Winnipeg Water Treatment Program

Size: px
Start display at page:

Download "Winnipeg Water Treatment Program"

Transcription

1 Winnipeg Water Treatment Program Test s Set 1

2

3 Test Pile Driving Summary Project: City of Winnipeg Water Treatment Plant Client: City of Winnipeg Contractor: Subterranean (Manitoba) Ltd. Project Number: Location: Proposed Clearwell Driving Date: March 2, 2005 Driving Hammer: Link Belt 520 Personnel: Follower 8.2m Pile Length: 19.0m Pile # Northing (m) Easting (m) Ground Elevation (m) Top of Pile (m) Tip Elevation (m) Pile Diameter (mm) Refusal Criteria* (bl /25 ) Final Set (mm) /19/ /13/ /20/ /19/ /15/ /25/ /19/ /10/ /19/ /6/0 *Refusal criteria increased 25% due to Follower. P:\3398\055-00\4 Development\4 Test Results and Analysis\Pile Driving Summary.dot

4 400mm Pile Number: 9362 Pile Size: 400mm m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 15 blows/25mm m blows per 0.3 meters Penetration for 15 blows (mm)

5 400mm Pile Number: 8276 Pile Size: 400mm Cast Date: 14-Feb m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 15 blows/25mm m blows per 0.3 meters Penetration for 15 blows (mm)

6 400mm Pile Number: 8004 Pile Size: 400mm Cast Date: 14-Feb m Supplier #: m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 15 blows/25mm m blows per 0.3 meters Penetration for 15 blows (mm)

7 400mm Pile Number: 8229 Pile Size: 400mm Cast Date: 14-Feb m Supplier #: m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 15 blows/25mm m blows per 0.3 meters Penetration for 15 blows (mm)

8 400mm Pile Number: 8898 Pile Size: 400mm m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 15 blows/25mm m blows per 0.3 meters Penetration for 15 blows (mm)

9 350mm Pile Number: 9249 Pile Size: 350mm m Supplier #: m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 10 blows/25mm pile started to hang up before the follower was used (ie. Top of pile at grade). Normal driving after switching to the folower -pile stopped dead at m m blows per 0.3 meters Penetration for 10 blows (mm)

10 350mm Pile Number: 9024 Pile Size: 350mm m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 10 blows/25mm m blows per 0.3 meters Penetration for 10 blows (mm)

11 350mm Pile Number: 8807 Pile Size: 350mm m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 10 blows/25mm m blows per 0.3 meters Penetration for 10 blows (mm)

12 350mm Pile Number: 8187 Pile Size: 350mm m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 10 blows/25mm m blows per 0.3 meters Penetration for 10 blows (mm)

13 350mm Pile Number: 8438 Pile Size: 350mm m Supplier #: P m Ground Elevation: m Top of Pile: m Tip Elevation: m Refusal Criteria: 10 blows/25mm - pile stopped dead at m m blows per 0.3 meters Penetration for 10 blows (mm)

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings.

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings. September 2015 2 contents General Information

More information

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE Prepared by Infratech ASTM CO., LTD. Contents Chapter Description Page Contents...... 1 List of Appendix. 1 1. Introduction.. 2 2. Test Method..2 3.

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification

Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Contents Introduction... 3 Asset Details... 3 Description... 3 Asset Tagging... 3 Attributes... 4 Data

More information

An Automatic Kunzelstab Penetration Test

An Automatic Kunzelstab Penetration Test An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology

More information

Anirudhan I.V. Geotechnical Solutions, Chennai

Anirudhan I.V. Geotechnical Solutions, Chennai Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often

More information

INSTALLATION SPECIFICATION FOR DRIVEN PILES

INSTALLATION SPECIFICATION FOR DRIVEN PILES INSTALLATION SPECIFICATION FOR DRIVEN PILES PDCA 103-07 PDCA Approved August 2007 PDCA Technical Committee Pile Driving Contractors Association www.piledrivers.org info@piledrivers.org 2007, Pile Driving

