Strategic Water Utility Management and Financial Planning Using a New System Dynamics Tool

Size: px
Start display at page:

Download "Strategic Water Utility Management and Financial Planning Using a New System Dynamics Tool"

Transcription

1 Rehan et al E Strategic Water Utility Management and Financial Planning Using a New System Dynamics Tool RASHID REHAN 1, ANDRE UNGER, MARK A. KNIGHT 3, AND CARL HAAS 3 1 National Institute of Urban Infrastructure Planning, University of Engineering and Technology Peshawar, Pakistan Department of Earth and Environmental Sciences, University of Waterloo, Ont., Canada 3 Department of Civil and Environmental Engineering, University of Waterloo, Ont., Canada This study demonstrates how to implement a novel system dynamics (SD) strategic water utility management and financial planning tool. Using data from several local water utilities in Ontario, Canada, the tool is run to simulate years to investigate: (1) long-term fee-hike rates required for system financial sustainability; () service and financial performance metrics for pay-as-you-go, borrowing, and capital reserving strategies; and (3) consumer affordability as a result of water use charges. For the case study, reserving cash and allowing water fees to increase by up to 7% per year are found to be the best financing strategy to eliminate infrastructure backlog/deficit. The study demonstrates the benefits of an SD model for developing and preparing strategic and tactical asset management, water conservation, and financial plans. The SD model parameterization and implementation for the demonstration case study can be helpful to other utilities in adapting the model to their own specific circumstances. Keywords: water main networks, financial sustainability, system dynamics, infrastructure management, affordability, service performance, customer satisfaction, water consumption During the past decade, significant changes have been made in the regulatory framework governing water utilities in Canada, especially in the province of Ontario. Regulations issued under the authority of the Safe Drinking Water Act () establish licensing requirements for municipal water systems that for the first time require the preparation and submission of financial plans (Ministry of the Environment, ). An important guiding principle for preparing financial plans is that water systems are to be financially self-sustainable (Ministry of the Environment, 7). To realize the mandate of these new regulations, municipal water utilities require comprehensive decision-support tools to help in preparing shortterm (less than 1 years) and long-term (1 to 1 years) asset management plans based on the principle of financial sustainability. Rehan et al (11) demonstrated that water and wastewater systems are complex, and interrelated systems are best modeled using the system dynamics (SD) approach. Rehan et al (1a, 1b) developed and implemented a wastewater utility SD managementdecision support tool that can be used to prepare long-term asset management plans based on the principle of financial sustainability. Rehan et al (13) developed an SD water utility network management and financial planning model. This water SD model is different from previous SD models (Rehan et al, 1a, 1b; Rehan et al, 11) in that it allows a water utility to investigate cash reserving, pay-as-you-go, and borrowing strategies. Other unique features are controls on the water fee growth as a function of service performance and household financial burden as a result of water-fee rate increases. In this study, the Rehan et al (13) SD water model is populated and implemented in Stella V9.1. (by ISEE Systems) using data from a water utility in southern Ontario, Canada. Pertinent information about the case-study city is presented along with a methodology for parameterization of key model variables. The demonstration case-study water network is deemed to be in good condition but contains a small backlog of deteriorated cast-iron pipes. The focus of this study is to address two salient objectives in the context of financial sustainability criteria imposed by legislation: (1) why it may be necessary for a utility to maintain a fee-hike rate in excess of the inflation rate on its expenses and () how alternative management strategies, such as pay-as-you-go, borrowing, and capital reserving, can be compared and contrasted. To address these objectives, scenarios are presented as alternative management strategies and are evaluated in terms of measuring the effects on key variables within the infrastructure, finance, and consumer sectors. The merit of each management strategy is ranked in terms of its benefit to the utility and water users. Results of the model application are discussed, and conclusions are drawn. DEMONSTRATION CASE STUDY For this demonstration case study, data are synthesized from a utility that operates a water distribution network serving a population of 1, people (medium-sized city) in southern Ontario. Additional data sources from other utilities are used to JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

2 Rehan et al E3 fill model data gaps. The water utility is managed by the city s municipal government, which purchases potable water from the upper tier of municipal government that manages water abstraction and treatment. This shared but differentiated arrangement is typical of many municipal governments in Ontario (PWC, ). The utility bills residents of the city for water consumption based on metered usage and charges constant volume-based water fees reflecting the costs of water production, treatment, transmission, and distribution. The polyvinyl chloride (PVC) and cast-iron pipes water distribution network is 3 km in length. As shown in Figure 1, PVC pipes constitute 7% of the network length, and about two-thirds of the network is composed of PVC pipes that are less than years old. The next age group ( 9 years) includes both PVC and cast-iron pipes and constitutes about % of the network length. Pipes older than years are all made of cast iron with only a small fraction (%) of the network being in the age group of 7 99 years. Both the water main network length and population are assumed constant during the simulation period. This assumption is deemed valid for the case in which expansion of the network is funded through development charges and does not create a financial burden to the existing customer base. PARAMETERIZATION OF MODEL VARIABLES This section presents the methodology and estimation procedures required to parameterize and implement the SD model. Typical average water consumption in the local region is liters per capita per day (lpcd) and is adopted as the initial water demand for this study. This study is focused on the long-term effects of the price of water on the consumption behavior of water users. Price elasticity of water demand is assumed to be equal to.3, which is the average of the range for residential FIGURE 1 Length of Pipes kilometers Cast Iron PVC Profile of the water main distribution network for the case study > 1 Pipe Age Groups years PVC polyvinyl chloride water demand reported by Boland et al (19) and Olmstead et al (7). Price-induced reduction in water demand is assumed to occur over a 1-year demand adjustment period. The limit to which water demand can decline is assumed to be lpcd a limit set on the basis of data published in Environment Canada (). For long-term planning purposes, an argument can be made in favor of assuming a single pipe size and associated cost of installation for all pipes within the network. Accordingly, the unit cost of pipe renewal is Can$ per meter based on installing 3-mm (-in.)-diameter PVC pipe using the open-cut method (Unger et al, 1a). The service life of PVC pipe is assumed to be 1 years, whereas that of cast-iron pipes is assumed to be 7 years. Two important parameters used in this study are the unit cost of pipe maintenance (Can$/m/year) and leakage rate (water leaked per unit length of pipe as a percentage of water supplied). Each of these parameters is a function of the structural condition of a pipe. For example, a pipe that is structurally deficient is likely to break more often and thereby increase maintenance costs. Similarly, water leakage from a pipe is a function of its structural condition (Kleiner, 1997). Unlike sanitary sewer pipes, there is no generally accepted standard structural condition grading protocol for water main pipes. As a result, the annual number of breaks in a water main pipe generally is considered an indicator of the network structural condition that is, an increased annual number of breaks means a decrease in structural condition. Shamir and Howard (1979) proposed a simple model that relates a pipe s condition to its age and material type: N t = N e g m t (1) in which N t is the number of breaks per unit length per year in a pipe of age t years, N is the initial number of breaks per unit length per year, and g m is the growth rate in pipe breaks per annum. Kleiner and Rajani () report that the growth rate in cast-iron pipe breaks g cast iron is 7.% per year. Insufficient break data for the relatively new PVC pipes (installed post-19) makes it impossible to estimate g PVC for PVC pipes. Using PVC break data presented in Burn et al (), a value for g PVC of 7.% per year is implemented in the model. The annual cost of maintaining a water distribution network can be divided into fixed maintenance costs and variable maintenance costs. Fixed maintenance costs include administrative overheads, office supplies, salaries, and benefits. These costs are independent of the structural condition of pipes and are assumed to depend on only the length of the distribution network. Summation of pipe lengths L mt for all materials m and ages t gives the total length of the network TL N (km) as TL N = m L mt () t For a network composed of TL N km of pipes, the fixed component of unit maintenance cost, UM f (Can$/m/year), is calculated as FC N UM f = TL N 1, m (3) km JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

