FLORIDA COLLEGE SYSTEM CURRENT STATUS OF FUNDED PROJECTS THROUGH FY August 1, 2012

Size: px
Start display at page:

Download "FLORIDA COLLEGE SYSTEM CURRENT STATUS OF FUNDED PROJECTS THROUGH FY 2012-2013 August 1, 2012"

Transcription

1 CURRENT STATUS OF FUNDED PROJECTS THROUGH FY August 1, 212 COLLEGE: GROSS SQUARE FEET (GSF) ADDITIOL FUNDS REQUIRED TOTAL PROJECT COSTS EST. COMPLETION DATE PROJECT TITLE Funding Source(s) YEAR(S) FUNDED TOTAL PRIOR FUNDS CURRENT STATUS (Select One from List) Requires Additional Ren/Chiller Underground Utilities (Special) ,179 15,85,663 15,65,842 Funds Until funded Gen ren/rem, infrastructure and site improvements ,69 585,69 Replace WF Dev Bldg-life safe&struc,chiller-main 21 1,574, ,217 Chiller Plant/ Underground Utilities Special 21 total 21 1,159,286 13,926,377 Until funded Chiller Plant/ Underground Utilities Special 21 total 211, Local Funds 1,21,5 Total of all prior applied to Chiller project 2,745,965 12,94,877 15,65,842 Requires Additional Funds Renovate Campus infastr & Facility #3 - Natural Science ,565 1,85,429 1,8,285 2,93,714 Planning Until funded Land Acquisition & Development , 1,, 1,375, Requires Additional Funds Until funded CIP-Current Status_212-.xls Page 1 7/2/212

2 =========================================================================== CIP-1 RRATIVE OVERVIEW OF COLLEGE CAPITAL IMPROVEMENTS PLAN COLLEGE: CHIPOLA COLLEGE ========================================================= COLLEGE OBJECTIVES AND POLICIES AS THEY RELATE TO THE CAPITAL IMPROVEMENTS PROGRAM has served its community for over 6 years. This makes it the third oldest of the 28 two-year public community colleges operating under Florida s Administrative Rules governing Florida s Community/Junior Colleges. The system is designed to provide the first two years of post-secondary education within commuting distance of every Florida citizen. The community/junior colleges offer an open-door admissions policy for semester-hour students, clock-hour students, employed workers needing retraining for jobs, and other citizens in need of basic skills for success. Each college is governed by a District Board of Trustees made up of community leaders in each district and appointed by the governor. This places policy control in the hands of local people. Although the scope of two-year institutions has been enlarged and changed over the years, the intent of community colleges has remained the same: to provide postsecondary educational opportunities for all the citizens in their respective districts. In Chipola s case, this district includes five rural counties in the Florida Panhandle, namely Calhoun, Holmes, Jackson, Liberty, and Washington. In addition, in June 28 Chipola was named a State College a part of a pilot project for nine Florida Community Colleges offering four-year degrees. Vision Statement: promotes learning and student achievement through excellence, opportunity, diversity, and progress. Mission Statement: Chipola is a comprehensive public college whose mission is to provide accessible, affordable, quality educational opportunities to the residents of Calhoun, Holmes, Jackson, Liberty and Washington counties and to all others who choose to attend. The college creates a student-oriented atmosphere of educational excellence and maintains an intellectual environment that inspires the full development of each individual s goals, abilities, and interests. Because there is no substitute for quality instruction, the college empowers faculty members to establish and achieve the highest possible standards. The college also promotes a strong working relationship with communities, businesses, state agencies, and other educational institutions. --Adopted June 15, 24 Page 2

3 Programs: Chipola provides the following: Educational programs which include general and pre-professional classes leading to the Associate in Arts degree for transfer into baccalaureate programs; Selected Baccalaureate degree programs which produce educated and capable professionals; Workforce Development programs leading to Associate in Science degrees, Associate in Applied Science degrees, and Certificates of Training to prepare students for careers; Continuing Education programs related to professional and personal development; and A broad range of enrollment and student services and instructional and administrative support to facilitate student success. The planning process for all community colleges begins at the state level with the Florida Board of Education. The chief executive officer of each community college, under the guidance of a District Board of Trustees, is responsible for institutional planning. Chipola has a wellestablished system of assessment and planning which has been widely replicated by community colleges in Florida and in other states. Chipola s most recent reaffirmation of accreditation was in June 28. This resulted in re-accreditation until 218 by the Southern Association of Colleges and Schools (SACS). As a comprehensive community college dedicated to its students and the community, Chipola s curriculum is designed to serve students in three major areas: general and pre-professional classes for transfer to other colleges and universities; workforce development instruction to prepare students for the job market; and learning opportunities for all who want to improve employment skills or to study new things for the sheer joy of learning. In addition, in June 23, Chipola was authorized by the State Board of Education to deliver Baccalaureate degrees to address local workforce needs. In June 23, SACS approved Chipola s Application for Substantive Change to a Level II-- Baccalaureate degree-granting institution. In August 23, the word junior was removed from the college s name, and in January 24, the first students enrolled in classes leading to the Bachelor of Science in Education degree to equip middle and high school math and science teachers. In June 28, Chipola officially became a State College in Florida. The new Florida College system consists of nine community colleges where 2-year and 4-year academic degrees are granted. This means more students in the college district will be able to access Baccalaureate degrees in academic areas where the demand for educated workers is exceeding the supply. The college enrolled students in additional BS in Educational degrees and BS in Business Management degrees in 28, as well as a BS in Nursing in 29. Chipola s programs are more affordable and cost-effective than those at the state university level; thereby benefitting both the taxpayers and the students. Page 3

4 Since its main function is still to provide Associate degrees for transfer to state universities, Chipola remains part of the Florida Community College System for administration and funding. Chipola continues to plan for the wise utilization of space in its efforts to meet the postsecondary needs of its large rural district. Therefore, the college established a University Center on campus in cooperation with Florida State University, University of Florida, Florida A & M, University of West Florida, and Troy University. The center has already experienced documented success and has been featured in national meetings. Data continues to support the need of local citizens for access to additional bachelor s degrees through Chipola or visiting universities. In addition, under the special legislative mandate allowing Chipola to provide the Bachelor of Science Degree in Education, the college responded to the federal No Child Left Behind law by initiating a plan to provide course work for Associate in Arts degrees for paraprofessionals/teacher s aides currently employed in public schools in five counties. This is only one example of the many challenges faced by the college as new opportunities arise in the baccalaureate degree arena. The Chipola campus is a beautifully wooded and landscaped tract of 139 acres located on the northern limits of the City of Marianna. Administration, instruction, and recreational facilities consist of forty one-story permanent buildings of brick and masonry construction and six twostory buildings. Major renovations have been completed in the Physical Education complex, Learning Resource Center, Business-Technology Building, Residence Hall, Student Services Building, and Cafeteria. Most recently the Administration Building remodeling was completed as an additional wing to the Student Services Building. This allows space to house all services to students including counseling, financial aid, admissions, testing, business affairs offices, as well as the college administrative offices. The renovation, remodeling, and site improvement needs of Chipola s campus are necessary to support the College Mission and Chipola s dedication to the instructional programs for its students and the community. Chipola is committed to maintaining a positive learning environment--one in which personnel, resources, facilities, and services contribute to the growth and development of students from an area where the future is looking brighter. HIGHLIGHTS OF CAPITAL IMPROVEMENTS PROGRAM The survey team found that permanent buildings were in satisfactory condition, with the exception of Facility #435 Workforce Development (N) and Facility #1 Physical Plant (E) because of structural issues associated with settlement. These two facilities were recommended to be replaced. Other buildings were recommended for remodeling with additions and/or renovations. Construction and improvements are planned for college parking, drainage, centralized chilled water plant, data and telecom systems, and signage. The college has received a designation change of the Reddoch Annex to a Special Purpose Center. Their recommendations include the following: 1) Construction includes the main campus and special purpose center as follows: program lab suite spaces for Fine and Applied Arts; Workforce including but not limited to, Masonry, Civil Engineering, Survey/Mapping, and physical plant. Page 4

