MERO Access Floor / Floor systems for data centers * *Ready for Cloud-Computing



Similar documents
MERO Floor Systems - CleanRoom

Modular Access Floor for Data Center. From Rack to Row to Room to Building

Iso Floor Raised Floor System

Authorized Dealers Access Floors Limited The Studio 15 Huntsmead Northampton NN3 5HT

A few inches will give your business room to grow...

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

TecCrete. Data Center Flooring

In-Floor Cooling Solutions. In-Floor Cooling Solutions. Airfl ow Management Solutions for Raised Floor Data Centers

Knürr Miracel. Knürr Miracel. 19 Network and Server Rack Platform 1.12 to

Cable Trays Technical Instructions & Specifications

CRAC Precision climate control units for data centres

Miracel 19 rack platform for data center, telecommunication and network technology. Rack & Integrated Enclosure Systems

High-speed folding doors. F Series

- White Paper - Data Centre Cooling. Best Practice

Thermal Optimisation in the Data Centre

Light-Weight Panels. High quality panels.

HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE

Luxor. Automatic retractable bollard

User guideline NORTEC sonic

CABINET & ENCLOSURE STANDARD FEATURES MATERIALS APPLICATION N C B C A B I N E T P/N:NCB

How To Build A T7 Rack For Information Technology

06 / Optional components. MAXDATA PLATINUM Server-Rack PLATINUM. [Product Guide]

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

Vacuum drying oven for non-flammable solvents

INDEX. Chapter8. air master. Perforated Ceiling Diffusers

Data Sheet FUJITSU PRIMECENTER M2 19-inch Racks

19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.

Raised Access Floors Technical Guidance

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version

Rockwool Flexi Insulation Application Guide

Understanding Raised Floor Systems for the Specifier (2008)

Knürr DCM. Knürr DCM. 19 Server Rack System 19 Heavy Duty Rack 1.2 to

sound reduction systems for commercial, educational and industrial environments

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

Sliding and Folding Door Fittings Sliding Door Accessories

PS-SEAL PTFE based high performance seal

STENCA PIPE. High quality pipe insulation.


Data Centre and Server Room Technical Cleaning

ORAY PREFABRICATED GSM SHELTER CONTAINERS TECHNICAL SPECIFICATIONS

DataCenter 2020: first results for energy-optimization at existing data centers

Dow Corning PROPRIETARY. Dow Corning. A Thermal Modelling Comparison of Typical Curtain Wall Systems

TARIFF CODE and updates standard

Q-Lon foam weatherseal: for PVC, timber and aluminium applications THE WORLDS BEST WEATHERSEAL

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

High-speed spiral doors for deep-freeze applications. TK Series

LHD LINEAR HEAT D ETECTIONN

Linkeo 19" freestanding cabinets

Iso Floor. the only dynamic raised floor on the market

Climasys Thermal Management System. Schneider Electric Universal Enclosures 2009

Containment Solutions

EJOT Spiralform. The thread formers for metal. EJOT The Quality Connection

Technical Concept. Filter Fan Unit COMPACT. Type COMPACT AC Type COMPACT EC

AMF Line; wall absorbers Wall mounted acoustic designs PERFORMANCE CEILINGS. M ore s c op e f or i n n ovat i on MADE IN GERMANY

Product Catalogue HW-B150H

European Technical Assessment ETA-10/0153 of 10/06/2015

TYPE APPROVAL CERTIFICATE

Concepts. Products. Service. Enjoy wall-to-wall comfort. NORTEC raised floor systems

Confort 26. Sliding Systems. Sapa Building System

INNOVATIONS. Economic Flat Roof Refurbishment with NOVOPROOF Sealing Systems. A Company of the SAARGUMMI Group

CATALOGO PRODOTTI PORTONI INDUSTRIALI COIBENTATI

Energy Performance Optimization of Server Room HVAC System

FIRE-FIGHTING DESIGN BRIEF REPORT

UNIVERSAL RAILING, STEEL

Industrial Linergy LED

Concepts. Products. Service. All options laid out. FLOOR and more dry floor system

