BOC Healthcare Consultancy Services

Similar documents
BOC Supply Solutions

Medical & Industrial Gas Installations & Maintenance

MANAGEMENT OF MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY. Senior Managers Operational Group. staff)

MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS

Medical Gas Data Sheet (MGDS) Medical air

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Health and Safety Policy

Electrical Safety Policy

Procedure: OHS CONTRACTOR MANAGEMENT

Risk Engineering Guideline

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

OHSAS OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS

OCCUPATIONAL HEALTH AND SAFETY POLICY: INCIDENT AND INJURY REPORTING ERJ

Safety Systems Review Facilities Management Guidance and specification Version

Entrepreneurs Programme - Business Evaluation. Version: 3

HORIZON OIL LIMITED (ABN: )

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Medical Gas Pipeline Systems (MGPS) Policy

ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE)

HEALTH & SAFETY POLICY

Incident Investigation Procedure

IGEM/UP/11 Edition 2 Communication 1744 Gas installations for educational establishments

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEMS MANUAL

Occupational Health & Safety Policy Injury & Incident Reporting

Preparation of a Rail Safety Management System Guideline

Internal Audit Hearing Sheet

Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) elindsay@blueyonder.co.

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

CHAPTER I INTRODUCTION

Health and Safety Management Standards

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

INCIDENT POLICY Page 1 of 13 November 2015

SafetyMAP Initial Level User Guide

WORKING IN CONFINED SPACES GUIDELINES

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

Insurance Commission of Western Australia

4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7

Clients in Construction Best Practice Guidance

CRYOSPEED. Cryogenic solutions for science and research

Australia Pacific LNG Project. Narrows Crossing Pipeline Environmental Management Plan Attachment 3 Crisis and Emergency Management Directive

JOB DESCRIPTION. Advanced Nurse Practitioner Professional Lead

TRUST SECURITY MANAGEMENT POLICY

RISK ASSESSMENT POLICY

Health and Safety Policy Part 1 Policy and organisation

Drinking Water Quality Management Plan Review and Audit Guideline

CONTROLLED DOCUMENT. Number: Version Number: 4. On: 25 July 2013 Review Date: June 2016 Distribution: Essential Reading for: Information for:

Liquid Nitrogen from BOC Healthcare.

Health Choice Enterprises ASSE Medical Gas Course

CATERING CONTRACTORS General Code of Safety Practice

CITY & GUILDS LEVEL 2 PRINCIPLES OF SAFE HANDLING AND APPLICATION OF PESTICIDES (PA1)

Inspect and Test FPAS Units of Competencies descriptions

QUALIFICATION HANDBOOK

The Designated Persons Roles and responsibilities

Code of Practice for the Manual Handling of Gas Cylinder and exchange of regulators

WHS Contractor Management Procedure

Auditing Health and Safety Management Systems. 4th Edition

Accident/Incident Investigation & Reporting Procedure

Victorian Public Health Sector Classification System

CER Audit and Inspection System. part of the Petroleum Safety Framework

The anglo american Safety way. Safety Management System Standards

Service Children s Education

Health and Safety Management in Healthcare

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

Corporate. Security Management Policy. Document Control Summary. Contents

OH&S Management Systems Audit Checklist (NAT, E3)

4 Adoption of Asset Management Policy and Strategy

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

Safe Bathing, Hot Water and Surface Temperature Policy

Customer Installation Safety Plan. March 2015

Contractor Safety Program Office of Environmental Health and Safety University of Toronto

QUALIFICATION HANDBOOK

Service Level Agreement/Specification

Examples of pressure systems and equipment are:

Division of Public Health Administrative Manual

Jonathan Wilson. Sector Manager (Health & Safety)

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Data Quality Policy. Appendix A. 1. Why do we need a Data Quality Policy? Scope of this Policy Principles of data quality...

The Importance of Safe Isolation of Plant and Equipment

Experis Gas Mixtures. When accuracy, stability and reliability are a must

Risk Management Guidelines

Medical Gas Data Sheet (MGDS) 5% carbon dioxide/air medical gas mixture

Domestic Shipping. Safety Management System. Company:

How To Ensure Safety On A Caravan Site

Risk Management Guidelines

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

Owner-User Pressure Equipment Integrity Management Requirements

An inventory of hazardous materials used in your workplace will prove useful.

MSS40111 Certificate IV in Sustainable Operations

Elevator Malfunction Anyone Going Down?

CONTENT OF BOOKLET. 4 Objective & Scope 5 Safe Management Practices. 6. Training. 8. Emergency Response. 9. Control of Operations. 10.

Contract Relationship Management DRAFT

NHS Professionals. Guidelines for the Administration of Medicines

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

PLUMBING & HEATING CONTRACTORS ALLIANCE (PHCA) SCHEME GUIDE

Principal Designer Guidance

8. To ensure the accurate use of all pharmacy computer systems and to record all issues, receipts and returns of medicines.

