User Manual for Equipment PAS. Operational Benefit Evaluation by Testing an A-SMGCS. A. Gilbert



Similar documents
WHICH AIR TRAFFIC CONTROLLER TO CONTACT

Report on the format, quality and quantity of raw system performance results for the Toulouse Blagnac airport

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

NAMIBIAN RADIO LICENSE VALIDATION

Learning Objectives 04 COMMUNICATIONS (VFR)

ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots

European Air Traffic Management Master Plan Edition 1-30 March 2009

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

Operational Need Technical Challenges Technical Solution System Architecture MDS Performance Experience from Austria (A-SMGCS) Agenda

The CREDOS Project. Human Machine Interface Design

Training program for S2 (TWR) rating

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

Air Traffic Management Services Plan

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)

EDTY Schwäbisch Hall

How To Understand The Rules Of An Aerodrome

International Virtual Aviation Organization. Hong Kong. Division Report Annual Report

Appendice 1 al Regolamento ENAC ATSEP Basic training Shared

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

ATCoach Radar Training Simulator

REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION CIVIL AVIATION SAFETY REGULATION (C.A.S.R)

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

Die Zukunft der Luftfahrt Die europäische Vision 2020

How To Improve The Performance Of Anatm

SESAR Definition Phase - Deliverable 5. SESAR Master Plan D5

ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.

PPL Radiotelephony Manual Antonios Papadakis

CCAMS CONTINGENCY PLAN. Network Operations

1.1 The circumstances of each aircraft emergency can vary to such an extent that detailed instructions cannot be given for every situation.

LOCAL OPERATING PROCEDURES (LOP) LANDVETTER TWR (ESGG)

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

Area Navigation (RNAV) and Required Navigation Performance (RNP)

SUP 42/15 (AD 2 EPWA)

EUROPEAN NETWORK OPERATION SAFETY TOP 5 RISKS. HOW TO IDENTIFY, ANALYZE AND RESPOND? RUNWAY SAFETY ACTION PLANS. Joe Sultana

Key Performance Indicators for Performance-Based Airport Management from the perspective of airport operations

Official Journal L 281. of the European Union. Legislation. Non-legislative acts. Volume October English edition. Contents REGULATIONS

Chapter 15. Airports Authority of India Manual of Air Traffic Services Part EMERGENCY PROCEDURES

Overview of NM and CDM

CONCEPT FOR ACTIVITY 1: DYNAMIC & PROACTIVE ROUTES OR GREEN-ROUTES

11 Distress and Urgency

AIRSPACE EXPLAINED. Separation of Traffic

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

ADS-B NRA deployment by DSNA

Collaborative Departure Queue Management

Pricing Framework July 2012

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

SESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006

FLIGHT TEST SCHEDULE. Pagina 1 of 5. Examiner(s): TRAINING/SKILL TEST/PROFICIENCY CHECK. single pilot aeroplanes (except HPA complex aeroplanes)

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

LONDON SOUTHEND AIRPORT CLASS D CONTROLLED AIRSPACE GUIDE

A Strategic Vision of Air Traffic Management in New Zealand to 2025

In-flight Evaluation of Avionic Systems

Familiarisation Briefing for Jet and Multiengine Aircraft Crews.

SECTION 2 - GENERAL. Callsign. Tower Control Service Tower _TWR Active Runway(s) & ATZ/CTR. Approach or Departure or Radar Area or Radar

How To Know What Is Happening In European Air Transport

AVIATION TRAINING ACADEMY

CNS/ATM SYSTEMS IN INDIA

CREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE. (according to Article 10 of Commission Regulation (EU) No 1178/2011)

RULES OF THE AIR AND AIR TRAFFIC SERVICES

Overview of the European PPlane project

ICAO FLIGHT PLAN MODIFICATIONS 2012

Information to VFR pilots

Accident Bulletin 1/2010. Date and time of accident: 13 April 2010 at 1343 hours local time (0543 UTC)

Air Traffic Management

Aurora Air Traffic Management System

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

FINAL REPORT. Investigation into the incident of aircraft B 777-2Q8ER, at LKPR on 18 April Prague October Ref. No 105/06/ZZ.

