1 Edition 1.0 Edition date: 15/04/2011 Advanced Surface Movement, Guidance and Control Systems (A-SMGCS) Implementation Manual Directorate Network Management EUROCONTROL
2 EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Advanced Surface Movement, Guidance and Control Systems (A-SMGCS) - Implementation Manual Edition Number : 1.0 Edition Date : 15/04/2011 Status : Released Issue Intended for : General Public DIRECTORATE NETWORK MANAGEMENT
3 DOCUMENT CHARACTERISTICS TITLE Advanced Surface Movement, Guidance and Control Systems (A-SMGCS) - Implementation Manual Publications Reference: ISBN Number: Document Identifier Edition Number: 1.0 A-SMGCS_Implementation-Manual Edition Date: 15/04/2011 Abstract This manual is intended to support project managers/leaders and other involved parties of an implementation project for A-SMGCS technology and operations. It shall provide guidance on activities to be considered, depending on the local set-up of such an implementation project. Keywords Implementation Manual Guidance A-SMGCS Level 1 Level 2 Authors Marie-Louise BERRY, Bert KLINKERS, Matthis BIRENHEIDE Contact(s) Person Tel Unit Matthis BIRENHEIDE DNM/COO/NOM/APT STATUS, AUDIENCE AND ACCESSIBILITY Status Intended for Accessible via Working Draft General Public Intranet Draft DNM Stakeholders Extranet Proposed Issue Restricted Audience Internet ( Released Issue Electronic copies of this document can be downloaded from : html Edition: 1.0 Released Issue Page 1
4
5 DOCUMENT CHANGE RECORD The following table records the complete history of the successive editions of the present document. EDITION NUMBER EDITION DATE REASON FOR CHANGE PAGES AFFECTED /10/2010 Creation of Document All /01/2011 Incorporation of proposed changes of the stakeholder review group All /02/2011 Internal review All /03/2011 Proposed issue All /04/2011 Released issue after stakeholder consultation All Publications EUROCONTROL Headquarters 96 Rue de la Fusée B-1130 BRUSSELS Tel: +32 (0) Fax: +32 (0) Edition: 1.0 Released Issue Page 3
6 CONTENT DOCUMENT CHARACTERISTICS...1 DOCUMENT APPROVAL...2 DOCUMENT CHANGE RECORD...3 INTRODUCTION...7 DOMAIN LAYER...10 ACTIVITY LAYER Stakeholder Analysis Stakeholder Commitment General Operations Contract/ Purchase/ Legal Certification Technology OPS - Reporting...19 Change Management...20 Quality Management...21 Requirements...23 OPS - Technology...24 OPS - Licensing...25 OPS - Training...26 OPS - Phraseology...27 OPS - OPS - Procedures...28 Testing...29 OPS - Regulation...30 OPS - Project Management...31 Page 4 Released Issue Edition: 1.0
7 OPS - Certification...32 OPS - Transition Management...33 TEC - System Certification...35 TEC - Contingency & Redundancy...36 TEC - Contract/ Purchase/ Legal...37 TEC - TEC - TEC - TEC - TEC - TEC - TEC - Requirements...38 Installation...39 Maintenance...40 Operations...41 Performance...42 Project Management...43 Testing...44 TEC - Training...45 REG - Operations...47 REG - Technology...48 REG - REG - Certification...49 Project Management...50 REG - Contract/ Purchase/ Legal...51 REG - Change Management...52 CER - Technology...54 CER - Operations...55 CER - Regulation...56 CER - CER - CER - Cases Safety/HF...57 Project Management...58 Change Management...59 CPL - Call for Tender...61 CPL - Tender Negotiations...62 CPL - Procurement...63 Edition: 1.0 Released Issue Page 5
8 CPL - Contract Management...64 CPL - Legal...65 CPL - Financial Management...66 CPL - Commercial Management...67 CPL - CPL - Financial Reporting & Controlling...68 Project Management...69 GUIDANCE MATERIAL...70 ABBREVIATIONS...72 Page 6 Released Issue Edition: 1.0
9 INTRODUCTION This Implementation Manual is intended to provide guidance on the planning and organisation of an implementation project for A-SMGCS, and provide assistance on the different steps leading to the successful implementation of an A-SMGCS System, regardless of the organisation responsible for leading the project. The document structure is based on a modular concept currently consisting of the following six Domains: - Project Management OPS - Operations TEC - Technology REG - Regulation CER - Certification CPL - Contract/ Purchase/ Legal Each Domain consists of a different number of Activities that should be taken into account when conducting the implementation. Such activities would be for example: Procedures Certification Requirements Certain Activities will appear under several Domains, highlighting the interrelation between the different Domains and actors. They will also address similar Sub-Activities per Domain from different perspectives as well as unique sub-activities for only one Domain. For providing a hands-on instrument, the level of Sub-Activities is composed of a dedicated Edition: 1.0 Released Issue Page 7
10 working sheet per activity identified. It includes a number of sub-activities to be conducted and considered but also provides for expansion based on local decision and requirements. It is printable and may be used as guidance for each project member conducting a dedicated task. The Sub-Activity sheet also provides for a linkage to other Domains involved in a certain Activity, being easily traceable by the colour-coding used for the Domain layer as shown by the example below: Technology TEC - Requirements Translate operational requirements into functional requirements Identify basic system layout Identify if actual systems or its components are eligible for migration/integration into the new system Define requirements regarding linkage to and/or from other systems (e.g. FDPS, DMAN, AGL, etc) Evaluate and define technical requirements Evaluate and define electrical requirements Evaluate and define IT requirements Evaluate and define HSE (Health, Safety and Environment) requirements Establish technical documentation Evaluate and list regulatory requirements in relation to the functional/technical requirements Request advise from REG on regulatory aspects Verify at regular basis if updates on standards, rules, regulations and specifications are available OPS REG CER Page 8 Released Issue Edition: 1.0
11 A selected group of stakeholders, composed of persons with practical experience on this kind of implementation project, was requested to review and provide feedback on the structure and contents of the manual. Two important principles were introduced as an outcome of the review group s evaluation of the manual: Activities and sub-activities are not numbered on purpose. This to avoid the impression that a specific order and sequence needs to be respected during the execution of the implementation project; Activities and respective sub-activities can be added, deleted, or altered at the airport s discretion, as required. With regard to the previous remarks, the possible dependencies and interdependencies between different sub-activities are indicated through the representation of the Domain icons in the field and maintained at this level on purpose. Edition: 1.0 Released Issue Page 9
12 DOMAIN LAYER Regulation (REG) Project Management () Certification (CER) A-SMGCS Technology (TEC) Contract Purchase Legal (CPL) Operations (OPS) Page 10 Released Issue Edition: 1.0
13 ACTIVITY LAYER Reporting Stakeholder Analysis Stakeholder Commitment Project Management () Certification Change Management Technology General Contract Purchase Legal Operations Quality Management Edition: 1.0 Released Issue Page 11
14 Project Management - Stakeholder Analysis Identify the individuals/groups to be involved in the project set-up Analyse the role of involved individuals/groups Identify the stages of the project at which the selected individuals need to be involved Divide between internal and external stakeholders (e.g. internal departments, external focal points, NSA/Regulator) Define a strategy on how to involve the selected people/organisations Develop a communication plan (define arguments to overcome blocking points and to find supporters, adopt language/content according to the hierarchical level) Develop a matrix of supporting and blocking factors OPS TEC REG CER CPL Page 12 Released Issue edition: 1.0