More information

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

PDCA Driven-Pile Terms and Definitions

PDCA Driven-Pile Terms and Definitions PDCA Driven-Pile Terms and Definitions This document is available for free download at piledrivers.org. Preferred terms are descriptively defined. Potentially synonymous (but not preferred) terms are identified

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

Mersin, TURKEY. Port extension project

Mersin, TURKEY. Port extension project Mersin, TURKEY Port extension project Mersin is situated on the Mediterranean Sea, on the southeast coast of Turkey. Several international contracting companies were invited to bid for the upgrading of

More information

ACTIVITY REPORT - JUNE 2012

ACTIVITY REPORT - JUNE 2012 ACTIVITY REPORT - JUNE 2012 INDEX PROJECT INFORMATION ACTIVITIES MASTER WORK SCHEDULE STATISTICAL INFORMATION PHOTOGRAPHS QUALITY DOCUMENTATION PROJECT INFORMATION LOCATION PROJECT INFORMATION Land Area

More information

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL J. P. Scientific Instruments 7, Civil Lines, Roorkee-247667 DYNAMIC CONE PENETRATION TEST CONTENTS: PAGE NO. 1.0 INTRODUCTION 03 2.0 PROBLEM

More information

Cold Weather Concrete Practices

Cold Weather Concrete Practices Cold Weather Concrete Practices The Information below is an outline of common practice for residential foundation placement and winter construction utilize Edmonton and surrounding Area. Conditions in

More information

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida

Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida Ahmed Said, PhD, PE Principal Engineering Consultant, Sinkhole Geotech, Inc. e-mail: admin@sinkholegeotech.com

More information

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2013 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

APPENDIX F GEOTECHNICAL REPORT

APPENDIX F GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 101-2016 Template Version: C420150806 - RW APPENDIX F GEOTECHNICAL REPORT AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax

More information

CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services

CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services 1 CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services Pile and deep foundations testing Geotechnical testing equipment supplier Geotechnical software supplier Geotechnical consulting Web page: www.fernandeztadeo.com

More information

Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015

Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015 Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015 Presented by: Jeff Dunlap, P.E. Terracon Consultants 1 Project Site Kentucky Official

More information

Teksam Pipe Cast CV 2600

Teksam Pipe Cast CV 2600 PIPE CAST PRODUCTION STATIONS Type: CV 2600 and CV 1600.Our mission is to provide high quality equipment that can be built from standardized modules to meet customer s specific requirements... Teksam Pipe

More information

Manitoba Curriculum Framework of Outcomes Refrigeration & Air Conditioning Overview 2013 Draft

Manitoba Curriculum Framework of Outcomes Refrigeration & Air Conditioning Overview 2013 Draft Acknowledgements Manitoba Curriculum Framework of Outcomes Refrigeration & Air Conditioning Overview 2013 Draft Manitoba Education gratefully acknowledges the contributions of the following individuals

More information

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

CPME75-100 CABLE PUSHING MACHINE WITH ELECTRIC MOTOR. fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES

CPME75-100 CABLE PUSHING MACHINE WITH ELECTRIC MOTOR. fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES CPME75-100 CABLE PUSHING MACHINE WITH ELECTRIC MOTOR fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES ABOUT US Our company ever since its incorporation in the telecommunication sector has been operating

More information

STATIC PILE LOAD TEST MANUAL. GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4

STATIC PILE LOAD TEST MANUAL. GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4 STATIC PILE LOAD TEST MANUAL GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4 AUGUST 2015 GEOTECHNICAL CONTROL PROCEDURE: STATIC PILE LOAD TEST MANUAL GCP-18 Revision #4 STATE OF NEW YORK DEPARTMENT

More information

UFGS-02362 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS-02362 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.20 (April 2006) Change 2-11/14 ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02362 (August 2004) UNIFIED FACILITIES

More information

repairing leaks to your service pipe increasing water efficiency

repairing leaks to your service pipe increasing water efficiency repairing leaks to your service pipe increasing water efficiency nobody loves a leak A water leak on your property is a waste of a precious resource. If left running it may cause damage to your property

More information

Electricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing)

Electricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing) Electricity Gas Send your completed application form with supporting documentation to: Thank you for considering Energy Services as your utility provider. In the East and West Midlands, electricity connections

More information

Offshore Work Packages

Offshore Work Packages Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up

More information

Recycling of Mineral Wool Composite Panels Into New Raw Materials

Recycling of Mineral Wool Composite Panels Into New Raw Materials Case Study: Mineral Wool/Steel Composite Panel Recycling Recycling of Mineral Wool Composite Panels Into New Raw Materials Eurobond have developed a method for recycling mineral wool composite panels.