3 Rehan et al E in which FC N is the annual fixed maintenance cost for the whole network (Can$/year). Fixed maintenance costs for the utility are Can$.73 million per year and are distributed over the 31.-km-long water main network. Therefore, UM f is calculated as Can$7. /m/year. Variable maintenance costs include expenditures on routine maintenance, pipe flushing, and emergency repairs. These costs are assumed to be a function of the pipes structural condition and are assumed to increase exponentially with pipe age. For a pipe age t consisting of material m, the variable component of maintenance cost, UM vmt (Can$/m/year), is given by UM vmt = UM v e g m t () in which UM v (Can$/m/year) is the unit variable maintenance cost for a new pipe, and g m is the growth rate in pipe breaks (per year) for material m. Note that UM v is the same for all new pipes regardless of the pipe material. The annual variable maintenance cost for the entire network, VC N (Can$/year), is given by VC N = m UM vmt L mt 1, m () t km Annual variable maintenance costs for a utility with the network age profile shown in Figure 1 are Can$1.79 million per year. To estimate UM v, the average age for each pipe group in Figure 1 is assigned as t for its respective group. Next, g m is taken as 7.% and 7% per year for cast-iron and PVC pipes, respectively. Finally, UM v is determined as Can$.31/m/year. Calculated values of UM v mt for both pipe materials and all age groups are summarized in Table 1. Total unit maintenance cost, UMmt (Can$/m/year), for a pipe of material m and age t is simply the sum of the fixed and variable unit maintenance costs: UM mt = UM f + UM vmt () Calculated values of UMmt and its components for both the pipe materials and all age groups are shown in Table 1. Leakage rate is defined as nonbillable water volume as a fraction of the total water supplied (billed) to customers. The leakage rate refers to the nonrevenue water (NRW) that is composed of unbilled authorized consumption and leakage on distribution mains. The leakage rate for a pipe is assumed to increase with age and at the same rate as the number of water main breaks. For a pipe of material m and age t years, the leakage rate LR mt (% of metered consumption) is given as LR mt = LR e g m t (7) in which LR (% of billed consumption) is the leakage rate for new pipes, and g m is the growth rate of water main breaks (per year). Eq 7 implies that some leakage will occur even when the whole distribution network is composed of new pipes. This is attributed to flushing of hydrants, street washing, and even poor quality of pipe installation. If PF mt is a fraction of the network composed of pipes made of material m and t years of age, then the total volume V mt (cubic meters per year) of water leaking from all pipes is given by V mt = LR mt PF mt V B () in which V B is the total annual metered consumption of water (cubic meters per year). It is noted that the sum of PF mt for all pipe materials and ages in the network is equal to unity. The total volume of lost water V NB (cubic meters per year) from the whole network is V NB = m V mt (9) t Annual metered consumption V B is m 3. Given the age distribution of the network shown in Figure 1, the volume of lost water V NB is m 3 (1.% of the metered consumption). The leakage rate of new pipes LR is estimated to be.7% of V B. Finally, values of LR mt are calculated for all pipe groups and presented in Table 1. The price of treated water from the upper tier of municipal government is Can$./m 3. This price includes the cost of abstraction and treatment of the water. The total cost W pc (Can$/year) the utility pays the upper tier of municipal government for potable water is given as W pc =. (V B + V NB ) (1) TABLE 1 Summaries of calculated values of UM v for both pipe material and all pipe age groups mt Parameter Pipe Age Groups Pipe Material years 9 years 7 years 7 99 years > 1 years Fixed unit maintenance cost (UM f ) Can$/m/year PVC Variable unit maintenance cost (UM v ) Can$/m/year Cast iron PVC Cast iron Total unit maintenance cost (UM m ) Can$/m/year PVC Cast iron Leakage Rate % of metered consumption PVC PVC polyvinyl chloride, UM v variable component of maintenance cost mt Cast iron JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

4 Rehan et al E The current water fee the utility charges its customers is Can$1.19/m 3. Consequently, the initial revenue R (Can$/year) earned by the utility in year is given by R = 1.19 V B. This revenue is generated by the utility billing households that are assumed to consist of 3. persons on average. The median household income in the case study area is Can$7, (US$,) per year. Unger et al (1b) report a.% per annum long-run inflation by analyzing 3 years of payment progress certificates for water main construction projects in southern Ontario between January 19 and May 1. The.% inflation rate is used in this study to inflate the unit cost of pipe renewal (Can$/m), the unit cost of pipe maintenance (Can$/m/year), and the unit price of treated water (Can$/m 3 ). The consumer price index (CPI) is used to inflate household income over time. Unger et al (1b) determined the CPI long-run inflation rate for the period from January 19 to May 1 to be.39% per annum. All costs are inflated using a continuously compounded interest-rate model. The rate at which the utility earns interest on its cash reserves is deemed to be equal to the risk-free (or nominal) rate r Ni. To model r Ni, Unger et al (1b) used the monthly returns on a 1+ years Canadian bond in the interval between January 19 and May 1 and employed the Vasicek model in its discrete form (Demers, 3): dr Ni = N ( N r Ni ) dt + N dz N E[r Ni ] = r N e N t + N (1 e N t ) (11) in which, N is the speed of adjustment, θ N the reversion level, and N the volatility on the index with estimated values of.39,.3% per annum, and.7, respectively. The expected value of the risk-free rate E[r N i ] is used to forecast r Ni for given timestep t i years at future time t within the simulation period based on its initial value r N. In the province of Ontario, municipal governments can borrow funds from Infrastructure Ontario at an interest rate that typically is about 1% per annum in addition to the risk-free rate (Infrastructure Ontario, 11). Consequently, a borrowing rate of 1% (+ r N t ) per annum is applied to all outstanding debt that the utility carries. The project depreciation rate needed to discount all dollar figures to present value is also assumed to be equal to the expected value of the risk-free rate, t E[r N t ]. As noted earlier, E[r Nt ] is adjusted for each time t step and is not a constant value throughout the simulation. Accordingly, to discount cost x t from time t to its present value x, a series of operations are performed, each using the prevailing discount rate t : x t Dt = x t e tdt x t Dt = x t Dt e t DtDt (1) x = x +Dt e +DtDt MODEL APPLICATION TO DEMONSTRATION CASE STUDY Water main pipes typically have a service life in the range of 7 to 1 years depending on the pipe material. To draw meaningful insights about the water utility long-term financial sustainability, it is critical to simulate the system over a similar planning horizon. The Ministry of the Environment (7) recommends that longterm strategies based on full cost recovery be compared over planning horizons that encompass the service life of the physical assets. The difficulty becomes one of identifying suitable market transactions and instruments with a matching term to enable future cost projections and inflation predictions given market volatility. Therefore, the analysis period in this study is restricted to years. Rehan et al (13) presents in detail the following policy levers that are used in this study: Debt capacity of the utility Desired cash reserve Preferred network rehabilitation rate Maximum acceptable fraction of deteriorated pipes Desired elimination period for deteriorated pipes fraction of the network Maximum allowable fee-hike rate These policy levers are used in several combinations to explore a variety of network management scenarios. To illustrate the utility of the model, three scenarios are presented to highlight tradeoffs between issuing debt, building cash reserves, and pay-as-you-go strategies. involves a pay-as-you-go strategy with debt capacity and cash reserve kept at zero. Scenario allows borrowing up to a debt capacity (annual debt-service charges as a fraction of revenues) of %. This value represents the maximum level of debt that Ontario municipalities are allowed to acquire (Ontario, 3). Finally, scenario 3 allows build-up cash reserves of up to % of the replacement value of the network. It should be noted that the objectives of this article are not to identify the best management strategy within the landscape of likely scenarios or to follow a mechanistic process wherein the policy levers are assigned values to optimize some objective functions. All three scenarios are assigned the same values for policy levers 3,, and. Specifically, the preferred network rehabilitation rate (policy lever 3) is set at.% of the network per year to reflect current utility practice. This rate means the network is replaced in approximately 1 years. Policy lever is assigned a value of %, indicating that the utility will allow up to % of its network pipes in the worst structural condition. When the fraction of the worst deteriorated pipes remains below % of the network length, the utility maintains the preferred network rehabilitation rate. If the % threshold is exceeded, a more aggressive rehabilitation strategy is adopted with the goal of renewing all (not just the fraction exceeding the % value) deteriorated pipes in the network. A new rehabilitation rate is determined such that the fraction of deteriorated pipes is eliminated over five years. This value is assigned to policy lever. Finally, maximum allowable water fee-hike rates are chosen such that the three scenarios yield similar life-cycle costs. Through trial and error, the annual allowable water fee-hike rates are found to be.%, 7%, and 7.% for scenarios 1,, and 3, respectively. Table summarizes the values assigned to all six policy levers for the three scenarios. RESULTS AND DISCUSSION Simulation results for the three scenarios are presented in Figures. These figures illustrate the behavior of key model JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

