NOTICE OF AMENDMENT TO A CODE AMENDMENTS TO THE DISTRIBUTION SYSTEM CODE BOARD FILE NO.: EB-2013-0311

Similar documents
Re: New Reporting Requirements Related to Smart Meter Deployment and the Application of Time-of-Use Pricing

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

Ontario Energy Board Business Plan

Migration To MDM/R Production Mode. P.D Ferguson, P.Eng President Newmarket Tay Power Distribution Ltd.

INTRODUCTION AND SUMMARY OF O&M COSTS

Component A Public Awareness of Electrical Safety Measure for Licensed Electricity Distributors

We are working hard to help Ontario businesses manage their electricity costs.

Ontario Smart Metering System Implementation Program (SMSIP) Bill Limbrick Vice President, IT&I Independent Electricity System Operator (IESO)

SEP 2014 OCT 2014 DEC 2014 NOV 2014 HOEP*

Defining Ontario s Typical Electricity Customer

Data Communications Company (DCC) price control guidance: process and procedures

APPLICATION AND PRE-FILED EVIDENCE

Ontario Smart Metering System Implementation Program (SMSIP) Panel Discussion: Smart Metering the road ahead

A. General Information

Market Readiness Update

Get Ready for Smart Metering

Hydro One Networks Inc. Subject: Regional Planning Status GTA West Region

The Art of Turning Wholesale Rates into Retail Rates. Paul Garcia The Prime Group, LLC

Scorecard - Oakville Hydro Electricity Distribution Inc.

HAVE YOUR SAY: PROTECTING ENERGY CONSUMERS. Review of the Energy Consumer Protection Act, 2010 Low Volume Consumer Workbook

Ontario Energy Board Smart Price Pilot Final Report

Global Trends in Smart Metering

Attachment 2-1 Distribution System Plan Attachment 2-2 OEB Appendix 2-FA and 2-FC REG Expansion Investment

Rule change request. 18 September 2013

FUNCTIONAL SPECIFICATION FOR AN ADVANCED METERING INFRASTRUCTURE VERSION 2

3.11. Smart Metering Initiative. Chapter 3 Section. Background. Ministry of Energy

MANDATORY ROLLOUT OF INTERVAL METERS FOR ELECTRICITY CUSTOMERS

Enbridge Gas Distribution Inc. Application re: Rate 332 Tariff STAR Board File No. EB

emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Management Alicia Carrasco, Regulatory Director

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

CUSTOMER EXPERIENCE PLAN Executive Summary

PowerStream Inc. and Collus PowerStream Inc. Business Refrigeration Incentives Program Rules

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, 2011

ONTARIO ENERGY BOARD AFFIDAVIT OF TODD WILLIAMS

A Smart Grid Electricity Price Plan. OSPE Energy Policy Presentation

SEC STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.

Scorecard - Performance Measure Descriptions

SDG&E and Its Illustrative Rate Summary Form

Interval Meter Rollout MSATS Implications

ONTARIO ENERGY BOARD

ELECTRICITY PRICING INFORMATION. This list shows the terms that appear on electricity bills and what they mean:

MUTUAL FUND DEALERS ASSOCIATION OF CANADA PROPOSED AMENDMENTS TO MFDA RULE (SEGREGATION OF CLIENT PROPERTY CASH)

Broader Public Sector Compensation Information Directive

Smart Grid Business Case Analysis. Rochester Public Utilities

Margin requirements for certain cash and security borrowing and lending arrangements - Amendments to Schedules 1, 7 and 7A of Dealer Member Form 1

PREPARED DIRECT TESTIMONY OF DANIEL J. SHULMAN CHAPTER 5 SAN DIEGO GAS & ELECTRIC COMPANY

What is the Impact of Utility Demand Charges on a DCFC Host?

Load Serving Entities and the Day-Ahead Market

Establishing the Scope for The Business Case Structure to Evaluate Advanced Metering

POWER YOUR WORLD With PLANET ENERGY through CANADA ENERGY

Itron White Paper. Itron Enterprise Edition. Meter Data Management. Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS

Electricity Demand Forecast: Do We Need the Power?

Residential Demand Charges: Good or Bad Idea??