15 Project Management - Stakeholder Commitment Secure and maintain commitment from (internal) senior management for required and identified resources in written Secure and maintain commitment from (external) senior management for the identified individuals with the support of own senior management, where required Ensure that middle and lower management is informed about decisions and commitments to ensure that required resources are made available OPS TEC REG CER CPL Edition: 1.0 Released Issue Page 13
16 Project Management - General Create a project management plan (P) Secure regular update and maintenance of the P Establish and maintain a project schedule Define a schedule for project meetings Set-up a selection board with all partners (operational, technology and finance) for reviewing and selecting offers Establish a list on who is entitled to sign-off contracts, contract amendments, deliverables and invoices (in case of a multi organisational project take co-signing into account) Define the required amount of the support of those individuals and develop a justification Develop a Work Break-down Structure (WBS) Bring all parties together for explaining the dependencies and interdependencies on a regular basis Secure buy-in by making all parties involved understanding their respective role and contribution Secure that the defined operational requirements are agreed and signed-off by all parties involved Define the project objectives OPS TEC REG CER CPL Page 14 Released Issue edition: 1.0
17 Project Management - Operations Identify individuals acting as facilitator > build the core team Develop a timeline to be presented to operational staff and explaining the stages of the project and involvement of operational staff Secure that OPS identifies the operational requirements Secure that TEC identifies the functional requirements and develops the specifications Ensure that the most recent guidance material is available and used (with support of REG and CER) Secure that TEC and OPS are identifying contingency/redundancy needs Support TEC in developing a package for testing, validation and site acceptance activities Task OPS to develop a training package Secure that OPS supports contract management OPS TEC REG CER CPL Edition: 1.0 Released Issue Page 15
18 Project Management - Contract/ Purchase/ Legal Determine the available budget Task CPL to establish the procurement process Task CPL to establish the required legal support Task CPL to establish the contract management (cooperation between CPL/ / TEC/ OPS) Secure that CPL is involved in the change management process OPS TEC CPL Page 16 Released Issue edition: 1.0
19 Project Management - Certification Task CER to identify required certification steps on operational level and identify, which steps need to be fulfilled Task CER to identify required certification steps on technical level and identify, which steps need to be fulfilled Bring both parties together and identify a common stepby-step approach to achieve overall system certification Ensure that relevant cases are built (e.g. Safety, Human Factors, Environment, etc) Secure that the new system is integrated in the Safety and Security Management Systems CER Edition: 1.0 Released Issue Page 17
20 Project Management - Technology Secure that OPS is sufficiently involved in identifying the functional requirements Task TEC to develop a package for testing, validation and site acceptance activities Task TEC and OPS to identify contingency/ redundancy needs Assure contribution of TEC to the call for tender process Task TEC to support the contract management (cooperation between CPL/ / TEC/ OPS) Secure that TEC has the required regulatory input for certification Task TEC to develop a training package for system maintenance Task TEC to support the development of a training package for OPS TEC Page 18 Released Issue edition: 1.0
21 Project Management - Reporting Create milestones and management decision points Establish a reporting methodology and secure agreement of all relevant parties (especially external) OPS TEC REG CER CPL Edition: 1.0 Released Issue Page 19
22 Project Management - Change Management Develop and establish an appropriate risk management activity Develop and establish a change request process Develop and establish a non-conformance cost management (NCC) Secure the contribution of all relevant actors in the change management process Develop a transition plan from current procedures and technology towards the new system OPS TEC CER CPL Page 20 Released Issue edition: 1.0
23 Project Management - Quality Management Establish a Quality Management Plan (QMP) for internal activities and processes in accordance with the Quality Management Handbook (QMH) of your organisation Secure with external parties that quality management is effectively demonstrated Identify the areas of the project where quality assurance is key Secure the contribution of all relevant actors in the quality management process OPS TEC REG CER CPL Edition: 1.0 Released Issue Page 21
24 Phraseology Regulation Training Testing Operations (OPS) Project Management Technology Licensing Procedures Transition Management Certification Requirements Page 22 Released Issue edition: 1.0
25 Operations OPS - Requirements Develop the operational requirements for the A-SMGCS Assess which requirements are essential and which are non-essential. Evaluate potential impact of identified requirements not being realised Establish an evaluation and change process in case of limitations (e.g. budget/ technical/ ergonomics) TEC REG CER CPL Edition: 1.0 Released Issue Page 23
26 Operations OPS - Technology Provide TEC with the operational requirements Support identification of functional requirements Support identification of technical requirements Identify any limitations in using this system Ensure that the technical solution meets the defined operational requirements Define a service level for restoration of degraded system services Collect recent operational documents and guidance material for reference in support of TEC Support the development of the technical contingency and redundancy requirements Define a minimum equipment list being essential for the operations for degraded modes of operation (redundancy and potential failures). TEC REG CER Page 24 Released Issue edition: 1.0
27 Operations OPS - Licensing Identify what category of license and/or endorsement is required Match the current licenses/endorsements against the requirement and identify gaps Ensure that operational staff in question is trained according to the requirement REG CER Edition: 1.0 Released Issue Page 25
28 Operations OPS - Training Identify the staff that requires training Define the training modules for the different user groups, e.g. TWR, Approach, Apron, vehicle drivers Consult with the relevant training department(s) and identify what kind of training material is required (e.g. technical part and operational part) Identify the groups/ individuals to support the training package (e.g. TEC, supplier, etc) Develop training plans in cooperation with the relevant training department(s) Identify if part of the training package needs to be provided by the supplier Establish a core team being involved in the training activities TEC REG CER Page 26 Released Issue edition: 1.0
29 Operations OPS - Phraseology Consult documentation related to phraseology, e.g. ICAO Identify appropriate standard phraseology to be applied for the use of A-SMGCS Address required changes in the training package REG CER Edition: 1.0 Released Issue Page 27