5 Rehan et al E TABLE Summary of values assigned to policy levers for the three scenarios Policy Lever Debt capacity debt-service charges as a percentage of revenue Desired cash reserve % of the network s replacement value Preferred rehabilitation rate % of network per year Maximum acceptable fraction of deteriorated pipes % of network Desired elimination period for deteriorated pipes fraction of the network years Scenario Maximum allowable fee-hike rate %/year variables over years. Table 3 compares the three scenarios by summarizing the peak values attained, average values over the entire simulation period, final values at the end of simulation, and the cumulative values over the simulation period. All costs (i.e., operational, capital, asset value) presented are discounted to present value. Figure, parts A, B, and C, show the average age of pipes in the network, fraction of deteriorated pipes in the network, and the actual rehabilitation rate of the network, respectively. All of these figures have a single curve that indicates that all three scenarios yield similar findings. In Figure, part A, the average age of the network is about years at the start of simulation, then increases steadily after year to a maximum value of 33 years at the end of the -year simulation. When averaged over the entire -year simulation period, the age of the network is years (Table 3). Figure, part B, shows that initially about.% of the network is composed of deteriorated pipes. This fraction is higher than the stipulated acceptable limit (policy lever ). Therefore, the actual exceeds the preferred rehabilitation rate and is calculated as 1.1% of the network length per annum (Figure, part C). This rehabilitation rate is maintained for the first six years of simulation and reduces the fraction of deteriorated pipes to less than 1% during the same period (Figure, part B). After year, the initial backlog of deteriorated pipes is eliminated, and the rehabilitation of the network is carried out at the preferred rate of.% per year until the end of simulation (Figure, part C). This rate is sufficient to maintain the fraction of deteriorated pipes at.31% of the network. On average, the fraction of deteriorated pipes is 1.% of the network per year over the simulation period (Table 3). Although the average age of the network rises between year and year, the fraction of deteriorated pipes during the same period stays constant. This counterintuitive situation occurs because the initial backlog of mostly cast-iron deteriorated pipes is replaced with PVC pipes, and the PVC pipes are assumed to have a longer service life than cast-iron pipes in this study. Thus, unlike cast-iron pipes, the PVC pipes do not attain a deteriorated state even when they are comparatively older. Figure, part D, presents the annual funds-balance position of the utility (on the left y-axis) and the asset value of the network (on the right y-axis). For scenario 1, the funds balance remains at zero throughout the simulation as annual revenues generated by the water fee are equal to annual expenses (pay-as-you-go). Under scenario, the utility is allowed to borrow for financing capital works. After year, the debt starts accumulating rapidly. By the end of the -year simulation, the present value of utility s debt is approximately Can$ million. It should be noted that during the first six years, the utility is carrying out network rehabilitation at a higher annual rate with no noticeable debt accumulated. The debt accumulation after year is a function of the 7% annual water fee-hike rate imposed on the utility as part of scenario. Under scenario 3, the utility builds up cash reserves equal to % of the network s replacement cost. Initially, the utility has no cash reserve and must generate one via the allowable 7.% annual water fee hike. By year, the utility s funds balance shows a reserve of Can$9. million (Table 3). The dotted curve in Figure, part D, shows the asset value of the network over the simulation period. The asset value of a segment of water main pipe is based on the assumption that new pipe (age zero years) has an asset value equal to replacement value. The asset value of older pipes is linearly depreciated with age. Once its service life is reached, the asset is deemed to have no asset value. The network s asset value P t (dollars) at any time t is calculated as P t = UC R e (r c t) i S i Ai t Si L i (13) in which UC R is the unit cost of pipe renewal (Can$/meter) at time, r c is the annual rate of inflation for capital expenditures (percent per annum), S i is the total service life (years) for a group of pipes i, A i t is the prevailing age (years) of pipes i at time t, and L i is the total length (meters) of all pipes in group i. The network s asset value is identical for all of the scenarios consistent with the information presented in Figure, parts A and B. Initially, the network s value is about Can$13 million and increases almost linearly throughout the -year simulation period to reach a final value of approximately Can$3 million, suggesting an improvement in the physical condition of the underlying asset (pipe network). Figure 3 presents annual revenues and the parameters on which the revenues depend. Revenue generated by the utility is presented in Figure 3, part A, along with its annualized rate of change, as demonstrated by the dashed lines enumerated using the right vertical axis. Revenue is the product of the water fee (Figure 3, part B) with the total water consumption otherwise denoted as revenue water (Figure 3, part C). This relationship invokes a feedback loop influenced by the price elasticity of demand. Essentially, consumers choose to conserve water as its price increases in an irreversible manner. All three scenarios require the utility to immediately increase the water fee at the onset of the simulations as a result of the initial backlog of deteriorated cast-iron water mains. requires the utility to simultaneously begin to build its reserve fund. The practice of conservation is shown by the decline in the per capita water demand shown in Figure 3, JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

6 Rehan et al E7 part D, which almost reaches the minimum demand by the end of the simulation period. Figure 3, part B, shows that the target controls of limiting the annual water fee-hike rate to a maximum value of.% per annum for scenario 1, 7% per annum for scenario, and 7.% per annum for scenario 3 are consistently achieved over the simulation period. The single exception is scenario at the end of the simulation period. This is a result of the utility using borrowed funds to pay for capital works and not operational expenditures. This is a result of insufficient revenue to cover operational expenditures, so the utility must temporarily exceed the cap on its annual water fee-hike rate. It should be noted that because of water conservation, the rate at which the utility s revenues increase is consistently less than the rate by which it increases the water fee. At some point, the spread between the rates of change in these variables exceeds the longrun rate for CPI of.39% per annum. Table 3 reports the final water fee rate at year as Can$1.9/m 3, Can$1./m 3, and Can$1.9/m 3 for scenarios 1,, and 3, respectively. Similarly, the final water demand is lpcd, lpcd, and 3 lpcd for the three scenarios, respecively. Operational expenses for the three scenarios are categorized as follows: annual maintenance expenditures (Figure, part A), water treatment/purchase expenditures (Figure, part B), and interest expenditures (Figure, part C). Capital expenditures involve replacement of water mains and are shown on Figure, part D. The annualized rate of change of these expense categories are presented as dashed lines enumerated using the right vertical axis. Of the three operational expense categories, Table 3 shows FIGURE Selected indicators for physical and financial performance of the network Scenario A B Average Age of Network years 3 3 All three scenarios Deteriorated Pipes % of network 3 1 All three scenarios 1 1 C D 1 Actual Rehab Rate % of network All three scenarios Funds Balance constant million $ 1 1 Asset value all three scenarios 17 1 Network Value constant million $ JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

7 Rehan et al E that water treatment/purchase expenditures are by far the largest, accounting for 7.19%, 9.9%, and 9.9% of the cumulative costs over the -year simulation period for scenarios 1,, and 3, respectively. Interest rate expenditures are the least with a cumulative value of.% of all operational costs for scenario. Maintenance expenditures are approximately. times greater than capital expenditures. Both are identical for the three scenarios. This is not surprising considering that they are a function of pipe condition within the network, and the pipe network condition is identical for all scenarios (Figure, parts A and B). The annualized rate of growth in maintenance expenditures reaches 7.% per annum by year. This value exceeds the inflation rate of.% per annum because the network is getting comparatively older, with the unit cost of maintenance increasing with the age of the pipes (Table 1). In contrast, water treatment/ purchase expenditures are consistently less than the inflation rate of.% per annum because of conservation. Nonrevenue water (which leaked from the network) is shown in Figure 3, part C, and does not contribute significantly to water treatment/purchase expenditures given the excellent condition of the network, amounting to.% of cumulative water purchase expenditures for all three scenarios (Table 3). The annualized rate of growth in capital expenditures remains constant over the entire simulation period at the inflation rate of.% per annum. This occurs because cast-iron pipe is consistently replaced with PVC pipe, and the actual rate of capital works remains constant with the single exception as it declined from 1.1% of the network length per annum to the preferred rate once the backlog of deteriorated cast-iron pipes is removed. Returning to the objectives of this work, the first objective is to determine why it may be necessary for a utility to maintain a fee-hike rate in excess of inflation rate on its expenses. Two FIGURE 3 Annual revenue, water fee, water consumption volume, water purchase volume, and water demand Scenario A 1. B 1 Revenue constant million $ 1 1 Solid lines: left axis Dashed lines: right axis Rate Revenue % per year Water Fee constant $/m Solid lines: left axis Dashed lines: right axis Rate Water Fee % per year C D Water Consumption million m Solid lines: left axis Dashed lines: right axis Water Purchase million m 3 Water Demand lpcd JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

8 Rehan et al E9 potential reasons are leakage and conservation. For this case study, leakage is an inconsequential contribution given the excellent condition of the network. Conservation as a contributor is tested by making price elasticity of demand zero. For scenario 1, the resulting annual water fee-hike rate became identical to the inflation rate on capital and operation expenditures of.% per annum over the entire simulation period. The second objective of this work is to address how alternative management strategies, such as pay-as-you-go, borrowing, and capital reserving, can be compared and contrasted. The relative merits of each strategy are discussed with reference to Figure, parts A, B, and C, for scenarios 1,, and 3, respectively. The shaded regions in Figure represent annual maintenance expenditures, water purchase expenditures, interest expenditures, and capital expenditures, progressively stacked over each other in that order. The black dashed line delimits the sum of operational expenditures, whereas the red line denotes the sum of all expenditures. In contrast, the blue solid line indicates revenues. For scenario 1, revenues are equal to the sum of expenditures over the entire simulation period. For scenario, the cap of 7% per annum in the water fee-hike rate causes revenues to decline relative to total expenditures. Once this spread is greater than capital expenditures, this cap must be temporarily exceeded because borrowed capital cannot be used to cover operational expenditures. Because capital expenditures are a small component of the overall expenses when operating a water main network, borrowing provides little opportunity to influence the long-term operation of the network beyond smoothing short-term fluctuations in FIGURE Maintenance expenditures, water treatment expenditures, interest expenditures, and capital expenditures Scenario Maintenance Expenditures constant million $ 1 1 A Solid lines: left axis Dashed lines: right axis Rate Maintenance Expenditures % per year Water Treatment Expenditures constant million $ 1 1 B Solid lines: left axis Dashed lines: right axis Rate Water Treatment Expenditures % per year 1. C 1 D 1 Interest Expenditures constant million $ Interest income Interest expenditure. Capital Expenditures constant million $ 1 Solid lines: left axis Dashed lines: right axis All three scenarios Rate Capital Expenditures % per year JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