LOW COST PREFABRICATED CONSTRUCTION SYSTEM

DIGITUS Network & Server Cabinets. UNIQUE Series

Decree of the Ministry of the Environment on fire safety of ventilation systems

SERVER ROOM CABINET INSTALLATION CONCEPTS

Concepts. Products. Service. From one source. Plafotherm Plasterboard Heated and Chilled Ceilings

Switchboard system. NorLine 800

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

DATACENTER COLOCATION. Flexible, Secure and Connected

Cannon T4 Modular Data Centres. For Outside Deployment & Challenging Environments

Networking Cabinets > Part No Capacity Available Colors Height(mm) Width(mm) Depth(mm)

Customized Server Cabinets

Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.

RPV - RP - RA air handling units

MagTek A. Aluminium Manual Attack Resistant Doors

Colocation Rack Secure, Separate Server Hosting and Housing in Data Centers

BETONYP building boards. The modern way of living.

Introduction to Data Centre Design

Transformer oil cooler ALFA A02

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

RiMatrix S Make easy.

MILLENIUM INSTALLATION MANUAL NTR 735 A. Simple Automation Control Module (MAS)

Planning Information. Passenger and Freight Elevators.

INFRASTRUCTURE FOR DATACENTERS

Element D Services Heating, Ventilating, and Air Conditioning

Commercial Gas Furnace Upflow

Vibration Isolation in Data Centers

Roof Curbs, Extensions and Equipment Supports

Transcription:

MERO Access Floor / Floor systems for data centers * *Ready for Cloud-Computing Innovative Komplettlösungen aus einer Hand Innovative solutions from one source Development Access floor Consulting Hollow floor Planning Floor covering and Manufacturing Installation Installation Services Floor Systems

Ready for the future All started 50 years ago. At that time, MERO received the first order to construct an access floor for an IBM data center. Later, IBM was followed by many famous names like : SAP, VW, BMW, DHL, Sony, Honeywell, DELL, Samsung and many other important companies worldwide companies which rely on the high quality and the years of experience of MERO data center access floors. Nowadays we install more than 100,000 m² per year. MERO has developed a new standard together with international active data center planners. A current project (nov. 2011) is a data center which will be installed acc. to the new Standard in Singapore. MERO has a separate technical division which is also in a position to carry out earthquake-proof applications. From 1960 2

50 years innovative solutions for data centers til now. 3

Our know-how for an operational data center Computer power needs air and cooling The heat which is generated during the operation of computers must be continuously, safely and cost-effectively removed whilst reducing any effect on our Natural Environment. Data centers need suitable floor coverings The specific requirements regarding use and conductivity are the basis for the choice of suitable floor coverings to withstand the movement of server racks, UPS and other equipment. 4

Our systems meet all your requirements Computer power needs stability Larger floor heights, heavier racks and requirements for earthquake safe ty must be considered. Data centers need fire protection Data centers are huge, closed buildings where easy access to the emergency exits is very important. The use of calcium sulphate core can bring enhanced fire-proofing and improve escape time for personel, also reduced Insurance Loss is likely should a wet sprinkler system be in place. 5

Air conditioning and cooling 53 % 40 % 32 % Volume pressure diagram Air conditioning panel without air flow controls Air conditioning panel with air flow controls Air volume flow V [m 3 /hour and panel] 53 % 40% 32 % 24% 16% Air volume flow V [m 3 /hour and panel] Adjustability 16% Adjustability 24 % Adjustability 32 % air flow regulation closed Pressure drop Δ P [Pa] Pressure drop Δ P [Pa] 6

