CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS)

Similar documents
PROJECT ATN GROUND-GROUND AND AIR GROUND APPLICATIONS IN THE SAM REGION

Follow-up to the activities of Project D2 - Ground-ground and air-ground applications in the SAM Region. (Presented by the Coordinator) SUMMARY

Implementation of the Quality Management System in AIM units PROJECT G3 IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM IN AIM UNITS

GREPECAS Project G3. Implementation of the Quality Management System in AIM units. (Presented by the Secretariat) SUMMARY

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

Update of the NOTAM Contingency Plan. (Presented by the Secretariat) Summary

TRANSITION TO THE NEW ORGANISATION OF GREPECAS. (Presented by the Secretariat)

Project G3: Development of quality specifications applicable to the AIM digital environment (SAM) (Presented by the Secretariat) Summary

Cooperation Agreements for SAR Service and COSPAS-SARSAT STATUS OF SAR AGREEMENTS IN THE NAM/CAR/SAM REGIONS. (Presented by the Secretariat) Summary

ICAO State Safety Programme (SSP) Introduction

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

Curriculum Reform in Computing in Spain

(Presented by the MEVA/TMG Coordinator)

Review of the ATN CAR/SAM planning / implementation activities

Caribbean/South American Air Traffic Flow Management Concept of Operation

FAA International Strategies 2010 to 2014 Western Hemisphere Region

Review of the conclusions formulated by the CAR/SAM AIS/ATM/CNS 02/00 Informal Meeting

PA (Process. Areas) Ex - KPAs

International Civil Aviation Organization South American Regional Office

Table of Contents. Introduction 9. Argentina 18. Brazil 31

August / Agosto 2015 Phillips Elementary School Parent Calendar of Classes / Calendario de Clases para Padres. Mon Tue Wed Thu Fri

Action Plan of the Bolivarian Republic of Venezuela for the activities to reduce CO2 emissions

Block 0: Capabilities within our Grasp

ICAO/LACAC NAM/CAR/SAM

STEP BY STEP 1. DEADLINE

Open access policies: What can we learn from Latin America? Roxana Barrantes Instituto de Estudios Peruanos

INTERNATIONAL CIVIL AVIATION ORGANIZATION. Meeting/workshop of Air Traffic Management (ATM) Authorities and Planners (Lima, Peru, 18 to 21 July 2000)

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

Public Sector Enterprises (Combined Use of IPSAS and IFRS) Marcia Maurer August 2, 2013

DRAFT TERMS OF REFERENCE. (Presented by the Secretariat) SUMMARY

Uruguayan Electoral Process

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Propiedades del esquema del Documento XML de envío:

Performance management Identification of metrics

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

AIR TRAFFIC FLOW MANAGEMENT (ATFM)

Visión general de la integración con asanetwork

Evaluation of an exercise for measuring impact in e-learning: Case study of learning a second language

GUIDANCE ON SECURITY FOR THE IMPLEMENTATION OF IP NETWORKS

Admission to UNICAMP. 1. The Undergraduate Program Regular students The vestibular examination

Module B0-DATM: Service Improvement through Digital Aeronautical Information Management

International Workshop. Nuclear Safety and Security Education and Training in Countries Embarking on or Expanding Nuclear Programmes

Guidelines for Designing Web Maps - An Academic Experience

Sub- Regional Workshop and Consulta;ons on Capacity- Building in Travel Document Security: Colombia, 2013

APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru

INTERNATIONAL CIVIL AVIATION ORGANIZATION. Caribbean/South American Air Traffic Flow Management Concept of Operation (CAR/SAM CONOPS ATFM)

MOBILE ADS. HUNT Mobile Ads Traffic Q2-2011

How To Understand The Relationship Between Free Trade And Meat Production In Mexico

Link. Links. Links. Links. Network. Links. Currículum - Portafolio. Content. Community. Community. Online. Feedback. Feedback. Twitter.

(GREPECAS) ATTACHMENT 2 REPORT OF THE FIFTH MEETING OF THE CNS COMMITTEE OF THE ATM/CNS SUBGROUP OF GREPECAS (CNS/COMM/5)

Motorcycle as a new massive mode of urban transportation: a challenge for many LA countries, cities and citizens

Agricultural Reinsurance in Latin America Actual Situation & Outlook. 4 th Reinsurance Congress Rio de Janeiro (Brazil) April 2015

Impreso de Solicitud / Application Form

Agility2.0. Enterdev S.A.S. Collin Kleine

How To Help The Environment

Strategies to Reduce Defects in Floor and Wall Tiles; Application of Continuous Improvement Processes

GREPECAS AIR NAVIGATION DEFICIENCIES DATABASE (GANDD) USER GUIDE CAR/SAM REGIONS

REPORT OF THE KNOWLEDGE TRANSFER NETWORK*

How To Help People From Latain To European

ECLAC Economic Commission for Latin America and the Caribbean

"IMPROVEMENT OF MANAGEMENT AND PRODUCTIVE EFFICIENCY OF

Environmental Impact Assessment Systems in Latin America and the Caribbean 1,2

GUIDE TO SUPPORT THE IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM AERONAUTICAL METEOROLOGY SERVICES (MET/QMS) IN THE CAR/SAM REGIONS.

