Integrated Water and Sediment Management of Yellow River

Similar documents
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Flooding Hazards, Prediction & Human Intervention

Post-Flood Assessment

Floodplain Connectivity in Restoration Design

Frequently Asked Questions (FAQs) on Hydropower

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

FLOOD CONTROL FOR SPECIFIC TYPES OF FLOODS. A.F. Mandych Department of Physical Geography and Land Use, Institute of Geography, Moscow, Russia

Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software

Flood Mitigation and Management in Bangkok Metropolitan Area

Master Plan on Water Resource Management

Sustainable. Infrastructure and Asset. Management. Kiyoshi KOBAYASHI

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

National Disaster Management Institute

Extreme Flood Events & their Prevention in Jordan

Property Care White Papers. Site Drainage: Monitor and Maintain

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

Hydrologic Engineering Techniques for Regional Water Resources Planning

Assessment of hydropower resources

Estimating Potential Reduction Flood Benefits of Restored Wetlands

INDONESIA - LAW ON WATER RESOURCES,

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

7.0 Stream Restoration

Overview and highlights

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,

SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2

International Data Centre for Hydrology of Lakes and Reservoirs (HYDROLARE)

How To Build A River Restoration Project In North Korea

Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Numerical Modeling and Simulation of Extreme Flood Inundation to Assess Vulnerability of Transportation Infrastructure Assets


Environmental Data Management Programs

Prattsville Berm Removal Project. 1.0 Project Location

Small Dam Hazard Assessment Inventory

FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan

THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER

Flood Mitigation Efforts in the Red River Basin. Slobodan P. Simonovic University of Manitoba University of Western Ontario

Water is beautiful. Until it isn t.

STORMWATER MANAGEMENT CHECKLIST

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam

Water management planning for Naurzum National Nature Reserve, Kazakhstan. Abstract. By Y. A. Bragin

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience

Safety of Small/Rural Dams and Barrier Lake Management

Sewerage Management System for Reduction of River Pollution

FOUR RIVERS RESTORATION PROJECT

XAYABURI HYDRO POWER PLANT, LAO PDR

BEST PRACTICE GUIDELINES FOR FLOOD RISK ASSESSMENT IN THE LOWER MEKONG RIVER BASIN

Challenges. Estimated Damages from 100-Year Flood

Evaluation of Open Channel Flow Equations. Introduction :

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

DESIGN OF STORM WATER DETENTION POND

The Hydrologic Engineering Center Training Course on

Topic 8: Open Channel Flow

Flood Risk Management

Flood Risk Management

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

RESTORING streams to reduce flood loss

Landslides & Mudflows

Earth Science. River Systems and Landforms GEOGRAPHY The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Image source: Visual Data Analytics, LLC

4. Environmental Impacts Assessment and Remediation Targets

CORUH RIVER DEVELOPMENT PLAN

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference

Burnt River Black River and Gull River Flood Contingency Plan

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Standard Operating Procedures for Flood Preparation and Response

COMPREHENSIVE DEVELOPMENT OF THE BRANTAS RIVER BASIN THE REPUBLIC OF INDONESIA

Outlet stabilization structure

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

US Army Corps of Engineers BUILDING STRONG

Appendix H Dredging and Stream Channel Restoration

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

WEPP MODEL APPLICATIONS FOR EVALUATIONS OF BEST MANAGEMENT PRACTICES

Transcription:

Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey

Outline: I. Yellow River Characteristic and Strategy of Integrated Water and Sediment Management of Yellow River II. Implementation of Yellow River Water and Sediment Regulating III. Main Technical Approaches and Innovation IV. Success and Effectiveness Analysis

I. Yellow River Characteristic and Strategy of Integrated Water and Sediment Management of Yellow River Yellow River Characteristics Less water with more sediment, disharmony of sediment and water Annual water inflow: 58 billion m 3 ; Annual sediment transportation: 1.6 billion t; Sediment contents: 35kg/m 3

Annual water inflow of YR is 6% of Yangtze, however, Annual sediment transportation of YR is 3.7 times of Yangtze, If the sediment of YR was built in a mound 1 meter high and 1 meter wide, it could circle the equator of the earth 27 times! Yangtze 960 Yellow 58 Yellow 1.6 Yangtze 0.53 Annual water inflow (billion m3) Annual sediment transportation (billion ton) 年 水 量 ( 亿 立 方 米 ) 年 输 沙 量 ( 亿 吨 )

Yellow River in History YR is known for its large amount of sediment, suspended river, tendency to silt, to break, to move, and frequent flood disaster; During the past 2540 years before 1938, YR is breached averagely twice every three years and changes its course once every hundred years. called as the Sorrow of Chinese Nation The lower YR bed was silting up 10 cm/a. The embankment of lower YR has been raised up for 4 times since 1950, with a total input of 20 billion RMB.

