King Fahd University of Petroleum and Minerals



Similar documents
Total Quality. 1) Quality

Vendor Performance Evaluation Requirements

CHAPTER 23. Contract Management and Administration

Appendix 18 NEC3 Options

Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program

Project Implementation: Procurement & Contract Management. April 2012

Tendering to Public Sector Organisations

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

Procurement guidance Prequalifying suppliers

IEC Electronics Terms and Conditions

Consultancy Services Proposal

Guidance on Framework Agreements

How To Do Business With Omaha Public Schools

How to Prepare and Evaluate Tenders

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Handbook No REV 2 CHAPTER 6. SEALED BIDS

Project Procurement Management

Generic CMMS Quality Assurance Plan

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

REQUEST FOR SERVICES Digital Marketing Campaign Specialist Winter Travel in Muskoka

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts)

Request for Proposal. MPAO Data Center Virtualization

PROJECT MANAGEMENT BASICS

Bidding Documents Tender No SEATING ARRANGEMENT OF SEMINAR IN COLLABORATION WITH APNA AND KEMCAANA AT KING EDWARD MEDICAL UNIVERSITY, LAHORE

The Procurement Guidelines of. the Japanese Grant Aid. (Type I-G)

Contract and Vendor Management Guide

LSB Procurement Framework

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

How To Get Construction Procurement Services

Procedures for Tenders and Contracts. October Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

How to do Business with the Province of British Columbia

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

INTER-PARLIAMENTARY UNION

REQUEST FOR SERVICES Marketing Project Manager. What s Cooking Bracebridge

PREQUALIFICATION INFORMATION

A GOOD PRACTICE GUIDE FOR EMPLOYERS

How to do Business with the London. Borough of Sutton

PROJECT PROCUREMENT MANAGEMENT

2.3.9 Construction Procurement

Canterbury Park Pool Chamber Replacement

Lawrence Livermore National Laboratory

TAHOE REGIONAL PLANNING AGENCY REQUEST FOR PROPOSAL FOR SOFTWARE CONSULTANT

REQUEST FOR EXPRESSIONS OF INTEREST

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

City of Greenville/Greenville Utilities Commission Minority and Women Business Enterprise Program

INVITATION TO BID: ITB

The SME Engagement Handbook

Invitation to Tender

Seradex White Paper. Engineering Change Process. A Discussion of Issues in the Manufacturing OrderStream

HOW TO DO BUSINESS WITH THE STATE OF ALASKA

TABLE OF CONTENTS. Prefacej... 1

COUNTY OF DUTCHESS OFFICE OF CENTRAL AND INFORMATION SERVICES DIVISION OF CENTRAL SERVICES 27 HIGH STREET POUGHKEEPSIE, NEW YORK (845)

TENDER FOR THE SUPPLY, INSTALLATION AND COMMISSIONING OF DISASTER RECOVERY EQUIPMENT AND REPLICATION SOFTWARE

I N T R O D U C T I O N THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES.

How To Get A Job Done

Request for Proposal For: PCD-DSS Level 1 Service Provider St. Andrew's Parish Parks & Playground Commission Bid Deadline: August 17, 2015 at 12 Noon

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

Project Management Procedures

Purchases from $750 $1,500 requires 3 Verbal Quotes. Purchases from $1,501 $24,999 requires 3 Written Quotes

Ministry Of Health Registration of Interest

STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS)

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION INTERSTATE TRANSPORTATION OF GOODS (FREIGHT) SERVICES PUBLICATION

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

Washington County School District Request for Proposal School Bus Fleet Tracking System RFP #TD 1011

CASH MANAGEMENT POLICIES AND PROCEDURES HANDBOOK

PROCUREMENT GUIDELINES OF THE DISTRICT OF COLUMBIA COURTS

FMC Technologies Measurement Solutions Inc.

CONTRACT POLICES & PROCEDURES MANUAL CONTRACT POLICIES AND PROCEDURES MANUAL

Prequalification Document for Procurement of Works

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Supplier s Guide to Doing Business with American Snuff Company, LLC

Attachment 5 Electrical Engineering

Current Initiatives May 2015

INSTRUCTIONS TO BIDDERS

How To Plan A Production Process

Module 10 Procurement Management PMP Exam Questions

ANNOUNCEMENT. Bidders pre-qualification for Event Management Services. Procurement & Contracts Management Division Bidders pre-qualification

REQUEST FOR PROPOSAL Mobile Tours (Website) Development

The South African Council for the Project and Construction Management Professions (SACPCMP)

REQUEST FOR QUOTE. RFQ Reference Number: RFQ <<INSERT e.g SWR 03-11/12>> <<Enter Course Name>>

Contractor Performance Report Scoring Guide

Valuable Metrics for Successful Supplier Management

Request for Proposal Permitting Software

STEEL fabrication quality SySTEmS guideline

CORPORATE QUALITY MANUAL

Subvented Social Welfare Non-Governmental Organisations Procurement Procedures

Lawrence University Procurement Policy for Federally Sponsored Projects

ADMINSTERING YOUR FEDERAL CONTRACT

TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #

ITEM DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI

Doing Business with the UN System. Practical Tips. January Published by

Manage Deliverables - Construction Step 6. July 12, 2012

REQUEST FOR PROPOSAL

Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012

ATTACHMENT 1: CONTRACTOR PAST PERFORMANCE REPORT CONSULTING SERVICES Note: Continuation sheets may be used if more space is required.

