1 ALTERNATE No. 2 BFS LOCATION: Locate BFS North of B-3 on new house-keeping pad. HOUSE KEEPING PAD and DRAIN CONNECTIONS: Furnish house-keeping pad for new boilers B-2 and B-3 including trench drains to extend existing drains. Trench drain shall be a 4 x 8 10 gauge 304 stainless steel channel anchored to existing floor with #3 re-bar suspended 3" "chairs" on 12 centers both North-South and East-West with re-bar within 3" of edges. Concrete: 3,000 pound test. The existing south drain shall be extended approximately 3.5 to the east to the east edge of the new pad with stainless steel cap. The drain shall extend to the west to the wall north of the new location for boiler B-3. The north drain shall be extended south and turned east to cross the center of the rear of Boiler B-2. The bottom of the channel shall have a 20 gauge 304 stainless steel bottom plate graded 2% to the existing drains and grouted in place prior to the pour. After the pad has cured, the top of channel shall be cut with an 8 diameter penetration with a stainless steel collar and removable grate. The pad shall extend a minimum to 1-6 outside of the foot-print of the new boilers with 1 chamfered edges. Yellow-edging is for delineation of the pad and will be provided by others after a three-month curing period. Pentration for drains and blow-down. 10 gauge 304 S.S. Sloped bottom plate: 16 ga. 304 S.S. PD-1 of 1
2 Per ALTERNATE No. 2: Equipment dimenstions and connections. Per PD-1, this equipment will site North of the Boiler B3. ED-1
3 ED-2
4 Switch as shown with clear Lexan cover on hinge on outside of west exit and on outside of east door entry into generator room. Lexan cover shall have no locking mechanism. Furnish an additional sign above the switch in.1" engraved white letters in read back-ground identifying nature and function of switch.: " EMERGENCY SHUT-OFF BUTTON". Activation of either switch shall disable all natural gas and/or diesel fuel-burning equipment including make-up air combustion fans and related gas valves. Signal conduit routed to switches shall be in 1/2" EMT and interfaces with boilers No. 1, No. 2 and No. 3. Lowvoltage conductor: No. 18 copper THHN. Line Voltage conducter: No. 10 THHN. ED-3
5 ED-4
6 Existing outside air inlet in soffit south of mechanical room. MAKE-UP AIR SYSTEM VIEW LOOKING SOUTHWEST Transparent surfaces in blue are for clarity. Alt. No. 3. New Make-Up Air Fan wih new 18" x 36" access panel.. New Baffle: 16 Gauge with 1.5 pound liner on both sides. Base Bid. Blank-off of existing make-up duct with 16 gauge galvanized sheet metal with 1.5 pound liner for sound abatement. Base Bid New 16" (sixteen inch) round make-up duct for Boiler No. 3. Existing outside air inlet in soffit south of mechanical room. Base Bid. New 18" x 42" lined sheet-metal drop with side-discharge and motorized damper positioned south of new 700 HP boiler. Motorized damper with pilot switch opens on call for boiler and closes end-switch prior to operation of boiler. Route to new lined 36" x 10" retangular duct on west wall above Boiler B-3. Terminate ductwork 2' above the new drainage channel (PD-1) with motorized damper and louver at the bottom of the duct. Minimum air-flow at full operation of Boiler No. 2: 5,943 CFM. Nominal CFM rating of boiler requirment: 7,000 CFM. Test and Balance to 5,943 CFM. Motorized damper shall operate on call from Boiler B-3 and close end-switch permitting B-3 to operate. Insulate all make-up water piping in Alternate No. 3: Make-Up Air Fan vicinity of B-3 with 2" fiberglass Make-Up Air Fan- Enervex SFTA-32 with 480 Volt 3-Phase 5 Horsepower inverter-rated TEFC Motor with VFD and static pressure sensor control. insulation. Existing 3-Phase electrical service from 30 Amp existing three-phase switch on existing boiler control module for original boiler No. 2. Intercept existing service above boiler with new junction box and extend service with four (4) No. 10 THHN copper. Change Fusing to 20 Amp and Relabel existing safety switch as "Make-Up AIr Fan.". Static pressure controller set to maintain positive pressure adjacent to new boiler No. 2 and ramp make-up air fan according to boiler VFD and static pressure signal. ED-5
