Generation Cost Calculation for 660 MW Thermal Power Plants



Similar documents
TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT

NEW CERC REGULATIONS TO ENCOURAGE INVESTMENT, EFFICIENCY IN POWER SECTOR

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Terms and Conditions of Tariff Notification No. 12 of 2005

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No.L-7/145(160)/2008-CERC Dated 19 th January, 2009 NOTIFICATION

Central Electricity Regulatory Commission Core 3, 7 th Floor, Scope Complex, New Delhi (Tele No FAX No.

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

DRAFT ORDER (SUO-MOTU)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

TERMS AND CONDITIONS OF TARIFF REGULATIONS

Draft Solar Power Tariff - Ground Mounted Grid Connected and Solar Rooftop with Net Metering Regulations

TISSUE PAPER MANUFACTURING

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

Year A perspective

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore

Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur, Dated March 29, 2011

Energy Economics. Rangan Banerjee

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines

INDEX S. No. PARTICULARS Note:

3.9 Interest on Working Capital (IOWC)

Guidelines for Solar Grid Power Projects

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009

Case No. 100 of Smt. Chandra Iyengar, Chairperson Shri Vijay L. Sonavane, Member ORDER (SUO-MOTU)

Tamil Nadu Electricity Regulatory Commission

Consultative Paper on Comprehensive Tariff Order on Solar Power. (Comments/Suggestions are invited on or before )

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

NIGERIAN ELECTRICITY REGULATORY COMMISSION. Presentation at the ELECTRIC POWER INVESTORS FORUM

IREDA-NCEF REFINANCE SCHEME

METHOD FOR PROJECT APPRAISAL: NET PRESENT VALUE OR NPV The sum of discounted cash flows.

(To be published in Part II, Section 3, Sub-section (ii) of Gaztte of India) MINISTRY OF POWER NOTIFICATION

The Gazette of India. EXTRAORDINARY PART I - Section 1 PUBLISHED BY AUTHORITY Ministry of Power RESOLUTION

Draft Large-scale Consolidated Methodology ACM00XX: Construction of a new natural gas power plant

CHILLY AND TURMERIC POWDER

CENTRAL ELECTRICITY REGULATORY COMMISSION

: Promoters Contribution : Term Loan Total Profitability at optimum level. : Optimum Utilization(3 rd Year)

Financial Statements of Electricity Companies

1: Levelized Cost of Energy Calculation. Methodology and Sensitivity

Financial Analysis of Infrastructure Project - A Case Study on Built-Operate-Transfer Project in India

COST ACCOUNTING STANDARD ON OVERHEADS

Jharkhand State Electricity Regulatory Commission

System. Applied Electro-Magnetics Pvt Ltd.

Half the cost Half the carbon

Fact sheet. Conversion factors. Energy and carbon conversions 2011 update

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR

Karnataka Electricity Regulatory Commission. Discussion note on

Renewable Energy. and Renewal Energy Certificates in Indian Context

02 July VIPL Response to balancedata gaps 1 / Queries Set Case 36 of 2015 Data Gaps/Deficiencies on the Petition submitted by VIPL

CASH FLOW STATEMENT. MODULE - 6A Analysis of Financial Statements. Cash Flow Statement. Notes

Cost Reflective Tariffs: Balancing Commercial and Socio-economic Imperatives The MYTO Perspective

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

Lesson-13. Elements of Cost and Cost Sheet

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY to FY Assam Power Generation Corporation Limited (APGCL)

E N G I N E E R I N G

El Paso Electric Company

Webpage: Volume 3, Issue IV, April 2015 ISSN

NOVA Gas Transmission Ltd. Appendix E APPENDIX E TO GAS TRANSPORTATION TARIFF OF NOVA GAS TRANSMISSION LTD. CRITERIA FOR DETERMINING PRIMARY TERM

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable.