The Healthcare and Health Tourism. Sector

The remainder of this handbook is divided into the following sections: Getting Started (p. 2); Beginner Mode (pp. 3 5); Expert Mode (pp. 5 11).

Curriculum Vitae: Maria-Jose Vieira

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

Agenda. Company Overview. IT Industry in Latin America. Comprehensive Offering. Financial Performance. Strategic Plan. Conclusions

Social Security in Latin America

Traffic Flow Management. December 2010

1.- NAME OF THE SUBJECT 2.- KEY OF MATTER. None 3.- PREREQUISITES. None 4.- SERIALIZATION. Particular compulsory 5.- TRAINING AREA.

ANA ROSA ALCALDE Fundación Carolina, España

Minnesota Health Insurance Exchange (MNHIX)

Valther Galván Ponce de León. V. Galván Ponce de León. Universidad Iberoamericana

Transcription:

CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS) SAM Region PROJECT DESCRIPTION (DP) PD N C1 Programme Title Starting Date Ending Date and Situational Awareness (Programme Coordinator: Onofrio Smarrelli) Objective Scope Metrics Strategy Coordinator: Alessander Santoro (Brazil) Contributing experts: Omar Gouarnalusse (Argentina) and SAM/IG May 2008 June 2016 Support States of the SAM Region in the implementation of automated systems, and in their regional interconnection The scope of the project includes the initial drafting of guidelines, trials for the identification of the automation level required at the Region s ATS units in the short and medium term, and the implementation of automation systems and their interconnection through the VSAT based South American digital network (REDDIG) Drafting of the following documents: Guidance document on automated systems requirements at ATS units (SSS) Guideline for the implementation of integrated automated systems Action plan for the interconnection of automated systems Preliminary interface control document (ICD) between systems for the interconnection of ACCs in the SAM Region Memorandum of Understanding (MoU) model for the interconnection of automated systems Interconnection of automated systems between adjacent ACCs in the SAM Region: Reduction in number of operational errors, including LHD in the SAM Region All tasks will be conducted by experts nominated by States and organizations of the SAM Region members of the, and SAM States, under management of the project coordinator, in coordination with the programme coordinator. Communications among project members, as well as between the project coordinator and programme coordinator, shall be carried out through teleconferences and the Internet. In addition, the programme coordinator, together with the project coordinator and the contributing experts, can convene at SAM/IG implementation meetings Once studies are completed, the results will be submitted to the ICAO programme coordinator as a final consolidated document for its analysis, review, approval and presentation at the GREPECAS PPRC

-2- Justification goals Related s The CAR/SAM air traffic control centres have had difficulties in duly coordinating air traffic, an important factor contributing in air traffic incidents. The air traffic control automated centres interconnection will permit a coordinated automated air traffic for the transfer of responsibilities between CAR/SAM adjacent area control centres, thus reducing the risk in aeronautical incidents generated by undue coordination activities and improving, at the same time, the planning phases for an efficient control of flights from/to corresponding Flight Information Regions (FIR). The interconnection of automated systems would be facilitated, in view of REDDIG (SAM VSAT regional network), which has the necessary capability to transport automated systems applications This project contributes towards the implementation of modules B0 FICE, and B0 SNET of the Air Navigation System Performance-Based Implementation Plan for the SAM Region (SAM PBIP) Initial drafting of five guideline documents in support of the implementation of automated systems interconnection for completion in the period (May 2008 October 2012) Initial drafting of 18 MoU for the interconnection of automated systems 5 MoU period 2009-2011 4 MoU for the end of 2012 9 MoU for the end of 2013 Implementation of the interconnection of automated systems Flight plan 9 OLDI interconnections 2012-2016 1 interconnection considering Doc 44 for 2012 7 AIDC interconnections for period 2012-2016 Asterix protocol radar data 20 radar data exchanges using Asterix protocol period 2011-2016 1 owner exchange for 2012 ATFM Improve Situational Awareness