More information

PRODUCTS PRODUCTS ABOUT US. www.gmm.com.tr

PRODUCTS PRODUCTS ABOUT US. www.gmm.com.tr PRODUCTS Fiber Optic Cable Production Lines Secondary coating line Optical fiber cable stranding line Sheathing line for optical cable Rewinding line for optical cable PRODUCTS Copper Communication Cable

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

HYDROFOK MACHINES. HYDRAULIC CABLE & TUBE BLOWING MACHINE with HYDRAULIC POWER UNIT) fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES

HYDROFOK MACHINES. HYDRAULIC CABLE & TUBE BLOWING MACHINE with HYDRAULIC POWER UNIT) fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES HYDROFOK MACHINES HYDRAULIC CABLE & TUBE BLOWING MACHINE with HYDRAULIC POWER UNIT) fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES ABOUT US Our company ever since its incorporation in the telecommunication

More information

Plant Maintenance Services and Application of ICT

Plant Maintenance Services and Application of ICT Plant Maintenance Services and Application of ICT Hitachi Review Vol. 62 (213), No. 4 276 Shigeru Toida Fumio Hatori Mitsuhiro Takemoto OVERVIEW: After a plant is constructed, the plant s owners need to

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362 California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

AURORA-RIETVLEI SOLAR POWER (PTY) LTD.

AURORA-RIETVLEI SOLAR POWER (PTY) LTD. AURORA-RIETVLEI SOLAR POWER (PTY) LTD. NERSA Public Hearing on the Application for a Generation License for Renewable Energy Power Plants 13 AUGUST 2012 Contents 1. Background and Project Company Structure

More information

RATCHET RELEASE SHACKLE

RATCHET RELEASE SHACKLE RATCHET RELEASE SHACKLE INNOVATIVE PILING EQUIPMENT HYDRAULIC PILING HAMMERS EURO RATCHET RELEASE SHACKLE FOR STEEL ERECTION OPERATORS INSTRUCTIONS & SPARE PARTS LIST EXCAVATOR MOUNTED VIBRATORS EXCAVATOR

More information

How strong are magnets?

How strong are magnets? Experiments with magnets and our surroundings How strong are magnets? Typical Values Here is a list of how strong some magnetic fields can be: Smallest value in a 10^-14 Tesla magnetically shielded room

More information

TECHNICAL REPORT ON SCALA DYNAMIC CONE PENETROMETER IRREGULARITY

TECHNICAL REPORT ON SCALA DYNAMIC CONE PENETROMETER IRREGULARITY TECHNICAL REPORT ON SCALA DYNAMIC CONE PENETROMETER IRREGULARITY CETANZ Technical Report TR 1 Author(s) SJ Anderson, Geotechnics Ltd Report Date First Issue May 2010 Report Revision Date September 2011

More information

Measuring the Diameter of the Sun

Measuring the Diameter of the Sun Chapter 24 Studying the Sun Investigation 24 Measuring the Diameter of the Sun Introduction The sun is approximately 150,000,000 km from Earth. To understand how far away this is, consider the fact that

More information

D3O PARTNER MARKETING SUPPORT TOOLS

D3O PARTNER MARKETING SUPPORT TOOLS D3O PARTNER MARKETING SUPPORT TOOLS D3O INTRODUCTION TO D3O D3O is a ground breaking impact protection solutions company with a range of unique patented smart materials. It is a premium, branded, ingredient