9 Rehan et al E3 FIGURE Constant million $ Constant million $ 1 1 A Comparison of expenditures and revenues Operational expenditures Revenue Maintenance expenditures Water purchase expenditures B Scenario Total expenditures Interest expenditures Capital expenditures the actual water fee-hike rate. For scenario 3, the cap of 7.% per annum in the water fee-hike rate allows revenues to exceed expenses until year, at which point the backlog of deteriorated cast-iron pipes is rehabilitated and the fund balance reaches a surplus of Can$7. million (Figure, part D). Thereafter, revenue is more or less equal to expenses, and the surplus is maintained and used to smooth out short-term fluctuations in the water feehike rate. Figure 3, part B, shows the water fee (solid lines) in constant Can$/m on the left axis and the rate water fee (in percentage) on the right axis, for scenarios 1 to 3 over the -year simulation period. This figure shows water fee rate increases linearly after year until the maximum annual water fee-hike rate is achieved in year (i.e., scenario 1 =.% per annum, scenario = 7% per annum, scenario 3 = 7.% per annum). Figure shows the water bill (solid lines) in percent of household income on the left y-axis, and water bill rate (dashed lines) in percent per year on the right y-axis over the -year simulation period. This figure shows that the initial value of the water bill is.% of a household s income and increases to between..9% of household income in year. It should be noted that the percentage of household income is below the % financial hardship level noted by the US Environmental Protection Agency (USEPA) (NDWAC, 3). Figure also shows that the water bill rate will increase over the -year simulation period at close to the long-term CPI rate of.39% per annum. Note the low percentage increase in water bill as a fraction of household income when compared with CPI. This is because of the price elasticity of demand of.3, which models water conservation as a result of rising water fees. Water conservation, shown in Figure 3, part D, shows the initial water usage of lpcd to be reduced to lpcd in year. Table 3 presents a summary of the performance of scenarios 1,, and 3 based on service levels; asset liabilities; and cumulative total, operational, capital, maintenance, water FIGURE Financial impact (affordability) for consumers Constant million $ C Water Bill % household income Scenario Solid lines: left axis Dashed lines: right axis CPI =.39% 1 Water Bill Rate % per year CPI consumer price index JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

10 Rehan et al E31 TABLE 3 Comparison of the three scenarios Scenario 1 3 Service Level Water fee Can$/m 3 Maximum Final Fee-hike rate %/year Maximum Final Average.3..3 Water demand lpcd Final 3 Average 7 3 Water bill burden bill as % of household income Maximum Final Water consumption Unbilled 1 m % of total purchased.3..3 Billed 1 m % of total purchased Total purchased 1 m Deteriorated pipes fraction % of network Maximum... Final Average Average network age years Maximum Final Average Cumulative Expenditure Operational expenditures million Can$ % of total expenditures Capital expenditures million Can$ % of total expenditures Total expenditures million Can$ Cumulative Operational Expenditure Water purchase expenditures million Can$ % of OpEx Maintenance expenditures million Can$ % of OpEx Interest expenditures million Can$. 1.. % of OpEx... Cumulative Water Purchase Expenditures Leaked water cost million Can$ % of water purchase exenditure...3 Billed water cost million Can$ % of water purchase exenditure Assets/Liabilities Final funds balance million Can$ Final network value million Can$ OpEx operational expenditures JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

11 Rehan et al E3 purchase, leaked water, and billed water expenditures. These metrics are aggregated over the -year simulation period and are interpreted as life cycle costs. Table 3 shows that the total volume of water consumed during the years is largest under scenario with 3. 1 m 3, and this is slightly greater than scenario 1 with 9. 1 m 3. water consumption is the lowest with m 3. For all three scenarios, the percentage of volume of unbilled or leaked water is.3%. This is inferred to be because of the high percentage of the network consisting of relatively new PVC pipes. Total cumulative expenditures are the highest under scenario (Can$31.7 million), followed by scenario 1 (Can$31. million) and scenario 3 (Can$31.33 million). Under each scenario, approximately 9% of the total cost is operational expenditures, and 1% is capital expenditures. Approximately 7% of the operational expenditures cover the cost of water purchase with the rest being maintenance expenditures (~ 3%). All three scenarios also have a very similar average age and fraction of deteriorated pipes. This means all three scenarios will have similar network service performance (e.g., pipe breaks, service disruptions, and discolored water events). is considered to be the preferred strategy for the following reasons. First, this scenario has the least cumulative total expenditures in the simulation period. Second, although the asset value is the same for all scenarios, under scenario 3 the utility ends up with a cash reserve of Can$9. million compared with almost zero under scenario 1 and an outstanding debt of Can$.1 million under scenario. Third, the maximum fee-hike rate that the consumers experience under scenario 3 is 7.% per annum, whereas for scenarios 1 and it reaches.% and 9.1% per annum, respectively. Fourth, the total volume of water consumed under scenario 3 is the least among the three scenarios. This is preferable when considering conservation of water resources. Scenario yields the lowest water fee over the -year simulation period. This is achieved by the utility maintaining a low 7% per annum cap on the allowable fee-hike rate over much of the simulation period. As discussed earlier, this cap forces the utility to borrow money by year to fund capital works. In this scenario, the 7% fee-hike cap (Table ) is increased to.% per annum at the end of the simulation period to cover operational expenses. Table 3 shows cumulative interest expenses at Can$1. million, which is.% of operational expenditures. The Can$1. million in borrowing cost is deemed to be small when compared with operational and capital expenditures, which are orders of magnitude larger. In scenario, it should be noted that interest costs are not offset by cost savings resulting from improved system performance, such as a decrease in leaked water. The previous sections presented scenarios 1,, and 3 as independent but comparable end-members typifying pay-as-you-go, borrowing, or cash-reserving approaches for the utility to achieve financial sustainability. These three scenarios can be viewed as end members; however, a continuum of scenarios does exist that will achieve the same objectives. Considering this, three of the five policy levers are varied (Table ) to determine the effect of debt capacity, cash reserve, and maximum allowable fee-hike rate on the networks long-term (-year) financial sustainability. The TABLE Policy levers for three selected scenarios Policy Lever Debt capacity debt-service charges as a % of revenue Scenario Set A Scenario Set B Cash reserves % of network replacement value Maximum allowable fee-hike rate %/year 1 1 Maximum acceptable fraction of deteriorated pipes % of network Desired elimination period for deteriorated pipes fraction of the network years Preferred rehabilitation rate % of network per year.. following analysis is intended to demonstrate the power of the SD model. It is not intended to suggest that any point in this continuum of scenarios is optimal for financial sustainability as certain combinations of the policy levers may yield impractical or alternatively desirable outcomes. In scenario set A, the maximum allowable fee-hike rate is combined with the maximum debt capacity of utility to explore a variety of borrowing strategies. It should be noted that scenario set A includes previously discussed scenario 1. In scenario set B, the maximum allowable fee-hike rate is combined with the cashreserve fraction to explore a variety of capital-reserving strategies. This scenario set includes previously discussed scenario 3. In both scenario sets A and B, the maximum allowable fee-hike rate is varied from to 1% per annum in increments of.%. In scenario set A, for each value of the maximum fee-hike rate the cash reserve is set to %, whereas the maximum debt capacity is varied from to % in increments of.%, thereby yielding 31 individual scenarios. Similarly, in scenario set B for each value of the maximum fee-hike rate, the maximum debt capacity is set to % and the cash reserve is varied from to % in increments of.%, thus yielding 31 individual scenarios for this set. In addition, -year life-cycle contours for metrics cumulative total expenditures and peak deteriorated fraction are shown in Figure 7. Similar contours for final funds balance and network asset value are shown in Figure. In Figures 7 and, scenario 1 straddles the x-axis in all plots. The optimal pay-as-you-go scenario is deemed to be the one that simultaneously minimizes cumulative expenditures and the peak-deteriorated fraction of pipes in the network, maximizes the network asset value, and yields a zero funds balance. Using this criterion, the optimal payas-you-go scenario is deemed to the left of the scenario 1 location with an allowable fee-hike rate of 7% per annum. The optimal borrowing strategy is deemed to achieve the same objectives as pay-as-you-go with the addition of minimizing the amount of debt incurred (i.e., maximize the funds balance). Figure 7, parts A and C, and Figure, parts A and C, show that all four metrics have a relatively broad flat optimal region to the right of scenario as the allowable fee-hike rate increases beyond 7% per annum. It also indicates that the operational region the utility might JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

12 Rehan et al E33 FIGURE 7 Total expenditures and peak deteriorated fraction indicators for scenarios landscape Cumulative Total Expenditures millions of $ A B Scenario Maximum Debt Capacity % of revenue 1 1 Desired Reserve Fraction % of network value Peak Deteriorated Fractions % of network C D Scenario Maximum Debt Capacity % of revenue 1 1 Desired Reserve Fraction % of network value 3 1 Allowable Fee-Hike Rate % per year 1 1 Allowable Fee-Hike Rate % per year JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

13 Rehan et al E3 FIGURE Funds balance and network asset value indicators for scenarios landscape Final Funds Balance millions of $ A 1 1 B Scenario Maximum Debt Capacity % of revenue 1 1 Desired Reserve Fraction % of network value Network Asset Value millions of $ C D Scenario Maximum Debt Capacity % of revenue 1 1 Desired Reserve Fraction % of network value Allowable Fee-Hike Rate % per year 1 Allowable Fee-Hike Rate % per year JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