Yellow River in Nowadays Carrying capacity of flood and sediment decreased; Plain runoff reduced from 6000m3/s to1800m3/s; Main channel silted and shrank severely. Large-scale overflow with only small flood; 1.8 million inhabitants suffering from the floods. Secondary silting is serious; High risk of dike breaching. Situation of Yellow River safety is getting severe Flood level with current 7600m 3 /s is 29 cm higher than 22300m 3 /s in 1958 (Huayuankou Station)

Height 71 70 69 68 67 66 65 64 63 62 Yellow River Dike The Diagram of Cross-section in Yangxiaozhai of Yellow River lower region Flood Plain River Channel Yellow River Dike 61-1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 1000011000 Distance of Jumping-off (m) 1958-10-25 1982-10-24 2002-7-22

Key Problems of Yellow River Management Restrict the tendency of downstream silting and shrinking, resume the plain runoff,avoid large-scale overflow with small flood,, decrease the risk of disaster in the lower Yellow River. To achieve high efficiency of sediment transportation with limited water resources, improve the carrying capacity of sediment and flood, control the trend of secondary silting, make sure the safe of Yellow River. To accomplish sediment flushing in both reservoir and river channel, extend the operating life of reservoir, extend the running time of lower river course,make sure Yellow River keep good training and safety in a long term.

Water and sediment regulating is one of the main approaches to harmonize the water and sediment of the YR. Approaches Increase water Decrease sediment Water and sediment regulating Save water Trans-boundary water division water and soil conservancy Silt tracking by main projects Check dam Joint regulating of reservoir groups + River channel Build a harmony relationship between water and sediment

Strategy of Integrated Water and Sediment Management of Yellow River Based on long term theory study model experiment practical experience; Make reasonable scheme for water and sediment regulating; Use reservoir group in main stream and tributary as regulation method; Build a relative harmonious relationship between water and sediment; ent; Rehabilitate and maintain the carrying capacity of sediment and flood in main channel, expand plain runoff, to reduce silting in both water course and reservoir, to mitigate the harsh situation of flood control in lower Yellow River; Explore the trend of water and sediment movement in Yellow River.

YR Water and Sediment Regulating Short Term Objectives Long Term Objectives To rehabilitate the carrying capacity of flood and sediment in lower river channel, to increase the plain runoff, to mitigate the situation of large overflow when small flood To explore the technology index system to harmonize water and sediment in YR, and the operation methods of water and sediment regulating with reservoir groups. Control the developing trend of secondary silting, make sure the YR is safe every year. To explore the movement rules of YR water and sediment in river course and reservoirs, to build a technological foundation and accumulate experiences for the water and sediment regulating in the whole River. To explore methods to extend the operating time of lower river course, to achieve YR s long term safety.

Outline: I. Yellow River Characteristic and Strategy of Integrated Water and Sediment Management of Yellow River II. Implementation of Yellow River Water and Sediment Regulating III. Main Technical Approaches and Innovation IV. Success and Effectiveness Analysis

II. Implementation of Yellow River Water and Sediment Regulating 1. Preparation 1 Since 1960 s to the operation of Xiaolangdi Reservoir in 1999, several generations of people work hard consistently to explore methods to harmonize the relationship between water and sediment of YR. 2 Since 1990 s to 2001, many researches on various index and approaches of YR water and sediment regulating, finally formed the schemes of YR water and sediment regulating.

2. Experiments 2002~2004, three experiments of Yellow River water and sediment regulating were conducted. The range of experiment includes the reservoirs in the main stream and tributaries of Middle Yellow River like Xiaolangdi, Sanmenxia, Wanjiazhai, Luhun, Guxian, and also the 2000km river course from Wanjiazhai reservoirs to the River estuary. To ensure the success of the experiments, dozens of schemes and experimental process have been made.

On 4-15 July 2002, the first experiment of YR water and sediment regulating was conducted mainly using the storing water of Xiaolangdi Reservoir, combined with the inflow above Sanmenxia Reservoir.

First time YR water and sediment regulating am 9:00 4 July Experiment start Discharge: 2740m 3 /s Totally 11 days Water discharged: 2.61 billion m 3 Average Sediment content when release from the reservoir: 12.2 kg/m 3 am 9:00 15 July Return to normal discharge

3. Regular Operations Up to the present from 2005, five times operations of Yellow River water and sediment regulating have been undertaken.

More than hundreds thousands people has involved in the experiments and operations of YR water and sediment regulating, and acquired over 10 millions sets of scientific data about hydrology and sediment.

Outline: I. Yellow River Characteristic and Strategy of Integrated Water and Sediment Management of Yellow River II. Implementation of Yellow River Water and Sediment Regulating III. Main Technical Approaches and Innovation IV. Success and Effectiveness Analysis

III. Main Technical Approaches and Innovation 1. First time to successfully implement large-scale, systematic, well-planned experiments of water and sediment regulating; Acquired lots of scientific data and huge outputs; Makes significant benefits for flood control in the lower YR; A magnificent innovation in the world history of river management.