30 Operations OPS - Procedures List current operational procedures Consult documents (e.g. ICAO)/ operational manuals/ AIP Adapt existing and/or develop new operational procedures for the use of A-SMGCS and feed them into the Safety case, if so required If changes are applicable ensure that certification requirements are considered Update relevant documentation (e.g. AIP, operational manuals, safety management manuals, etc) Notify affected airport partners (e.g. ground handlers, aircraft operators) on changing or new procedures Define contingency procedures Implement and publish transponder operating procedures Address required changes on procedures in the training package TEC REG CER Page 28 Released Issue edition: 1.0
31 Operations OPS - Testing Evaluate overall operational acceptability of the system Agree and confirm on time slots for all testing activities required Establish a core team to be involved in the different test phase and validation activities Contribute to the factory acceptance test (FAT) Contribute to the site acceptance test (SAT) Perform to the operational acceptance test Document the results from the operational acceptance test for the certification process TEC CER Edition: 1.0 Released Issue Page 29
32 Operations OPS - Regulation Verify the regulatory requirements with the supervisory authority Identify European norms and specifications, if applicable Identify national standards Identify ICAO global and regional standards and recommendations Identify EASA Safety Requirements, if applicable Consult EUROCONTROL guidance material TEC REG CER Page 30 Released Issue edition: 1.0
33 Operations OPS - Project Management Identify timelines/ risks from the operational perspective Support contract management Contribute to project reporting Contribute to project meetings Contribute to change management Assist to the selection process of eligible members of the project core team Edition: 1.0 Released Issue Page 31
34 Operations OPS - Certification Identify the contribution of OPS within the certification process Identify the necessary steps for achieving the certification Collect all relevant documentation/ evidence of the operational part of the system required for the certification process Ensure support in building the Safety and the Human Factors Case Ensure that you are provided with the results of the certification process TEC REG CER Page 32 Released Issue edition: 1.0
35 Operations OPS - Transition Management Develop a transition schedule Develop the transition Safety Case Develop the transition procedure Establish a core team being involved in the transition process Create a management decision point for transition to the new system TEC REG CER Edition: 1.0 Released Issue Page 33
36 Installation Operations Testing Technology (TEC) Training Project Management Requirements Performance Contingency Maintenance Redundancy System Certification Contract Purchase Legal Page 34 Released Issue edition: 1.0
37 Technology TEC - System Certification Collect and analyse applicable standards Collect and analyse applicable specifications Ensure that the documentation on supplier conformance to applicable standards and specifications is available Support the development of the system certification process Conduct a full system certification for the technical part Support in building the local Safety and Human Factors Case Compile a list of applicable A-SMGCS regulation Compile a list of applicable A-SMGCS rules Verify at regular basis if updates on standards, rules, regulations, and specifications are available OPS REG CER Edition: 1.0 Released Issue Page 35
38 Technology TEC - Contingency & Redundancy Establish contingency and redundancy procedures for technical staff Define redundancy and availability for each system component and for the overall system Develop technology risk scheme Support the development of OPS contingency and redundancy procedures OPS CER Page 36 Released Issue edition: 1.0
39 Technology TEC - Contract/ Purchase/ Legal Support the call for tender process on technical issues Support the contract management on technical issues for potential maintenance contract with the supplier Document the maintenance requirements Document the spare parts requirements Define and document the warranty requirements CPL Edition: 1.0 Released Issue Page 37
40 Technology TEC - Requirements Translate operational requirements into functional requirements Identify basic system layout Identify if actual systems or its components are eligible for migration/integration into the new system Define requirements regarding linkage to and/or from other systems (e.g. FDPS, DMAN, AGL, etc) Evaluate and define technical requirements Evaluate and define electrical requirements Evaluate and define IT requirements Evaluate and define HSE (Health, Safety and Environment) requirements Establish technical documentation Evaluate and list regulatory requirements in relation to the functional/technical requirements Request advise from REG on regulatory aspects Verify at regular basis if updates on standards, rules, regulations and specifications are available OPS REG CER Page 38 Released Issue edition: 1.0
41 Technology TEC - Installation Perform a local survey Contribute to the reception of delivered equipment Develop a siting plan for the respective systems Monitor compliance to the HSE Plan Conduct periodic installation progress meetings Assure that appropriate installation schedules, documentation and design are developed and regularly reviewed OPS Edition: 1.0 Released Issue Page 39
42 Technology TEC - Maintenance Define maintenance service levels Provide technical support to operations Define warranty requirements Define spare parts policy Develop and establish maintenance procedures Ensure that the appropriate maintenance tools are available Collect applicable maintenance standards and norms Define required supplier support after warranty period Ensure that maintenance is performed in accordance to HSE (Health, Safety and Environment) requirements Ensure that maintenance is performed in accordance with quality assurance and control Ensure that qualified technical staff is available and appropriately trained for maintaining the system OPS REG CPL Page 40 Released Issue edition: 1.0
43 Technology TEC - Operations Agree and develop the transition schedule Establish the fault reporting process and documentation Establish a change management process Provide technical support to the development of operational requirements Define data recording and extraction requirements for accident and incident investigation Support to simulator training activities Collect system design and layout requirements from OPS Assist OPS in the development of the transition plan OPS REG CER Edition: 1.0 Released Issue Page 41
44 Technology TEC - Performance Define and elaborate requirements for replay of recorded A-SMGCS data Define requirements for archiving operational data Define requirements for archiving maintenance data Establish a system performance measuring process Define system performance measuring tools OPS Page 42 Released Issue edition: 1.0
45 Technology TEC - Project Management Contribute to the definition of system components Contribute to the definition of the system concept Contribute to the final turnover (handover to OPS) documentation Provide input to the master project plan Support the stakeholder analysis Provide support in obtaining internal stakeholder commitment Contribute to project status meetings Contribute to the project reporting Contribute to the change management processes Assist to the selection process of eligible members of the project core team and project resources Contribute to the Safety Management System Contribute to the Security Management System REG CER Edition: 1.0 Released Issue Page 43
46 Technology TEC - Testing Participate and witness the Factory Acceptance Test Execute the Site Acceptance Test (technical and interface perspective) Support the Operational Acceptance Test (evaluation of the system from an operational point of view before starting warranty period) Perform trials (evaluate system stability and performance during a contractually agreed period) Collect required test equipment and tools Define and list environmental requirements during the different test phases / periods Develop, plan and prepare test validation activities OPS CER Page 44 Released Issue edition: 1.0