14 Rehan et al E3 consider is much greater than for scenario 1 (pay-as-you-go). As mentioned earlier, borrowed funds can be used only to pay for capital works, which is approximately 1% of the total expenditures. Because operational costs dominate in this demonstration case study, the ability to borrow funds to complete capital works does little for optimizing utility finances. The optimal capital-reserving strategy is also set to achieve pay-as-you-go objectives, as well as to build a positive funds balance that complies with the desired reserve fraction policy lever. Figures 7, parts B and D, and Figure, parts B and D, show scenario 3 in the upper-right quadrant. Figure 7, parts B and D, and Figure, part D, show that the desired reserve fraction is not very sensitive to cumulative total expenditures, peak deteriorated fraction, or network asset value. Figure, part B, shows that the final funds balance is very sensitive to the desired reserve fraction and allowable water fee hike, and ultimately generates the optimal region for the utility to operate (i.e., the region on this figure in which the final funds balance is greater than zero). Again, for this case study, the optimal region appears as a vertical extension of the optimal scenario 1 (pay-as-you-go) position across the entire range of desired reserve fraction. Surprisingly, this region is slightly suboptimal in that Figure 7, part B, shows an elevated cumulative total expenditure relative to neighboring regions at a lower allowable fee-hike rate. At the highest permissible value of allowable fee-hike rate and desired reserve fraction, the utility simultaneously minimizes its cumulative expenditures and maximizes its final funds balance. is located just outside this region. Because the majority of the pipes in the network are in excellent condition at the start and end of the simulation, extensive funding to renew deteriorating and aging pipes is not required in this case study. Thus, in this case the conclusion that reserving funds (scenario 3) is the best strategy is deemed reasonable as large capital expenditures to renew the pipe network are not required. However, many utilities may not have infrastructure assets in such a desirable condition. Further analysis beyond the -year simulation is required to determine when reserving funds should begin. For networks that have a large percentage of pipes in the network that will be reaching or approaching the end of their service life during the -year simulation period, large-capital work funds will be required to renew the network and to reduce operational expenditures. In such cases, borrowing funds and not reserving may be a better management strategy. CONCLUSIONS As a result of this study, the following conclusions are drawn: Interrelationships and feedback loops among model variables have significant effects on key performance indicators. The choice of inflation rates has a major influence on the water utility financial sustainability in the long term. Cumulative total expenditures over the -year simulation period present an incomplete picture of the full effects of any management strategy and should not be used as a sole criterion for selecting a management strategy. The implementation of the system dynamic water utility tool can assist with long-term management and financial planning and the establishment of defensible strategic and tactical organization objectives. ACKNOWLEDGMENT The authors gratefully acknowledge the financial support provided by the Natural Sciences and Engineering Research Council of Canada, the Ontario Graduate Scholarship, the University of Waterloo, and the Centre for Advancement of Trenchless Technologies located at the University of Waterloo. The authors also acknowledge the City of Niagara Falls, the City of Waterloo, and the City of Cambridge for their kind financial support, provision of data, and sharing of valuable insights on water utility management. ABOUT THE AUTHORS Rashid Rehan is an assistant professor at the National Institute of Urban Infrastructure Planning, University of Engineering and Technology, Peshawar, Pakistan. He received his PhD from the University of Waterloo, Ont., Canada. He received a masters of engineering science degree in civil engineering from the University of Western Ontario, London, Ont., Canada, and a bachelor of science degree in civil engineering from the University of Engineering & Technology, Peshawar, Pakistan. Rehan has four years of university teaching experience; eight years of research experience in condition assessment of water and wastewater infrastructure assets, deterioration modeling, infrastructure asset management, utility financing, and service delivery; and seven years of professional experience in the water supply and wastewater engineering industry. Andre Unger is an associate professor in the Department of Earth and Environmental Sciences, University of Waterloo. Mark Knight (to whom correspondence may be addressed) is an associate professor, Department of Civil and Environmental Engineering, University of Waterloo, University Avenue, Waterloo, Ont., Canada NL 3G1; maknight@uwaterloo.ca. Carl Haas is a professor in the Department of Civil and Environmental Engineering, University of Waterloo. PEER REVIEW Date of submission: //1 Date of acceptance: 9//1 REFERENCES Burn, S.; Davis, P.; Schiller, T.; Tiganis, B.; Tjandraatmadja, G.; Cardy, M.; Gould, S.; Sadler, P.; & Whittle, A.J.,. Long-Term Performance Prediction for PVC Pipes. Awwa Research Foundation, Denver. Boland, J.J.; Dziegielewski, B.; Baumann, D.D.; & Optiz, E.M., 19. Influence of Price and Rate Structures on Municipal and Industrial Water Use. Contract Report -C-. US Corps of Engineers Institute for Water Resources, Fort Belvoir, Va. Demers, F., 3. The Canadian Phillips Curve and Regime Shifting. Bank of Canada working paper 3-3. Bank of Canada, Ont. ca/3/1/working-paper-3-3/ (accessed Nov. 19, 1). JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

15 Rehan et al E3 Environment Canada,. Municipal Water and Wastewater Survey, Summary Data. Environment Canada, Gatineau, Que. MWWS/en/publications.cfm (accessed May 13, 1). Infrastructure Ontario, 11. Lending Rates. Infrastructure Ontario, Government of Ontario crown corporation. (accessed June, 11). Kleiner, Y., Water Distribution Network Rehabilitation: Selection and Scheduling of Pipe Rehabilitation Alternatives. PhD thesis, Department of Civil Engineering, University of Toronto, Ont. Kleiner, Y. & Rajani, B.B.,. Considering Time-Dependent Factors in the Statistical Prediction of Water Main Breaks. AWWA Infrastructure Conference, Baltimore. NDWAC (National Drinking Water Advisory Council), 3. Recommendations of the NDWAC to U.S. EPA on Its National Small Systems Affordability Criteria. US Environmental Protection Agency, Washington. ndwac/pdfs/report_ndwac_affordabilitywg_final_-3.pdf (accessed June, 1). Ministry of the Environment,. Safe Drinking Water Act,. Drinking Water Legislation. statutes_s3_e.htm (accessed July 1, 11). Ministry of the Environment, 7. Toward Financially Sustainable Drinking-Water and Wastewater Systems. Financial Plans Guideline EBR Registry Number: 1-9. Olmstead, S.M.; Hanemann, W.M.; & Stavins, R.N., 7. Water Demand Under Alternative Price Structures. Journal of Environmental Economics and Management, ::11. Ontario, 3. Ontario Regulation 3/ Debt and Financial Obligation Limits. The Ontario Gazette, 13:1:77. PWC (PricewaterhouseCoopers),. Organization of Municipal Water and Wastewater Systems in Ontario. PWC and Ontario SuperBuild Corp. (accessed July 11, ). Rehan, R.; Knight, M.A.; Haas, C.T.; & Unger, A.J.A., 11. Application of System Dynamics for Developing Financially Self-Sustaining Management Policies for Water and Wastewater Systems. Water Research, :1:737. Rehan, R.; Knight, M.A.; Unger, A.J.A.; & Haas, C.T., 13. Development of a System Dynamics Model for Financially Sustainable Management of Municipal Water Main Networks. Water Research, 7::71. Rehan, R.; Knight, M.A.; Unger, A.J.A.; & Haas, C.T., 1a. Financially Sustainable Management Strategies for Urban Wastewater Collection Infrastructure Development of a System Dynamics Model. Tunnelling and Underground Space Technology, 39:11. Rehan, R.; Unger, A.J.A.; Knight, M.A.; & Haas, C.T., 1b. Financially Sustainable Management Strategies for Urban Wastewater Collection Infrastructure Implementation of a System Dynamics Model. Tunnelling and Underground Space Technology, 39:1. Shamir, U. & Howard, C., An Analytical Approach to Scheduling Pipe Replacement. Journal AWWA, 71::. Unger, A.J.A.; Rehan, R.; Younis, R.; Nazir, A.; Knight, M.A.; & Darrell, R., 1a. Development of a Unit Cost Database for Water Main and Sanitary Sewer Capital Works. Centre for Advancement of Trenchless Technologies, University of Waterloo. Waterloo, Ont., Canada. Unger, A.J.A.; Younis, R.; Rehan, R.; Yu, S.; Budimir, F.; & Knight, M.A., 1b. Forecasting the Unit Cost of Water main and Sanitary Sewer Capital Works. Technical Report, Centre for Advancement of Trenchless Technologies, University of Waterloo. Waterloo, Ont., Canada. JOURNAL AWWA 1 American Water Works Association JANUARY 1 17:1

A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability

A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability Amin Ganjidoost/Dr. Rashid Rehan/Dr. Mark Knight/Dr. Andre Unger/Dr. Carl Haas University of Waterloo, Canada

More information

Table of Contents. WATER AND WASTEWATER MODEL AND SITUATIONAL ANALYSIS 6 Model Development 6 10-Year Water/WW - Challenges, Risks and Opportunities 7

Table of Contents. WATER AND WASTEWATER MODEL AND SITUATIONAL ANALYSIS 6 Model Development 6 10-Year Water/WW - Challenges, Risks and Opportunities 7 Table of Contents LONG-RANGE FINANCIAL PLAN INTRODUCTION 1 Water and Wastewater Financial Plan 2 What is a Long Range Financial Plan 3 Importance of a Long Range Financial Plan 4 General Approach to Preparing

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

Water Rate Study & O.Reg.453/07 Water Financial Plan No.103-301A

Water Rate Study & O.Reg.453/07 Water Financial Plan No.103-301A March 2, 2012 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond Street St. Catharines Ontario Canada L2R 2T3 Telephone: (905) 938-0965 Fax: (905) 937-6568 March

More information

Many directors of public enterprises

Many directors of public enterprises Management & Careers The Finance Director s Role in Helping Public Enterprises Look their Best By Bryan A. Mantz Finance directors of public enterprises face special challenges; developing expertise in

More information

Scorecard - Tillsonburg Hydro Inc.