5 2) Additional space was recommended for library, auditorium, audiovisual, student services, offices, and support services; at the Reddoch Special Purpose Center additional improvements were planned for expanding Fire Science Programs, Public Service Driving Range with Skid Pad expansions, and Workforce Programs such as Electrical Lineman and Power Distribution. Construction planning for all sites included covered walkway between buildings, training tracks, land acquisition of adjoining properties for future expansion, updating campus wide data and telecommunications systems, infrastructure for future wireless communications, and related site development. In considering utilization for planning this space, much of the old space is undersized and outdated for the newer program requirements necessary in the 21st century. 3) Remodeling: Learning Resources # 2, present day Auditorium #6, Fine Arts #7 as classrooms for upper level programs, and Student Center #8. 4) Renovation: Social Science #1; Natural Science #3; Academic Center for Excellence #4, Cosmetology #49; Math Annex #41, Electronics # 475, Cultural Civic Arts #5, Health Center #91, Continuing Education #1, Child Care #15; irrigation system; security lighting system; enclosed walkway #4; campus signs and landscaping; replacement of building cooling towers; exterior walls of buildings; electronic energy management systems; campus wide utilities/building systems; underground utilities; storm water management; tennis courts; telecommunications and data systems. s capital improvement program will be implemented if PECO funds are allocated from the General Revenue of the State of Florida. At this time, Chipola does not anticipate any increased need for leased space within the next five years. CURRENT STATUS OF FACILITY EFFORTS AND HIGHLIGHTS OF FACILITY PROGRAM OVER LAST FIVE YEARS 25-6 Final appropriation was received for the last phase of Building 1, general renovation/remodeling, etc., and adjacent land acquisition Received appropriation for general renovation/remodeling, telecommunication systems, utilities, Buildings #3 & #13, and site improvement. The first phase of appropriations for the replacement of the Performing Arts Bldg. #6 was received with additional appropriations to follow Received appropriations for general renovation/remodeling of Buildings #8, #4, and campus utilities systems and site improvements. Additional appropriations for the replacement of Building #435 Workforce and the Performance Arts Bldg. #6 were also received. Page 5

6 28-9 Received appropriations for general renovation/remodeling for campus utilities systems in which the college, after conducting a Chiller Plant/Underground Utilities replace study, has determined that this needs to be a Major project for the College to help reduce future operational cost. The college also received additional funding for the replacement of Building #435 and the Performance Arts Bldg. # Received appropriations for general renovation/remodeling for campus-wide Chilled Water Plant and other campus utilities systems. The college also received additional funding for the replacement of Building #435, Workforce Development SUMMARY OF THE SIZE, USE, AND CONDITION OF THE COLLEGE'S PHYSICAL PLANT The physical plant of consists of 4 buildings constructed mainly in the 195's, 196's, and three new buildings completed in 2, 21, 22, 26 (#1 wing). The previous section explains the extensive renovation that has been necessary in the past years. In area of actual square feet, these buildings contain 21,146 for classrooms, 2,778 for academic labs, 67,464 for vocational labs, 29,639 for physical education, 14,178 for the learning resource center, 1,364 for audio-visual, 16,34 for the auditorium, 9,358 for student services, 41,944 for support service, 4,888 for offices, 31,631 for residential, 2,777 other assignable, and 135,84 non-assignable, for a total of 432,555 NSF. Recommended demolish/terminate is 35,536 NSF. Chipola does not project any major surplus or deficit in the next five years. The college s main needs are in the areas of Special Renovation Project for the Chiller Plant and Under/Ground utilities replacement and the renovation and remodeling to accommodate new programs and shared space. IMPACT OF THE CURRENT AND PROPOSED PHYSICAL PLANT SIZE, USE, AND CONDITION ON THE COLLEGE'S OPERATING BUDGET does not project any major increases or decreases in the operating budget as a result of the requested renovation or remodeling projects. The savings gained in building a new chiller plant will help offset some cost associated with the additional space when Building 435 is replaced and the new Fine Arts building is complete. This major project is also designed to replace aging stand alone cooling units at older buildings and thus help with the operational cost. These renovations including HVAC, new windows, and the planned energy management system should increase efficiency and save on energy consumption. In the future, the addition of new buildings and outdoor improvements could place a significant strain on custodial and maintenance personnel. OTHER FACTORS AFFECTING THE COLLEGE'S CAPITAL IMPROVEMENTS PROGRAM The college faces several challenges as a result of relocations involving renovation and remodeling projects of areas currently housing Workforce Development and Student Services. Existing facilities vacated due to relocations must be renovated/remodeled to house future program needs. Future plans include Workforce Development classrooms, joint use space for the University Center, spaces for offices and classrooms for Chipola s Baccalaureate Degree Programs. Page 6

7 CIP - 2 SUMMARY CAPITAL IMPROVEMENT PLAN AND LEGISLATIVE BUDGET REQUEST through COLLEGE: RENOVATION PROJECTS: Initial CIF / TOTAL PRIOR Req'st CHALL SITE PAGE FIVE YEAR TOTAL PRIOR PROJECT GROSS NO. Yr GRANT PROJECT TITLE NO. REF TOTAL APPROP COST* SQUARE FT. SURVEY RECOMMENDATION 1 29 Ren/Chiller Underground Utilities (Special) 1,2 41 5,34,973 5,97,228 2,772,676 $12,94,877 $2,745,965 15,65,842 N/A , Renovate Facility #3 - Natural Science ,8,285 1,8,285 $1,85,429 2,93,714 34,565 7/8;1.37, SR Renovate Building Roofs and Parking all Sites 1, , 75, 75, 75, 75, 3,75, 3,75, 7/8;1.22, SR Renovate Facility #49 - Cosmetology/Business ,876,39 1,876,39 1,876,39 22,427 7/8;1.41,1.39 SR Renovate Facility #5 - Cultural Arts Center ,742,499 1,742,499 1,742,499 16,426 7/8;1.42,SR Renovate Facility #1 - Continuing Education , , ,648 11,215 7/8;1.44,SR Renovate Facility #15 - Child Care Center , , ,285 4,429 7/8;1.45,SR1-6 TOTAL RENOVATION PROJECTS $6,793,258 $7,723,537 $6,231,823 $1,114,285 $75, $22,612,93 * Total Project Cost includes funding from all sources Page 7 CIP2_212-Chipola final w page.xls 7/2/212

8 CIP - 2 SUMMARY CAPITAL IMPROVEMENT PLAN AND LEGISLATIVE BUDGET REQUEST through COLLEGE: REMODELING PROJECTS: Initial CIF / TOTAL PRIOR Req'st CHALL SITE PAGE FIVE YEAR TOTAL PRIOR PROJECT GROSS NO. Yr GRANT PROJECT DESCRIPTION NO. REF TOTAL APPROP COST* SQUARE FT. SURVEY RECOMMENDATION 4 25 Remodel/Renovate Facility #91 - Health Center 1 1 1,176,942 9,343,542 1,52,484 1,52,484 52,465 7/8;1.43. SR Building 6 to Bookstore Phase II of Student Ce 1 12 $1,331,432 $2,895,518 4,226,951 $4,226,951 15,47 7/8; 1.33,1.54, Building 7 to Classrooms ,476,313 3,476,313 3,476,313 17,193 7/8; Library remodel with Addition ,725,479 6,725,479 6,725,479 3,23 7/8; 1.32,1.58 TOTAL REMODELING PROJECTS $1,176,942 $1,674,975 $6,371,831 $6,725,479 $ $24,949,226 * Total Project Cost includes funding from all sources Page 8 CIP2_212-Chipola final w page.xls 7/2/212