-3- Deliverables Regional guideline document for the automation level required according to the service provided in airspace and international aerodromes, assessing operational architecture design, characteristics and attributes for interoperability, data bases and software FPL, CPL, CNL, RLA, etc., and technical requirements. Guideline for the integration of automated systems and corresponding action plan Relationship with Performance Based Regional Plan (PFF) and ASBU Block 0 Modules B0 SNET Responsible Status of Implementation 1 Delivery Date Remarks June 2011 October 2010 May 2012 The System and Subsystem Specifications (SSS) document has been drafted for the identification of automated requirements necessary at ATS units (ACC), and a revision process has been conducted with the support of RLA/06/901 project and SAM/IG. Document published in site www.lima.icao.int. The following has been drafted: Guideline for the integration of automated systems and revision process. Action plan revision for the integration of automated systems and continuous revision. Both documents drafts with the support of RLA/06/901 project and the SAM/IG. Document published in site www.lima.icao.int. 1 Gray: Activity has not started Green: Activity has or will deliver planned milestone as scheduled Yellow: Activity is behind schedule on milestone, but still within acceptable parameters to deliver milestone on time Red: Activity has failed to deliver milestone on time, mitigation measures need to be identified and implemented

-4- Deliverables Preliminary interface control document (SICD) between systems for the interconnection of ACCs in the SAM Region Relationship with Performance Based Regional Plan (PFF) and ASBU Block 0 Modules B0 FICE Responsible Programme Coordinator, Status of Implementation 1 Delivery Date Remarks October 2008 October 2012 Document ICD drafted. Document elaborated with the support of RLA/98/003 and later, RLA/06/901. Document published in site www.lima.icao.int. The document requires updating in view of installation of new automated and surveillance systems in the Region Guidelines for elaboration of Memorandum of Understanding (MoU) for the implementation of the automation system interconnection B0 FICE October 2009 A model MoU for the interconnection of automated systems has been developed, with the support of RLA/06/901 project and SAM/IG. The MoU model is published in site www.lima.icao.int. Drafting of Memorandum of Understanding (MoU) for the interconnection of automated systems between adjacent ACCs B0 FICE SAM States, October 2013 To date, six MoU have been drafted and signed between the following SAM States: Argentina-Brazil; Argentina-Chile; Argentina-Uruguay, Brazil-Uruguay; Brazil- Peru; and Brazil-Venezuela. 12 additional MoUs are planned to be drafted.

-5- Deliverables Interconnection of automated systems between adjacent ACCs Relationship with Performance Based Regional Plan (PFF) and ASBU Block 0 Modules B0 FICE Responsible Status of Implementation 1 Delivery Date Remarks SAM States June 2016 1. Radar data has been interconnected between Argentina-Uruguay using IP protocol through REDDIG; 2. Flight plan and radar data exchange trials have been conducted between Brazil- Venezuela through REDDIG; 3. Letter LT 12/3.54-SA130 containing a questionnaire was sent to Argentina, Brazil, Chile, Peru and Uruguay with the aim of identifying the causes for the delays and formulate recommendations permitting the completion of the interconnections. Replies were received from Argentina, Brazil and Peru; 4. Replies from Argentina, Brazil, Chile and Peru were analysed upon; 5. A mission was programmed for 6 to 10 May 2013, involving two automation experts with the aim of restarting and concluding the interconnection trials between the Brazil and Venezuela systems. Visits to the remainder States will be scheduled for June-July 2013, with presentation of results at SAM/IG/12. 6. Argentina, Bolivia, Brazil, Chile, Colombia, Ecuador, panama, Paraguay, Peru, Uruguay and Venezuela were requested for the updating of the SICD document. SICD updating was received regarding the Brazilian automated systems

-6- Deliverables Monitor implementation progress of automation activities in the SAM Region Relationship with Performance Based Regional Plan (PFF) and ASBU Block 0 Modules Responsible Programme Coordinator Status of Implementation 1 Delivery Date Remarks May 2008 June 2016 Resources necessary Implement facilities required by SAM States permitting the interconnection of automated systems in accordance with the dates established in the MoUs drafted and signed to this end