Scorecard - Tillsonburg Hydro Inc. Scorecard - Tillsonburg Hydro Inc. 9/18/215 Performance Outcomes Performance Categories Measures 21 211 212 213 214 Trend Industry Distributor Target Customer Focus Services are provided in a manner that

More information

Fiscal Impact Analysis of the Annexation Proposed by the Town of Beaumont. Leduc County FINAL REPORT

Fiscal Impact Analysis of the Annexation Proposed by the Town of Beaumont. Leduc County FINAL REPORT Fiscal Impact Analysis of the Annexation Proposed by the Town of Beaumont Leduc County FINAL REPORT Suite 2220 Sun Life Place 10123 99 Street Edmonton, Alberta T5J 3H1 T 780.425.6741 F 780.426.3737 www.think-applications.com

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen

More information

Asset Management Plan Final Report

Asset Management Plan Final Report AssetManagementPlan FinalReport DillonConsultingLimited 10FifthStreetSouth Chatham,ONN7M4V4 T:519-352-7802 F:519-354-2050 May,2014 www.dillon.ca EXECUTIVE SUMMARY Public infrastructure is central to our

More information

Scorecard - Oakville Hydro Electricity Distribution Inc.

Scorecard - Oakville Hydro Electricity Distribution Inc. Scorecard - Oakville Hydro Electricity Distribution Inc. 9/24/215 Performance Outcomes Performance Categories Measures 21 211 212 213 214 Trend Industry Distributor Target Customer Focus Services are provided

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Strategy. Appendix A Debt. History and Background. Purpose of Review

Strategy. Appendix A Debt. History and Background. Purpose of Review Appendix A Debt Strategy History and Background During the late I 980s and the early I 990s, the City of Winnipeg incurred significant debt for capital purposes. In the mid-i 990s, the cost to service

More information

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 TABLE OF CONTENTS TABLE OF Contents... 2 1. INTRODUCTION... 4 1.1 MUNICIPAL DRINKING WATER LICENSING PROGRAM... 4 1.2

More information

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Town of Mattawa Asset Management Plan. December 2013

Town of Mattawa Asset Management Plan. December 2013 Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,

More information

How To Understand Farm Financial Performance

How To Understand Farm Financial Performance Understanding Key Financial Ratios and Benchmarks How does my business stack up compared to my neighbors? This question is becoming more and more common as the agricultural industry continues to change

More information

A Discussion on Discount Rates in Alberta

A Discussion on Discount Rates in Alberta A Discussion on Discount Rates in Alberta In personal injury cases, a lump sum award often is provided to a plaintiff as compensation for the loss of a future stream of employment earnings, or to compensate

More information

Financing Strategy. 6.1 Introduction

Financing Strategy. 6.1 Introduction SECTION 6 Financing Strategy 6.1 Introduction Asset management planning in London is integrated with and dependent upon financial planning and budgeting. This chapter contains summaries of the current

More information

Part III. Survey Highlights and Observations. Survey Highlights and Observations. Other Charges Billing

Part III. Survey Highlights and Observations. Survey Highlights and Observations. Other Charges Billing The data compiled in this rate survey can be used extensively for comparative analysis. Because of the site-specific nature of rate development implementation, users are cautioned not to broadly generalize

More information

Financial Plan #203-301B

Financial Plan #203-301B The Corporation of the Township of Whitewater Region Financial Plan #203-301B Cobden Drinking Water System Licence #203-101 Beachburg Drinking Water System Licence #203-102 Haley Drinking Water System

More information

Scorecard MD&A - General Overview

Scorecard MD&A - General Overview Scorecard MD&A - General Overview In 2014, Essex Powerlines Corporation has exceeded all performance targets except for the Net Annual Peak Demand Savings. Essex has seen improvement in some areas from

More information

PROVIDING RETIREMENT INCOME WITH STRUCTURED PRODUCTS

PROVIDING RETIREMENT INCOME WITH STRUCTURED PRODUCTS PROVIDING RETIREMENT INCOME WITH STRUCTURED PRODUCTS CUBE INVESTING David Stuff david.stuff@cubeinvesting.com ABSTRACT Structured products are an attractive type of investment for income seeking investors.

More information

Current Ratio - General Fund

Current Ratio - General Fund Current Ratio - General Fund Are General Fund expenses able to be paid as they come due? Description: This measure is designed to focus on the liquidity position of the County s General Fund that has arisen

More information

What Is the Funding Status of Corporate Defined-Benefit Pension Plans in Canada?

What Is the Funding Status of Corporate Defined-Benefit Pension Plans in Canada? Financial System Review What Is the Funding Status of Corporate Defined-Benefit Pension Plans in Canada? Jim Armstrong Chart 1 Participation in Pension Plans Number of Plans Number of Members Thousands

More information

Our Challenging Future

Our Challenging Future Protecting Our Future by Making Advanced Asset Management Decisions < All stories in this section Gregory M. Baird Dec 23, 2011 America s economic dominance as a world power over the past several decades

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account

More information

Fiscal Consolidation Study: Horicon and Mayville School Districts

Fiscal Consolidation Study: Horicon and Mayville School Districts Fiscal Consolidation Study: Horicon and Mayville School Districts November 23, 2015 Robert W. Baird & Co. Incorporated 777 East Wisconsin Avenue Milwaukee, Wisconsin 53202 800-792-2473 / 414-298-7354 Fax

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MEMORANDUM NOV 2 4 20 14 I SUBJECT: Financial Capability Assessment Framework for Municipal Clean Water Act Requirements FROM: Ken Kopocis

More information

HELP Interest Rate Options: Equity and Costs

HELP Interest Rate Options: Equity and Costs HELP Interest Rate Options: Equity and Costs Bruce Chapman and Timothy Higgins July 2014 Abstract This document presents analysis and discussion of the implications of bond indexation on HELP debt. This

More information

Centre for Addiction and Mental Health. Financial Statements March 31, 2014

Centre for Addiction and Mental Health. Financial Statements March 31, 2014 Centre for Addiction and Mental Health Financial Statements June 4, Independent Auditor s Report To the Trustees of Centre for Addiction and Mental Health We have audited the accompanying financial statements

More information

Introduction. example of a AA curve appears at the end of this presentation.

Introduction. example of a AA curve appears at the end of this presentation. 1 Introduction The High Quality Market (HQM) Corporate Bond Yield Curve for the Pension Protection Act (PPA) uses a methodology developed at Treasury to construct yield curves from extended regressions

More information

THE CORPORATION OF THE TOWNSHIP OF SPRINGWATER

THE CORPORATION OF THE TOWNSHIP OF SPRINGWATER THE CORPORATION OF THE TOWNSHIP OF SPRINGWATER Drinking Water System: Financial Plan 128-301A January 2012 1 www.springwater.ca 2231 Nursery Road Minesing, Ontario L0L 1Y2 Canada DRINKING WATER SYSTEM:

More information

MACROECONOMIC ANALYSIS OF VARIOUS PROPOSALS TO PROVIDE $500 BILLION IN TAX RELIEF

MACROECONOMIC ANALYSIS OF VARIOUS PROPOSALS TO PROVIDE $500 BILLION IN TAX RELIEF MACROECONOMIC ANALYSIS OF VARIOUS PROPOSALS TO PROVIDE $500 BILLION IN TAX RELIEF Prepared by the Staff of the JOINT COMMITTEE ON TAXATION March 1, 2005 JCX-4-05 CONTENTS INTRODUCTION... 1 EXECUTIVE SUMMARY...

More information

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email:

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email: Rehabilitation Scenarios for Sustainable Water Mains Khaled Shahata 1 ; Tarek Zayed 2 ; and Saad Al-Jibouri 3 1 Graduate Student, Department of Building, Civil, and Environmental Engineering, Concordia

More information

a GAO-04-461 GAO WATER INFRASTRUCTURE Comprehensive Asset Management Has Potential to Help Utilities Better Identify Needs and Plan Future Investments

a GAO-04-461 GAO WATER INFRASTRUCTURE Comprehensive Asset Management Has Potential to Help Utilities Better Identify Needs and Plan Future Investments GAO United States General Accounting Office Report to the Ranking Minority Member, Committee on Environment and Public Works, U.S. Senate March 2004 WATER INFRASTRUCTURE Comprehensive Asset Management

More information

Ten Year Financial Plan

Ten Year Financial Plan 2013 2022 Ten Year Financial Plan Department of Finance and Performance Management September 2013 0 Ten Year Financial Plan 2013 2022 Table of Contents Executive Summary... 2 Building the Base Case...