How to Do Business With Us ST. LOUIS COUNTY GOVERNMENT DIVISION OF PROCUREMENT AND ADMINISTRATIVE SERVICES

How to do Business. with Charlotte-Mecklenburg Utilities.

REQUEST FOR PROPOSAL Stakeholder Workshop Series Google Analytics and Trip Advisor

Transcription:

King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM 515 Project Quality Management Term Paper Procurement Quality Management In Construction Project Name : Abdulkarim Sulais ID : 524054 Date : Monday, December 26, 2005-1 -

Index Page 1 Abstract 2 2 Methodology 2 3 Objective 2 4 Introduction 3 5 Procurement Process 5 5.1 Procurement planning 5 5.2 Documentation 6 5.3 Evaluation 7 5.4 Award Contract 7 5.5 Administration 8 5.6 Inspection 8 5.7 Delivery 9 5.8 Improvement 10 6 References 11-2 -

Procurement Quality Management for Industrial Construction Project Abstract: Procurement Project quality management of prime contractor for medium size project is submitted to owner for review and approval directly after signing the contract.in industrial project, equipment representative more than 50 % of project total cost, hence more attention should be considered for procurement quality management that is part of project quality plan. The monitor and revised the process according to site location, progress of construction and product availability will increase the project saving that will be shown in this brief procurement. Methodology: The procurement quality project management process will be based on the followings: 1. Project tender specification. 2. Quality Project Management 3. Equipment and subcontractors requirement 4. International Standard ISO 900aA: 2000 5. General site condition 6. Siemens work experience with SEC-EOA 7. Problems and difficulties in completed and ongoing construction projects done by competitors. Objective / Project Scope of work: Setting and doing procurement quality management to deliver services and equipments that is refereed to product right as per requirement at right time and within lowest cost that meeting customer satisfaction and purpose of procured. The processes will help the company to benefits the followings : 1. Improve company and project reputation name 2. Achieving customer satisfaction and increase market share 3. Reduce rework and mistake 4. Standardized forms 5. Reduce warranty period 6. Increase profit 7. Lower insurance cost 8. Improve cash follow - 3 -

Introduction: Industrial construction detailed Project quality management submitted after contractors signed the contract. Hence procurement services and equipments are considered the main cost of a project. Project quality plan should be set directly after awarded a project and procurement mainly for the equipment has to be set at the beginning. The main process: 1. Planning 2. Documentation 3. Evaluation 4. Awarded 5. Administration 6. Inspection 7. Delivery 8. Improvement The product delivery will be closely monitor and delivery decision will be responsibility of project manager based on the following variables that changed from a project to other : 1. Project site storage facility 2. Site location 3. Type of suppliers 4. Market condition 5. Reliable of sub contractor and progress of construction 6. Availability and schedule of installation manpower 7. Cash follow of the project Procurement systems process has a profound impact on the construction industry project. For example: Ineffective and inefficient procurement systems can impede delivery or compromise the intended project outcomes. non-uniform procurement practices between different authorities and different spheres of the public and private sector increases tendering costs, expose tenderers to increased risks and frustrates initiatives aimed at the development of an adequate procurement skills base. Emphasis on lowest price rather than best value impacts negatively on industry performance in terms of time, cost and quality. It affects the sustainability of enterprises and their ability to develop and retain a skilled workforce, and to actively promote safety, health and the environment. It - 4 -

tends to encourage opportunistic tenders, leading to a delivery paradigm that is focused on claims and adversity. Poor choices in contracting, pricing and targeting strategies can lead to disappointing or costly project outcomes Construction Project Quality Management Procurement Process The construction project quality management process is dependent on several factors such as criticality, complexity, and dollar value of the system, equipment, material, or service, as well as the nature of the procurement (i.e. fixed price vs. cost, R&D vs. production, etc.). The procurement processes are used to fulfill the contract that occurs at any point in a project life cycle where external resources are required to provide supplies and services in any combination. Procurement Process Procurement process is process of identifying the project products needs that can be procure within time and budget and seek support from out side the project team member for specialist products. 1- Procurement Planning Procurement planning is process of identifying the project products needs that is needed to deliver a project which satisfy customer. a- Project scope of work It provided important information about projects needs Provide short description of the products. Provide brief outline of the quantity and quality of product. b- Project Specification and drawings It provided the boundary of the products. c- Product list List of equipments and well the subcontract work to be subcontracted. d- Company resources If the organization doe not have contacting group or product then the project team has to supply both resources and expertise to conduct the activities. e- Product estimated value Estimate the financial value of the proposed contract for budget value - 5 -