9 CIP - 2 SUMMARY CAPITAL IMPROVEMENT PLAN AND LEGISLATIVE BUDGET REQUEST through COLLEGE: NEW CONSTRUCTION PROJECTS: Initial CIF / TOTAL PRIOR Req'st CHALL SITE PAGE FIVE YEAR TOTAL PRIOR PROJECT GROSS NO. Yr GRANT PROJECT DESCRIPTION NO. REF TOTAL APPROP COST* SQUARE FT. SURVEY RECOMMENDATION 7 25 Land Acquisition & Development , 6, 1,, 375, 1,375, 7/8;1.1,1.2,1.3, 2.1,2.2, Fine and Applied Arts Labs ,56 2,681,834 3,324,34 3,324,34 13,295 7/8; Public Service Broadcasting ,574 1,387,643 1,756,217 1,756,217 4,261 7/8; Driving Range & Skid Pad Area - Reddoch , , , ,525 7/8;2.9, Swimming Pool Enclosure/Bldg.92,93, ,145,219 3,145,219 3,145,219 23,24 7/8;1.16, SR PE Training Track W/Facilities ,398 64,398 64,398 7/8; Replace Facility 1 Physical Plant ,357 2,877,366 3,56,723 3,56,723 15,566 7/8; Physical Plant and loading dock Reddoch Center ,77 48,23 65,936 65,936 1,42 7/8;2.14, Covered Walkway between Eleven Bldgs , , ,898 7/8; Additional Burn and Fire Maze Building Reddoch , , ,333 2,983 7/8;2.23, Parking Spaces and Service Roads 1,2 38 2,999,75 2,999,75 2,999,75 7/8;1.7,2.4 TOTAL NEW CONSTRUCTION PROJECTS $4, $1,242,56 $4,629,218 $8,29,635 $4,164,98 $18,466,339 GRAND TOTAL OF ALL PROJECTS $8,37,2 $19,641,17 $17,232,871 $15,869,399 $4,914,98 $66,28,468 * Total Project Cost includes funding from all sources Page 9 CIP2_212-Chipola final w page.xls 7/2/212

10 CIP-3 PROJECT EXPLATION through College Name Project Title Remodel/Renovate Facility #91 - Health Center Budget Entity Priority Rem - 4 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) REMODEL/RENOVATE ALL ROOMS IN FACILITY 91 HEALTH CENTER; TO INCLUDE ROOF, HVAC, FURNITURE, AND EQUIPMENT. Major replacement of all building systems and equiptment to bring building up to code and reduce long term maintenance cost. If repairs are not started soon system failures will increase the cost and damage to this building. CRITICAL PROTIONS of Funding are need for this project. Initial Year Requested: 25 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-13 Aug-14 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ ,937 36,937 Page 1

11 CIP-3 CALCULATION WORKSHEET Remodel/Renovate Facility #91 - Health Center NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed. 19, $4,864,96 Vocational Lab $ Library $ Audio-Visual $22,89 Audit.-Exhibit $ Student Services $91,811 Support Services 14, $3,33,731 Offices 2, $7,726 TOTAL 36,937 52,465 New Construction Cost $9,11,64 REMODELING/RENOVATION NSF GSF $/GSF Const. Cost 8% $7,28,851 $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $7,28,851 Site development/improvement** (2.6%) $187,43 Total Base Construction Costs $7,396,281 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $7,396,281 Add'l Extraordinary Construction Costs c. d. e. f. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements $3, g. h. i. j. Parking spaces: Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment $15, o. Other: Subtotal: CONSTRUCTION COSTS $ $7,846,281 $ $ $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $78,463 $612,1 3) Inspection Services* 4) On-site representation (1.2%) $392,314 $94,155 5) Other prof. services* (sugg..5%) $392,314 c. Testing/surveys (2.2%) $162,718 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $156,926 f. Movable equipment/furnishings (1.2%) $735,33 Subtotal: OTHER PROJECT COSTS $1,176,942 $1,497,261 $ $ $ TOTAL: COSTS BY YEAR (1+2) $1,176,942 $9,343,542 $ $ $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $1,52,484 Page 11

12 CIP-3 PROJECT EXPLATION through College Name Project Title Budget Entity Priority Statutory Authority Type of Project (*) Building 6 to Bookstore Phase II of Student Center Rem - 6 Sec (4)(a) Construct Remodel Acquisition X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) Planned as Second Phase part of the of the Student Center Remodel, the remodel of Bd. 6 into the new College Bookstore and Student Support Spaces and the enclosure of the Atrium and Covered Walkways between Buildings (K-8), (J-6), and (Z- 17). Structural and environmental issues in the old Bd. 6-Auditoria will be addressed at the time of remodeling of remodeling Building 6 into the new College Bookstore and Student Support Spaces. New Survey Recommendations include Remodel 6, 1.33; enclosure of courtyard Fac 8, 1.54; and portions enclosing Covered Walkways between building 6, 8, and 17. This project will make the old Auditoria usable and resolves the environmental and structural issues of Building 6. Program space includes Bookstore, Student Computer Terminal Study areas and Student Support spaces. Initial Year Requested: 25 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-14 Aug-15 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/28 7/28 7/ ,448 1, ,448 1,943 5 Page 12

13 CIP-3 CALCULATION WORKSHEET Calc Building 6 to Bookstore NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed $ Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services 2, $568,641 Offices $ TOTAL 2,443 3,47 New Construction Cost $568,641 REMODELING/RENOVATION NSF GSF $/GSF Const. Cost 8, $2,156,35 $ Remodeling/Renovation Cost $2,156,35 Base Construction - New & Rem/Rem $2,724,677 Site development/improvement** (2.6%) $7,842 Total Base Construction Costs $2,795,518 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $2,795,518 Add'l Extraordinary Construction Costs Environmental Impacts/Mitigation $1, c. d. e. f. g. h. Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication $5, i. j. k. Electrical service Water distribution Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment $1, o. Other: Floor infill $1, Subtotal: CONSTRUCTION COSTS $25, $2,895,518 $ $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $31,455 $245,35 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $157,276 $37,746 $157,276 c. Testing/surveys (2.2%) $61,51 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $62,91 f. Movable equipment/furnishings (1.2%) $277,917 Subtotal: OTHER PROJECT COSTS $ $1,81,432 $ $ TOTAL: COSTS BY YEAR (1+2) $25, $3,976,951 $ $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $4,226,951 Page 13

14 CIP-3 PROJECT EXPLATION through College Name Project Title Building 7 to Classrooms Budget Entity Priority Rem - 8 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) With the construction of the New Fine Arts Auditoria located at the north west corner of the campus the Fine Arts programs located in Building (H) 7 located at the south east corner of the campus need to be moved to closer proximity to the Auditoria. The current Arts programs space is inadaquate to meet the needs of the programs. The 7 building will be remodeled into classrooms supporting Higher Education programs on Campus. This remodel project tracks after Construction priority 4. Initial Year Requested: 29 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Available Funding Funding Educational Specifications Section (must be completed for all first-year priority construction) Date of Survey Recomm Number Recomm Total NSF NSF Used Student Stations Used Page 14

15 CIP-3 CALCULATION WORKSHEET Building 7 to Classrooms NEW CONSTRUCTION CATEGORY Classroom NSF 12,14 GSF $/GSF LOCAL FACTOR.88 Const. Cost $3,111,95 Teaching Lab $ Physical Ed $ Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services $ Offices $ TOTAL 12,14 17,193 New Construction Cost $3,111,95 REMODELING/RENOVATION NSF GSF $/GSF Const. Cost.8% $2,489,524 $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $2,489,524 Site development/improvement** (2.6%) $64,728 Total Base Construction Costs $2,554,252 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $2,554,252 Add'l Extraordinary Construction Costs c. d. e. f. g. h. i. j. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment o. Other: Subtotal: CONSTRUCTION COSTS $ $ $2,554,252 $ $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $25,543 $199,232 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $127,713 $3,651 $127,713 c. Testing/surveys (2.2%) $56,194 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $51,85 f. Movable equipment/furnishings (1.2%) $253,93 Subtotal: OTHER PROJECT COSTS $ $922,61 $ $ TOTAL: COSTS BY YEAR (1+2) $ $3,476,313 $ $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $3,476,313 Page 15

16 CIP-3 PROJECT EXPLATION through College Name Project Title Library remodel with Addition Budget Entity Priority Rem -12 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) The old library underwent a renovation project several years ago, however this stopgap measure did not allow (because of limited space), for the new missions of. The upper level program resources need expansion and space is at a premium. The old Public Service Broadcast Station occupies the basement and is extremely limited in space. This remodeling project with addition removes the PBS to a newly constructed space and expands the existing Library space with new and remodels the existing. This project is attached to the Construction priority 5 for Public Broadcasting. Initial Year Requested: 25 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-16 Aug-17 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ ,264 6, 15,264 6, Page 16