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 19. April 2012 Prepared By Fakhir.F. Mohammed Civil Aviation Consultant

IMPLEMENTATION AND VALIDATION OF TAXI-CPDLC FUNCTIONALITY WITHIN THE EU PROJECT EMMA2

Título ponencia: Guidance for GBAS Operations Implementation

EMERGENCIES IVAO BE 28 OCT by Bob van der Flier IVAO-TA12 & PATCO

Performance-based Navigation and Data Quality

Advanced Surface Movement, Guidance and Control Systems (A-SMGCS)

Airspace E. update. Controlled airspace in which IFR and VFR traffic is permitted

RULES OF THE AIR AND AIR TRAFFIC SERVICES

SWIM Connect SWIM Partnerships: Collaboration with the FAA s Decision Support Service (DSS) Programs 3:00 PM. Federal Aviation Administration

Air Traffic Management

For Flight Simulation purposes only on the VATSIM Network.

Flight information that keeps pilots a step ahead.

Remote Tower Operations - Wo geht die Reise hin? -

COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO)

MANUAL OF S1 CLEARANCE DELIVERY AND GROUNG SERVICE

EUROCONTROL COOPERATIVE NETWORK DESIGN

Automatic Dependent Surveillance Broadcast (ADS-B)

EUROCONTROL Specification For On-Line Data Interchange (OLDI) Edition 4.2

CTAF PROCEDURES GUIDE

ALAMEDA DO AEROPORTO Caixa Postal, Maputo REGULATIONS NEW FORMAT FLIGHT PLAN

Safety Risk Impact Analysis of an ATC Runway Incursion Alert System. Sybert Stroeve, Henk Blom, Bert Bakker

KBCT HIGH. Boca Raton Airport Boca Raton, Florida, United States. Diagram #1: Airport Diagram. NOISE ABATEMENT PROCEDURES by Whispertrack

INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM

Southwest Texas Regional Advisory Council Air Medical Provider Advisory Group (AMPAG)

AVIATION INVESTIGATION REPORT A07A0025 LOSS OF SEPARATION

Transcription:

BETA Growth Project 1999-RD.10804 A. Gilbert Project Funded by European Commission, DG TREN The Fifth Framework Programme Competitive and Sustainable Growth Contract 1999-RD.10804 Project Manager Michael Roeder Deutsches Zentrum für Luft und Raumfahrt Lilienthalplatz 7, D-38108 Braunschweig, Germany Phone: +49 (0) 531 295 3026, Fax: +49 (0) 531 295 2550 e-mail: beta@dlr.de Copyright Notice: 2003, EC Sponsored Project Beta This document and the information contained herein is the property of Deutsches Zentrum für Luft- und Raumfahrt, Park Air Systems AS, Deutsche Flugsicherung, Nationaal Lucht- en Ruimtevaartlaboratorium, QinetiQ, Air Navigation Services of the Czech Republic, Ceská správa letist, Hamburg Airport, ERA, Thales ATM and the European Commission (EC). Any reproduction or other use of this material shall acknowledge the BETA-Project, the companies involved and the EC as the information sources. Visit the BETA Web page: http://www.dlr.de/beta

BETA Growth Project 1999-RD.10804 Document Control Sheet Project Manager M. Röder Responsible Author(s): A. Gilbert Additional Author(s): H. Skatvedt; E. Blakstad; T. Sommerseth Company: Subject / Title of Document: Related Task(s): WP3000 Deliverable No. and Target Date D19 Save Date of File: 2003-09-18 Document Version: 1.0 Reference / File Name D19-UME-10_Abstract.DOC Number of Pages 5 Distribution Category: (P/R/I)* Public Abstract *Type: P: Public, R: Restricted, I: Internal dt-wordtmp-10.dot chg. "0" Document Distribution Member type Organisation Name Distributed ** Web page intranet http://www.dlr.de/beta internet Contractors ANS-CR M. Tykal AUEB K. Zografos BA J. Conlon CSL P. Hlousek QINETIQ A. Wolfe DFS K.-R. Täglich DLR M. Röder ERA Z. Svoboda FHGG D. Wolf HITT A. Vermeer TATM S. Paul BAE Systems B. Wortley A. R. Johansen NLR F. van Schaik Quality Assurance B. Helgerud Sub-Contractors AHA D. Gleave Airport BS (BWE) K. Oertel CSA (2 nd Airline) K. Mündel Customer EC C. Bernabei Additional ACI J. Waechtler EUROCONTROL P. Adamson IATA T. van der Veldt IFATCA L. Staudt ** Distributed: put in date of delivery A date in the Web page=intranet column corresponds to a delivery to all Project members (Contractors) A date in the Web page=internet column corresponds to a delivery to all in the list Copyright Notice: 2003, EC Sponsored Project Beta This document and the information contained herein is the property of Deutsches Zentrum für Luft- und Raumfahrt, Park Air Systems AS, Deutsche Flugsicherung, Nationaal Lucht- en Ruimtevaartlaboratorium, QinetiQ, Air Navigation Services of the Czech Republic, Ceská správa letist, Hamburg Airport, ERA, Thales ATM and the European Commission (EC). Any reproduction or other use of this material shall acknowledge the BETA-Project, the companies involved and the EC as the information sources. Visit the BETA Web page: http://www.dlr.de/beta