Internal Auditing Guidelines

Transcription:

BOC Healthcare Consultancy Services BOC Healthcare Consultancy Services Are you managing the risks? BOC: Living Healthcare

03 Medical Engineering Services. The same exact standard of quality that made us the medical gas experts is now the platform for an outstanding portfolio of services. We call it BOC Medical Engineering Services. And it is our offering of reliability and peace of mind to our partners within healthcare around the world. The BOC Medical Engineering Services are designed to help your hospital provide the highest levels of patient safety. To us this means establishing outstanding quality in the complete chain of events for gases from the production facility to services that ensure fail proof delivery, installation and maintenance of medical gases. In other words, the complete array of services that take care of your gas installation needs. So that you can concentrate on what you do best taking care of patients. It s our way of being outstanding in a supporting role

04 BOC Healthcare Consultancy Services Are you managing the risks? Medical Engineering Services One partner with the experience and knowledge to deliver a broad spectrum of engineering services. We will support you in saving precious resources while facilitating compliance with medical gas standards and regulations. Consultancy Services At least 60% of patients are administered medical gases during their stay in hospital. Your staff will handle and administer medical gases everyday frequently when time is short. That means that everyone needs to understand and carry out their responsibilities to avoid potential danger. A moment of carelessness, an overlooked precaution or simple mistake can lead to an accident, injury and loss. Unless your hospital has the procedures, regular training and facilities in place to manage medical gases safely, the safety of patients, staff and visitors could be at risk. HTM 02-01 is not retrospective unless staff or patient safety is compromised. How can you assess the level of risk unless a compliance audit has been carried out, the risk identified and quantified. Even if the non-compliance is minor, you should still prepare a plan to bring the MGPS up to standard. Compliance with HTM 02-01 is your responsibility but where can you find the expertise, time and resources to ensure you meet the demands of guidance and best practice? Comprehensive Audit Seeing the risks you face We will make a detailed assessment of how medical gases are managed in your hospital. This involves surveying equipment and conducting interviews with your staff, covering all of the areas referred to in HTM 02-01, BOC standard operating procedures and best practice. The audit will include identification of potential risks and shortcomings in the following areas: Plant capacity and condition Distribution systems Emergency preparedness Manual handling Management systems and documentation preventative maintenance effectiveness Training needs analysis Cylinder storage and signage Level of patient risk Provision of equipment and emergency back-up At BOC we have the solutions...

05 What the assessment covers Consultancy services Areas of the hospital Operational Policies Emergency Procedures Piped System Cylinder Staff As-Fitted Drawing Training Supply Bulk Supply Medical Air Plants Vacuum Plants Manifolds AGSS Main Cylinder Storage Wards and departments Risk Assessments Developing Solutions Identifying the risks in your hospital is not enough. They need to be documented, prioritised, and incorporated into your hospital s risk register. We are able to provide an impartial and pragmatic view of risk in your systems, using our experience with supplying medical gases to the NHS since 1948. We apply tried and tested risk analysis methodology using our national database to ensure consistency and we provide the hospital with a solid foundation upon which to build. The next step is to start reducing the level of risk to as low as reasonably practical. Common risks identified by comparison to HTM 02-01 and best practice No cylinder management program in place No designated storage points at ward level Indistinct MGPS specifications No indication of plant and system flowrate capacities/demand characteristics No H&SAWA/COSHH assessments on medical gas systems or procedures AP(MGPS) not authorised You may recognise some of these non conformities. BOC Healthcare can provide you with expert, impartial and qualified guidance and ensure that they are prioritised accurately. No nurse/dmo/dno training Inadequate product/prohibition/warning signage and emergency notices Medical gas drawings incomplete/out of date Operational policy incomplete/out of date Inadequate storage/segregation No knowledge of standards/compliance shortfall

06 BOC Healthcare Consultancy Services Are you managing the risks? Managing Medical Gas Solutions

07

08 BOC Healthcare Consultancy Services Are you managing the risks? Operational Policy As medical gases are classified as a medicine the control and distribution needs to be managed in accordance with the recommendations of HTM 02-01. This requires that a policy is developed specific to the hospital in question advising the relevant stakeholders of their duties and responsibilities, and based on the comprehensive compliance survey detailed earlier. The policy should be detailed enough to enable the extraction of best practice procedures and information. Elements would include but not be limited to: System description overview and operation Management responsibilities. Stakeholder s defined and accepted responsibilities Training requirements Operation of the permit to work system Normal and emergency operational procedures Specifications (where available) Plant and manifold log-sheets As-Fitted Drawings Drawings representing medical gas pipeline systems are the primary tool of the AP(MGPS) in the management of the medical gas systems. The drawings and associated detail must be able to be relied upon as lives could be put at risk if errors are left undetected. Accuracy therefore is a prerequisite of any such undertaking and validation of the drawings should be carried out to prove the drawings are a true representation of the installed systems. The drawing detail would include: Main distribution pipe work with branches to, and internally within, wards and departments Direction of flow and pipe work sizing together with location where pipework changes size Controls and warning equipment valves, pressure reducing sets and alarm systems (excludes wiring runs) Terminal unit details Valve chart detailing: valve number, key number and area served where identified Current ward and department names and functions Plant schematics The drawings would be a true representation of your medical gas services, scaled accurately to overlay your existing architectural drawings and detail the position of equipment and run of pipework. The valve chart is an essential element of the drawings as it is a link between the drawing and the physical element. The valve chart also details the date of verification of the valve in question and provides sufficient information to enable valve and AVSU labels to be manufactured. All drawings will be completed so as to make importation into our unique Information Management System seemless.