Overview of the IESO-Administered Markets. IESO Training. Updated: January, Public

IN THE MATTER OF THE SECURITIES ACT R.S.O. 1990, c.s.5, AS AMENDED - AND -

Four Pillars of Urban Sustainability Submission

COMPENSATION. Toronto Hydro-Electric System Limited EB Exhibit C2 Tab 1 Schedule 5 ORIGINAL Page 1 of 10

Daily Daily Network Network Network Energy Rates Step Rates Capacity. Price Rates Rates

Transcription:

Ontario Energy Board P.O. Box 2319 2300 Yonge Street 27 th Floor Toronto ON M4P 1E4 Telephone: 416-481-1967 Facsimile: 416-440-7656 Toll free: 1-888-632-6273 Commission de l énergie de l Ontario C.P. 2319 2300, rue Yonge 27 e étage Toronto ON M4P 1E4 Téléphone: 416-481-1967 Télécopieur: 416-440-7656 Numéro sans frais: 1-888-632-6273 May 21, 2014 NOTICE OF AMENDMENT TO A CODE AMENDMENTS TO THE DISTRIBUTION SYSTEM CODE BOARD FILE NO.: EB-2013-0311 TO: All Licensed Electricity Distributors All Participants in Consultation Process EB-2013-0311 All Other Interested Parties The (the "Board") has today issued amendments to the Distribution System Code (the "DSC") pursuant to section 70.2 of the Ontario Energy Board Act, 1998 (the "Act"). A. Background On January 16, 2014, the Board issued a Notice of Proposal to Amend a Code (the January Notice ) in which it proposed amendments to the DSC (the January Proposed Amendments ). The January Proposed Amendments set out revisions to the DSC to require a distributor to install an interval meter (i.e., a MIST meter 1 ) on any installation that is forecast by the distributor to have a monthly average peak demand during a calendar year of over 50 kw. Currently, many customers with a monthly average peak demand during a calendar year of over 50 kw and less than or equal to 500 kw are demand metered and billed based on one or two month usage data mapped to the net system load shape of the 1 MIST meter means an interval meter from which data is obtained and validated within a designated settlement timeframe. MIST refers to Metering Inside the Settlement Timeframe.

- 2 - distributor, which may have little resemblance to the customers actual hourly consumption. This situation leaves some customers with a monthly average peak demand during a calendar year of over 50 kw and less than or equal to 500 kw in a unique position among electricity consumers in Ontario. Almost all residential and general service customers with demand less than 50 kw now have time-of-use ( TOU ) meters (i.e., smart meters) and are being billed on a TOU basis. Large customers with a peak demand over 500 kw have interval meters and pay the hourly Ontario energy price from the IESO-administered real-time energy market based on their actual usage. The January Proposed Amendments set out to bring these customers in line with the rest of the electricity customers in Ontario in terms of pricing. The Board received written comments on the January Proposed Amendments from eight stakeholders: Canadian Niagara Power Inc. and Algoma Power Inc.; the Electricity Distributors Association; a joint submission from Enersource Hydro Mississauga Inc., Horizon Utilities Corporation, Hydro Ottawa Limited, PowerStream Inc., and Veridian Connections Inc.; Essex Powerlines Corporation; Halton Hills Hydro Inc.; Hydro One Networks Inc.; Orillia Power; and Rodan Energy Solutions. The written comments are available for viewing on the Board s website at www.ontarioenergyboard.ca. The Board has considered the comments received and has determined that two minor revisions should be made in relation to the January Proposed Amendments. B. Overview of Written Comments The comments received from stakeholders generally supported the January Proposed Amendments. However, a number of stakeholders had questions of clarification regarding items mentioned in the January Notice and some stakeholders suggested revisions to the January Proposed Amendments. Smart Meters versus Interval Meters Some distributors stated that they have installed smart meters for their general service > 50kW customers. These distributors recommended that if a customer has a smart meter that is approved by Measurement Canada as an Interval Metering Device, then replacement of the smart meter by an traditional interval meter (e.g., using a

- 3 - dedicated phone line or internet connection) should not be required. These distributors argued that adopting this recommendation would require changes to specific sections of the DSC and the Retail Settlement Code ( RSC ) regarding the treatment of smart meters as interval meters. The Board is of the view that if a general service > 50kW customer has a meter that meets the DSC s definition of an interval meter and is approved by Measurement Canada as an Interval Metering Device, then replacement of the meter by an traditional interval meter should not be required. However, the Board disagrees that any changes to the DSC and RSC are necessary to accommodate this view. The DSC states that: smart meter means a meter that is part of an advanced metering infrastructure that meets the functional specification referenced in the Criteria and Requirements for Meters and Metering Equipment, Systems and Technology Regulation, O. Reg. 425/06. Ontario Regulation 425/06 defines the criteria and requirements for smart meter deployment as pertaining to residential and small general service customers (i.e., general service < 50kW), referring to the Functional Specification for Advanced Metering Infrastructure Version 2 (the Functional Specification ). The Functional Specification states that [t]his Specification sets the required minimum level of functionality for AMI in the Province of Ontario for residential and small general service consumers where the metering of demand is not required. Therefore, any smart meters installed for a general service > 50kW customers are outside the regulation and the DSC definition of a smart meter. 2 If the meter meets the DSC s definition of an interval meter and is approved by Measurement Canada as an Interval Metering Device, then it is an interval meter and meets the requirements of section 5.1.3 of the DSC. As a result, no changes to the DSC and RSC are necessary to accommodate such metering technology. Use of Advanced Metering Infrastructure Some distributors sought clarity regarding whether use of their Advanced Metering Infrastructure ( AMI ) was required or discretionary, arguing that there could be 2 This view was expressed by the Board in its G-2011-0001 Guidelines Smart Meter Funding and Cost Recovery Final Disposition. See pp. 15-16.