DELHI ELECTRICITY REGULATORY COMMISSION

Methodology to Approve Maximum Prices of Piped- Gas in South Africa

Case Study (part II)

FINANCIAL STATEMENTS-II

Cost and benefit of investment in integrated broiler farming study

1.0 INTRODUCTION 2.0 PRODUCT 3.0 MARKET POTENTIAL 3.1 Demand and Supply 3.2 Marketing Strategy

DST GUIDELINES FOR SEED SUPPORT SYSTEM (SSS) FOR START-UPS IN INCUBATORS

Annual Electricity and Heat Questionnaire

Staff Paper. April 2013

TOPIC LEARNING OBJECTIVE

Fuel cell microchp: Greener and cheaper energy for all

The function of a power station is to deliver

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

PAPER 19: Cost and Management Audit

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Fire? Loss of Profits? 3. What company covers the machinery to be insured under a Machinery Breakdown Policy?

Energy Conservation Measure implemented in (To be filled up separately for each Energy Conservation Measure)

Paper 5- Financial Accounting

True up of Capitalization of FY 2006 and FY 2007, RoCE, Depreciation for the MYT Control Period and True up of FY

(CAS-4) COST ACCOUNTING STANDARD ON COST OF PRODUCTION FOR CAPTIVE CONSUMPTION

Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

Proposal for Improve the Electrical Power Supply in Port Sudan Town

Wisconsin Energy Corporation Plan

ČEZ, a. s. BALANCE SHEET in accordance with IFRS as of March 31, 2015 in CZK Millions

SINGAPORE S ELECTRICITY MARKET AFTER REFORM. Timeline of Market Reform in Singapore s Electricity Market

PG&E Corporation and Pacific Gas and Electric Company Annual Report

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND

CHAPTER 4. Final Accounts

110 Questions(with Answers) On Accounting Basics FREE E-book from

Evaluation of Indian Construction Companies using Financial Tool

PINEAPPLE AND ORANGE PRODUCTS

Chapter 1.3 Energy management & audit

NTPC Limited Q2 Financial Year 2015 Earning Conference Call October 31, 2014

Draft consolidated baseline and monitoring methodology ACM00XX

Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario

REGULATORY ACCOUNTING GUIDELINES FOR TRINIDAD AND TOBAGO ELECTRICITY COMMISSION DRAFT FOR CONSULTATION

HEAT PUMPS A KEY COMPONENT IN LOW CARBON FUTURE

Transcription:

P P IJISET - International Journal of Innovative Science, Engineering & Technology, Vol. 1 Issue 10, December 2014. Generation Cost Calculation for 660 Thermal Power Plants 1 1* 2 Vilas S. MotghareP P, R. K. ChamP P PMaharashtra State Power Generation Company Ltd. Koradi, Nagpur-441111, (M.S.), INDIA 2 PSindhu Mahavidyalaya, Nagpur, (M.S.), INDIA Abstract: The Central Electricity Regulatory Commission (CERC) has the power of deciding the tariff for electricity generated by various power stations. Tariff is calculated on the basis of capacity charge (fixed cost) and energy charge (variable cost). The various components of capacity charge on which the tariff depends are return on equity, interest on capital loan, depreciation, interest on working capital, operation & maintenance cost, cost of secondary oil. The components of energy charge are primary fuel costs, secondary fuel oil consumption and auxiliary energy consumption. Tariffs are classified into Nominal, Discount and Levelized tariff. Tariff calculations for 660 thermal power plants have been discussed. Keywords: Electricity Act, Electricity tariff, Plant load factor, fixed and variable cost. 1.Introduction: The Electricity Act (supply) 1948 has been replaced by Electricity Act 2003 by Government of INDIA. According to this act, the rights of determination of tariffs, for the power generated by central, state and private power generating stations, based on specific terms and conditions has been given to the Central Electricity Regulatory Commission (CERC). Section 61 of the Act empowers the Commission to specify and regulate the terms and conditions for determination of tariff in accordance with the provisions of the said section along with the National Electricity Policy and Tariff Policy. As per the Electricity Act 2003, the CERC in March 2004, had put forth tariff regulations for the FY 2004-09 and on expiry of this, CERC had notified new tariff regulations on January 19, 2009 for the next regulatory period FY 2009-14. The new regulations were applicable to all power generating stations (excluding stations based on non-conventional energy sources) and transmission licensees, except those entities which are determined through bidding process in accordance with the guidelines issued by the Central Government. 2. Regulatory Norms for calculations of Power Tariff Tariff for power generated by various power stations is decided on the basis of 2.1. Capacity charge or fixed cost 2.2. Energy charge or variable cost 2.1. Components of Capacity Charges/ Fixed Charge: Table 1. Components of Capacity Charges for FY 2009-2014 Component of Capacity FY 2009-2014 Charges/ fixed cost a Return on Equity 15.50% b Interest on Capital As per actual Loan c Depreciation 5.28% d Interest on Working Capital e Operation & maintenance cost f Cost of Secondary Oil (a)return on Equity (RoE) CERC has specified a Pre-Tax RoE of 15.5% for the tariff period FY 2009-14. Further, it has allowed an additional RoE of 0.5% for projects commissioned after April 2009 within specific timelines. The additional RoE allowed by CERC is acting as an incentive for a project developer to achieve time-bound milestones. On the other hand, the Tariff Regulations does not allow utilities to recover tax on income such as unscheduled interchange (UI) and incentive income from beneficiaries. 660