More information

Service & Maintenance Packages. Service & After-Sales. A Strong Company

Service & Maintenance Packages. Service & After-Sales. A Strong Company Service & Maintenance Packages Service & After-Sales A Strong Company Trust the Experts Since 2001, Wood Energy Ltd have supplied, installed and continue to maintain some of the highest quality biomass

More information

Contents General Requirements Location Size Inlet and Outlet Piping Protection Security Electrical Automatic Meter Reading (AMR)

Contents General Requirements Location Size Inlet and Outlet Piping Protection Security Electrical Automatic Meter Reading (AMR) The information in this booklet is provided to assist in planning your meter area requirements. Actual field conditions may result in additional requirements. For more information, please contact the ATCO

More information

PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA. Pile Dynamic Load test as alternative to Static Load test

PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA. Pile Dynamic Load test as alternative to Static Load test PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA Pile Dynamic Load test as alternative to Static Load test Gorazd Strnisa, B.Sc.Civ.Eng. SLP d.o.o. Ljubljana ABSTRACT Pile Dynamic test is test

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 240-6 Standard Test Procedures Manual Section: PENETRATION TEST & SPLIT- BARREL SAMPLING 1. SCOPE 1.1. Description of Test This method describes the standard penetration test using the split-barrel

More information

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Airport Rail Link is gathering speed Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Integrated Public Transit System for Metropolitan Regions Regional / Long Distance Rail Service

More information

What you need to know about electric choice in Pennsylvania.

What you need to know about electric choice in Pennsylvania. What you need to know about electric choice in Pennsylvania. Inside this handbook: Components of your bill Questions and answers about Electric Choice Consumer protection checklist Energy-saving tips Shopper

More information

European Technical Approval ETA-12/0500

European Technical Approval ETA-12/0500 ETA-Danmark A/S Kollegievej 6 DK-2920 Charlottenlund Tel. +45 72 24 59 00 Fax +45 72 24 59 04 Internet www.etadanmark.dk Authorised and notified according to Article 10 of the Council Directive 89/106/EEC

More information

MINIFOK MACHINES MINI FIBER OPTIC CABLE BLOWING MACHINE. fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES

MINIFOK MACHINES MINI FIBER OPTIC CABLE BLOWING MACHINE. fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES MINIFOK MACHINES MINI FIBER OPTIC CABLE BLOWING MACHINE fokmachine.com FIBER OPTIC CABLE BLOWING MACHINES ABOUT US Our company ever since its incorporation in the telecommunication sector has been operating

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

A guide to volume measurement solutions for the. Mining Industry. Changing the market from level to volume

A guide to volume measurement solutions for the. Mining Industry. Changing the market from level to volume A guide to volume measurement solutions for the Mining Industry 1 Changing the market from level to volume Potash Production 2 Changing the market from level to volume Potash Production Potash Production

More information

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Uniclass L6129 EPIC F122 CI/SfB Yp3 Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Introduction... 2 Product... 2 Sustainability... 2 Physical Properties of Lightweight Aggregate...

More information

Electricity to your property

Electricity to your property Vattenfall Distribution AB Electricity to your property How an electrical connection is made and what you need to consider How electricity reaches your property 8 simple steps! 1. Please leave plenty of

More information

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations

More information

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage 3.3. Evaluation of Building Foundation Damage Basic Terminology: Damage: Destruction, deformation, inclination and settlement of a building foundation caused by an earthquake. Damage grade: Degree of danger

More information

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information

More information

Lawn Sprinkler Systems Reserve Irrigation Inc. O & M. Version 2009 1382 Roseland Drive Macedonia, Ohio 44056 800.435.4979 www.rilawnsprinklers.