17 CIP-3 CALCULATION WORKSHEET Library Rem NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed $ Vocational Lab $ Library * 21, $4,85,336 Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services $ Offices $ TOTAL 21,264 3,23 *6 sq ft of new space New Construction Cost $4,85,336 REMODELING/RENOVATION NSF GSF $/GSF Const. Cost 9% $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $4,85,336 Site development/improvement** (2.6%) $126,19 Total Base Construction Costs $4,976,445 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $4,976,445 Add'l Extraordinary Construction Costs c. d. e. f. g. h. i. j. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment o. Other: Subtotal: CONSTRUCTION COSTS $ $ $ $4,976,445 $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $49,764 $388,163 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $248,822 $59,717 $248,822 c. Testing/surveys (2.2%) $19,482 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $99,529 f. Movable equipment/furnishings (1.2%) $494,734 Subtotal: OTHER PROJECT COSTS $ $ $ $1,749,34 $ TOTAL: COSTS BY YEAR (1+2) $ $ $ $6,725,479 $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $6,725,479 Page 17

18 CIP-3 PROJECT EXPLATION through College Name Project Title Land Acquisition & Development Budget Entity Priority Const - 7 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION Main -394 Indian Circle; Marianna, Florida and Reddoch Special Purpose Center, Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) This project will acquire partials of land, with improvements, located approximate to main campus and the Reddoch center, It also includes part of the monies to accomplish the site development needed to make it usable by the college. Purchase cost is an estimate, as actual purchase cost is dependant upon negotiations. Initial Year Requested: 25 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): As available Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ Page 18

19 CIP-3 CALCULATION WORKSHEET Land Acquisition & Development NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed $ Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services $ Offices $ TOTAL New Construction Cost $ REMODELING/RENOVATION NSF GSF $/GSF Const. Cost $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $ Site development/improvement** (2.6%) $ Total Base Construction Costs $ **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) Add'l Extraordinary Construction Costs c. d. e. f. g. h. i. j. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment o. Other: Subtotal: CONSTRUCTION COSTS $ $ $ $ $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* $4, $6, Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) c. d. Testing/surveys (2.2%) Permit/Environmental Fees* e. f. Miscellaneous cost* (sugg. 1-3%) Movable equipment/furnishings (1.2%) Subtotal: OTHER PROJECT COSTS $4, $6, $ $ $ TOTAL: COSTS BY YEAR (1+2) $4, $6, $ $ $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: , TOTAL: 375, TOTAL: - TOTAL PROJECT COSTS $1,375, Page 19

20 CIP-3 PROJECT EXPLATION through College Name Project Title Fine and Applied Arts Labs Budget Entity Priority Const - 12 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) With the construction of the New Fine Arts Auditoria located at the north east corner of the campus, the Fine Arts programs located in Building (H) 7 located at the south east corner of the campus needs to be moved to closer proximity to the Auditoria. The current Arts programs space is inadaquate to meet the needs of the programs. The 7 building will be remodeled into classrooms supporting Higher Education programs on Campus. Initial Year Requested: 29 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-15 Aug-16 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ ,36 8,36 77 Page 2

21 CIP-3 CALCULATION WORKSHEET Fine and Applied Arts Labs NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab 8, $2,31,48 Physical Ed $ Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services $ Offices 1, $257,38 TOTAL 9,36 13,295 New Construction Cost $2,288,86 REMODELING/RENOVATION NSF GSF $/GSF Const. Cost $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $2,288,86 Site development/improvement** (2.6%) $59,51 Total Base Construction Costs $2,348,37 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $2,348,37 Add'l Extraordinary Construction Costs c. d. e. f. g. h. i. j. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: 1 Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment $1, o. Other: Subtotal: CONSTRUCTION COSTS $ $ $2,448,37 $ $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $24,484 $19,973 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $122,419 $29,38 $122,419 c. Testing/surveys (2.2%) $53,864 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $48,967 f. Movable equipment/furnishings (1.2%) $233,464 Subtotal: OTHER PROJECT COSTS $ $642,56 $233,464 $ $ TOTAL: COSTS BY YEAR (1+2) $ $642,56 $2,681,834 $ $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $3,324,34 Page 21

22 CIP-3 PROJECT EXPLATION through College Name Project Title Public Service Broadcasting Budget Entity Priority Const - 13 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) The current broadcast space is located in the basement of the old library building in very cramped quarters that doesn't meet the program requirements of the station. With the planned remodeling and the expansion of the Library the station is planned to be moved to new space separate from the library so that it can be operated during times of emergency without opening the complete library building. This project is planned to precede the library remodel and expansion. CIP request Remodel 3 Initial Year Requested: 29 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-16 Aug-17 Funding Educational Specifications Section (must be completed for all first-year priority construction) Date of Survey Recomm Number Recomm Total NSF NSF Used Student Stations Used 7/ ,5 1, ,5 1,5 Page 22

23 CIP-3 CALCULATION WORKSHEET Public Service Broadcasting NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed $ Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services 3, $698,265 Offices $ TOTAL 3, 4,261 New Construction Cost $698,265 REMODELING/RENOVATION NSF GSF $/GSF Const. Cost $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $698,265 Site development/improvement** (2.6%) $18,155 Total Base Construction Costs $716,42 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $716,42 Add'l Extraordinary Construction Costs c. d. e. f. g. h. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication $5, i. j. k. Electrical service Water distribution Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment $1, o. Other: Subtotal: CONSTRUCTION COSTS $ $ $ $1,316,42 $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $13,164 $12,681 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $65,821 $15,797 $65,821 c. Testing/surveys (2.2%) $28,961 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $26,328 f. Movable equipment/furnishings (1.2%) $71,223 Subtotal: OTHER PROJECT COSTS $ $ $368,574 $71,223 $ TOTAL: COSTS BY YEAR (1+2) $ $ $368,574 $1,387,643 $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $1,756,217 Page 23

24 CIP-3 PROJECT EXPLATION through College Name Project Title Driving Range & Skid Pad Area - Reddoch Budget Entity Priority Const - 14 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION Reddoch Special Purpose Center, Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) This project is planned to construct additional paved driving area and additional Skid Pad area to include wetable surface areas at Reddoch Annex Facility to meet Florida Police Standards & Training Course requirements; pursuant to Section 11B-21.5, Criminal Justice Training School Requirements for Certification. Initial Year Requested: 25 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-15 Aug-16 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ , 18, 2.1 4,8 4,8 Page 24

25 CIP-3 CALCULATION WORKSHEET Driving Range & Skid Pad Area - Reddoch NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed $ Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services $ Offices $ TOTAL New Construction Cost $ REMODELING/RENOVATION NSF GSF $/GSF Const. Cost $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $162,593 Site development/improvement** (2.6%) $4,227 Total Base Construction Costs $166,82 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $4, $122,593 Add'l Extraordinary Construction Costs c. d. e. f. g. h. i. j. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment o. Other: Subtotal: CONSTRUCTION COSTS $ $ $4, $122,593 $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $1,626 $12,682 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $8,13 $1,951 $8,13 c. Testing/surveys (2.2%) $3,577 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $3,252 f. Movable equipment/furnishings (1.2%) $16,584 Subtotal: OTHER PROJECT COSTS $ $ $89,348 $16,584 $ TOTAL: COSTS BY YEAR (1+2) $ $ $129,348 $139,177 $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $268,525 Page 25

26 CIP-3 PROJECT EXPLATION through College Name Project Title Swimming Pool Enclosure/Bldg.92,93,94 Budget Entity Priority Const -15 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) This project will construct an enclosure for the swimming pool, including climatic controls to accommodate winter aquatics, physical education programs, employee wellness program, and joint community use. Initial Year Requested: 29 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-15 Aug-16 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ ,336 16,336 Page 26

