Pavement Management Program



Similar documents
Date: 10/10/2014 Initiated by: AAS-100

PCN Safety Standard, Design Criteria or Management Tool (ALACPA 2013, MEXICO)

Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech)

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM

Pavement Management Systems

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS

Washington Airport Pavement Management System. Pavement Management Manual

PAVER Version 7.0. May US Army Corps of Engineers Engineer Research and Development Center Construction Engineering Research Laboratory

DEPARTMENT OF THE AIR FORCE AIR FORCE CIVIL ENGINEER CENTER TYNDALL AIR FORCE BASE FLORIDA

Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE

Pavement Management Implementation: Success Stories for Maryland Counties

Earth Retaining Structures

IMPLEMENTING PAVEMENT MANAGEMENT SYSTEMS FOR LOCAL AGENCIES

Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands

Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald

Transportation Infrastructure Asset Management

Construction Management Program

Framework for Short-Line Railroad Track Asset Management and Condition Reporting

Pavement Engineering & Asset Management. Meeting the requirements of our existing & future diverse road networks

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

Benefit Cost Models to Support Pavement Management Decisions

OHIO ASPHALT PAVING CONFERENCE

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Standards for Specifying Construction Of Airports

Surface Treatment Cost - Based on 100,000 Sq. Yds.

TAC Primer Pavement Asset Design and Management

Runway 12R-30L Lambert St. Louis International Airport

airsight Company Profile

CHAPTERS PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Final Report Evaluation of I-Pave Low Volume Road Design Software

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

Benefits of Preventative Maintenance Pavement Sealers

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.

Case Studies - Concrete Overlays

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan

The City of Owen Sound Asset Management Plan

Integrated Asset Management Tool for Highway Infrastructure

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity

MODULE 3. Upon completion of this module the participants will be able to:

Life Cycle Cost Analysis (LCCA)

DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA. Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

RoadMatrix V3.1 has incorporated many engineering enhancements including the following:

SECTION PAVEMENT DESIGN

Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester

Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION Terminal Way, Suite 125 Reno, Nevada 89502

Asset Management: A Best Practices Guide

Road Asset Management: Evolution and Trends

700 Life-Cycle Cost Analysis

AirCost LCCA Software An overview of AAPTP Paul M. Dalbey, P.E.

Review of Recent Bridge Asset Management Systems

Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level

Asset Management Plan Final Report

2006 Report Card for Pennsylvania s Infrastructure

Texas Transportation Institute The Texas A&M University System College Station, Texas


Rehabilitation for Concrete Pavements

Transportation Asset Management

Chhote L. Saraf Kamran Majidzadeh V. R. Kumar. Resource International, Inc. 281 Enterprise Drive Westerville, OH August, 1992.

Reinforcement HUESKER. HaTelit. Engineering with geosynthetics

Airport Safety and Construction Management Under The FAA

Airport Safety Management Systems and New Technologies

How To Manage The County Of Simcoe'S Infrastructure

CHAPTER 2 LCCA APPROACHES

Cornell Asset Management Program - Roads & Streets (CAMP-RS) 2014

Reformulated Pavement Remaining Service Life Framework

TITLE: DCP analysis and design of low volume roads by new TRL software UK DCP AUTHORS: Piouslin Samuel and Simon Done, TRL

Advancements in GPR for a Sustainable Tomorrow

Road Asset Management Research Program In Finland

FAARFIELD 1.4. Updates, Improvements and New Capabilities. Federal Aviation Administration. 3 September, 2014

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

All-in-One Asset Management Tool

Cement-Based Pavement Solutions. Full Depth Reclamation with Cement A Useful and Cost Saving Tool

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

Facility Manager TM a Computerized Maintenance Management System. Developed by CTL Engineering, Inc.