Lawn Sprinkler Systems Reserve Irrigation Inc. O & M. Version 2009 1382 Roseland Drive Macedonia, Ohio 44056 800.435.4979 www.rilawnsprinklers. Lawn Sprinkler Systems Reserve Irrigation Inc. O & M Version 2009 1382 Roseland Drive Macedonia, Ohio 44056 800.435.4979 Table of Contents Spring Maintenance of Irrigation system Page 1-9 Summer Maintenance

More information

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT

More information

Solving Persistent Moisture Problems and Moisture Damage

Solving Persistent Moisture Problems and Moisture Damage B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

DECLARATION OF PERFORMANCE NO. HU-DOP_TN-212-25_001

DECLARATION OF PERFORMANCE NO. HU-DOP_TN-212-25_001 NO. HU-DOP_TN-212-25_001 Product type 212 (TN) 3,5x25 mm EN 14566:2008+A1:2009 NO. HU-DOP_TN-212-35_001 Product type 212 (TN) 3,5x35 mm EN 14566:2008+A1:2009 NO. HU-DOP_TN-212-45_001 Product type 212 (TN)

More information

Build in self resetting protection systems: short circuit, overwattage overvoltage, thermal.

Build in self resetting protection systems: short circuit, overwattage overvoltage, thermal. Our Electronic Transformers are designed to use with low voltage halogen lamps. Precisly set, soft power supply make lamps live two times longer. Construction of our transformers remove main flaws of traditional

More information

Partnerships Implementing Engineering Education Worcester Polytechnic Institute Worcester Public Schools

Partnerships Implementing Engineering Education Worcester Polytechnic Institute Worcester Public Schools Partnerships Implementing Engineering Education Worcester Polytechnic Institute Worcester Public Schools Supported by: National Science Foundation Simple Machines: 4.G.2 _ Inclined Planes and Pulleys Grade

More information

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS. 701.02 Materials Materials shall be in accordance with the following:

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS. 701.02 Materials Materials shall be in accordance with the following: 701.03 SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING 10 701.01 Description This work shall consist of furnishing and driving foundation piles of the type and dimensions specified including cutting off

More information

Vegyesipari Kereskedelmi és Szolgáltató kft

Vegyesipari Kereskedelmi és Szolgáltató kft Vegyesipari Kereskedelmi és Szolgáltató kft www.kovacskft.hu About Us 1 Introduction Kovacs Ltd. short prezentation Quality Management System 2 Activities Forging plant Turning plant Machining plant 3

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

WDC 14-056 - Whakatane Central Business District Geotechnical Investigation

WDC 14-056 - Whakatane Central Business District Geotechnical Investigation WDC 14-056 - Whakatane Central Business District Geotechnical Investigation Data Delivery Report Simon Henderson 11/4/2014 Site investigation relating to the ground investigation of the Whakatane central

More information

We are looking for well-rounded individuals and as a result, the applications will be evaluated using the following criteria:

We are looking for well-rounded individuals and as a result, the applications will be evaluated using the following criteria: 2015 High School SCHOLARSHIPS We are pleased to be awarding the Chartered Professional Accountants (CPA) High School Scholarships to graduating high school students in Manitoba. Up to thirteen scholarships

More information

DECLARATION OF PERFORMANCE NO. HU-DOP_TD-25_001

DECLARATION OF PERFORMANCE NO. HU-DOP_TD-25_001 NO. HU-DOP_TD-25_001 Product type TD 3,5x25 mm EN 14566:2008+A1:2009 NO. HU-DOP_TD-35_001 Product type TD 3,5x35 mm EN 14566:2008+A1:2009 NO. HU-DOP_TD-45_001 Product type TD 3,5x45 mm EN 14566:2008+A1:2009

More information

Application for electricity connections Business premises

Application for electricity connections Business premises Electricity Thank you for considering Western Power Distribution for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information

More information

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA John R. Wolosick, P.E.,D.GE 1, Michael W. Terry, P.E. 2, W. David Kirschner 3 and Robert F. Scott Jr. P.E. 4 SYNOPSIS In

More information

Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning.

Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning. Three-Part Specifications - Copyright 2014 - Nixalite of America Inc Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning.