27 CIP-3 CALCULATION WORKSHEET Swimming Pool Enclosure/Bldg.92,93,94 NEW CONSTRUCTION CATEGORY NSF GSF $/GSF LOCAL FACTOR Const. Cost Classroom $ Teaching Lab $ Physical Ed. 16, $2,47,57 Vocational Lab $ Library $ Audio-Visual $ Audit.-Exhibit $ Student Services $ Support Services $ Offices $ TOTAL 16,336 23,24 New Construction Cost $2,47,57 55% REMODELING/RENOVATION NSF GSF $/GSF Const. Cost $ Remodeling/Renovation Cost $ Base Construction - New & Rem/Rem $2,47,57 Site development/improvement** (2.6%) $26,371 Total Base Construction Costs $2,37,428 **Note: If 2.6% is used for basic site dev/imp, do not request additional extraordinary construction costs for sitework below. ESTIMATED EXPENDITURES SCHEDULE OF PROJECT COMPONENTS FY FY FY FY FY CONSTRUCTION COSTS a. Base Construction Cost (from above) $2,37,428 Add'l Extraordinary Construction Costs c. d. e. f. g. h. i. j. Environmental Impacts/Mitigation Site preparation Landscape/Irrigation Plaza/Walks Roadway improvements Parking spaces: Telecommunication Electrical service Water distribution k. Sanitary sewer system l. Chilled water system m. Storm water system n. Energy efficient equipment o. Other: Subtotal: CONSTRUCTION COSTS $ $ $ $2,37,428 $ 2. OTHER PROJECT COSTS a. Land/existing facility acquisition* Professional Fees 1) Planning/programming (1%) 2) A/E fees (7.8%) $23,74 $179,979 3) Inspection Services* 4) On-site representation (1.2%) 5) Other prof. services* (sugg..5%) $115,371 $27,689 $115,371 c. Testing/surveys (2.2%) $5,763 d. Permit/Environmental Fees* $5, e. Miscellaneous cost* (sugg. 1-3%) $46,149 f. Movable equipment/furnishings (1.2%) $229,394 Subtotal: OTHER PROJECT COSTS $ $ $ $837,792 $ TOTAL: COSTS BY YEAR (1+2) $ $ $ $3,145,219 $ *As needed Year Amount Projected Costs beyond CIP Appropriations to Date: TOTAL: - TOTAL: - TOTAL PROJECT COSTS $3,145,219 Page 27

28 CIP-3 PROJECT EXPLATION through College Name Project Title PE Training Track W/Facilities Budget Entity Priority Const- 16 Statutory Authority Sec (4)(a) Construct Remodel Acquisition Type of Project (*) X GEOGRAPHIC LOCATION 394 Indian Circle; Marianna, Florida Site street address, City COUNTY: Jackson PROJECT RRATIVE: (PURPOSE, NEED, SCOPE, PROGRAMS, FACILITIES AND EDUCATIOL PLANT SURVEY RECOMMENDATIONS) The project will construct a 32 x 132 asphalt (rubberized) training track complete with lights, restrooms, and exercise stations, all to comply with ADA and Title IX requirements. The track will serve the needs of the Criminal Justice Training academy, physical education programs, athletic programs, employee wellness programs, as well as serve our district schools and the community. Initial Year Requested: 25 List All Proposed Sources of Funding: PECO Projected Bid Date/Start of Construction (Month, Year): Projected Occupancy Date (Month, Year): Aug-15 Aug-16 Funding Educational Specifications Section (must be completed for all first-year priority construction) Student Stations Date of Survey Recomm Number Recomm Total NSF NSF Used Used 7/ Page 28

Part II: The Institutional Summary Form Prepared for Commission Reviews (Applicable to all institutions)

Part II: The Institutional Summary Form Prepared for Commission Reviews (Applicable to all institutions) Part II: The Institutional Summary Form Prepared for Commission Reviews (Applicable to all institutions) Directions: Please include Part II with Parts I, III, and V on the same electronic device or with

More information

COMMUNITY COLLEGE BACCALAUREATE DEGREE PROPOSAL EVALUATION

COMMUNITY COLLEGE BACCALAUREATE DEGREE PROPOSAL EVALUATION COMMUNITY COLLEGE BACCALAUREATE DEGREE PROPOSAL EVALUATION The proposals of several community colleges to undertake programs resulting in the granting of baccalaureate degrees is an important issue because

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

Description of Project Statewide Student Data Warehouse

Description of Project Statewide Student Data Warehouse Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data

More information

375 - Central Washington University Capital Project Request. 2015-17 Biennium

375 - Central Washington University Capital Project Request. 2015-17 Biennium Starting Fiscal Year: 2012 Project Class: Program Agency Priority: 3 Project Summary CWU completed a self-funded predesign on the existing vacated Samuelson Union Building (SUB) in June 2010, which was

More information

Operational Unit Plan: 4-B. Library/Distance Learning

Operational Unit Plan: 4-B. Library/Distance Learning Vol. III, Operational Unit 4-B Library/Distance Learning Operational Unit Plan: 4-B Library/Distance Learning Chipola s Library/Distance Learning Unit is committed to helping the college fulfill its mission:

More information

FORT HAYS STATE UNIVERSITY

FORT HAYS STATE UNIVERSITY FORT HAYS STATE UNIVERSITY Actual FY 2014 Agency Est. FY 2015 FY 2015 Agency Req. Agency Req. FY 2017 FY 2017 Operating Expenditures: State General Fund $ 32,656,997 $ 34,036,691 $ 33,988,112 $ 33,921,728

More information

STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT The State University of New York at New Paltz traces its beginnings to 1828, when a group of leading citizens founded the New Paltz

More information

Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret

Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret Capital Budget Testimony to the Maryland General Assembly Presented by Dr. Robert L. Caret President, Towson University March 2009 Capital Budget Testimony to the Maryland General Assembly Presented by

More information

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5 EXECUTIVE SUMMARY Page 1 of 5 ACTION ITEM: Academic Renovations and Deferred Maintenance Phase I, Revised Revised Project Implementation Approval, (ASU). ISSUE: ASU requests Revised Revised Project Implementation

More information

Capital Budget Summary

Capital Budget Summary ZA00JKL Maryland Independent College and University Association Miscellaneous Grant Programs Capital Budget Summary Grant and Loan Capital Improvement Program Program 2014 Approp. 2015 Approp. MICUA $10.500

More information

Committee Draft November 27, 2007

Committee Draft November 27, 2007 Coordinating Commission for Postsecondary Education Capital Construction Project Evaluation Form Institution/Campus: Project Name: Date of Governing Board Approval: November 20, 2007 Date Complete Proposal

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Minnesota State Colleges & Universities St. Cloud Tech College - Allied Health Building Renovation Design

Minnesota State Colleges & Universities St. Cloud Tech College - Allied Health Building Renovation Design 2008 STATE APPROPRIATION REQUEST: $300,000 AGENCY PROJECT PRIORITY: 36 of 37 PROJECT LOCATION: St. Cloud Technical College, St. Cloud ProjectAtAGlance Design for renovation of Allied Health Center building

More information

The Master Building Program Budget Plan. The Los Angeles Community College District. The Colleges

The Master Building Program Budget Plan. The Los Angeles Community College District. The Colleges The Master Building Program Budget Plan The Master Building Program Budget Plan represents the amounts established to accomplish the District s 329 new building, renovation, and campus wide infrastructure

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY AT CANTON 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY AT CANTON 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY AT CANTON 2015 CAMPUS STATEMENT Originally founded in 1906, as the School of Agriculture at St. Lawrence University, SUNY Canton is the first postsecondary,

More information

County of Fairfax, Virginia

County of Fairfax, Virginia County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County Honorable Board of Supervisors February 26, 2007 County of

More information

THE FLORIDA COLLEGE SYSTEM BACCALAUREATE PROGRAM APPROVAL PROPOSAL FORMAT

THE FLORIDA COLLEGE SYSTEM BACCALAUREATE PROGRAM APPROVAL PROPOSAL FORMAT THE FLORIDA COLLEGE SYSTEM BACCALAUREATE PROGRAM APPROVAL PROPOSAL FORMAT COVER SHEET INSTITUTION: St. Johns River State College BACCALAUREATE DEGREE CONTACTS: PRIMARY Name: Dr. Melanie Brown Title: Vice