Condition and Reliability Prediction Models using the Weibull Probability Distribution

STATE HIGHWAY ASSET MANAGEMENT MANUAL

What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces

ethekwini Metropolitan Municipality s

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL

Improving Rehabilitation Selection for Pavement Life Cycle Cost Analysis

Transcription:

Pavement Management Program ALACPA Short Course on Pavements Maintenance

Course Objective Pavement Management Program Benefits of a Pavement Management System Components of a Pavement Management System Commercial Pavement Management System Software Management Levels Report Generation and Usage

Airfield Pavement Basic Function Provide adequate bearing capacity Provide good riding qualities Provide good surface friction characteristics Other requirements Longevity Ease of maintenance

Benefits of Pavement Management Program Objective & consistent t condition evaluation of pavement Systematic & documented engineering basis for determining maintenance and rehabilitation needs Identifying budget requirement at various levels of serviceability Documents current, historic and future pavement condition of the airfield pavement network Assist in the selection of life-cycle cost analysis for various maintenance and rehabilitation alternatives Identifies the impact on the pavement network as a result of not performing the required major repairs Identifying major and minor pavement repairs

Airport Pavement Management Program Theory An airport s Pavement Management Program (PMP) not only evaluates the current condition of the airfield pavements, but also predicts its future condition through the use of historic information and pavement condition indicators By projecting the rate of deterioration, a life cycle cost analysis can be made for various alternatives ti

Airport Pavement Management Program Theory Such analysis will help to determine the optimal time for applying the best alternative. Pavement generally performs well for the majority of its life, after which it reaches a critical condition, it begins to deteriorate quickly Studies have shown that t maintaining i i pavement in good condition versus periodically rehabilitating poor condition pavement is four to five times less expensive Maintenance & rehabilitation solutions would be easy to plan if pavements exhibit clear signs that they have reached the critical condition point

Airport Pavement Management Program Theory The deterioration curve shape and the optimal maintenance and repair points vary greatly within a pavement network Due to the difficulty in determining when a pavement has reached its critical condition, the PMP can help identify the optimal rehabilitation point and help decision makers target available recourses where they will be most effective The PMP does this by making use of data collected from the pavement condition surveys and predicting future conditions and indicate whether the distress is an environmental or traffic load related

Cost Effective Solutions Information on pavement deterioration, by itself, is not enough to answer questions involved in selecting cost effective maintenance and repair program This type of decision requires information on the cost of various maintenance and repair procedures and their effectiveness; effectiveness means: Solutions that target the source of the deficiency and will improve the pavement condition rating Pavement will stay in this improved condition for several years to optimally recover the cost of the solution PMP will enable a user to store pavement condition and maintenance information into a database and use the resources to determine cost-effective solutions for the up keep of the airport pavement network

Components of the Pavement Management Program In order to take full advantage of the pavement management program, pavement condition information must be periodically collected and updated Alternative rehabilitation strategies must be identified along with the decision making criteria and maintenance policy that will determine which rehabilitation procedure will be employed The pavement management system must contain performance prediction models, cost alternative strategies, and optimization procedure that considers the entire pavement life-cycle

Components of the Pavement Management Program A system for accomplishing these objectives generaly include: System to collecting and storing information Objective and repeatable system for evaluating pavement condition Procedure for prediction of future pavement condition Procedure for modeling historic and future pavement performance Procedures for determining the consequences on pavement condition, life-cycle costing for a given maintenance and rehabilitation budget Procedures for determining budget requirements to meet management objectives, such as maintaining a minimum condition Procedures for formulating and prioritizing M&R projects

Essential Components of the PMP Data Base Pavement Structure Inventory Maintenance History Traffic Data Pavement Condition Data Capabilities Predicting Future Pavement Condition Optimum Maintenance & Rehabilitation ti Plans for a Given Budget Budget/Financial Management Prioritization of Maintenance & Rehabilitation Projects

Database Several elements are critical in making good pavement repair decisions: Pavement Structural Inventory Maintenance History Pavement Condition Data Traffic Data

Pavement Structural Inventory Starts with mapping the airfield pavement structural composition (material and thickness), subsequent overlays, rehabilitation, ti etc., is the key to analyzing problems and design solutions Asbuilt records should provide this information; if they are not available or if the records are suspected to contain erroneous information, coring of the pavement section (top of surface into the subgrade) at multiple locations will be required to prepare a realistic pavement sectional profile