(b) Interest on Capital Loan The CERC has specified a debt-equity ratio of 70:30 as the funding mix for the capital cost of a project. The interest on debt funds is recoverable as part of the tariff. The Tariff Regulations allows retention of 1/3rd of the benefits, if any, arising out of re-financing of loans; earlier such benefits were required to be passed on entirely to the beneficiaries. (c) Depreciation In the Regulations for the earlier tariff periods, the CERC followed the concept of Advance Against Depreciation (AAD) in case where the normal depreciation rates (notified by the regulator) were not sufficient to meet the debt repayment obligation of the utility. The Tariff regulations for the period FY 2009-14 the CERC has removed the concept of AAD and at the same time increased the depreciation rates applicable for projects as against the earlier deprecation rate of 3.6% for thermal power projects (based on a 25-year project life and 90% of the capital cost), the CERC has increased the depreciation rate to 5.28% for most components of the project (d) Interest on Working Capital The working capital for a thermal power station is given in table 2. Table 2. Working capital for thermal power station for FY 2009-2014 Components FY 2009-14 1 Coal Stock 1½ Months for Pit Head 2 Months for Non-Pit Head 2 Secondary Fuel Oil 2 Months Stock 3 Maintenance Spares 20% of O&M Costs Coal Based 30% of O&M Costs Gas Based 4 Sales Receivables 2 Months 5 O&M expenses 1 Month (e) Operations & Maintenance Costs (O&M) The CERC has specified O&M Costs for thermal power stations on the normative (Rs. lakh/), depending on the class of the machine installed by the power station. The normative O&M expenses allowed are given in table 3. Table 3. Operations & Maintenance Costs for different capacity power plants. Rs Lakh/M W 200/210/2 50 300/33 0/350 500 600 and Abov e 2009-10 18.20 16.00 13.00 11.70 2010-11 19.24 16.92 13.75 12.37 2011-12 20.34 17.88 14.53 13.08 2012-13 21.51 18.91 15.36 13.82 2013-14 22.74 19.99 16.24 14.62 (f) Cost of Secondary Fuel Oil As per Tariff regulations for the period FY 2009-14, the CERC has included the cost of SFO as part of AFC. Projects are able to recover the cost of SFO on the basis of normative consumption norms specified by the regulator and the plant availability factor during the year. 2.2. Energy Charges (for recovery of Primary fuel costs) Energy charges for thermal power stations are linked to the normative operational as specified by the regulator. The normative are given in table 4. Table. 4 Normative Operational Parameters for Coal based Thermal Power Projects Norms for Operations FY 2009-14 1 Plant Availability Factor 85% 2 Gross Station Heat Rate For existing Stations 200/210/250 Sets 2500 500 and above 2425 3 Secondary Fuel Oil Coal Based 1.0 ml/kwh 4 Auxiliary Energy 200 Series 9.0%/8.5% 500 Series(Steam driven BFP) 500 Series(power driven BFP) 6.5%/6.0% 9.0%/8.5% 661