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

RESOLUTION NO. 2003-04-13

RESOLUTION NO. 2003-04-13 RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of

More information

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER UNIVERSITY OF WASHINGTON OFFICE OF THE VICE PROVOST PLANNING AND BUDGETING Capital and Space Planning PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER JULY 31, 2006 University of Washington

More information

SOUTH GEORGIA COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 UNIVERSITY SYSTEM OF GEORGIA

SOUTH GEORGIA COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 UNIVERSITY SYSTEM OF GEORGIA SOUTH GEORGIA COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 UNIVERSITY SYSTEM OF GEORGIA A MEMBER OF AMERICAN ASSOCIATION OF COMMUNITY COLLEGES GEORGIA ASSOCIATION OF COLLEGES GEORGIA

More information

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III G DATE: October 9-10, 2013 ****************************************************************************** SUBJECT: South Dakota

More information

NORTHWEST TECHNICAL INSTITUTE

NORTHWEST TECHNICAL INSTITUTE NORTHWEST TECHNICAL INSTITUTE Enabling Laws Act 6 of 22 A.C.A. 6-5-9 et seq. History and Organization History - Northwest Vocational Technical School (NTI) was established in 975 and became Northwest Technical

More information

NORTHWEST TECHNICAL INSTITUTE

NORTHWEST TECHNICAL INSTITUTE NORTHWEST TECHNICAL INSTITUTE Enabling Laws Act 56 of 24 A.C.A. 6-5-9 et seq. History and Organization History- Northwest Vocational Technical School (NTI) was established in 975 and became Northwest Technical

More information

Workforce Investment Area 3

Workforce Investment Area 3 The Tennessee College of Applied Technology Knoxville is located on Liberty Street, immediately adjacent to Interstate 40 just a few miles east of Downtown Knoxville. The campus is located on the same

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

D. Hofstra University School of Medicine Capital (W269) October 22, 2009. General Project Plan

D. Hofstra University School of Medicine Capital (W269) October 22, 2009. General Project Plan D. Hofstra University School of Medicine Capital (W269) General Project Plan Grantee: ESD Investment: Project Location: Hofstra University (the University ) A grant of up to $12,500,000 to be used for

More information

PAGE INTENTIONALLY LEFT BLANK

PAGE INTENTIONALLY LEFT BLANK PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation

More information

BACHELOR OF APPLIED SCIENCE with a major in Health Science with an Option in Physician Assistant Studies

BACHELOR OF APPLIED SCIENCE with a major in Health Science with an Option in Physician Assistant Studies PROPOSAL BACHELOR OF APPLIED SCIENCE with a major in Health Science with an Option in Physician Assistant Studies Submitted to: The Florida Department of Education by MIAMI DADE COLLEGE School of Health

More information

CHAPTER 42. PROGRAM APPROVAL PRELIMINARY PROVISIONS SPECIALIZED ASSOCIATE DEGREE PROGRAMS APPROVAL PROCEDURE

CHAPTER 42. PROGRAM APPROVAL PRELIMINARY PROVISIONS SPECIALIZED ASSOCIATE DEGREE PROGRAMS APPROVAL PROCEDURE Ch. 42 PROGRAM APPROVAL 22 CHAPTER 42. PROGRAM APPROVAL Sec. 42.1. Scope. 42.2. Exception. PRELIMINARY PROVISIONS SPECIALIZED ASSOCIATE DEGREE PROGRAMS APPROVAL PROCEDURE 42.11. Application. 42.12. Evaluation.

More information

Broward College Focused Report August 26, 2013

Broward College Focused Report August 26, 2013 3.13.1 The institution complies with the policies of the on Colleges. (Policy compliance) *3.13.1. Accrediting Decisions of Other Agencies Applicable Policy Statement. Any institution seeking or holding

More information

CHAPTER 2008-52. Committee Substitute for Committee Substitute for Senate Bill No. 1716

CHAPTER 2008-52. Committee Substitute for Committee Substitute for Senate Bill No. 1716 CHAPTER 2008-52 Committee Substitute for Committee Substitute for Senate Bill No. 1716 An act relating to postsecondary education; amending s. 1000.21, F.S.; redesignating the names of certain community

More information

2015 CAMPUS STATEMENT

2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK UNIVERSITY AT STONY BROOK 2015 CAMPUS STATEMENT The University at Stony Brook got its start in 1957 at a temporary location on the Planting Fields estate in Oyster Bay, Long

More information

NORTHWEST TECHNICAL INSTITUTE

NORTHWEST TECHNICAL INSTITUTE NORTHWEST TECHNICAL INSTITUTE Enabling Laws Act 139 of 25 A.C.A. 6-51-91 et seq. History and Organization History - Northwest Vocational Technical School was established in 1975 and became Northwest Technical

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

DEVELOPMENT OF A CAMPUS WIDE DISTRICT CHILLED WATER SYSTEM SAMFORD UNIVERSITY

DEVELOPMENT OF A CAMPUS WIDE DISTRICT CHILLED WATER SYSTEM SAMFORD UNIVERSITY DEVELOPMENT OF A CAMPUS WIDE DISTRICT CHILLED WATER SYSTEM SAMFORD UNIVERSITY Mr. Rick Stephens, Director of Campus Planning Samford University, Birmingham, Alabama Mr. David W. Wade, P. E., President

More information

Florida Gulf Coast University School of Integrated Watershed and Coastal Studies (Academic Building 9) $44.7 M

Florida Gulf Coast University School of Integrated Watershed and Coastal Studies (Academic Building 9) $44.7 M BOARD of GOVERNORS State University System of Florida 1 BOARD of GOVERNORS State University System of Florida 2 DEMAND METRICS 116,505 gross/77,670 net square feet Reduce FGCU current deficit of STEM labs

More information

Core Requirement 2.11.2

Core Requirement 2.11.2 Core Requirement 2.11.2 The institution has adequate physical resources to support the mission of the Institution and the scope of its programs and services. Impact Statement Baton Rouge Community College

More information

Those tables are provided at the end of this section in the following order.

Those tables are provided at the end of this section in the following order. T e c h n i c a l M e m o r a n d u m Date Project Subject From To October 2008 Tennessee State University Campus Master Plan 4. Future Campus Requirements Paulien & Associates, Inc Tennessee State University

More information

RSU 21 Board of Directors considering major renovation projects

RSU 21 Board of Directors considering major renovation projects RSU 21 Board of Directors considering major renovation projects On Monday, September 16, the RSU 21 Board reviewed proposals to renovate three schools within the district: Kennebunk High School, Mildred

More information

EXPENDITURES SUMMARY 2014 2015 INCREASE BUDGET BUDGET (DECREASE) (Restated) Over 2014

EXPENDITURES SUMMARY 2014 2015 INCREASE BUDGET BUDGET (DECREASE) (Restated) Over 2014 EXPENDITURES SUMMARY 2014 2015 INCREASE (Restated) Over 2014 Mayor and Council 879,500 900,000 20,500 Office of Chief Administrative Officer 577,500 598,500 21,000 Clerks 1,727,500 1,635,000 (92,500) Legal

More information

Preserve the Tax-Exempt Status of Municipal Bonds

Preserve the Tax-Exempt Status of Municipal Bonds The, and its members, support the preservation of the existing tax-exempt status of municipal bonds. Specifically, FAC supports legislative provisions that: Uphold the tax-exempt status of municipal bonds.