- 4 - significant costs involved in upgrading AMI infrastructure to capture information required for interval metering general service > 50kW customers. There is no requirement in the amended section 5.1.3 of the DSC to use the distributor s AMI infrastructure for the general service > 50kW customers. The decision is at the discretion of the distributor. Size Threshold for Interval Metering Canadian Niagara Power Inc. and Algoma Power Inc. recommended that the threshold for mandatory interval metering be for customers with demand greater than 100 kw or 200 kw rather than the 50 kw threshold in the January Proposed Amendments. The Electricity Distributors Association argued that the mandatory threshold should apply to customers with average demands over 200 kw. The Board does not agree with changing the threshold and reiterates its comments from the January Notice, namely that the current metering situation leaves some customers with a monthly average peak demand during a calendar year of over 50 kw and less than or equal to 500 kw in a unique position among electricity consumers in Ontario in that they are demand metered and billed based on one or two month usage data mapped to the net system load shape of the distributor, which may have little resemblance to the customers actual hourly consumption. The primary objective of the amendments to section 5.1.3 of the DSC is to eliminate this metering gap and ensure that all customers are billed based on their actual consumption. Use of the Meter Data Management and Repository Some distributors sought clarification on whether the data collected through the interval meters must be sent to the Meter Data Management and Repository ( MDM/R ). The Board is of the view that the data would not be sent to the MDM/R. Currently, the only meter reads sent to the MDM/R are for residential and general service < 50kW customers who are billed on a time-of-use basis.

- 5 - Minimum Requirements Rodan Energy Solutions recommended that the Board set minimum requirements for metering installations that provide for (a) customer access to a meter communication port; and (b) meters that provide 5-minute interval data. The Board is not persuaded by the arguments that it should be more prescriptive regarding meter functionality in the DSC. The Board reiterates its comments from the January Notice, namely that it will not prescribe meter specifications or metering system functionality beyond the minimum required to enable spot pricing based on actual consumption. If a distributor thinks enhanced features beyond the minimum will benefit their customers, then it will need to justify that benefit to the Board before being allowed to recover the cost from customers. Cost Recovery A number of distributors recommended the use of deferral accounts to allow distributors to capture material prudently incurred incremental costs associated with the January Proposed Amendments. The Board will establish a deferral account to be used to capture the costs of these amendments. The Board notes that the recording of amounts into this deferral account does not guarantee final recovery of those amounts. C. Adoption of the January Proposed Amendments With Minor Revisions Based on the comments received, the Board has determined that two minor changes will be made in relation to the January Proposed Amendments. Orillia Power argued that the implementation time frame should be changed so distributors can exhaust their existing meter inventory before installing interval meters for new customers and that the time period of the amendments should be changed from 5 years to 6 years to coincide with Measurement Canada s reseal period. The Board is of the view that the implementation time frame set out in 5.1.3(b) of the DSC should be 6 years so that distributors are better able to design efficient implementation plans that can more fully take into consideration any Measurement Canada metering requirements.

- 6 - To further assist distributors in developing implementation plans, the Board is amending section 1.7 of the DSC to state that the amendments contained in this Notice come into force 3 months from today s date. The Final Amendments to the DSC as adopted by the Board are set out in Attachment A to this Notice. D. Anticipated Costs and Benefits The anticipated costs and benefits of the January Proposed Amendments were set out in the January Notice and interested parties should refer to the January Notice for further information in that regard. E. Coming into Force The Final Amendments to the DSC as set out in Attachment A to this Notice come into force on August 21, 2014. This Notice, including the Final Amendments to the DSC set out in Attachment A, will be available for public viewing on the Board s web site at www.ontarioenergyboard.ca and at the office of the Board during normal business hours. Any questions relating to the Final Amendments to the DSC set out in Attachment A should be directed to market.operations@ontarioenergyboard.ca. DATED at Toronto, May 21, 2014 ONTARIO ENERGY BOARD Original signed by Kirsten Walli Board Secretary Attachments: Attachment A Amendments to the DSC

Appendix A Amendments to the DSC 1. The following will inserted at the end of section 1.7 of the DSC: The amendments to section 5.1.3 come into force on August 21, 2014. 2. Section 5.1.3 of the DSC will be deleted and replaced with the following: 5.1.3 For the purposes of measuring energy delivered to the customer, a distributor shall: a) install a MIST meter on any new installation that is forecast by the distributor to have a monthly average peak demand during a calendar year of over 50 kw; and b) have until August 21, 2020 to install a MIST meter on any existing installation that has a monthly average peak demand during a calendar year of over 50 kw.