2. Put forward the index system of water and sediment regulating, including the critical flow of initial sediment trapping in Xiaolangdi reservoir; Through joint regulating of water and sediment by reservoir groups, realized the artificial density flow, and developed the approaches on reservoir sediment discharge.

Index system of water and sediment regulating in lower Yellow River under current condition. Unit: Sediment content:kg/m 3 Runoff:m 3 /s Sediment content in Huayuankou Runoff in Huayuankou Runoff in Aishan Flood Duration S 20 Q 2600 Q 2300 T 9 days S 30 Q 2700 Q 2500 T 12 days S 40 Q 3000 Q 2700 T 8 days Note: Amount of fine sediment with d<0.025mm take account more than 90%

3. Three application models of Yellow River water and sediment regulating in the initial stage of Xiaolangdi Reservoir operation has been put forward as: Priority on single reservoir regulating of Xiaolangdi Reservoir, Connection of water and sediment in spatial scale, Joint regulating of reservoir groups in the main stream.

4. Made scientific scheme of water and sediment regulating based on river monitoring, modeling and digital stimulating; Achieved effective control on the process of water and sediment through the systematic innovation and integration on hydrology weather forecast, coupling of forecast and regulating, remote monitoring of water regulating, etc.

5. Developed vibratory suspending sandiness measuring system, muddy water interface detector; introduced advanced equipments suitable for muddy river measuring, such as laser particle size analyzer, etc. Achieved the fast online monitoring of sediment, which ensured the real time water and sediment regulating. 激 光 粒 度 仪 振 动 测 沙 仪

Main technical methods of water and sediment regulating Technology of water and sediment regulating Index of balanced water and sediment relationship Forecast and control of sediment content flowing out of reservoir Artificial sediment disturbing water and sediment connection Flowing capacity forecast of lower main channel Overall flow process control Reservoir silting reduction hydrology monitoring and forecasting Validated and developed through experiments and practical operations Good technological foundation for future operation of YR water and sediment regulating

Outline: I. Yellow River Characteristic and Strategy of Integrated Water and Sediment Management of Yellow River II. Implementation of Yellow River Water and Sediment Regulating III. Main Technical Approaches and Innovation IV. Success and Effectiveness Analysis

IV. Success and Effectiveness Analysis 高 程 (m) (m) 1. Lower YR main channel has accomplished all line flushing; Capacity of flood and sediment transportation is highly improved; Plain runoff increased from 1800m3/s to 3800m3/s, and Form of river channel has been modified. 雷 口 断 面 调 水 调 沙 试 验 前 后 断 面 对 照 图 52 52 50 50 48 48 46 46 44 44 42 42 2002 年 5 月 实 测 2002 年 5 2004 年 10 月 实 测 2004 年 10 月 实 测 40 40 1650 1750 1850 1950 2050 2150 1650 1750 1850 1950 2050 2150 起 点 距 (m)

2 Achievements of YR Water and Sediment Regulating Eight times YR water and sediment regulating (2002-2008): Water entering the downstream: 29.4 Billion m 3 Sediment flushing to the sea: 0.540 Billion T Sediment reduced from the lower channel: 0.322Billiont Average Scouring of the lower channel elevation: 1.70 m

Effectiveness Analysis of Eight Times Water and Sediment Regulating in the Middle and Lower Yellow River Year 2002 2003 2004 2005 2006 2007 Pre-flood season 2007 Flood season 2008 Mode Priority on single reservoir regulating of Xiaolangdi Connection of water and sediment in spatial scale Joint regulating of main stream reservoir group Joint regulating of Wanjiazhai, Sanmenxia and Xiaolangdi reservoirs Joint regulating of, Sanmenxia and Xiaolangdi reservoirs Joint regulating of Wanjiazhai, Sanmenxia and Xiaolangdi reservoirs Connection of water and sediment in spatial scale Joint regulating of Wanjiazhai, Sanmenxia and Xiaolangdi reservoirs Regulated runoff (m 3 /s) Regulated sediment content (kg/m 3 ) Sediment flushing to the Sea (million ton) Flushing from river course (million ton) 2600 20 66.4 36.2 2400 30 120.7 45.6 2700 40 69.7 66.5 3000~ 3300 3500~ 3700 2600~ 4000 Note Experiment 1 Experiment 2 Experiment 3 40 61.26 64.67 Operation 40 64.83 60.11 Operation 40 52.40 28.80 Operation 3600 40 44.93 00.03 Operation 2600~ 4000 40 59.82 20.07 Operation Total 540 322

3. Notable integrated social benefits Flow passing ability of main channel is improved,the plain runoff is increased; The situation of continuous shrinking of main channel is in primarily controlled; The situation of secondary silting is mitigated; Water for YR sediment transportation is regulated; Deepened the common understanding of harmony life of human and river ; The ecological environment in the estuary region has improved.

Conclusion Remarks: Through the YR water and sediment regulating: Pressure of flood control in the lower reach is released on certain degree; Social stability of the floodplain is protected; Promoted the development of relevant subjects; Significant impacts on the social, economy and ecological development.

Thanks for you attention!