More information

The Board of Governors of the California Community Colleges

The Board of Governors of the California Community Colleges The Board of Governors of the California Community Colleges PRESENTED TO THE BOARD OF GOVERNORS DATE: May 19-20, 2014 SUBJECT: Request for Approval for State Center Community College District to Pursue

More information

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning ARTICLE II. USE REGULATIONS 5:10.2. R1A, R1B, R1C, R1D single family dwelling district (1) Intent. (a) These single family residential districts are designed to provide an environment of predominantly

More information

Churches and Schools Development Standards

Churches and Schools Development Standards Uses Code Provisions Site Development Standards RS-4 Sec.24-44 RD Sec. 24-45 RM-23 Sec. 24-48 Residential Single Family Residential Two- Family (Duplex) Residential Mid- Rise Multifamily (High Density)

More information

Baccalaureate Programs at the California Community Colleges. Overview and Summary of Issues

Baccalaureate Programs at the California Community Colleges. Overview and Summary of Issues Baccalaureate rograms at the California Community Colleges Overview and Summary of Issues Constance M. Carroll, h.d. Chancellor, San Diego Community College District Since the adoption of California s

More information

How To Improve A School In Ancient Ginghamshire

How To Improve A School In Ancient Ginghamshire Projects Index Facility Study and Five Year Capital Improvements Plan 2012-2016... 2 Energy Conservation Program, House Bill 264... 3 New Rosemore Middle School... 4 Medical/Dental Addition, Lorain Correctional

More information

John Jay College of Criminal Justice

John Jay College of Criminal Justice Section Contents College Statement and Statistics Campus Site Map Five Year Capital Request FY 2009-10 through FY 2013-14 Project Funding Type 5 Year Request Total ($ 000s) Haaren Hall Ventilation Upgrades

More information

21 st CENTURY HIGH SCHOOLS

21 st CENTURY HIGH SCHOOLS 21 st CENTURY HIGH SCHOOLS 1 CO-LABS & ACTIVITIES What is a Co-Lab? A collaborative workshop session with stakeholder groups. These sessions were designed to examine opportunities and define parameters

More information

Tuesday, June 14, 2016 2:00 PM

Tuesday, June 14, 2016 2:00 PM Agenda Arlington City Council Special Meeting Council Briefing Room 101 W. Abram St., 3rd Floor Tuesday, June 14, 2016 2:00 PM I. CALL TO ORDER II. WORK SESSION A. City Council Committees B. Economic Development

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves Southwest Florida Water Management District Fiscal Year 2011 2012 through Fiscal Year 2015 2016 Five-Year Capital Improvements Plan (As required by Section 373.536(6)(a)3, Florida Statutes) n e td m e

More information

Part II: The Abbreviated Institutional Summary Form Prepared for Commission Reviews

Part II: The Abbreviated Institutional Summary Form Prepared for Commission Reviews Part II: The Abbreviated Institutional Summary Form Prepared for Commission Reviews History and Characteristics Denmark Technical College is a public, comprehensive, Historically Black, two-year institution

More information

CITY OF SAN JOSE 2015-2016 PROPOSED OPERATING BUDGET FUND DESCRIPTIONS

CITY OF SAN JOSE 2015-2016 PROPOSED OPERATING BUDGET FUND DESCRIPTIONS Airport Capital s CITY OF SAN JOSE These Enterprise s account for the Airport s capital expenditures and revenues and consist of the following: Airport Capital Improvement ; Airport Revenue Bond Improvement

More information

Sitting Bull College. Koreen Ressler, Ph.D. Vice President of Academics

Sitting Bull College. Koreen Ressler, Ph.D. Vice President of Academics Sitting Bull College Koreen Ressler, Ph.D. Vice President of Academics History of Sitting Bull College Located on the Standing Rock Sioux Reservation in south central North Dakota and north central South

More information

SOUTH GEORGIA STATE COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 UNIVERSITY SYSTEM OF GEORGIA

SOUTH GEORGIA STATE COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 UNIVERSITY SYSTEM OF GEORGIA SOUTH GEORGIA STATE COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 UNIVERSITY SYSTEM OF GEORGIA A MEMBER OF AMERICAN ASSOCIATION OF COMMUNITY COLLEGES GEORGIA ASSOCIATION OF COLLEGES GEORGIA

More information

STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT The University at Buffalo Medical School was established in downtown Buffalo, New York in 1846. Later additional schools were added

More information

BACCALAUREATE ACCOUNTABILITY REPORT Form No. BAAC-03

BACCALAUREATE ACCOUNTABILITY REPORT Form No. BAAC-03 BACCALAUREATE ACCOUNTABILITY REPORT Form No. BAAC-03 Section 1007.33(5)(h), Florida Statutes, requires a Florida College System institution to annually report its status on specified performance and compliance

More information

Los Angeles Community College District

Los Angeles Community College District Los Angeles Community College District BLUE AND GREEN TOGETHER Developing Sustainable Integrated Approaches to Green Technologies and Water Usage Green California Schools and Community Colleges October

More information

GOVERNOR S P-20 COUNCIL HIGHER EDUCATION AD HOC COMMITTEE RECOMMENDATIONS

GOVERNOR S P-20 COUNCIL HIGHER EDUCATION AD HOC COMMITTEE RECOMMENDATIONS GOVERNOR S P-20 COUNCIL HIGHER EDUCATION AD HOC COMMITTEE RECOMMENDATIONS In order for the state to be globally competitive, recent data has shown that it is imperative that Arizona must significantly

More information

Maximum Floor Area and Maximum Development Area

Maximum Floor Area and Maximum Development Area TOWN OF LOS ALTOS HILLS 26379 Fremont Road Los Altos Hills, CA 94022 Phone: (650) 941-7222 www.losaltoshills.ca.gov Maximum Floor Area and Maximum Development Area Revised-7/31/13 INSTRUCTIONS FOR WORKSHEET

More information

City of Plano COMPREHENSIVE PLAN EDUCATION ELEMENT TABLE OF CONTENTS INTRODUCTION 8-1

City of Plano COMPREHENSIVE PLAN EDUCATION ELEMENT TABLE OF CONTENTS INTRODUCTION 8-1 City of Plano COMPREHENSIVE PLAN EDUCATION ELEMENT TABLE OF CONTENTS INTRODUCTION 8-1 MAJOR CONCEPTS 8-1 Creating Educational Opportunities 8-1 Adapting to Changing Demographics 8-1 Facilities Siting and

More information

Second Regular Session Sixty-ninth General Assembly STATE OF COLORADO SENATE SPONSORSHIP HOUSE SPONSORSHIP. Bill Summary

Second Regular Session Sixty-ninth General Assembly STATE OF COLORADO SENATE SPONSORSHIP HOUSE SPONSORSHIP. Bill Summary LLS NO. 14-0092.01 Brita Darling x2241 Todd, Second Regular Session Sixty-ninth General Assembly STATE OF COLORADO SENATE SPONSORSHIP DRAFT SENATE BILL Wilson and May, HOUSE SPONSORSHIP Senate Committees

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

SOUTH GEORGIA STATE COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098

SOUTH GEORGIA STATE COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 SOUTH GEORGIA STATE COLLEGE 100 WEST COLLEGE PARK DRIVE DOUGLAS, GEORGIA 31533-5098 A UNIT OF THE UNIVERSITY SYSTEM OF GEORGIA South Georgia State College is accredited by the Southern Association of Colleges

More information

STATE BOARD OF EDUCATION Update March 18, 2014

STATE BOARD OF EDUCATION Update March 18, 2014 STATE BOARD OF EDUCATION Update March 18, 2014 SUBJECT: Florida College System Update PROPOSED BOARD ACTION N/A AUTHORITY FOR STATE BOARD ACTION N/A EXECUTIVE SUMMARY The Florida College System (FCS) Council

More information

Nature of the Program

Nature of the Program Nature of the Program The University of West Florida has had an accredited social work undergraduate program since 1974, the first year that the Council on Social Work Education recognized undergraduate

More information

RECOMMEND APPROVAL OF BACHELOR OF ARTS IN INTERDISCIPLINARY STUDIES WITH TEACHER LICENSURE AT COLORADO MOUNTAIN COLLEGE

RECOMMEND APPROVAL OF BACHELOR OF ARTS IN INTERDISCIPLINARY STUDIES WITH TEACHER LICENSURE AT COLORADO MOUNTAIN COLLEGE Page 1 of 9 TOPIC: PREPARED BY: RECOMMEND APPROVAL OF BACHELOR OF ARTS IN INTERDISCIPLINARY STUDIES WITH TEACHER LICENSURE AT COLORADO MOUNTAIN COLLEGE IAN MACGILLIVRAY, ASSISTANT DEPUTY DIRECTOR FOR ACADEMIC