BETA Change Control Sheet Date Issue Changed Items/Chapters Comment 2001-05-20 0.1 First Draft based on working paper Phase 1 Functions 2001-08-20 0.2 Section 3.2.6. Added stopbar monitoring. Section 3.3.5. Added flight data message window. 2001-12-10 0.3 Editorial changes. Internal review 2002-03-15 0.4 Section 3.2.4. Changes to EFS windows. Phase 2 improvements Section 3.2.5. Changes to TARGET menus. Section 3.2.6. Changes to ALERT menus. Section 3.3. Changes to Special Windows. New section 3.4. Special Target Functions. 2002-05-24 0.5 Chapter 4. Added description of DLR onboard Contribution from DLR HMI. Corrections throughout. 2002-06-20 0.6 Chapter 4. Added description of QinetiQ onboard Contribution from QinetiQ HMI. 2002-07-29 1.0 Formal changes Date and issue of Document as approved by the EC 2003-09-18 Public Abstract Contents 1. Scope of Document...4 1.1 Document Structure...4 1.2 Acronyms and Abbreviations...5 Issued: 2003-09-18 Public Abstract Page 3 of 5

BETA 1. Scope of Document This document is the User Manual for the NOVA equipment, and is a deliverable of Work Package 3000, in accordance with the BETA Project Management Document Fehler! Verweisquelle konnte nicht gefunden werden.. Since the main users of the BETA A-SMGCS are air traffic and apron controllers, the document concentrates primarily on the operation of the Controller HMI, but also provides the basic knowledge necessary for BETA personnel to operate the On-board HMI and the Recording and Playback System (RPS). 1.1 Document Structure The document is divided into 6 chapters as follows: Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 is this introduction describes the general features of the BETA controller working position provides a detailed description of the operation of the Controller HMI describes the function and operation of the On-board HMI describes the function and operation of the Recording and Playback System is an appendix containing lists of references, figures, tables, acronyms and abbreviations. Issued: 2003-09-18 Public Abstract Page 4 of 5

BETA 1.2 Acronyms and Abbreviations ACK AGL APR A-SMGCS ATC BRM CA-ARR CA-DEP CWP EFS EFIS EMG ETA ETD EOBT FL GDPS GND HIJ HMI LAN MET NM RCF RPS RT RVR RWY SID SMR SSR STAR TECAMS UTC UME VFR VMI Acknowledge Aerodrome Ground Lighting Apron Advanced Surface Movement Guidance and Control System Air Traffic Control Bearing and Range Marker Conflict Alert - Arrival Conflict Alert - Departure Controller Working Position Electronic Flight Strip Electronic Flight Information System Emergency Estimated Time of Arrival Estimated Time of Departure Estimated Off-Block Time Flight Level Ground plan Data Processing System Ground Hijack Human-Machine Interface Local Area Network Meteorological Nautical Mile Radio Communication Failure Recording and Playback System Radiotelephony Runway Visual Range Runway Standard Instrument Departure Surface Movement Radar Secondary Surveillance Radar Standard Instrument Arrival Route Technical Control and Monitoring System Coordinated Universal Time Visual Flight Rules Vertical Motion Indicator Issued: 2003-09-18 Public Abstract Page 5 of 5