More information

STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva

STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva INTRODUCTION: The United States Embassy in Suva, Fiji is seeking contractor proposals to upgrade

More information

QUEENSLAND HEALTH POPULATION HEALTH QUEENSLAND INVESTIGATORS REPORT

QUEENSLAND HEALTH POPULATION HEALTH QUEENSLAND INVESTIGATORS REPORT QUEENSLAND HEALTH POPULATION HEALTH QUEENSLAND INVESTIGATORS REPORT WATER FLUORIDATION INCIDENT NORTH PINE WATER TREATMENT PLANT June 2009 1.0 INTRODUCTION On 13 May 2009 Seqwater advised Queensland Health

More information

Platform Carts. Growing Together

Platform Carts. Growing Together Platform Carts Metazet/FormFlex has developed various types of platform carts for looking after your crop and/ or maintenance work at height. All our platform are easy to use and maintain, and fitted with

More information

PVE Piling and Drilling Rigs Powerful, Versatile and Efficient. PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines

PVE Piling and Drilling Rigs Powerful, Versatile and Efficient. PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines PVE Piling and Drilling Rigs Powerful, Versatile and Efficient PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines Member of the PVE Piling and Drilling Rigs PVE Piling

More information

XVII. Science and Technology/Engineering, Grade 8

XVII. Science and Technology/Engineering, Grade 8 VII. Science and Technology/Engineering, Grade 8 Grade 8 Science and Technology/Engineering Test The spring 2014 grade 8 Science and Technology/Engineering test was based on learning standards in the four

More information

BIOMASS SUPPLY CHAIN MANAGEMENT AND CONTROLLING

BIOMASS SUPPLY CHAIN MANAGEMENT AND CONTROLLING BIOMASS SUPPLY CHAIN MANAGEMENT AND CONTROLLING FOCUS AND CONTENT The focus of the presentation is on forest biomass in Central Finland Content Entities of the forest biomass demand and supply chain Forest

More information

Money Matters. Welcome to the first edition of our monthly newsletter. A Monthly Newsletter from the Barrow Advice Hub

Money Matters. Welcome to the first edition of our monthly newsletter. A Monthly Newsletter from the Barrow Advice Hub 1 February 2015 A Monthly Newsletter from the Barrow Advice Hub Welcome to the first edition of our monthly newsletter This newsletter is aimed at everyone interested in saving money and will be packed

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014

SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014 SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014 PRODUCT: Turbochargers 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for evaluating and

More information

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware.

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware. Three-Part Specifications - Copyright 2014 - Nixalite of America Inc Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting

More information

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile

More information

The Smart Meter Revolution_

The Smart Meter Revolution_ The Smart Meter Revolution_ Towards a Smarter Future m2m 1 00 - Contents Contents_ 01_ Introduction - By Rob Searle, Smart Metering Industry Lead at Telefónica Digital 02_ Market dissemination 03_ Installed

More information

ELECTROFOK MACHINE. ELEKTROFOK (MICRO FIBER OPTIC CABLE BLOWING MACHINE with ELECTRIC)

ELECTROFOK MACHINE. ELEKTROFOK (MICRO FIBER OPTIC CABLE BLOWING MACHINE with ELECTRIC) ELECTROFOK MACHINE ELEKTROFOK (MICRO FIBER OPTIC CABLE BLOWING MACHINE with ELECTRIC) GENERAL DESCRIPTION ELEKTROFOK is designed and produced with feedbacks from users who has specialty on cable blowing

More information

Dynamic Load Testing of Helical Piles

Dynamic Load Testing of Helical Piles Dynamic Load Testing of Helical Piles ANNUAL KANSAS CITY SPECIALTY SEMINAR 2014 JANUARY 10, 2014 Jorge Beim JWB Consulting LLC Pile Dynamics, Inc. Main Topics Brief description of the Dynamic Load Test

More information

Performance Contracting

Performance Contracting Performance Contracting ENERGY STAR Monthly Partner Web Conference February 21, 2007 Call-in Number: 1-866-299-3188 Conference Code: 202 343 9965 About The Web Conferences Monthly Topics are structured

More information

Built for Power. Engineered to Last.

Built for Power. Engineered to Last. Product Range Jaw Crushers Machine Weight: 54,000kgs (119,049lbs) Machine Weight: 53,000kgs (116,850lbs) 10570 TESAB ENGINEERING LTD. Gortrush Ind Est Omagh Co.Tyrone N.Ireland BT78 5EJ Tel: 0044 (0)28

More information