Pavement Inventory Obtain a topographic survey as the base Obtain pavement condition and index values from the conception of the airfield (if available) Create a map for all of the inspection performed from the conception or rehabilitation to current date Input this data into the PMP model

Pavement Maintenance History History of maintenance performed and its associated cost will provide valuable information on the effectiveness of various maintenance procedures on the different airport pavements The cost of each maintenance project is necessary when performing lifecycle analysis At a minimum the following information should be collected and placed into the PMP Documentation of Reconstruction/Rehabilitation and all repairs Historic Inspection Reports, PCI, PCN, field notes and associated drawings and maps

Traffic Data Data about the number of daily operations and type of aircrafts using the pavement is necessary when analyzing probable causes of the deterioration and when to consider alternative ti M&R procedures Historic traffic data at each inspection cycle should be logged into the PMP

Pavement Condition Data A fundamental component of any pavement management system is the ability to track historic and current pavement condition This requires an evaluation process that is objective, systematic and repeatable A pavement condition rating system-such as the pavement condition index (PCI) rating system described in ASTM D5340, Stabdard Test Method for Airport Pavement Condition Index Survey along with the FAA AC 150/5320-6 Airport Pavement design and Evaluation, Chapter 6 for determining the pavement classification number (PCN) provides a systematic pavement rating system that can be utilized consistently throughout every pavement survey Periodically collecting condition data is essential for tracking pavement performance, modeling pavement performance and determining when to schedule M&R

Program Capabilities The PMP must be capable of providing the following: Predicting future pavement condition; condition predictions are necessary in developing optimum, multiyear M&R plans Producing optimum maintenance & rehabilitation plans that identifies where and when M&R is required and approximates how much it will cost; This data will assist in setting priorities that fit the predetermined M&R budget Determining budget requirements meeting the specified management objectives. Typically management objectives include maintaining of pavement above a specific condition and eliminating M&R requirements over a specific number of years Developing optimum maintenance & rehabilitation plans at a section level; should facilitate the formulation & prioritization of M&R projects; Engineering judgment remains a key component in transforming the optimum M&R plan into a practical executable project

Pavement Management System Software Several Pavement Management Software (PMS) options exist for the development of an electronic Airport s Pavement Management Program Applications created by the USACE Construction Engineering Research Laboratory, such as PAVER TM provides an excellent platform to store, manage, analyze and generate reports of the historic, current and predictions of the airport s pavement network condition Cost about $800 USD for three users, best investment for the airport engineer

Management Levels Managing a PMP effectively requires decision making at two levels: Network Management Level Project Management Level

Management Levels Network Management Level - addresses the short-term and long term budget needs, the overall condition of the pavement network, and sections to be considered at the project level; Decisions are made to manage the entire pavement network At this level the use of PMS provides automated tools for storing and analyzing pavement condition information; customized reports addressing critical sections and forecasting budget will help decision makers become more effective in solving the pavement needs within a specified budget Condition prediction at this level l involves the basis for developing the inspection schedules & identifying pavement requiring M&R; once the pavement network needs are identified a current year budget and future M&R budgets can be composed, and funding needs addressed

Management Levels Project Management Level decisions are made about cost effective M&R alternatives; at this level the pavement condition is surveyed in great detail; non-destructive, destructive load bearing test along with the PCI and friction surveys have been performed, recorded and analyzed, and are used to scope the project At this level the overall condition of the pavement should be taken into account, the structural integrity, the surface condition along with the surface texture levels; it is extremely important that once a project is determined that all of the failing components are addressed Use of PMS to quantify a number of engineering measurements of the pavement condition is ideal at this level; pavement structural testing and condition survey results can be entered into the database and reports extracted that quantifies the specific project goals and budget

Report Generation and Usage Regardless if the airport s engineering team is using a PMP software or not, decision making reports need to be created and distributed to those in charge of allocating funds and authorizing the works. The recommended minimum set of reports are as follows: Inventory Inspection Scheduling Pavement Condition Budget Planning Network maintenance Economic Analysis