47 Technology TEC - Training Collect applicable standards Define and provide relevant documentation and/or software Define the level of training to be provided by the supplier for maintenance staff Develop training syllabi Support the OPS training package Identify appropriately qualified maintenance personnel eligible for training OPS REG CER Edition: 1.0 Released Issue Page 45
48 Technology Project Management Regulation REG Contract Purchase Legal Certification Operations Change Management Page 46 Released Issue edition: 1.0
49 Regulation REG - Operations Identify European and national regulation and norms being relevant for the operational part Identify all relevant ICAO and ICAO Regional material for the operational part Divide between mandatory and recommended provisions Verify the results with the Supervisory Authority Advise OPS on standards, norms, and regulation to be met OPS CER Edition: 1.0 Released Issue Page 47
50 Regulation REG - Technology Identify European and national regulation being relevant for the technical part, e.g.: EASA, EUROCONTROL, European Commission, if applicable in your State Identify relevant Directives and cross-check applicability and/or potential national deviations with the Supervisory Authority Identify relevant national norms Advise TEC on standards, norms, and regulation to be met, for defining the functional requirements and specifications Advise on the different entities that have to be taken into account (e.g. NSA for the system certification, potential other authorities for technical sub-parts of the system, as electronic devices, radar, redundancy supplies, etc) Advise on interoperability requirements to be considered for certification TEC CER Page 48 Released Issue edition: 1.0
51 Regulation REG - Certification Identify all relevant ICAO global and regional material for the certification Secure that relevant means of compliance are available for both, technology and operations Identify if European or national norms are available as means of compliance Identify additional material being relevant for the project, e.g. from EUROCAE CER Edition: 1.0 Released Issue Page 49
52 Regulation REG - Project Management Advise and CPL on standards, norms, and regulation to be met, when defining the call for tender Advise on standards, norms, and regulation to be met when preparing the certification activity In case no standards are available, advise on other means of compliance to be considered Advise during interaction with the Supervisory Authority on certification issues Investigate potential impact on the aerodrome certification and advise Liaise with the legal department, where deemed necessary Assist to the selection process of eligible members of the project core team and project resources CER CPL Page 50 Released Issue edition: 1.0
53 Regulation REG - Contract/ Purchase/ Legal Identify European and national rules and regulation for preparing the invitation to tender Identify relevant contract guidelines Identify relevant rules and regulation related to procurement activities Identify and advise on external and internal policy with relevance to the negotiation process CPL Edition: 1.0 Released Issue Page 51
54 Regulation REG - Change Management Even if you are sure that you have captured everything, check for updates, and new material that might be relevant and/or support the project Consult regularly the Official Journal of the EU Consult regularly the national publications (i.e. government, standardisation bodies) Consult regularly the State letters of ICAO Communicate to the relevant domain(s) in case of changes OPS TEC CER CPL Page 52 Released Issue edition: 1.0
55 Project Management Technology Operations Certification (CER) Regulation Cases (Safety/HF) Change Management Edition: 1.0 Released Issue Page 53
56 Certification CER - Technology Advise which documents/material are relevant for technical guidance Ensure that the system meets all certification requirements Ensure availability of full documentation In case further analysis/ changes are required, provide advice to TEC TEC REG Page 54 Released Issue edition: 1.0
57 Certification CER - Operations Assess certification requirements for the introduction of new procedures Identify the certification process and the certification requirements for operational aspects Advise in case further analysis or changes are emerging during the certification process OPS REG Edition: 1.0 Released Issue Page 55
58 Certification CER - Regulation Identify persons responsible for regulatory issues within the organisations involved Collect documentation relevant for certification Identify relevant regulations to system certification Identify existing and applicable implementing rules/norms/specifications Ensure compliance with EU regulation where applicable Assess the requirements for the integration into the Safety and Security Management Systems REG Page 56 Released Issue edition: 1.0
59 Certification CER - Cases Safety/HF Identify Safety/HF experts eligible for this task Identify guidance material/documents to support Safety Case/ Human Factors Case Monitor the development of the cases Highlight and advise issues/areas which require further analysis and/or changes OPS TEC Edition: 1.0 Released Issue Page 57
60 Certification CER - Project Management Lead and monitor the certification process Contribute to change management Support reporting process Contribute to the development of the project master plan Assist to the selection process of eligible members of the project core team Page 58 Released Issue edition: 1.0
61 Certification CER - Change Management Consult regularly with REG if something relevant has changed or is about to change impacting the certification Advise TEC on certification requirements in case system changes are conducted Advise OPS on certification requirements in case operational changes are to be implemented REG Edition: 1.0 Released Issue Page 59
62 Procurement Commercial Management Tender Negotiations Call for Tender Contract Purchase Legal (CPL) Contract Management Financial Reporting & Controlling Legal Project Management Financial Management Page 60 Released Issue edition: 1.0
63 Contract/ Purchase/ Legal CPL - Call for Tender Develop generic tender documentation (e.g. Summary of Requirement ) Define and list the conditions of tender Develop the conditions of contract Develop the statement of work Develop tender response schedules Secure conformity of the ITT documentation with applicable standards and regulation Issue an invitation to tender (ITT) Analyse and respond to clarification requests Determine the national/european format for publishing the contract notice (e.g. Common Procurement Vocabulary (CPV), Nomenclature commune des Unités Territoriales Statistique (NUTS) Code) Develop the contract notice Publish the contract notice OPS TEC Edition: 1.0 Released Issue Page 61
64 Contract/ Purchase/ Legal CPL - Tender Negotiations Define required competences/skills for the members of the negotiation team Select negotiation team members Elaborate a list containing all items requiring further clarification from candidate suppliers Define the boundaries of the negotiation framework (i.e. what are the limits imposed by management decisions, corporate rules and regulations) Organise clarification session for each submitted bid Perform technical and commercial evaluation of each submitted tender Develop and keep up to date the Limits of Authority (LoA) documentation OPS TEC REG CER Page 62 Released Issue edition: 1.0
65 Contract/ Purchase/ Legal CPL - Procurement Define contract award criteria Appoint a supplier (contract launch) Define the applicable terms and conditions Align procurement of the A-SMGCS system to the organisation s internal procurement handbook/methodology or process Verify if EU Regulations and/or Directives in relation to procurement are applicable and if so, are respected accordingly Ensure that budget, timescales and requirements, being approved at managerial level, are respected Edition: 1.0 Released Issue Page 63