More information

The Underground Infrastructure Crisis: Rebuilding Water and Sewer Systems without a Flood of Red Ink

The Underground Infrastructure Crisis: Rebuilding Water and Sewer Systems without a Flood of Red Ink The Underground Infrastructure Crisis: Rebuilding Water and Sewer Systems without a Flood of Red Ink NTU Issue Brief #176 By Bruce Hollands January 18, 2010 Introduction: Valuable and Critical Assets With

More information

Table of Contents. Long Range Financial Plan 28

Table of Contents. Long Range Financial Plan 28 Table of Contents Water and Wastewater Long Range Financial Plan 1 Introduction 2 Principles of Financial Sustainability 3 The LRFP is Dynamic Regular Updates Will Be Undertaken 4 Financial Metrics and

More information

SUN LIFE GLOBAL INVESTMENTS (CANADA) INC.

SUN LIFE GLOBAL INVESTMENTS (CANADA) INC. SUN LIFE GLOBAL INVESTMENTS (CANADA) INC. ANNUAL MANAGEMENT REPORT OF FUND PERFORMANCE for the financial year ended December 31, 2014 Sun Life BlackRock Canadian Universe Bond Fund This annual management

More information

The Incentives to Issue Municipal Debt Override the Sound Principles of Infrastructure Management.

The Incentives to Issue Municipal Debt Override the Sound Principles of Infrastructure Management. From: Greg Baird Sent: Tuesday, March 22, 2011 6:25 AM To: Muni Field Hearings Subject: SEC feedback on Munis: The incentives to issue municipal debt override the sound principles of infrastructure management

More information

Office of the Minister of Transport. Chair Cabinet NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING. Proposal

Office of the Minister of Transport. Chair Cabinet NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING. Proposal Chair Cabinet Office of the Minister of Transport NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING Proposal 1. This paper advises on future transport expenditure and revenue pressures, discusses options for

More information

Lump Sum Term-Vested Payouts Is Now the Time?

Lump Sum Term-Vested Payouts Is Now the Time? Institutional Group Lump Sum Term-Vested Payouts Is Now the Time? After a difficult five years overseeing pensions, plan sponsors in the U.S. and Canada are finding pension funding levels the healthiest

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Modern societies base their economic prosperity on a standard of living which includes a complex network of infrastructure, both above and below ground. Quality drinking water brought

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power

Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power PNB Audit: Accounting for Pensions and NB Power Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power Contents Introduction... 41 Provincial Pension Plans... 41 Accounting for

More information

CITIGROUP INC. BASEL II.5 MARKET RISK DISCLOSURES AS OF AND FOR THE PERIOD ENDED MARCH 31, 2013

CITIGROUP INC. BASEL II.5 MARKET RISK DISCLOSURES AS OF AND FOR THE PERIOD ENDED MARCH 31, 2013 CITIGROUP INC. BASEL II.5 MARKET RISK DISCLOSURES AS OF AND FOR THE PERIOD ENDED MARCH 31, 2013 DATED AS OF MAY 15, 2013 Table of Contents Qualitative Disclosures Basis of Preparation and Review... 3 Risk

More information

TOWN OF RICHMOND HILL WATER AND WASTEWATER ONTARIO REGULATION 453/07 FINANCIAL PLAN

TOWN OF RICHMOND HILL WATER AND WASTEWATER ONTARIO REGULATION 453/07 FINANCIAL PLAN TOWN OF RICHMOND HILL WATER AND WASTEWATER ONTARIO REGULATION 453/07 FINANCIAL PLAN Financial Plan #022-301 JUNE 3, 2010 CONTENTS Page 1. INTRODUCTION 1.1 Study Purpose 1-1 1.2 Background 1-1 1.2.1 Financial

More information

Financial advisors are asked to assist their clients in

Financial advisors are asked to assist their clients in Which Would You Choose: Funding Retirement or Paying Off Consumer Debt? By James M. Grayson, Ph.D.; Peter M. Basciano, Ph.D.; and Christopher L. Cain, J.D., Ph.D., CFA EXECUTIVE SUMMARY Paying off consumer

More information

Office of the Rail Access Regulator. Contents

Office of the Rail Access Regulator. Contents 1 A Brief Comparison of the WA Rail Access Code approach to calculating ceiling cost with the conventional Depreciated Optimised Replacement Cost methodology 18 July 2002 Contents 1. Purpose Of Paper 2.

More information

City of Brantford Water and Wastewater Ontario Regulation 453/07 Financial Plans. Financial Plan #063-301

City of Brantford Water and Wastewater Ontario Regulation 453/07 Financial Plans. Financial Plan #063-301 City of Brantford Water and Wastewater Ontario Regulation 453/07 Financial Plans Financial Plan #063-301 May 26, 2015 Contents Page EXECUTIVE SUMMARY (i) 1. Introduction... 1-1 1.1 Study Purpose... 1-1

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN DECEMBER 2013 (Released in August 2014) Asset management planning is the process of making the best possible decisions regarding the building, operating, maintaining, renewing, replacing

More information

PENSION MANAGEMENT & FORECASTING SOFTWARE

PENSION MANAGEMENT & FORECASTING SOFTWARE PENSION MANAGEMENT & FORECASTING SOFTWARE PMFS Copyright 2012 by Segal Advisors, Inc. All rights reserved. Table of Contents Overview... 1 Policy Analysis... 2 Financial Planning & Forecasting Actual Illustrations...

More information

Economics of Traditional Planning Methods

Economics of Traditional Planning Methods Economics of Traditional Planning Methods 1.0 Introduction These notes are partly adaptations of information from four sources in the bibliography [1], [2], [3, ch. 5], with some information obtained from

More information

PROJECTION OF THE FISCAL BALANCE AND PUBLIC DEBT (2012 2027) - SUMMARY

PROJECTION OF THE FISCAL BALANCE AND PUBLIC DEBT (2012 2027) - SUMMARY PROJECTION OF THE FISCAL BALANCE AND PUBLIC DEBT (2012 2027) - SUMMARY PUBLIC FINANCE REVIEW February 2013 SUMMARY Key messages The purpose of our analysis is to highlight the risks that fiscal policy

More information

We Need to Prepare Ourselves for Higher Interest Rates

We Need to Prepare Ourselves for Higher Interest Rates We Need to Prepare Ourselves for Higher Interest Rates Summary If deflation continues to be coming to an end in Japan, then interest rates are expected to rise significantly in the mid- and long-terms.

More information

City of Sacramento, California Department of Utilities. March 2011

City of Sacramento, California Department of Utilities. March 2011 Department of Utilities Utility Rate Study March 2011 March, 2011 page i TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 SECTION I: INTRODUCTION... 13 SECTION II: FINANCIAL POLICIES... 15 A. Defining Revenue

More information

12 April 2007. Hedging for regulated AER

12 April 2007. Hedging for regulated AER 12 April 2007 Hedging for regulated businesses AER Project Team Tom Hird (Ph.D.) NERA Economic Consulting Level 16 33 Exhibition Street Melbourne 3000 Tel: +61 3 9245 5537 Fax: +61 3 8640 0800 www.nera.com

More information

Debt & Fiscal Balance

Debt & Fiscal Balance Debt & Fiscal Balance Debt policy is effectively the result of government spending and tax polices. This section focuses on fiscal balance (the difference between annual revenues and expenditures), debt

More information

2014 FINAL BUDGET TOWN OF AURORA. I. Simanovskis, Director of Infrastructure & Environmental Services

2014 FINAL BUDGET TOWN OF AURORA. I. Simanovskis, Director of Infrastructure & Environmental Services TOWN OF AURORA GENERAL COMMITTEE REPORT No. IES14-007 SUBJECT: FROM: Water, Wastewater and Stormwater Budget I. Simanovskis, Director of Infrastructure & Environmental Services DATE: January 20, 2014 RECOMMENDATIONS

More information

Long-Term Debt Pricing and Monetary Policy Transmission under Imperfect Knowledge

Long-Term Debt Pricing and Monetary Policy Transmission under Imperfect Knowledge Long-Term Debt Pricing and Monetary Policy Transmission under Imperfect Knowledge Stefano Eusepi, Marc Giannoni and Bruce Preston The views expressed are those of the authors and are not necessarily re

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

The Town of South Bruce Peninsula. South Bruce Peninsula Drinking Water Systems. Financial Plan #094-301A

The Town of South Bruce Peninsula. South Bruce Peninsula Drinking Water Systems. Financial Plan #094-301A The Town of South Bruce Peninsula South Bruce Peninsula Drinking Water Systems #094-301A September 9, 2014 Town of South Bruce Peninsula South Bruce Peninsula Drinking Water Systems Page i Table of Contents

More information

Measurement of Banks Exposure to Interest Rate Risk and Principles for the Management of Interest Rate Risk respectively.