7 Alt. No. 3. New Make-Up Air Fan wih new 18" x 36" access panel.. Base Bid New 16" (sixteen inch) round make-up duct for Boiler No. 3. Existing outside air inlet in soffit south of mechanical room. Route to new lined 36" x 10" retangular duct on west wall above Boiler B-3. Terminate ductwork 2' above the new drainage channel (PD-1) with motorized damper and louver at the bottom of the duct. Motorized damper shall operate on call from Boiler B-3 and close end-switch permitting B-3 to operate. Insulate all make-up water piping in vicinity of B-3 with 2" fiberglass insulation. Existing outside air inlet in soffit south of mechanical room. Transparent surfaces in blue are for clarity. MAKE-UP AIR SYSTEM VIEW LOOKING NORTH-EAST ED-6
Commercial Gas Furnace Upflow
Commercial Gas Furnace Upflow Model G24-200 80% A.F.U.E. 200,000 Btuh Input Heating Cap. 7.5 or 10 Tons Nominal Add-On Cooling GUK FEATURES Certified by A.G.A./C.G.A. Laboratories. Heavy gauge painted
More informationCOMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
More informationSECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2
More informationAll work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
More informationGas Unit Heaters Duct Furnaces Horizontal - 60 HZ Form No. LF24-100-400 (10/2011) LF24 Standard
LF Standard Features Horizontal unit heaters are compact in design and easy to install. Steady State Efficiencies of up to 80.%. Ideal for economical commercial heating systems. Shipped completely assembled
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationM7RL Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. High Efficiency / Direct Vent Condensing Downflow Gas Furnace
TECHNICAL SPECIFICATIONS M7RL Series High Efficiency / Direct Vent Condensing Downflow Gas Furnace Induced Draft - 9%+ AFUE Input 4,000 thru 7,000 Btuh The high efficiency downflow gas furnace is especially
More informationREPLACE ROOFING DENVER CENTRAL LIBRARY PHASE I CITY & COUNTY OF DENVER DENVER, COLORADO
PUBLIC LIBRARY PHASE I 4828 W. 6TH Avenue, Unit B-8 Golden, Colorado 8040 Phone: (303) 233-092 VICINITY MAP SHEET INDEX GT /26/2009 SHEET DESCRIPTION G.0 COVER SHEET R.0 COMPOSITE ROOF PLAN R. NEW ROOF
More informationG26 Corp. 9721-L11 Revised 07-2001 LENNOXOEMPARTS.COM. Service Literature G26 SERIES UNITS
Service Literature G26 SERIES UNITS G26 series units are high-efficiency upflow gas furnaces manufactured with DuralokPlust aluminized steel clamshell-type heat exchangers. G26 units are available in heating
More informationIRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
More informationCooling Capacity CFM range @.5 in. w.c. (125 Pa)
N8MXL Product Specifications 80% ECM Single Stage Heating Furnace EASIER TO SELL 80% AFUE Flame roll out sensors standard Category I venting Blocked vent switch 24 VAC humidifier terminal Electronic air
More informationSECTION 11 78 13 MORTUARY REFRIGERATORS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in
More informationWelcome: What is U Drain? Drain Materials. Flow
Welcome: Thank you for looking into the U Drain floor drain system. This paper will explore the functional features of the U Drain and why it is superior to other grated systems in the marketplace. We
More informationBring the fresh in. Dedicated Outside Air Systems
Bring the fresh in. Dedicated Outside Air Systems The inside story on outside air. On average, we breathe in 3,400 gallons of air each day. Ambient indoor air pollution is a major problem, affecting health
More informationInspection Report Atlanta Strip Mall Commercial Building Property Address:
Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of
More informationFIRE DAMPER APPLICATION GUIDE
FIRE AND CEILING RADIATION DAMPERS FIRE DAMPER APPLICATION GUIDE Use this application guide to help determine what type of fire damper best suits the application. Below are listed the ten Metal-Fab fire
More informationCooktop Low-Profile Ventilation Hoods
INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............
More informationENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
More informationRFQ # PR5006805 Replace Kitchen Equipment in the CGR
RFQ # PR5006805 Replace Kitchen Equipment in the CGR GENERAL The Consulate General of the United States of America has a requirement to furnish and install new kitchen equipment at the Consul General s
More informationCircuit breaker panel. Power supply for condensing unit. Power supply for furnace. Air handler (Furnace)
UNIT OBJECTIVES Describe the concept of year-round air conditioning List three typical year-round air conditioning system types List the five ways to condition the air Determine airflow for a cooling system
More informationFINAL December 2012 SECTION 233100 DUCTWORK
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insula tion shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More informationSECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions
More informationFLASH TANK ECONOMIZER PRODUCT GUIDE
FLASH TANK ECONOMIZER PRODUCT GUIDE Overview A flash tank is used to recover blowdown energy in the form of flash steam and blowdown. This can only be used with a deaerator or some other pressurized device.
More informationOVEN PARTS For Models:GMC305PDB07, GMC305PDQ07, GMC305PDT07, GMC305PDS07 (Black) (White) (Biscuit) (S.Steel)
OVEN PARTS 30" BUILT IN ELECTRIC COMBO SENSOR/SC (GOLD LINE) 7 03 Litho In U.S.A. (cre) 1 Part No. OVEN PARTS NOTE: The screws and nuts required to attach a part are listed immediately following that part.
More informationGROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used by
More informationServices Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
More informationElement D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
More informationFiberstars Mini Lighted Laminar Flow Fountains
Fiberstars Mini Lighted Laminar Flow Fountains SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation and operation of Fiberstars Mini Lighted Laminar Flow Fountain. The
More informationCLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
More informationELECTRODE BOILERS VAPOR POWER INTERNATIONAL
ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in
More informationAcumen Enterprises, Inc.
Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter
More informationHVAC Code Requirements
one and two family dwellings? Answer: SECTION 2001: GENERAL 2001.1 Air supply. Fuel-burning equipment shall be provided with a supply of air for fuel combustion, draft hood dilution and ventilation of
More informationElectrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
More informationCE6500 Energy Recovery Ventilator
ADVANCED COMMERCIAL Energy Recovery Ventilator PRODUCT SPECIFICATIONS & TECHNICAL DATA Features NOMINAL CAPACITY 5500-7000 CFM CASING Double-wall cabinet White exterior paint, -gauge galvanized steel -gauge
More information(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark
Spectrum Laboratories Ltd is accredited by International Accreditation New Zealand (formerly Telarc). The tests reported herein have been performed in accordance with the terms of our accreditation. This
More informationSECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
More informationDuct Design. Presented by Dave Janquart
Duct Design Presented by Dave Janquart Overview of Topics Duct design Duct insulation SMACNA Standards Factors Influencing Duct Design Equipment Losses Air Velocity Duct Material Duct Size & Shape Length
More informationT 3 Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T 3 SQ
TSQ--0 7-7-07 T Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T SQ Model Configuration T SQ- Heating / Cooling Border Type (Lay-In) Full Face Nominal Round Duct Size
More informationMETER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
More informationHELIPORT FUEL/WATER SEPARATOR MODEL H-200
HELIPORT FUEL/WATER SEPARATOR MODEL H-200 Suite 150 Voice 1-973-540-0011 55 Madison Avenue Fax 1-973-540-0131 Morristown, NJ 07960-6012 Email info@heliport.com U.S.A. Web www.heliport.com A. PRINCIPLE
More informationCHILLED WATER DATA ROOM UNITS
Critical Infrastructure for the World s Leading Data Centers CHILLED WATER DATA ROOM UNITS Downflow Net Sensible Cooling 79 220kW Upflow Net Sensible Cooling 66 206kW A Nortek Company DATA CENTER COOLING
More informationNominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
More informationElement D Services Electrical
Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as
More informationPLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW
CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,
More informationSECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationMechanical Rooftop Custom Capabilities
Mechanical Rooftop Custom Capabilities Mechanical Construction Capabilities Price manufactures a wide range of custom gas heat and DX cooled units to meet your new construction and retrofit needs. In addition
More informationHV AC CODE CHECKLISTS
The following text is informational only and shall serve as an informational guide for HV AC contractors, journeymen, and apprentices working in the Heating, Ventilation, and Air Conditioning industry.
