACK ALL WEATHER ROOF COATING PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

Installation Manual for STANDING SEAM ROOFING

Installation Manual for STANDING SEAM ROOFING Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building

More information

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the

More information

Ubiflex. Non-lead flashing system

Ubiflex. Non-lead flashing system Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

Active and Passive Sash Replacement

Active and Passive Sash Replacement for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural

More information

Profiles for floors of same height Cerfix Projoint

Profiles for floors of same height Cerfix Projoint PROFILPAS S.P.A. VIA EINSTEIN, 38 35010 CADONEGHE (PADOVA) ITALY TEL. +39 (0)49 8878411 +39 (0)49 8878412 FAX. +39 (0)49-706692 EMAIL: INFO@PROFILPAS.COM s for floors of same height Cerfix Projoint Application

More information

SECTION 07400 STANDING SEAM METAL ROOF

SECTION 07400 STANDING SEAM METAL ROOF SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

RT7. Practical commercial roofing & cladding solutions innovative products www.roof.co.nz

RT7. Practical commercial roofing & cladding solutions innovative products www.roof.co.nz RT7 Practical commercial roofing & cladding solutions innovative products www.roof.co.nz february 2010 RT7 escription RT7 is a visually appealing medium rib-height trapezoidal roofing profile, has an exceptional

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

Commercial Roof Management

Commercial Roof Management Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading

More information

The existing roof angle change terminations and flashings when sound and intact can be reused.

The existing roof angle change terminations and flashings when sound and intact can be reused. January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment

More information

Screw Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel

Screw Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel Screw Patterns Roof & Walls Overlap Underlap ¾ 9 TR-36 36 5/8 6 MD-36 36 ½ 8 TSM-32 32 1¼ 12 PBR-Panel 36 Bottom Edge Screw Pattern apply to every profile except for MD36 (1 screw beside every rib) High

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof

More information

Metal Building Systems Installation and Flashings & Details Guide. Table of Contents

Metal Building Systems Installation and Flashings & Details Guide. Table of Contents Table of Contents Section Page Notes to Designer/User..................1-2 Map of Typical Roof Conditions............3 Fastener Placement.......................4 Fastener Selection........................5

More information

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes: BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors

More information

Why is my air conditioner dripping on my customers?

Why is my air conditioner dripping on my customers? De-Mystifying HVAC Why is my air conditioner dripping on my customers? By Ron Prager One of the most frequent emergency service requests is a call for an air conditioner leaking water into the store. These

More information

RECOATING AND RENEWING SPF ROOFING SYSTEMS

RECOATING AND RENEWING SPF ROOFING SYSTEMS RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. Roofing Systems There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. BUR (Built-Up Roofing) Built-Up-Roofing, BUR is a roof that

More information

IMPORTANT INFORMATION

IMPORTANT INFORMATION Curved Quadrant Instruction Manual CQ IMPORTANT INFORMATION Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to our guidelines.

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 - CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b

More information

Section Page Section Page

Section Page Section Page Western States Western Rib Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer / Installers..1 Fastener Placement and Selection.2-3 Key

More information

What you need to know about concrete block basement construction.

What you need to know about concrete block basement construction. Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013] FLASHMAN WINDOW AND DOOR FLASHING SYSTEM This Appraisal replaces BRANZ Appraisal No. 573 (2007). Amended 05 February 2016. BRANZ Appraisals Technical Assessments of products for building and construction.

More information

0845 0098 980 www.nicholsonsts.com

0845 0098 980 www.nicholsonsts.com 0845 0098 980 www.nicholsonsts.com ROOFTRAK The IFP is revolutionising the way we fix things to roofs. Technical Director of a leading UK roofing system manufacturer The ROOFTRAK-IFP A revolutionary solution

More information

Colonnade Security Pipe

Colonnade Security Pipe Description: Round & Square downpipe formed from extruded 6060 T4 aluminium in various sizes (Ø83mm, Ø108mm, 83x83 mm & 108x108mm*) & supplied with a complete range of accessories i.e. Offsets, bends,

More information

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed

More information

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new

More information

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS Table of Contents Chapter 1: FLAT ROOF REPAIR - CUT COST WITHOUT CUTTING CORNERS Chapter 2: PVC RECOVER SYSTEM HOW IT WORKS Chapter 3: 8 STRATEGIES TO

More information

Shingle Installation Guide

Shingle Installation Guide Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

How to Install UnderDeck The Original.

How to Install UnderDeck The Original. How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

Regulatory Services. Asbestos in the Home. What is asbestos?

Regulatory Services. Asbestos in the Home. What is asbestos? Regulatory Services Asbestos in the Home What is asbestos? Asbestos is a natural silicate mineral consisting of fibres. The fibres are strong, durable, and resistant to heat, long, thin and flexible. There

More information

Building Owners Guide to a Duro-Last System!

Building Owners Guide to a Duro-Last System! Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof

More information

Epdm Flat Roofing Systems

Epdm Flat Roofing Systems Epdm Flat Roofing Systems EDPM can be fully bonded, loose laid and ballasted or mechanically attached depending on the existing roof and its proposed usage. This applies to roofs to be refurbished and

More information

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE 3 TO 30 METRE SPAN TILT UP METHOD SUPPLIED BY: Last update 8 December 2010 2010 FBHS (Aust) Pty Limited FBHS (Aust) Pty Limited ABN 83 126 232 504 trading

More information

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

Classic Products, Inc. ClickLock Standing Seam Installation Manual

Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. 8510 Industry Park Drive Piqua, OH 45356 800.543.8938 Table of Contents page Introduction 1. 1 Starter. 2. 1 Panels.

More information

NEOGARD. Preventive Maintenance Manual

NEOGARD. Preventive Maintenance Manual NEOGARD Preventive Maintenance Manual Fluid-Applied Roof Coating Systems December 2014 Notes NEOGARD luid-applied roof coating systems are designed to be long lasting, monolithic membranes which provide

More information

ROOFS, SNOW AND ICE DAMS

ROOFS, SNOW AND ICE DAMS ROOFS, SNOW AND ICE DAMS The Problem Ice dams are a common roof performance problem in cold climate buildings. Simply put, they are ridges of ice and icicles caused by melt water from further up the roof

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L AT I O N I N S T R U C T I O N S C A R E F U L LY CAR

More information

12.1 Schlüter -KERDI-BOARD

12.1 Schlüter -KERDI-BOARD I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter

More information

Composite Panel Firewall Systems

Composite Panel Firewall Systems Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.

More information

The formation of roof waterproofing details calls for

The formation of roof waterproofing details calls for 3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design

More information

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced

More information

Activ ActivTM self-cleaning glass Activ

Activ ActivTM self-cleaning glass Activ Pilkington Activ TM Activ self-cleaning glass Pilkington Activ The world s first self-cleaning glass with advanced dual action for superior results A revolution in glass Self-cleaning glass has been described

More information

GENERAL RUBBER LINING PRINCIPLES

GENERAL RUBBER LINING PRINCIPLES GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface

More information

Manual lifting and handling

Manual lifting and handling Manual lifting and handling When installing British Gypsum products and systems care should be taken to ensure that appropriate methods of handling and lifting are adopted. The following guidance details

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information