24 % 16 % Partial perforation The ventilation / cooling are essential for the operation safety of the data center. The most common system is the access floor with air plenum where the cold air is transported specifically to the racks by means of perforated panels. Higher and changing computing capacity requires larger free crosssections and adjustment for the air volume. In order to meet the specific requirements, MERO offers a range of air conditioning panels with free cross-sections from 16% to 53%. This makes a pressure drop of 10 Pa air volumes up to 2.200 m3 per panel and hour possible. In addition, we provide a continuously adjustable air flow control which allows the fine-tuning from above. Contrary to aluminium bar type air grills, racks etc. can be moved safely on the MERO air conditioning panels. The access floor also provides a physical barrier if water-cooled systems are being used with CRAC units, all supply and waste lines as well as any condensation are contained under the cavity formed by the access floor, so that the data processors will not endangered in case of water leakage. 7

Statics 8

Increasing load capacity due to the development of racks with drawersystem (can be retrofitted on re quest at place of location), serial installation (always 2 load applications in one field) and higher construction height (buckling length of pedestals) must be considered during the planning stage. MERO-TSK meets load requirements up to 15 KN by means of system testing acc. to DIN EN 12825 and certificate of conformity. Higher load requirements can be provided with further calculations. Specific customer requests such as calculation of seismic safety can be provided by our technical department. Depending on the seismic zone in which the project shall be executed, additional static requirements must be met. 9

Floor coverings Standard panels of steel, calcium sulphate and chipboard as well as steel air conditioning panels are provided with durable floor coverings which meet the required conductivity values. Depending on the requirements, it can be PVC, linoleum, rubber or high pressure laminate. In peripheral areas even textile floor coverings can be used. For the load application of dynamic loads not only the floor covering but also the used adhesives are of decisive importance in order to prevent wave formation of the floor covering caused by the rolling loads. A personal consultation is absolutely necessary. 10

Fire protection The building material class requirements must be met by the installed floor systems. This applies also to the fire resistance classes. 11

Technical data*: Data center System accessories: Continuous air flow control 0-32 % Panel screwing *For further technical data please ask for our product data sheets. Panel: Dimensions: 600 x 600 mm 1 Panel thickness: (without covering) from 28 mm 2 The air conditioning panel is compatible with all MERO floor systems 3 System weight: ~ 47 64 kg/m² 4 Panel weight: ~ 14 21 kg/pc 5 Panel material: Steel construction, conductive powder coating, screwed on request Understructure: Grid: 600 x 600 mm 1. Floor panel (with or without covering, panel Pedestal material: galvanized steel conductive powder coated) Construction height (without covering): up to 2000 mm 2. Stringer or switch gear substructure Recommendation: Use stringers generally from a floor 3. Gasket height of > 500 mm; If high concentrated 4. Pedestal (type of construction loads are required use switch gear substructure depending on floor height) Load values: 5. Base plate glued to subfloor Point load: up to 15.000 N possible Element class acc. to DIN EN 12825: class 2 6 Ultimate Load: up to 30.000 N Safety factor: 2,0 Ventilation: Free cross section: 16%; 24%; 32%; 40%; 53% Air volume: up to 2200 m 3 per hour and panel at pressure drop of 10 Pa Air flow control: possible Electrostatic: Fire protection: Building material class supporting panel acc. to DIN EN 13501 T1: acc. to DIN 4102 T1: F30 stability: > 10 5 Ohm (depending on system and covering) A1 A1 possible Thermal conductivity: (base material) ~ 50 W/mk TÜV-certified since 1997 Head office: MERO-TSK International GmbH & Co. KG Max-Mengeringhausen-Str. 5 97084 Würzburg, Germany Postal adress: MERO-TSK International GmbH & Co. KG Product Division Floor Systems Lauber Straße 11 97357 Prichsenstadt, Germany Phone.: +49 (0) 93 83 203-603 Fax: +49 (0) 93 83 203-629 E-mail: bodensysteme@mero.de Internet: www.mero.de 06.12 / Floor Systems for data centers Subject to technical changes without prior notice