66 Contract/ Purchase/ Legal CPL - Contract Management Select contract guidelines: e.g. Fédération Internationale des Ingénieurs-Conseils (FIDIC), Organisme de Liaison des Industries Métalliques Européennes (ORGALIME), National Authority, others Ensure that all relevant legal aspects are covered in the contract Compile a list of elements that must be part of the contract Develop a policy on subcontracting TEC REG Page 64 Released Issue edition: 1.0
67 Contract/ Purchase/ Legal CPL - Legal Define the framework of the supplier s liability Develop internal strategy in case of breach of contract Develop methodology for settlement of disputes Manage warranty issues, delay and liquidated damages Compile a list of all legal elements Define the authorities of the key project members on legal issues related to the project/contract OPS TEC REG Edition: 1.0 Released Issue Page 65
68 Contract/ Purchase/ Legal CPL - Financial Management Specify the type of accounts that could be considered for the contract (e.g. Escrow) Compile a list of the required and/or mandatory Bonds (e.g. Performance bonds, Bid Bonds, Advance Payment Bonds, Warranty Bonds, ) Compile a list of the required or mandatory down payments, guarantees and retention money Specify the policy related to currency and exchange rates Develop financing mechanisms Develop a financial Risk Management Process Implement the endorsed financial Risk Management Process Page 66 Released Issue edition: 1.0
69 Contract/ Purchase/ Legal CPL - Commercial Management Determine the appropriate insurance schemes, both financial (e.g. Hermes Insurance) and others (e.g. CAR ( Construction All Risk Insurance), EAR (Erection All Risk Insurance) Define payment schedule(s) and related invoicing process Define budget boundaries Define shipment/transportation conditions Compile a list of all taxes / customs / duties related directly and indirectly to the implementation project (at all stages) Compile a list of all warranty related issues Define a claim management strategy OPS Edition: 1.0 Released Issue Page 67
70 Contract/ Purchase/ Legal CPL - Financial Reporting & Controlling Develop an internal reporting and controlling schedule Define appropriate accountancy practices (e.g. Generally Accepted Accounting Principles (GAAP)) according to organisational requirements Page 68 Released Issue edition: 1.0
71 Contract/ Purchase/ Legal CPL - Project Management Contribute to the development of the Master Project Management Plan Develop CTA (Cost Trend Analysis) tool and other project particular reporting and monitoring tools Assist to the selection process of eligible members of the project core team and project resources Establish a project reporting Contribute to project status meetings Support change management processes Edition: 1.0 Released Issue Page 69
72 GUIDANCE MATERIAL The references in this section are a selection of the most relevant technical and operational documentation that is to be considered during the implementation activity for an A-SMGCS. It does not represent an exclusive list and requires regular verification if updated versions are available. The list of references is focussing on European and ICAO global level and does not contain relevant material at national level as those may differ from State to State. Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5 Ref. 6 Ref. 7 Ref. 8 Ref. 9 Ref. 10 Ref. 11 Ref. 12 Ref. 13 Ref. 14 EUROCONTROL definition of A-SMGCS Implementation Levels, Edition 1.2, 30/06/2010 A-SMGCS Level 1 Operational Concept and Requirements, Edition 2.1, 30/06/2010 EUROCONTROL Operational Concept and Requirements for A-SMGCS Level 2, Edition 2.1, 30/06/2010 EUROCONTROL Preliminary Safety Case for A-SMGCS Levels 1 and 2, Edition 2.1, 30/06/2010 EUROCONTROL Human Factor Case for A-SMGCS Levels 1 and 2, Edition 1.2, 30/06/2010 EUROCONTROL Proposed AIC text on Transponder Operating Procedure, last update 09/05/2007 ICAO Manual of Surface Movement Control and Guidance Systems (SMGCS) Doc 9476-AN/927 First Edition 1986 Community Specification - European Norm on A-SMGCS, Part 1, A-SMGCS Level 1, ETSI EN V1.2.1 ( ) Community Specification - European Norm on A-SMGCS, Part 2, A-SMGCS Level 2, ETSI EN V1.1.1 ( ) Community Specification - European Norm on A-SMGCS, Part 3, Deployed Cooperative Sensors, ETSI EN V1.1.1 ( ) Community Specification - European Norm (EN) on A-SMGCS, Part 4-1, Generic requirements for non-cooperative sensors, ETSI EN V1.1.1 ( ) Community Specification - European Norm (EN) on A-SMGCS, Part 4-2, Specific requirements for a deployed SMR sensor, ETSI EN V1.1.1 ( ) ICAO Manual on Advanced Surface Movement Control and Guidance Systems (A-SMGCS), Doc 9830, First Edition 2004 ICAO Annex 14 Aerodrome Design and Operations, Volume I, Fifth Edition, July 2009 Page 70 Released Issue edition: 1.0
73 Ref. 15 Ref. 16 Ref. 17 Ref. 18 Ref. 19 Ref. 20 ICAO Doc 4444 Procedures for Air Navigation Services (PANS) Air Traffic Management (ATM), Fifteenth Edition 2007 EUROCAE Minimum Aviation System Performance Specifications (MASPS) for A- SMGCS (Level 1 and 2), Edition ED-87B, January 2008, including ED-87B amendment No 1 of January 2009 EUROCAE Minimum Operational System Performance Specifications (MOPS) for Surface Movement Radar sensor systems for use in A-SMGCS, Edition ED-116, January 2004 ICAO Doc 7030 European Supplementary Procedures, Fifth Edition 2008, working copy updated 15 March 2011 ICAO Doc 9870 Manual on the Prevention of Runway Incursions, First Edition, 2007 EUROCONTROL Guidelines on conformity assessment Ref. 21 EUROCONTROL specific guidance on conformity assessment with regards to surveillance systems: List of EATMN objects and standards for the surveillance domain Edition: 1.0 Released Issue Page 71
74 ABBREVIATIONS AP AIP AGL A-SMGCS AT ATC ATCO CAR CER CND CAA CoE CPL CPV CTA DMAN EAR EASA EU EN ETSI EUROCAE EUROCONTROL FAT FDPS FIDIC GAAP HF HSE ICAO IT ITT Airport Unit (Directorate Network Management) Aeronautical Information Publication Aerodrome Ground Lighting Advanced Surface Movement, Guidance and Control System(s) Air Traffic Management Division (Centre of Expertise) Air Traffic Control Air Traffic Control Officer Construction All Risk Insurance Certification Cooperative Network Design (Directorate) Civil Aviation Authority Centre of Expertise Contract/ Purchase/ Legal Common Procurement Vocabulary Cost Trend Analysis Departure Management System Erection All Risk Insurance European Aviation Safety Agency European Union European Norm European Telecommunications Standardisation Institute European Organization for Civil Aviation Equipment European Organisation for the Safety of Air Navigation Factory Acceptance Test Flight Data Processing System Fédération Internationale des Ingénieurs-Conseils (International Federation of Consulting Engineers) Generally Accepted Accounting Principles Human Factors Health, Safety and Environment International Civil Aviation Organization Information technology Invitation to Tender Page 72 Released Issue edition: 1.0
75 NCC NSA NUTS OPS ORGALIME P REG RWY SAT SMGCS TEC WBS Non-Conformance Cost National Supervisory Authority Nomenclature commune des Unités Territoriales Statistique Operations Organisme de Liaison des Industries Métalliques Européennes Project Management Project Management Plan Regulation Runway Site Acceptance Test Surface Movement, Guidance and Control Systems Technology Work Break-down Structure Edition: 1.0 Released Issue Page 73
76 EUROCONTROL May European Organisation for the Safety of Air Navigation (EUROCONTROL) This document is published by EUROCONTROL for information purposes. It may be copied in whole or in part, provided that EUROCONTROL is mentioned as the source and it is not used for commercial purposes (i.e. for financial gain). The information in this document may not be modified without prior written permission from EUROCONTROL.