f- Product supplier list List of equipment suppliers and subcontractors g- Type of product Procurement Non competitive bids - Sole souring : is the procurement of goods or service that is unique to particle vendor and cannot be obtained from anther source - Single sourcing: is the procurement of goods or service from particle vendor rather than competitive bids. Competitive bids: Accepted the lowest bid meeting the requirements and specification in the competition. h- Approval to procedure with procurement Management decision to proceed / not to proceed based on estimated and market condition of product Provide justification for not to proceed. 2- Documentation of purchasing requirement Documents shall identify scope, product characteristic, and forms. They should include delivery dates for product. Failure to identify things that exist at outset of the procurement give rise to costly dispute between the parties a- prepare procurement documents b- Standard forms Inquiry purchase order delivery note Establish terms and condition of the contract Correspondence and references c- Invite contractors from approved shortlist to submit tender offers or expression of interest - Advertise for tenders - Invite tenders offers from short list - Response to clarification - Conduct clarification meeting / site meeting as necessary - Issue attendance /with minute of meeting - Issue addenda if needed d- Receive tender offers or expression of interest e- Prepare evaluation report i- Review procurement documents j- Make official sue that finance is available - 6 -

3- Supplier and Subcontractor evaluation Based on setting criteria the bids or proposal are evaluated. a- Open and record tender offers received b- Determine whether or not tender offers are completed c- Determine whether offers compliance to request d- Evaluate tender submissions Standard items Price and term of payment Delivery Non standard - Overall or life cycle cost - Technical capability - Understudying the needs - Management of provider approach - Financial capability of provider - Price and technical skills - Installation and testing - History with vendor organization - Customer acceptance - Customer feedback and approval of the selection e- Perform a risk analysis All likely or possible outcome risks should be identify and explicitly assigned to a particle party in procurement documents, failing which - Tender price will be unexpected high f- Prepare a tender evaluation report The evaluation report should included the recommendation in respect of action to be taken. 4- Award Contract Procurement planning is process of identifying the project products needs that can be procure. a- Notify successful tender and unsuccessful tender of outcome Notify in writing the successful tender and unsuccessful tenders. b- Compile contract documentc- Capture contract award date d- Formally accepted tender offer - 7 -

5- Administration Procurement administration is process of ensuring that supplier / contractor performance meets contractual requirement. a- Administer contract in accordance with the terms and provision of the contract b- Ensure compliance with requirement Monitor the contractor / supplier s performance to ensure that the request quality standard is attained and all requirements are satisfied and certify compliance upon completion. c- Capture contract completion and closeout d- Payment Pay within the time period provided in the contract to avoid dispute and reasons for delay. 6- Inspection A formal inspection is review of deliverable by an inspector who would typically be external to the project team, third party. The inspector captures statistics on suspected defects. It is technique for use with documentation. 1- Request for manufactures / subcontractors inspection procedure 2- Review vendor/ manufacturer inspection procedures 3- Get approval of inspection test plan 4- Submitted inspectors third part CVs for approval for each equipments 5- Send RFI 6- Review and RFI report and clear punch list 7- Get release of the equipments 8- Ship the equipments 9- Document to be provided to selected third part inspector a. Copy of un price PO b. Approved drawings c. Approved specification d. Place of inspection e. Address of owner Characteristics, not wholly visible in the end item, for which conformance must be established progressively through precise measurements, inspections, tests, and controls applied during purchasing, manufacturing, performance, assembly, and functional operations. Noncomplex items have quality characteristics for which simple measurement and test of the end item are sufficient to determine conformance to contract requirements. Basically there are two levels of contract quality requirements - 8 -

a. Contractor & owner Inspection This simplest level, contractor inspection, is used for small purchases whereby the item being procured is not complex or critical. Using this requirement, the contractor is solely responsible for inspecting the item, and there is no third party inspection or involvement. b. Standard Inspection. There is a wide variety of clauses to use depending upon the nature of the procurement. The appropriate standard inspection clause(s) should be used on all procurements when the item procured warrants something greater than Contractor Inspection (i.e. other than non-complex small purchases). The various standard inspection clauses essentially require an inspection system acceptable to the owner, provide for owner inspection at source, and provide various administrative details such as handling unacceptable items. 7- Delivery Procurement planning is process of identifying the project products needs that can be procure. a- Deliver to site with the following documents Equipment / Material description Quantity, size, model brand Equipment test certificate Equipment / material manual b- Delivery Decision Available of site store facility Radiance of installation place Cash flow Installation Manpower Related interface item c- Site inspection Conduct visual inspection If the product or progress of subcontractor is rejected then i. Inform vendor, supplier and subcontractor for reason for rejection ii. Assure rectification iii. Check insurance regarding claim possibility for delay 8- Improvement - 9 -

Project manager shall monitor the process and Whether the procurement satisfied the stated objective Whether needs and expectation have be meets Whether the procurement process should be improve How external factors such regulation, standard component have change Whether the process improve cost saving Project manager will monitor the site References: 1) Bruce T Barkley & James Saylor. Customer Driven Project Management. Mc Graw Hill Mach 2000. 2) Siemens Quality manual 3) Quality Management. Guide to the project management body of knowledge (PMBOK Guide). Chapter 8 (PMBOK Guide) 2000 4) Project Procurement Management. Guide to the project management body of knowledge Chapter 12 (PMBOK Guide) 2000-10 -