Report Generation and Usage Inventory Report list all of the pavement networks and contains information such as: pavement type (PCC or HMA) surface type (grooved or non-grooved) Pavement function (taxiway, runway, apron) Location Area Overall the inventory of the pavement network is similar to a topographic survey, but without the details, its main purpose is to provide the outline areas of fthe airport s pavement

Report Generation and Usage Inspection Scheduling reports the schedule of inspections based on minimum acceptable condition levels l and deterioration ti rates Additionally, it helps the PMP manager schedule inspection at critical condition level or at constant periodical time lines

Report Generation and Usage Pavement Condition report provides a tabulated pavement condition assessment of the historic, current, and future years Report provides the condition of the individual pavement segments and the overall pavement network. Projected condition are presented and utilized in planning M&R needs and to inform management of the present and future condition of the pavement, with selected alternatives (repair, rehabilitation or donothing)

Report Generation and Usage Budget Planning projects the budget required to maintain the pavement network at or above the user specific condition level The report should predict the year in which minimum pavement conditions are reached and provides the projected budget for such repairs or rehabilitation, to obtain this the report must draw the following data: Minimum pavement condition (PCI) for each pavement type and use Average unit repair cost based on similar surface and PCI ranges, and Inflation rate during the analysis period

Report Generation and Usage Network Maintenance is the airport s maintenance strategy Which applies the pavement database of information to identify the distress levels in the latest PCI survey It can be used to estimate both the type and cost of routine maintenance for the development of the annual workplan

Report Generation and Usage Economic Analysis report consists of the most cost-effective alternative for pavement repairs. Each feasible alternative, initial cost, periodic maintenance cost, one-time future maintenance cost, interest rates and discount rates are presented A life-cycle analysis is performed for all alternative repairs The analysis includes various interest rates, repair cost, and timing and their effects on the alternatives

In Closing Using funds most efficiently requires good planning and accurate identification of appropriate rehabilitation projects Assessing pavement conditions is an essential first step in this process, yet the proper management and analysis of the pavement survey is critical in making sound decisions An Airport Pavement Management Program provides the airport s engineer with historic, current and futuristic predictions of the pavement network condition, maintenance and repair cost By having a centralized PMP, the search for data is easily available, the analysis of the data is readily performed, and the execution of the works is properly planned The Guessing of when the works is needed is now replaced with a systematic, logical and cost effective approach

References ASTM D5340-11, Standard Test Method for Airport Pavement Condition Index Surveys FAA AC 150/5320-6, Airport Pavement Design & Evaluation FAA AC 150/5320-17, Airfield Pavement Surface Evaluation & Rating Manual FAA AC 150/5380-6, Guidelines & Procedure for Maintenance of Airport Pavements FAA AC 150/5320-12, Measurement, Construction & Maintenance of Skid Resistant Airport Pavement Surface FAA AC 150/5380-7, Airport Pavement Management Program DOT/FAA/PM-84/8, Modified Reflex-Percussive Grooves for Runways DOT/FAA/CT-82/147, Braking of an Aircraft Tire on Grooved and Porous Asphaltic Concrete ICAO Annex 14 Volume 1, Aerodrome Design and Operations - Edition no 5 ICAO Doc 9157-AN901, Part 3 Pavements ICAO Cir 329 AN-191, Draft Runway Surface Condition Assessment, Measurement and Reporting USACE Engineering & Development Center, Paver 6.5 User Manual National Cooperative Highway Research Program Project 1-43, Guide for Pavement Friction, http://www.trb.org/nchrp/nchrp.aspx t /NCHRP/NCHRP Airfield Pavement Condition Assessment; by J. Greene Tyndall Air Force Base, FL & M. Shahin US Army Construction Engineering Research Laboratories, Champaign, IL Antiskid Surfacing Prevent Slippery When Wet Conditions At an International Airport A Case Study, by W.H. Walker Consulting Engineer, Pavement & Materials Volker & Partner, Kaenerbergstr. 40, 57076 Siegen, D Performance of Grooved Bituminous Runway Pavement, by Alex K. Apeagyei, Imad L Al-Qadi, Hasan Ozur & William G. Buttlar, University of Illinois Dept of Civil & Environmental Engineering 1212 NCEL, MC-250, Urbana, IL 61801