This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2004R0552 EN 04.12.2009 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT
Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual
3.1 Operations Manual to Contain or Refer to Information 3.1.1 Content CASR 172.060 The content of an Operations Manual must meet the requirements specified in Subpart C of Civil Aviation Safety Regulations
CS5 EAIMS Call For Interest Technical annexe
CS5 EAIMS Call For Interest Technical annexe 1. Purpose of the technical annexe This document provides information allowing the candidates who wish to express interest in the CS5 EAIMS (European ATM Information
North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project CHANGE MANAGEMENT MANUAL
NEFAB Project CHANGE MANAGEMENT MANUAL Version 0.5 Page 1 of 38 Revision history Version Date Description Approved 0.5 14/12/2011 Page 2 of 38 Table of Contents 1. Introduction... 4 1.1. The Scope of this
This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2004R0550 EN 04.12.2009 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EC) No 550/2004 OF THE EUROPEAN PARLIAMENT
NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013
NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013 Effective Date: 14 July 2013 ANA Department Telephone: +971 0 2 4054507 General Civil Aviation Authority Telefax: +971 0 2 4054406 P.O. Box 6558
Agreement on International Civil Aviation (Sops 11/1949), Annex 19 Safety Management) Modification details
1 (19) Date of issue: 11.2.2015 Enters into force: 11.2.2015 Validity: until further notice Legal basis: Underlying international standards, recommendations and other documents: Agreement on International
Quality Management System Manual. CAD Order 7130.1
Quality Management System Manual CAD Order 7130.1 BAHAMAS CIVIL AVIATION DEPARTMENT ORDER 7130.1 Effective Date: November 29, 2013 SUBJ: Aeronautical Information Service (AIS) Quality Management System
Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)
Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA) Integrated surface management Herve Drevillon (DSNA) Operational
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic
Space Project Management
EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Configuration Management Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:
MODEL REGULATION SAFETY MANAGEMENT SYSTEM REGULATION. International Civil Aviation Organisation
MODEL REGULATION SAFETY MANAGEMENT SYSTEM REGULATION 1 SAFETY MANAGEMENT SYSTEM REGULATION TABLE OF CONTENTS 1. INTRODUCATION... 3 2. SCOPE... 3 3. DEFINITIONS... 3 4. GENERAL... 4 5. APPLICABILITY...
CREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE. (according to Article 10 of Commission Regulation (EU) No 1178/2011)
CREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE (according to Article 10 of Commission Regulation (EU) No 1178/2011) 3 Contents Introduction... 6 1 National requirements for military
Guidance Material for Air Navigation Services Providers compliance with the Common Requirements
EUROCONTROL GUIDANCE MATERIAL related to the European Commission Regulation N 2096/2005 laying down Common requirements for the Provision of Air Navigation Services Guidance Material for Air Navigation
Validity: until further notice Legal basis: Underlying international standards, recommendations and other documents:
1 (19) Date of issue: 30.1.2014 Enters into force: 30.1.2014 Validity: until further notice Legal basis: Underlying international standards, recommendations and other documents: Agreement on International
COMMISSION REGULATION (EU)
L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and
ISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management
PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION
EUROPEAN COMMISSION PRESENTATION Patrick Ky Executive Director EUROPEAN COMMISSION WHY SESAR? EUROPEAN COMMISSION EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked
ISO 9001:2015 Overview of the Revised International Standard
ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements
ITS specification Handover and commissioning process (ITS-10-01)
ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material
17.1.2009 Official Journal of the European Union L 13/3
17.1.2009 Official Journal of the European Union L 13/3 COMMISSION REGULATION (EC) No 29/2009 of 16 January 2009 laying down requirements on data link services for the single European sky (Text with EEA
ICAO Procurement Process Briefing
ICAO Procurement Process Briefing The following is a briefing in an effort to provide the reader with an insight into the ICAO Technical Co-operation Bureau s Procurement Process and role in relation to
Common SES-Certification 4-States/Eurocontrol ANSPs Common Requirements AMCs and analyses working sheet Status: 2 February 2006
Common SES-Certification -States/Eurocontrol ANSPs Common Requirements AMCs and analyses working sheet Status: February 006 States AMC matrix ATS AIS CNS.xls 1 of 19 Common SES-Certification -States/Eurocontrol
European ADS-B Regulation
ADS-B Workshop SP/22 European ADS-B Regulation John Law Surveillance Programmes Manager EUROCONTROL Regulators Workshop Jakarta Aug 2010 European Regulation The European Organisation for the Safety of
ISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 1 February 2016
Part 175 CAA Consolidation 1 February 2016 Aeronautical Information Service Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 175 prescribes rules governing
The CREDOS Project. Human Machine Interface Design
The CREDOS Project Human Machine Interface Design Abstract This deliverable presents the first stage of the design and development of a Human Machine Interface (HMI) to support CREDOS operations. This
Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux
Version 6.3 Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux France Secretariat email: [email protected]
EUROPEAN CIVIL RPAS OPERATORS FORUM
EUROPEAN CIVIL RPAS OPERATORS FORUM REMOTELY PILOTED AIRCRAFT SYSTEMS CIVIL OPERATIONS EUROCONTROL RPAS regulatory status in Europe Edgar Reuber EUROCONTROL DSS/CM Current Status Civ UAS Regulation in
The SESAR programme: Making air travel safer, cheaper and more efficient
European Commission Directorate General for Energy and Transport MEMO November 2005 The SESAR programme: Making air travel safer, cheaper and more efficient The Single European Sky industrial and technological
Quality Assurance Manual for Flight Procedure Design
Doc 9906 AN/472 Quality Assurance Manual for Flight Procedure Design Volume 1 Flight Procedure Design Quality Assurance System Approved by the Secretary General and published under his authority First
airsight Company Profile
airsight Company Profile Company Consulting Training Software Consulting Innovative consulting services based on in-depth knowledge for various aviation aspects Training Expert know-how on aviationspecific
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE
International Civil Aviation Organization AIS-MAP-TF-IP/xx 30/04/09 INFORMATION PAPER FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE Agenda Item 3: etod Dakar, Senegal, 11 th May to 12 th May 2009
Subject: Establishment of a Safety Management System (SMS)
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDARJUNG AIRPORT, NEW DELHI 11 0 003 CIVIL AVIATION REQUIREMENTS SERIES 'C' PART I 20 TH JULY 2010 EFFECTIVE:
Explanatory Note to Decision 2015/022/R. Crew resource management (CRM) training
Crew resource management (CRM) training AMC and GM to Part-ARO Issue 3, Amendment 1; AMC and GM to Part-ORO Issue 2, Amendment 3; and AMC and GM to Part-SPA Amendment 2 RELATED NPA/CRD 2014-17 RMT.0411
AIXM Change Management Charter
AIXM Change Management Charter Article 1 Objective 1.1. The evolution of the Aeronautical Information Exchange Model (AIXM) shall be managed in the interest of the largest number of AIXM stakeholders (
The Virtual Centre Model
1 - Introduction Since the late 1980 s the European ANS system has gradually become unable to cope with growing traffic demand. The Single European Sky initiative of the European Commission is meant to
European AIS Database Developments of the EAD. Peter Matern Head of European AIM Unit
European AIS Database Developments of the EAD Peter Matern Head of European AIM Unit Topics Introduction Principle & Concept Services Static Data Operations (SDO) International NOTAM Operations (INO) Published
MOS Part 171 Aeronautical Telecommunication and Radio Navigation Services
MOS Part 171 Aeronautical Telecommunication and Radio Navigation VERSION 1.1: MARCH 2003 UNCONTROLLED VERSION MOS Part 171 Aeronautical This is a CASA policy manual. It contains specifications (standards)
EU CUSTOMS BUSINESS PROCESS MODELLING POLICY
EUROPEAN COMMISSION MASP Revision 2014 v1.1 ANNEX 4 DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Customs Policy, Legislation, Tariff Customs Processes and Project Management Brussels, 03.11.2014 TAXUD.a3
TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES
TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:
Safety Management 1st edition
Annex 19 Safety Management 1st edition ISM Integrated Safety Management June 2013 initial version Page 1 Why a new Annex? Page 2 Why a New Annex? The ICAO High-level Safety Conference (HLSC) held in 2010
Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION
REQUEST FOR PROPOSALS RFP No. 14-01-11 Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION Proposals will be received on or before 2:00 pm local time Wednesday, February 19, 2014
DNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
EUROCONTROL. Reference Guide to EUROCONTROL Guidelines for Contingency Planning of Air Navigation Services (including Service Continuity)
EUROCONTROL Reference Guide to EUROCONTROL Guidelines for Contingency Planning of Air Navigation Services (including Service Continuity) Edition 2.0 Released Issue page 2 EUROCONTROL DOCUMENT CHANGE RECORD
Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification
Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Protocol] is maintained on the Bonsucro website: www.bonsucro.com.