Measurement of Banks Exposure to Interest Rate Risk and Principles for the Management of Interest Rate Risk respectively. INTEREST RATE RISK IN THE BANKING BOOK Over the past decade the Basel Committee on Banking Supervision (the Basel Committee) has released a number of consultative documents discussing the management and

More information

Financing water supply and sanitation in the Greater Cairo area

Financing water supply and sanitation in the Greater Cairo area MEDITERRANEAN COMPONENT of the EU Water Initiative (MED EUWI) Strategic Partnership on Water for Sustainable Development Lead Country: Greece MED EUWI Egypt Country Dialogue on Water Brief policy document

More information

Financial Analysis and Funding

Financial Analysis and Funding California High- Speed Rail Authority Revised 2012 Business Plan Chapter 7 Financial Analysis and Funding Introduction This chapter presents the financial analysis and funding strategy for the California

More information

Managing Capital Assets

Managing Capital Assets Managing Capital Assets A New Emphasis on a Traditional Role By Public Sector Digest Research and Shayne Kavanagh Capital asset management has become a topic of increasing interest for local governments,

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

The Town of Fort Frances

The Town of Fort Frances The Town of Fort Frances Long-Term Capital Financial Plan POLICY Resolution Number: 391 (Consent) 12/09 SECTION ADMINISTRATION AND FINANCE NEW: December 2009 REVISED: Supercedes Resolution No. Policy Number:

More information

Politics, Surpluses, Deficits, and Debt

Politics, Surpluses, Deficits, and Debt Defining Surpluses and Debt Politics, Surpluses,, and Debt Chapter 11 A surplus is an excess of revenues over payments. A deficit is a shortfall of revenues relative to payments. 2 Introduction After having

More information

City Planning - Council's Improvement Strategy

City Planning - Council's Improvement Strategy Warringah Council Policy Policy No. Number 1 Purpose of Policy The purpose of this policy is to establish the strategic financial planning and sustainability framework to guide Council when developing

More information

5000 Public Personal Injury Compensation Plans

5000 Public Personal Injury Compensation Plans 5000 Public Personal Injury Compensation Plans Page 5001 Table of Contents 5000 Public Personal Injury Compensation Plans.5001 5100 Scope... 5003 5200 Extension of scope... 5004 5300 General... 5005 5310

More information

Appendix. Debt Position and Debt Management

Appendix. Debt Position and Debt Management Appendix Debt Position and Debt Management BUDGET '97 BUILDING ALBERTA TOGETHER Table of Contents Debt Position and Debt Management... 349 The Consolidated Balance Sheet and Net Debt... 350 Liabilities...

More information

Condensed Interim Consolidated Financial Statements of. Canada Pension Plan Investment Board

Condensed Interim Consolidated Financial Statements of. Canada Pension Plan Investment Board Condensed Interim Consolidated Financial Statements of Canada Pension Plan Investment Board September 30, 2015 Condensed Interim Consolidated Balance Sheet As at September 30, 2015 As at September 30,

More information

Discussion of Capital Injection, Monetary Policy, and Financial Accelerators

Discussion of Capital Injection, Monetary Policy, and Financial Accelerators Discussion of Capital Injection, Monetary Policy, and Financial Accelerators Karl Walentin Sveriges Riksbank 1. Background This paper is part of the large literature that takes as its starting point the

More information

RESP Investment Strategies

RESP Investment Strategies RESP Investment Strategies Registered Education Savings Plans (RESP): Must Try Harder Graham Westmacott CFA Portfolio Manager PWL CAPITAL INC. Waterloo, Ontario August 2014 This report was written by Graham

More information

City of Mt. Angel. Comprehensive Financial Management Policies

City of Mt. Angel. Comprehensive Financial Management Policies City of Mt. Angel Comprehensive Financial Management Policies May 2014 Table of Contents Section Description Page I. Purpose... 3 II. Objectives... 3 III. Management of Fiscal Policy... 4 IV. Accounting,

More information

Peak Debt and Income

Peak Debt and Income Peak Debt and Income! Ronald M. Laszewski ( 25 July 21) Just over two years ago, in a paper on Peak Debt, I analyzed the effect that reaching a limit on the amount of debt that can be supported by personal

More information

Your Guide to Profit Guard

Your Guide to Profit Guard Dear Profit Master, Congratulations for taking the next step in improving the profitability and efficiency of your company! Profit Guard will provide you with comparative statistical and graphical measurements

More information

PBGC M P R A R E P O R T

PBGC M P R A R E P O R T PBGC M P R A R E P O R T June 17, 2016 U.S. House of Representatives Committee on Education and the Workforce U.S. House of Representatives Committee on Ways and Means U.S. Senate Committee on Health,

More information

Redefining Retirement in the Health Care Industry

Redefining Retirement in the Health Care Industry Solutions Redefining Retirement in the Health Care Industry Aon Hewitt 2015 Report on Retirement Benefits in the Health Care Industry Part Three of a Five-Part Series: Efficient Retirement Design and Its

More information

Huron University College. Financial Statements April 30, 2012

Huron University College. Financial Statements April 30, 2012 Financial Statements April 30, June 27, Independent Auditor s Report To the Executive Board of Huron University College We have audited the accompanying financial statements of Huron University College,

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO. The Distribution of Household Income and Federal Taxes, 2008 and 2009

CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO. The Distribution of Household Income and Federal Taxes, 2008 and 2009 CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE Percent 70 The Distribution of Household Income and Federal Taxes, 2008 and 2009 60 50 Before-Tax Income Federal Taxes Top 1 Percent 40 30 20 81st

More information

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10 Asset Management Plan AUGUST 2014 County of Oxford Asset Management Plan 2014 Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 7 3.0 Purpose and Methodology... 10 4.0 State of Infrastructure...

More information

Glossary of Investment Terms

Glossary of Investment Terms online report consulting group Glossary of Investment Terms glossary of terms actively managed investment Relies on the expertise of a portfolio manager to choose the investment s holdings in an attempt

More information

The Corporation of the Municipality of Callander. Asset Management Plan

The Corporation of the Municipality of Callander. Asset Management Plan The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service

More information

Model for. Eleven factors to consider when evaluating bond holdings. Passage of time

Model for. Eleven factors to consider when evaluating bond holdings. Passage of time PERFORMANCEAttribution A Model for FIXED-INCOME PORTFOLIOS Eleven factors to consider when evaluating bond holdings. BY NABIL KHOURY, MARC VEILLEUX & ROBERT VIAU Performance attribution analysis partitions

More information

For Immediate Release

For Immediate Release For Immediate Release BRAMPTON BRICK REPORTS RESULTS FOR THE FOURTH QUARTER AND YEAR ENDED DECEMBER 31, 2014 (All amounts are stated in thousands of Canadian dollars, except per share amounts.) BRAMPTON,

More information

Financial Statement Guide. A Guide to Local Government Financial Statements

Financial Statement Guide. A Guide to Local Government Financial Statements Financial Statement Guide A Guide to Local Government Financial Statements January, 2012 Ministry of Community, Sport and 1 Financial Statement Guide Table of Contents Introduction Legislative Requirements

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

New York City s Water and Sewer System: Is the Rent Too Damn High?

New York City s Water and Sewer System: Is the Rent Too Damn High? New York City s Water and Sewer System: Is the Rent Too Damn High? By Rahul Jain, Maria Doulis and Charles Brecher December 2011 An important, yet obscure, element of municipal finance is a rental payment

More information

Fiscal Year 2015 Integrated Financial Plan. 2015 Operating Plan 2015 Capital Plan 2015 Financing Plan

Fiscal Year 2015 Integrated Financial Plan. 2015 Operating Plan 2015 Capital Plan 2015 Financing Plan Fiscal Year Integrated Financial Operating Capital Financing EXECUTIVE SUMMARY Despite the ongoing efforts A Deep Financial Hole (as of September 30, ) of the Postal Service to Liabilities exceed assets

More information

WATER UTILITY REFERENCE MANUAL

WATER UTILITY REFERENCE MANUAL Utility Plant and Accumulated Depreciation Capitalization Policy Costs are capitalized in the utility plant accounts, rather than being expensed in the current year, if: the service life is more than one

More information

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT.

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. ABSTRACT Steve Shoaf, City Of Asheville Nicholas Dierkes, Brown and Caldwell Understanding how well our Utilities

More information

ANNEX 1 - MACROECONOMIC IMPLICATIONS FOR ITALY OF ACHIEVING COMPLIANCE WITH THE DEBT RULE UNDER TWO DIFFERENT SCENARIOS

ANNEX 1 - MACROECONOMIC IMPLICATIONS FOR ITALY OF ACHIEVING COMPLIANCE WITH THE DEBT RULE UNDER TWO DIFFERENT SCENARIOS ANNEX 1 - MACROECONOMIC IMPLICATIONS FOR ITALY OF ACHIEVING COMPLIANCE WITH THE DEBT RULE UNDER TWO DIFFERENT SCENARIOS The aim of this note is first to illustrate the impact of a fiscal adjustment aimed

More information

Local Distribution Companies 25% of the Customer Bill

Local Distribution Companies 25% of the Customer Bill Local Distribution Companies 25% of the Customer Bill EUCI s The Future of Electricity Prices in Ontario and Key Canadian Markets Neil Freeman, Vice President, Business Development September 20, 2013 HORIZON

More information

Fiscal Year 2015 Integrated Financial Plan

Fiscal Year 2015 Integrated Financial Plan Fiscal Year Integrated Financial Operating Capital Financing Integrated Financial EXECUTIVE SUMMARY Unaudited - A Deep Financial Hole (as of September 30, 2014) Liabilities exceed assets by approximately

More information

CHAPTER 15: THE TERM STRUCTURE OF INTEREST RATES

CHAPTER 15: THE TERM STRUCTURE OF INTEREST RATES CHAPTER : THE TERM STRUCTURE OF INTEREST RATES CHAPTER : THE TERM STRUCTURE OF INTEREST RATES PROBLEM SETS.. In general, the forward rate can be viewed as the sum of the market s expectation of the future

More information