3. General Concepts & Definitions in reference to Tariff calculation 3.1 Auxiliary energy consumption The quantum of energy consumed by auxiliary equipment of the generating station, and transformer losses within the generating station, expressed as a percentage of the sum of gross energy generated at the generator terminals of all the units of the generating station. 3.2 Date of Commercial Operation or COD The date declared by the generating company after demonstrating the maximum continuous rating (MCR) or the installed capacity (IC) through a successful trial run after notice to the beneficiaries, from 0000 hour of which scheduling process as per the Indian Electricity Grid Code (IEGC) is fully implemented, and in relation to the generating station as a whole, the date of commercial operation of the last unit or block of the generating station. 3.3 Declared capacity The capability to deliver ex-bus electricity in declared by such generating station in relation to any time-block of the day or whole of the day, duly taking into account the availability of fuel or water, and subject to further qualification in the relevant regulation. 3.4 Gross calorific value The heat produced in kcal by complete combustion of one kilogram of solid fuel or one litre of liquid fuel or one standard cubic meter of gaseous fuel, as the case may be. 3.5 Gross station heat rate The heat energy input in kcal required to generate one kwh of electrical energy at generator terminals of a thermal generating station. 3.6 Infirm power Electricity injected into the grid prior to the commercial operation of a unit or block of the generating station. 3.7 Installed capacity The summation of the name plate capacities of all the units of the generating station or the capacity of the generating station (reckoned at the generator terminals) approved by the Commission from time to time. 3.8 Operation and maintenance expenses The expenditure incurred on operation and maintenance of the project, or part thereof, and includes the expenditure on manpower, repairs, spares, consumables, insurance and overheads. 3.9 Plant availability factor (PAF) The average of the daily declared capacities (DCs) for all the days during that period expressed as a percentage of the installed capacity in reduced by the normative auxiliary energy consumption. 3.10 Conversion of into Million Units (MUs) 1 1 x 365days x 24hours xplfx1000 10,00,000 3.11 Tariffs Nominal tariff Discount Tariff Levelized Tariff Nominal Tariff: The tariff calculated at for each year (fixed cost + variable cost) Discount Tariff: The tariff calculated at present value of the future tariffs. This is done by discounting future tariffs by discount rate (given by CERC) Discount tariff Nominal tariff x Discount factor Levelized tariff: The tariff calculated for all years. This is a simple tariff representing the tariffs throughout the plant life. In concept, this is Weighted Mean of all tariffs with weights as discounting factors. Levelized Tariff Where, i varies from 1 to n. n is the life of plant in years Nominal Tariff i x Discount Rate i Discount rate 1. The nominal tariff for the next year may be calculated by individually calculating for each year taking into consideration of future value of oil, coal etc. 2. Otherwise, we can escalate the nominal tariff for 1st year taking appropriate escalation factors. Tariff calculations for a 660 Thermal Power Plant are given in table 5. Table 5. Sr.No Particulars Normative Parameters 1 Plant Capacity 660 2 Capital cost 6 Cr/ 3 Debt equity ratio 70:30 4 Return on equity 15.50% 5 Interest on loan 10% 6 Working capital(10% 396Cr of capital cost) 7 Interest on Working 10% capital 8 Rate of Depreciation 5.28% 9 O&M cost 14.62% 10 Plant Load Factor 85% 11 Plant Availability 85% Factor 12 Specific Oil 1ml/kwh 13 Price of Oil Rs. 35000/kl 662