- 7 - ID Nombre de tarea Duration Start 1 Proyecto de automatizacion / 2129.13 days Mon 05/05/08 2 Nivel de automatización requerido de acuerdo con 85.88 days Fri 11/02/11 el servicio proporcionado en el espacio aéreo y los aeródromos internacionales / level required according to service provided in airspace and international aerodromes 3 Revision documento de especificaciones de sistemas y subsistemas (SSS) / Review of System and Subsystem Specifications (SSS) document 29.88 days Fri 11/02/11 4 Ajustes finales al documento / Final document 30.88 days Fri 25/03/11 adjustments 5 Entrega documento final / Delivery of final 4 days Tue 07/06/11 document 6 Guía de orientación para la implantación de la integración de los sistemas automatizados y plan de acción correspondiente/guideline for the integration of automated systems and corresponding action plan 1063.88 days Mon 05/05/08 7 Recolectar información /Collect information 64 days Mon 05/05/08 8 Entrega de propuesta de borrador / Delivery of 39 days Fri 01/08/08 draft proposal 9 Revision de la propuesta borrador / Review of 22 days Thu 25/09/08 draft proposal 10 Entrega documento final / Delivery of final 65 days Mon 27/10/08 document 11 Actualización guia de orientación /Updating 21 days Fri 01/10/10 of orientaion guideline 12 Modelo de plan acción regional para 44 days Tue 01/09/09 interconexión sistemas automatizados (planes de vuelo y datos radar) / Regional action plan model for interconnection of automated systems (flight plan and radar data) 13 Revisión del plan de acción /Review of 67 days Wed 29/02/12 action plan 14 Documento preliminar de control de interfaz (SICD) entre sistemas para la interconexión de 1433.88 days Mon 05/05/08 los ACC en la Región SAMy actualización de/preliminary interface control document (SICD) between systems for the interconnection of ACCs in the SAM Region 15 Recolectar información /Collect information 44 days Mon 05/05/08 16 Entrega de propuesta de borrador / Delivery of draft proposal 17 Revision de la propuesta borrador / Review of draft proposal 18 Entrega documento final / Delivery of final document 43 days Fri 04/07/08 8 days Wed 03/09/08 9 days Mon 20/10/08 2008 2009 2010 2011 2012 2013 2014 2015 2016 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 5/05 11/02 10/06 Coordinador Proyecto,Estados SAM,OACI/ICAO 11/02 24/03 A. Santoro (Coordinador Proyecto) 25/03 06/05 A. Santoro (Coordinador Proyecto) 07/06 10/06 Grupo Automatizacion,Estados SAM Grupo Automatizacion,A. Santoro (Coordinador Proyecto) A. Santoro (Coordinador Proyecto),Coordinador Proyecto Grupo Automatizacion,Estados SAM A. Santoro (Coordinador Proyecto),Estados SAM Coordinador Proyecto,Grupo Automatizacion

- 8 - ID Nombre de tarea Duration Start 19 Actualización del documento SICD 214 days Mon 07/01/13 /Updating of SICD document 20 Orientaciones para elaboración Memorándum de 33.88 days Tue 01/09/09 Entendimiento (MoU) para implantación de la interconexión de sistemas automatizados / Guidelines for elaboration of Memorandum of Understanding (MoU) for implementation of 21 Elaboracion de un modelo borrador de MoU / 24 days Tue 01/09/09 Elaboration of a draft MoU model 22 Revision del modelo de borrador de MoU / 5 days Mon 05/10/09 Review of draft MoU model 23 Entrega Modelo final de MoU / Delivery of final 5 days Mon 12/10/09 MoU model 24 Monitorear implantación de sistema de proceso 1748.88 days Mon 19/10/09 de datos de plan de vuelo, herramientas para transmisión electrónica e intercambio automático de mensajes ATS / Monitor implementation of flight plan data processing system and electronic transmission tools 25 MoU revisados y firmados para interconexion de 1053.94 days Mon 19/10/09 sistemas automatizados (plan de vuelo y datos radar) / Reviewed and signed MoUs for interconnection of automated ystems (flight plan and radar data) 26 Implantacion de la interconexion de sistemas automatizados (Datos radar y datos de plan de vuelo) 27 Monitorear las actividades de implantación del proyecto Automatización / Monitor implementation activities of project 28 Monitorear las actividades de implantación del Proyecto Automatizacion / Monitor implementation activities of project 1335 days Fri 20/05/11 2128.88 days Mon 05/05/08 5/05 2129 days Mon 05/05/08 2008 2009 2010 2011 2012 2013 2014 2015 2016 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 01/09 16/10 arnalusse (Argentina),A. Santoro (Coordinador Proyecto),OACI/ICAO 01/09 02/10 5/05 Grupo Automatizacion,OACI/ICAO 05/10 09/10 O. Gouarnalusse (Argentina) 12/10 16/10 19/10 Estados SAM,OACI/ICAO,A. Santoro (Coordinador Proyecto) 19/10 31/10 20/05 OACI/ICAO Estados SAM,A. Santoro (Coordinador Proyecto Estados SAM,OACI/ICAO