More informationAll work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.
DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which
More informationA Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses
A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses Robert L Crosby Jr, Biorealis Systems, Inc. Abstract: Bristol Bay Housing Authority (BBHA) currently
More informationDIVISION 23 - HVAC 23 30 00 HVAC Air Distribution
PART 1 - GENERAL 1.01 GENERAL CRITERIA A. General Design Criteria 1. System standards require that buildings be fully ducted (supply, exhaust and return air). 2. Provide positive exhaust ventilation for
More informationGUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
More informationFire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
More informationHVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings
SUCCESS WITH 2012 IECC DELAWARE Recommended Practices for Optimized Energy Savings for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED VERSION 2015.1.0 CHECKLIST: JOB READY 1. 2.
More informationCITY OF SELMA, TEXAS Inspection Checklist: Commercial
Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides
More informationUnderground Service Requirements and Instructions
This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page
More informationGlossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
More informationwww.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
More informationCROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS
CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS WARNING Improper installation, adjustment, alteration, service, or maintenance of this product can cause
More informationVertiCool Space Saver 2 to 15 tons Water-Cooled and Chilled Water
2 to 15 tons Water-Cooled and Chilled Water Unique Solutions for Challenging HVAC Projects Your Choice for Limited Space Applications Water-Cooled Chilled Water The VertiCool Space Saver allows installation
More information48/50EJ,EK,EW,EY038, 044, 048 SINGLE-PACKAGE COOLING UNITS VARIABLE VOLUME CONSTANT VOLUME FACTORY-INSTALLED OPTIONAL HEAT
48/50E-4SB 48/50EJ,EK,EW,EY038, 044, 048 SINGLE-PACKAGE COOLING UNITS VARIABLE VOLUME CONSTANT VOLUME FACTORY-INSTALLED OPTIONAL HEAT GAS HEAT ELECTRIC HEAT PERFORMANCE DATA CERTIFIED DIMENSION PRINT CERTIFIED
More informationOVEN PARTS For Models:GSC308PJB05, GSC308PJQ05, GSC308PJT05, GSC308PJS05 (Black) (White) (Biscuit) (Black Stainless)
OVEN PARTS 30" BUILT IN ELECTRIC COMBO SENSOR/SC (GOLD LINE) 3 05 Litho In U.S.A. (cre) 1 Part No. Rev.A OVEN PARTS 1 Literature Parts 4455994 Installation Instructions Use & Care Guide 8300346 Microwave
More informationNC State University Design and Construction Guidelines Division 26 Fire Alarm Systems
NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems 1.0 Purpose A. The following guideline provides the minimum standards and requirements for fire alarm systems. 2.0
More informationHome Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
More informationSECTION 23 34 13. A. Horsepower: Do not increase or decrease fan motor horsepower without written approval from Engineer.
PART 1 GENERAL SECTION 23 34 13 HVAC FANS 1.01 SUMMARY A. Section Includes: 1. Exhaust fans. 2. Transfer fans. B. Related Documents: 1. Drawings and general provisions of the Contract, including General
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationTown House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
More informationExhaust Calculation Booklet
Exhaust Calculation Booklet American Dryer Corporation 88 Currant Road Fall River MA 02720-4781 Telephone: (508) 678-9000 / Fax: (508) 678-9447 e-mail: techsupport@amdry.com ADC Part No. 450450 Exhaust
More informationHVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades
Success with 2015 IECC Northeast & Mid-Atlantic Checklist for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED TEMPLATE 2015.1.0 PAGE 1 CHECKLIST: JOB READY 1. 2. 3. 4. 5. 6. 7. 8.
More informationMOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
More informationPRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS
PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS OVENS MANUFACTURED BY: EARTHSTONE OVENS-6717 SAN FERNANDO RD GLENDALE CA 91201 TELEPHONE: 800-840-4915 818-553-1134 FAX: 818-553-1133
More informationELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
More informationSECTION 15140 - PIPE HANGERS AND SUPPORTS
Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the
More informationDESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS
DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS A. SCOPE 1. This information is intended to assist contractors, installers and code officials in the proper design and installation of flexible
More informationDESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES 33 70 00
SECTION 33 70 00 - ELECTRICAL DISTRIBUTION CONCRETE ENCASED PRIMARY DUCTBANK SYSTEMS Duct Banks shall be installed by qualified electrical contractors. Provide type EB PVC 5 inch duct equal to Carlon #68716
More informationHyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationFIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
More informationSPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
More informationCommercial Gas Water Heaters
POWERED BURNER MODELS LARGE-VOLUME POWERED BURNER FEATURES The large-volume powered burner line includes the largest, most powerful A. O. Smith tanktype gas water heaters. With tank capacities up to 600
More informationDirect Gas Fired [Make-Up Air / Displacement Ventilation / Space Heating] System
Section 15622 AA-Series (rev. 04/16/15) Direct Gas Fired [Make-Up Air / Displacement Ventilation / Space Heating] System Note: Optional items and/or items requiring a choice, are shown between brackets
More informationPre-Drywall Inspection Report
SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion
More information2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationInstallation Manual CLIFC Fan & Coil Variable Speed
Installation Manual CLIFC Fan & Coil Variable Speed General Description GENERAL DESCRIPTION FANS EQUIPMENT Totally Factory assembled within the unit all piping, wiring, and required controls for operation
More information2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
More informationWMSLW / WMBLWH Series Hydronic Upflow/Horizontal Left or Right, Heating and Cooling Air Handler
WMSLW / WMBLWH Series Hydronic Upflow/Horizontal Left or Right, Heating and Cooling Air Handler Installation Operation Maintenance The WMSLW/WMBLW series is designed for installation in a closet, utility
More informationHERZ-Thermal Actuators
HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01
More informationPentalift Equipment Corporation Lift table and positioning equipment glossary of terms
Pentalift Equipment Corporation Lift table and positioning equipment glossary of terms Access Plate removable or hinged plate which permits access to components that are covered by some portion of the
More informationCHAPTER 5 WATER HEATERS
PlumbingCode06_ch05 5/29/06 8:12 AM Page 1 CHAPTER 5 WATER HEATERS Water heaters are only a small portion of a plumbing system, but they are important, and they can be dangerous. Many plumbers take water
More informationCrawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809
More informationPUBLIC RESTROOMS, DESIGN INTENT
PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationsimple, efficient, and cost effective floor and surface drainage system
Manufactured by Norstar Industries Ltd. 1-800-661-5031 simple, efficient, and cost effective floor and surface drainage system U-drain provides unprecedented convenience as a trench drainage system that
More informationHeating, Ventilation, Air Conditioning and Refrigeration (HVACR)
Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety
More informationGENERAL ELECTRICAL REQUIREMENTS
GENERAL ELECTRICAL REQUIREMENTS RECEPTACLE SPACING Within 6-feet of the edge of any door HABITABLE Not more than 12-feet apart along wall ROOMS: At all wall spaces 24 or more wide Within 24 of edge of
More informationWON0502-B INSTALLATION INSTRUCTIONS FOR ELECTRIC FURNACES. Bulletin 30-34 / March 2013
Bulletin 30-34 / March 2013 INSTALLATION INSTRUCTIONS FOR ELECTRIC FURNACES General The information on the following pages is to provide the installer the necessary information to properly install the
More informationIn-Line Air Separators
Air Elimination & Control In-Line Air Separators The AC models of air separators deliver all the quality and performance you expect from Taco products. They are built to last with shell, heads and ANSI
More informationCOMMISSIONING OF HVAC SYSTEMS
FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS
More informationSECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS
SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating
More informationUDSA - UDSBD unit heater
APPLICATIONS Heating >> FACTORIES >> WAREHOUSES >> HALLS >> SHOWROOMS >> GREENHOUSES >> RETAIL >>... UDSA - UDSBD unit heater www.reznor.eu V3 gas fired unit heater Reznor V3 unit heaters are one of the
More informationSPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This