14 Gross Calorific value 10000kcal/l of Oil 15 Station Heat Rate 2425kcal/kg 16 Cost of Coal Rs. 2000/tonnes 17 Auxiliary Power 6.5% 18 Plant Life 25 yrs 19 Gross Calorific value of Coal 3800kcal/kg *Data as per CERC Tariff Regulations for FY 2009-14 Calculations: Fixed Cost Component calculations: (1) Return on equity Capital cost 660 x 6Cr./ Rs. 3960 Cr. Debt/Equity ratio 70:30 Hence Equity 3960x 0.30 Rs. 1188 Cr. Debt 3960 x 0.70 Rs. 2772 Cr. Return on Equity (ROE) 15.50x1188 100 2) Interest on loan: 10% of debt. 0.1x2772 Rs. 277.2 Cr Rs.184.14 Cr 3) Interest on working capital: 10% of WC 0.1x396 (10% of total cost) Variable cost: Calculation of variable cost: i) Specific oil consumption 1ml/KWh ii) Cost of oil consumption Specific Oil consumption x Cost of Oil/litre 1ml/KWh x 35000 1000 Rs. 0.035/ kwh iii) Heat contribution of oil Gross calorific value of Oil x Specific Oil consumption 10,000 x 1ml/kWh 10 kcal/kwh iv) Station Heat Rate Heat contribution of Oil + Heat contribution of coal Therefore, Heat contribution of Coal Station Heat Rate Heat contribution of Oil 2425-10 2415 Kcal/kWh 5) Specific Coal consumption Heat contribution of coal Gross calorific value of coal 2425/3800 0.64 Kg/KWh (6) Cost of Specific Coal consumption Specification Coal consumption x Cost of Coal. 0.64 Kg.x 2000 Rs kwh x Tonnes Rs. 39.6 Cr 4) Depreciation: 5.28% of capital cost 5.28x3960 100 Rs. 209.088 Cr 5) O&M cost: O & M cost Rs.15.62 lakh/ For 660 15.62x660 Rs. 103.09Cr 6) Total fixed cost 1 + 2+ 3+ 4+ 5 184.14 + 277.2 + 39.6 +209.088 + 103.09 Rs. 813.118 Cr Total Power Generation 660 x 365 x 24 x 0.85 x 1000 1,0,00,000 4914.36 MUnits 813.118 Cr Hence fixed cost per unit 4914.36 MU Rs. 1.65/ unit 0.64 Kg.x 2000 Rs kwh x 1000Kg Rs 1.28 /KWh Hence, Total Variable Cost per Unit: Cost of Specific Oil consumption + Cost of Specific Coal consumption Rs. (0.035 + 1.28) / kwh Rs. 1.315 /kwh a) The variable cost calculated above is the variable cost of generation. b) 6.5% of the Power generated is consumed in Auxiliary. So, in Calculating Power available Exbus we have to subtract 6.5% of Available Power. c) Variable cost per unit at bus bar Variable cost per unit 1 % Auxiliary consumption 1.315 1 0.065 Rs 1.406/kWh Nominal Tariff calculation: Nominal Tariff (Total Fixed Cost / Unit) + (Total variable cost (Ex-bus)/Unit) Rs (1.65+1.406)/Unit Rs. 3.05/Unit 663

4. Conclusion: The fixed cost and the variable cost of the power generated by thermal power plant of 660 were found to be Rs 1.65 and Rs. 1.406 respectively. Hence the total generation cost would be Rs. 3.05/unit. Acknowledgments The authors are thankful to Koradi thermal power station, Koradi, Nagpur. References: [1] R. K. Rajput, Power Plant Engineering: Laxmi Publications, Delhi, ( Edition 3) 2006 [2] P.K.Nag, Heat Power Engineering: (Edition5) 2007 [3] Cen PEEP volume 2009 [4] NTPC PMI Noida volume 5 [5] National productivity council volume on energy management Vilas S. Motghare B.E ( E&TC), M.B.A.( Finance), ICWAI. Executive Engineer Koradi Thermal Power Station Koradi, Executive Member of Nagpur Chapter of Cost & Management Accountant of India, Associate member of Cost & Management Accountant of India, Associate member of Institution of Engineers R. K. Cham M. Com, M. Phil. M.A(Eco), Ph.D, Professor, Sindhu Mahavidyalaya, Nagpur. 664