Title: Rio Tinto management system
Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23
North American Development Bank. Model Prequalification Document: Prequalification of Contractors
North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried
AeroMACS Briefing / Update
AeroMACS Briefing / Update European activities January 2016 Nikos FISTAS EUROCONTROL Agenda Why AeroMACS for aviation? Stakeholders Current Status Next Steps 2 Agenda Why AeroMACS for aviation? History
CDM@CDG 2010. User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG
2010 CDM@CDG User Forum EUROCONTROL s Brussels HQ 18 January 2011 CDG AIRPORT OVERVIEW Surface area :3200 ha 4 RWYs : East / West 80 km Taxiways 8 ILS CAT 3 Statistic 2009 Airport trafic: 525 000 ops (ARR/DEP)
CLIENT / PROJECT MANAGER AGREEMENT
Authorship of this work is claimed by The Association of Construction Project Managers and any unauthorised reproduction constitutes an infringement in terms of the Copyright Act No 98 of 1978. CLIENT
SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN
SQ 901 Version D Railway Application Quality Specification OBTAINING QUALITY OF PRODUCTS PURCHASED BY SNCF REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN Issue date March 2004 This English
Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India
Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India CNS Officers Guild 1 Airports Authority of India (AAI) is entrusted with responsibility of providing
Quality & Safety Manual
Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/1.1-12/19 10 April 2012
International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711
ICAO Safety Management Systems (SMS) Course Information and outline
ICAO Safety Management Systems (SMS) Course Information and outline International Civil Aviation Organization Page left blank intentionally ICAO Safety Management Systems (SMS) Course Revision Nº 11 (01/01/08)
Assessment of changes to functional systems in ATM/ANS and the oversight thereof
Assessment of changes to functional systems in ATM/ANS and the oversight thereof Entry Point North Seminar: The changing landscape of ATM Safety Malmo, 26 th -27 th May 2015 Jose L Garcia-Chico Gomez ATM/ANS
EASA s perspective on ATCO licensing and language proficiency
EASA s perspective on ATCO licensing and language proficiency Zsuzsanna Erdelyi European Aviation Safety Agency Montreal, 25 March 2013 What is EASA? EASA is located in Cologne, Germany It employs around
EUROCONTROL Training 2015 EUROCONTROL
EUROCONTROL Training 2015 EUROCONTROL Address: EUROCONTROL Institute of Air Navigation Services 12, rue Antoine de Saint Exupéry L-1432 Kirchberg Luxembourg LUXEMBOURG Telephone: + 352 43 60 611 Fax: +
Wales Procurement Policy Statement
Wales Procurement Policy Statement In December 2012 I launched the Wales Procurement Policy Statement (WPPS) setting out the principles by which I expect public sector procurement to be delivered in Wales.
GUIDANCE ON ORGANISATIONAL STRUCTURES
Safety Management System and Safety Culture Working Group (SMS WG) GUIDANCE ON ORGANISATIONAL STRUCTURES Authors: Stephen Clark, NATS Valerie Gray, UK CAA Peter Sorensen, IATA - 1 - EXECUTIVE SUMMARY This
QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL
PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS
EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL
EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Innovation policy Technology for innovation; ICT industries and E-business Brussels, 7 th December 2005 DG ENTR/D4 M 376 - EN STANDARDISATION
Terms of Reference for a rulemaking task. Miscellaneous in Part-66
Rulemaking Directorate Terms of Reference for a rulemaking task Miscellaneous in Part-66 ISSUE 1 14.7.2014 Applicability Process map Affected regulations and decisions: Affected stakeholders: Driver/origin:
SUMMARY. This information paper summarises the status of Airport CDM Trial s and Implementation. RECOMMENDATION
Information Paper 1 Airport CDM Trial & Implementation Status Report Submitted by the Agency SUMMARY This information paper summarises the status of Airport CDM Trial s and Implementation. The TF is requested
COMMITTEE ON STANDARDS AND TECHNICAL REGULATIONS (98/34 COMMITTEE)
EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Regulatory Policy Standardisation Brussels, 9 th November 2005 Doc.: 34/2005 Rev. 1 EN COMMITTEE ON STANDARDS AND TECHNICAL REGULATIONS (98/34
Module 2: The Project Initiation Stage
Overview Initiation stage is highly instrumental in the life cycle of a project as it defines the boundaries of the project gives clarity to all participants about the objectives, scope, cost timescale
How To Improve The Performance Of Anatm
EXPLORATORY RESEARCH IN ATM David Bowen Chief ATM 4 th May 2015 1 ATM Research in Europe HORIZON Transport Challenges smart, green and integrated transport FlightPath 2050 five challenges to aviation beyond
Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services
Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3
Compliance Management Systems
Certification Scheme Y03 Compliance Management Systems ISO 19600 ONR 192050 Issue V2.1:2015-01-08 Austrian Standards plus GmbH Dr. Peter Jonas Heinestraße 38 A-1020 Vienna, Austria E-Mail: [email protected]
Speaking the same language on noise exposure in Europe: the outcome of phase A of CNOSSOS-EU process
29 November 2012, Madrid Speaking the same language on noise exposure in Europe: the outcome of phase A of CNOSSOS-EU process Stylianos Kephalopoulos 1 and Marco Paviotti 2 1 European Commission, Joint
SES Safety and ATM/ANS Regulations - EASA activities related to MET services