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT Established in 1911 by an act of the New York State Legislature as the State s institution for educational

More information

AQIP The Overview. Through this commitment, Allen County Community College shall:

AQIP The Overview. Through this commitment, Allen County Community College shall: AQIP The Overview The Overview: contains the College Vision Statement, Mission Statement, history, location, control, status, and answers to nine items reflecting the nine AQIP categories. In the Overview,

More information

BACCALAUREATE PROPOSAL APPROVAL APPLICATION

BACCALAUREATE PROPOSAL APPROVAL APPLICATION BACCALAUREATE PROPOSAL APPROVAL APPLICATION COVER SHEET (To be submitted with Proposal) THE FLORIDA COLLEGE SYSTEM INSTITUTION: Miami Dade College BACCALAUREATE DEGREE CONTACTS: PRIMARY CONTACT: Name:

More information

Borough President and City Council Capital Funding Requests FY 2009

Borough President and City Council Capital Funding Requests FY 2009 Borough President and City Council Capital Funding Requests FY 2009 CIP Number Phase* Request $ Classroom Development GR-0928061514 DCE $1,088,000 Expansion of Campus Security Systems GR-0504070756 DCE

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF EDUCATION 333 MARKET STREET HARRISBURG, PA 17126-0333

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF EDUCATION 333 MARKET STREET HARRISBURG, PA 17126-0333 Pennsylvania Department of Education COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF EDUCATION 333 MARKET STREET HARRISBURG, PA 17126-0333 Student Services Report Monday, April 07, 2008 Entity: Ephrata Area

More information

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Workforce Investment Area 12. Tennessee Colleges of Applied Technology Master Plan: Paris

Workforce Investment Area 12. Tennessee Colleges of Applied Technology Master Plan: Paris Workforce Investment Area 12 R K A N S A S DYER GIBSON CR OC KE LAUDERDALE HAY- TT WOOD MADISON TIPTON BENT ON WEAKLEY HENRY TCAT Paris CARROLL DECATUR KE LA OBION M IS S O U R I K E N T U C K Y A The

More information

ADOPTED RULES: COLLABORATIVE BACCALAUREATE DEGREE DEVELOPMENT GRANT PROGRAM

ADOPTED RULES: COLLABORATIVE BACCALAUREATE DEGREE DEVELOPMENT GRANT PROGRAM Item #D-17 December 6, 2011 ADOPTED RULES: COLLABORATIVE BACCALAUREATE DEGREE DEVELOPMENT GRANT PROGRAM Submitted for: Action. Summary: This item seeks final adoption of rules to administer the new Collaborative

More information

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT

More information

City of Douglas Commercial Building Permit Site Application

City of Douglas Commercial Building Permit Site Application City of Douglas Commercial Building Permit Site Application *Complete the following information including a complete site plan and floor plan. *Incomplete information may result in delay and/or rejection

More information

Baccalaureate Programs in the Florida College System Guiding Principles and Policies

Baccalaureate Programs in the Florida College System Guiding Principles and Policies Baccalaureate Programs in the Florida College System December 2012 0 Introduction The Florida Legislature passed legislation in 2001 that outlines a process by which community colleges may seek approval

More information

FIRE SCIENCE PROGRAM

FIRE SCIENCE PROGRAM FIRE SCIENCE PROGRAM Academic Program Review 2000-2001 The Office of Instruction The Office of Institutional Planning, Research, and Assessment FIRE SCIENCE PROGRAM Academic Program Review 2000-2001 Committee

More information

2015-2016 CAPITAL BUDGET 2016-2020 CAPITAL IMPROVEMENT PROGRAM CSA STRATEGIC SUPPORT CSA

2015-2016 CAPITAL BUDGET 2016-2020 CAPITAL IMPROVEMENT PROGRAM CSA STRATEGIC SUPPORT CSA CAPITAL BUDGET 2016-2020 CAPITAL IMPROVEMENT PROGRAM STRATEGIC SUPPORT CSA STRATEGIC SUPPORT CSA City Service Area Mission: To effectively develop, manage and safeguard the City s fiscal, physical, technological,

More information

The Community College Baccalaureate

The Community College Baccalaureate 2014 Annual Trustees Conference The Community College Baccalaureate Constance M. Carroll, Ph.D. Chancellor San Diego Community College District Linda Thor, Ed.D. Chancellor Foothill-De Anza Community College

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 7 Housing

FLORIDA STATE UNIVERSITY MASTER PLAN 7 Housing HOUSING ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: General Services Contact: Rob Kambak Phone: (707) 565-3211 Board Date: 10/27/2009 4/5 Vote Required Deadline for Board Action: AGENDA SHORT TITLE:

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

FAYETTEVILLE STATE UNIVERSITY

FAYETTEVILLE STATE UNIVERSITY FAYETTEVILLE STATE UNIVERSITY FIXED ASSETS Authority: Category: Issued by the Chancellor. Changes or exceptions to administrative policies issued by the Chancellor may only be made by the Chancellor. Business,

More information

DEPARTMENT OF PARKS, RECREATION AND COMMUNITY SERVICES

DEPARTMENT OF PARKS, RECREATION AND COMMUNITY SERVICES DEPARTMENT OF PARKS, RECREATION AND COMMUNITY SERVICES Department Mission, Vision and Values Mission: The mission of the City of Rio Rancho s Department of Parks, Recreation, & Community Services is to

More information

STATE BOARD OF EDUCATION Action Item March 18, 2014. SUBJECT: Approval of New Bachelor Degree Programs in the Florida College System

STATE BOARD OF EDUCATION Action Item March 18, 2014. SUBJECT: Approval of New Bachelor Degree Programs in the Florida College System STATE BOARD OF EDUCATION Action Item March 18, 2014 SUBJECT: Approval of New Bachelor Degree Programs in the Florida College System PROPOSED BOARD ACTION For Approval Degree Programs for Colleges with

More information

Itawamba Community College Program Review Career-Technical and Health Science Programs

Itawamba Community College Program Review Career-Technical and Health Science Programs Itawamba Community College Program Review Career-Technical and Health Science Programs I. Program Information 1. Name of Program: Physical Therapist Assistant Program 2. Submission Date of Program Review:

More information

About the University. Southern University at Shreveport 2015-2017 Student Handbook Page 13

About the University. Southern University at Shreveport 2015-2017 Student Handbook Page 13 About the University Page 13 HISTORICAL SKETCH OF SOUTHERN UNIVERSITY AT SHREVEPORT Southern University at Shreveport, a unit of the Southern University System located at Baton Rouge, Louisiana, was created

More information

Helaine Doran, Campaign for Fiscal Equity New York, New York

Helaine Doran, Campaign for Fiscal Equity New York, New York TO: FROM: Helaine Doran, Campaign for Fiscal Equity New York, New York Mary Filardo, Executive Director, 21 st Century School Fund Board of Directors Roger Newell, Chair International Brotherhood of Teamsters

More information

Rio Hondo Community College District Measure A General Obligation Bonds Performance Audit July 1, 2012 through June 30, 2013 With Report of

Rio Hondo Community College District Measure A General Obligation Bonds Performance Audit July 1, 2012 through June 30, 2013 With Report of July 1, 2012 through June 30, 2013 With Report of Independent Auditors Table of Contents PAGE REPORT OF INDEPENDENT AUDITORS 1 PERFORMANCE AUDIT Objectives 2 Scope of the Audit 2 Background Information

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

How To Plan A Building

How To Plan A Building State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

University of Houston System

University of Houston System UNIVERSITY of HOUSTON SYSTEM University of Houston System FY2016 Annual Budget August 20, 2015 1 UNIVERSITY of HOUSTON SYSTEM Legislative Session Results FY2016 Budget Development o Increase in General

More information

2015 CAMPUS STATEMENT

2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK CONTRACT COLLEGES AT CORNELL UNIVERSITY 2015 CAMPUS STATEMENT Cornell University is a private corporation, founded in 1865, as New York State s land grant university. Cornell

More information