09 Specification and Design Maintenance Specification Medical gas systems are subject to PPM usually carried out by specialist contractors in accordance with the recommendations of HTM 02-01. This requires that a specification is developed specific to the hospital in question advising the contractor of their duties and responsibilities. The PPM specification should be detailed enough to enable all chosen contractors to price and carryout the maintenance required by your system ensuring best practice and procedures. Elements would include but not be limited to: MGPS installed plant Product specification General work procedures Schedule of maintenance services required In depth contractor questionnaire to ensure compliance with the various standards and benchmarking Cylinder Store Specification and Design Medical gas cylinders should be stored in accordance with the recommendations of HTM 02-01. This requires that a specification is developed specific to the hospital in question advising the contractor of the store requirements for the safe storage of medical gas cylinders. This could involve carrying out a site survey to determine optimum stock levels and designing the available space with the correct racking and storage systems. Provision of Authorised Person An AP(MGPS) is required by HTM02-01 to provide functional and technical management of the medical gas systems where the gases are carried and distributed within a pipeline system. The provision of an AP(MGPS) therefore needs to be by someone fully experienced and qualified to undertake duties that are required. In this instance BOC Medical can provide two different types of Authorised Person: Operational AP (MGPS) Where you need assistance on site or where your site isn t large enough to warrant a qualified engineer of your own, we can provide this on your behalf. Some of the duties would include: Manage interruptions to service requiring high hazard level permits to work Advise local staff on all aspects of medical gas management Train your staff to act as Responsible Persons deal with contractors and low hazard permits to work. Attend medical gas committee meetings Selection and management of medical gas contractors working on your site Construction AP (MGPS) Even where you have the operational staff required to manage your existing systems, you may not have the experience necessary to adequately manage a large MGPS installation project. Here we can provide technical assistance to enable you to ensure that the installation contractors working on your project are carrying out the work competently and that the completed works are tested and commissioned to the required design parameters.

10 BOC Healthcare Consultancy Services Are you managing the risks? This can be divided into the following elements: Design Validation, to ensure that the systems have been designed to cater for your demands Contractor evaluation, to ensure that the specialist installers have the correct training and qualifications to complete the work safely Installation testing, to ensure that all functional and safety tests are carried out at the correct times and to the correct standards Commissioning, after all the works have been completed the systems need to be commissioned to ensure the design parameters have been adhered to, the system performs to design and it is safe for patient connection. Authorising Engineer Service This is designed to allow the BOC Authorising Engineer to ensure that you can demonstrate your familiarity with the MGPS. During the survey you will show the BOC Authorising Engineer around: All primary plant and emergency reserves Main distribution and primary valving Alarm Systems Emergency inlet points and back up cylinder stock Representative selection of wards, theatres, ITU etc Permit to work book with any supporting documentation (Risk assessments and method statements, hot work permits etc.) Current copy of HTM 02-01 and C11 Maintenance and installation specifications for MGPS Plant/equipment history sheets and maintenance record sheets Written scheme of examination and competent person inspections (PSSR) Tools, equipment and test gear The BOC Authorising Engineer will set a typical occurrence within a hospital environment. They will review the pre visit work you have prepared and the manner in which the paperwork has been completed, they will also look at: Notification to users Specification preparation, risk assessments and method statement Instructions to contractors Permit to work Agreements with other stakeholders Our partnership approach to this service not only achieves your sign off requirement by the Chief Executive but also creates the foundations for you and your AP s to confirm your medical gas pipeline systems are managed in accordance with the standard. In this element, the BOC Authorising Engineer will be looking to review evidence of adequate and up to date training together with correct management systems, including relevant documentation: CV s, Certificates and training records of yours and those of your staff Your operational policy Hard/Electronic copy of your as fitted drawings

BOC Healthcare Priestley Road, Worsley, Manchester, M28 2UT, United Kingdom Tel +44 (0) 161 930 6010 Email bochealthcare-uk@boc.com Web www.bochealthcare.co.uk The stripe symbol and the letters BOC are registered trade marks of The BOC Group Limited. Both BOC Limited and The BOC Group Limited are members of The Linde Group, the parent company of which is Linde AG. Reproduction without permission is strictly prohibited. BOC Limited 2009 HLC/402445/APUK/0909