SES Safety and ATM/ANS Regulations - EASA activities related to MET services 13-14 October 2015 European Conference on Meteorology for Aviation Jussi MYLLÄRNIEMI Head of ATM/ANS & Aerodromes Department
EUROPEAN COMMISSION Enterprise and Industry DG
EUROPEAN COMMISSION Enterprise and Industry DG EUROPEAN COMMISSION Internal Market and Services DG THE EUROPEAN MULTI STAKEHOLDER FORUM ON E-INVOICING: ACHIEVEMENTS AND THE WAY AHEAD Introduction The European
CCAMS CONTINGENCY PLAN. Network Operations
Edition Number : 2,00 Edition Validity Date : 04/04/2016 DOCUMENT CHARACTERISTICS Document Title Document Subtitle (optional) Edition Number Edition Validity Date CCAMS CONTINGENCY PLAN 2,00 04/04/2016
UEMS 2004 / 47 EN ADOPT ED
EUROPEAN UNION OF MEDICAL SPECIALISTS Kroonlaan 20 Avenue de la Couronne tel: +32-2-649.51.64 B-1050 - BRUSSELS fax: +32-2-640.37.30 www.uems.net [email protected] NEW STATUTES UEMS 2004 / 47 EN ADOPT ED
Safety Oversight Audit Section
Safety Oversight Audit Section Regional Seminar on the Preparation, Conduct and Reporting of an ICAO Safety Oversight Audit Beijing, China, 12 to 15 December 2006 Introduction to the Audit Protocols Module
Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue
Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots
ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots CDM Task force 9th meeting Presented by Jean-Pierre LESUEUR, EUROCONTROL EATM/DAP/APT 1 Objectives of this presentation: Inform
Foreword... 11 Introduction - The Global Food Safety Initiative (GFSI)... 11 Scope... 12 Section Overview... 12 Normative References...
Version 6.3 Overview Contents Foreword... 11 Introduction - The Global Food Safety Initiative (GFSI)... 11 Scope... 12 Section Overview... 12 Normative References... 13 9 Foreword Global Food Safety Initiative
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',
Engineering Procurement Construction Quality Plan
Engineering Procurement Construction Quality Plan Index 1 Introduction... 4 1.1 Project Background... 4 1.2 Document Purpose... 4 1.3 Change Control... 4 1.4 Contract... 4 1.5 Quality system... 4 1.6 Distribution...
How to write a proposal
How to write a proposal Workshop Innovative space-based solutions for Future Cities July 8-9, 2014 Vienna Rob Postema Telecommunications and Integrated Applications Directorate European Space Agency ESA
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS. April 2008 1
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS April 2008 1 Contents 1 Introduction 3 2 Management Systems 2.1 Management Systems Introduction 3 2.2 Quality Management System
EPC020-08 11.02.2015 SEPA CARDS STANDARDISATION (SCS) VOLUME
EPC020-08 11.02.2015 (Vol Ref. 7.7.0.05) 1 2 3 4 5 6 7 8 9 10 11 12 13 SEPA CARDS STANDARDISATION (SCS) VOLUME BOOK 7 CARDS PROCESSING FRAMEWORK Payments and Cash Withdrawals with Cards in SEPA Applicable
Contract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM
ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM DEFINITION & CONTEXT Topic Description Associated supporting material finalised? What is it? What has to be done?
EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone
EUROCONTROL Paving the way towards UAS ATM integration Mike Lissone European Organisation for the Safety of Air Navigation: EUROCONTROL To harmonise and integrate Air Navigation Services in Europe, aiming
Project Plan for <project name>
Note: Text displayed in blue italics is included to provide guidance to the author and should be deleted or hidden before publishing the document. This template can be used at it is, or to complete and
ISO 9001:2015 Internal Audit Checklist
Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence
AGREEMENT BETWEEN THE PORTUGUESE REPUBLIC AND THE KINGDOM OF SPAIN ON THE ESTABLISHMENT OF THE SOUTH WEST FUNCTIONAL AIRSPACE BLOCK (SW FAB)
AGREEMENT BETWEEN THE PORTUGUESE REPUBLIC AND THE KINGDOM OF SPAIN ON THE ESTABLISHMENT OF THE SOUTH WEST FUNCTIONAL AIRSPACE BLOCK (SW FAB) Intentionally left blank 2 PREAMBLE The Portuguese Republic
AEROSPACE QUALITY MANAGEMENT SYSTEM ACCORDING TO SELECTED QUALITY STANDARDS
AEROSPACE QUALITY MANAGEMENT SYSTEM ACCORDING TO SELECTED QUALITY STANDARDS Izabela Sprycha Maria Curie-Skłodowska University, Poland [email protected] Agnieszka Piasecka Abstract: The quality is
EAM 5 / AMC ACCEPTABLE MEANS OF COMPLIANCE WITH ESARR 5
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL ESARR ADVISORY MATERIAL/ACCEPTABLE MEANS OF COMPLIANCE (EAM/AMC) EAM 5 / AMC ACCEPTABLE MEANS OF COMPLIANCE WITH ESARR 5 Edition : 2.0
EUROCONTROL Training 2016 EUROCONTROL
EUROCONTROL Training 2016 EUROCONTROL Address: EUROCONTROL Institute of Air Navigation Services 12, rue Antoine de Saint Exupéry L-1432 Kirchberg Luxembourg LUXEMBOURG Telephone: + 352 43 60 611 Fax: +
Space Applications and Technologies Expo Rome, Italy February 4 6, 2010
Space Applications and Technologies Expo Rome, Italy February 4 6, 2010 Overview of the EUROCONTROL UAS Integration Activity Anders Hallgren EUROCONTROL Manager ATM Procedures 1 European Organisation for
International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, 04-08 July 2016
International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, 04-08 July 2016 DGCA/52 OUTCOMES (Presented by the Secretariat) SUMMARY This paper
AUDIT SUMMARY REPORT OF THE DEPARTMENT OF CIVIL AVIATION MAURITIUS
ICAO Universal Safety Oversight Audit Programme AUDIT SUMMARY REPORT OF THE DEPARTMENT OF CIVIL AVIATION OF MAURITIUS (Port Louis, 22 to 29 September 2000) INTERNATIONAL CIVIL AVIATION ORGANIZATION ICAO
Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA
Quality Manual Kellaw Road Yarm Road Business Park Darlington DL1 4YA MANUAL IDENTIFICATION This document is a controlled/uncontrolled copy. Copy Number:...of... Issued to... Title... Holders of controlled