C-130 Fleet CNS/ATM Solutions



Similar documents
Tuesday, March 18, :00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.

Evolution in Regional Aircraft Avionics

Aircraft Tracking & Flight Data Recovery


AERONAUTICAL INFORMATION CIRCULAR 26/15

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015

( T A C T ) C A ) I A

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

ALAMEDA DO AEROPORTO Caixa Postal, Maputo REGULATIONS NEW FORMAT FLIGHT PLAN

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

FANS Over Iridium and Voice Solutions For the Cockpit & Cabin

Performance-based Navigation and Data Quality

12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES

CNS/ATM SYSTEMS IN INDIA

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

Policy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).

Título ponencia: RNP APCH Implementation

ICAO FLIGHT PLAN MODIFICATIONS 2012

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

SITA AIRCOM Service (VHF & Satellite)

IMPLEMENTATION OF ADS-C & CPDLC SERVICES

Air Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013

ICAO 2012 Change Summary

Space Based ADS-B. Transforming the Way you See the Sky March, COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.

AIRBUS INDUSTRIE. Flight Operations Support - Customer Services Directorate

A. Amendments to AMC/GM to Part-FCL

Exclusively Offered With Our Strategic Partner Falcon 7X SN 32

PBN Aeronautical Charts and Procedure Design

PAPER WORKING. International. Montréal, 12. (Presented by SUMMARY SARSAT. Appendix. C provides criteria. be undertaken. actions to 1. COSPAS-SAR 1.

C-130 Recapitalization, Lockheed Martin Fleet Support Services

Transport Spectrum Tune-Up Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009

Air Traffic Management

CHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012

CHAPTER 6 AIRSPACE OPERATIONS Federal Aviation Administration (FAA) Coordination.

Avionics requirements for civil aircraft Edition 30/10/2013

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

Iridium Update. Cross Polar Working Group. Mike Hooper Senior Business Manager - Aviation 05/12/15

2001 Cessna Citation CJ2 Serial Number: 525A-0033 Registration Number: F-HMSG AIRFRAME: 3,051 Total Time Since New 2,403 Landings

ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.

Safety Management Challenges for Aviation Cyber Physical Systems

Bombardier Challenger 605 Serial Number: 5865 Entered into Service: September, 2011 Total Time Since New: 910 Hours Cycles: 419

ADVISORY CIRCULAR AC

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

A Strategic Vision of Air Traffic Management in New Zealand to 2025

Airports Authority of India

Automatic Dependent Surveillance Broadcast (ADS-B)

CS#7 Network Infrastructure Performance monitoring and analysis Service (NIPS) Eric Potier

Rockwell Collins ARINC MultiLink SM flight tracking service

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

CNS / ATM R&D Activities in Korea

LOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K.

Honeywell Aerospace Fleet Experience

TACTICAL DATA LINKS, AIR TRAFFIC MANAGEMENT, AND SOFTWARE PROGRAMMABLE RADIOS*

White Paper Mode S and the European Mandates

International Civil Aviation Organization South American Regional Office

Prevention of loss of communication. Air China

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format.

ICAO Amendment 1 - Australian Flight Planning Guidance

What is NextGen? NextGen is more than just a. Single project It is the integration of many projects, concepts, and technologies.

IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral

Cabin and Cockpit SATCOM Connectivity Inmarsat Aero Conference June 12/13, 2013

Block 0: Capabilities within our Grasp

Iridium Venture Offers to Track Planes

Area Navigation (RNAV) and Required Navigation Performance (RNP)

FAA Familiarization Briefing

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Skedsmo videregående skole NO Rev. dato:

On-Board Performance Monitoring and Alerting (OPMA)

Appendice 1 al Regolamento ENAC ATSEP Basic training Shared

Providing Safety and Reliability with PBN Guy Greider HUGHES PROPRIETARY

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

ADS-B over Satellite Global Air Traffic Surveillance from Space

McDonnell Douglas MD-11 Avionics System

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Surveillance in Canadian Airspace Today and in the Future

Ref.: AN 13/2.5-09/45 19 June 2009

Cyber-hijacking Airplanes:

Global Avionics Training Specialists, LLC.

Performance Based Navigation (PBN)

TECHWATCH SUMMER 2015 EDITION

The Rebirth of Aviation and Air Transportation in Ohio

Mitigating the Impacts of Space Weather on Aviation Operations

Why it may be time to consider Certified Avionics for UAS (Unmanned Aerial Vehicles/Systems) White paper

TOPICS OFFERED (TOPICS AND NUMBER OF LESSONS SUBJECT TO CHANGE)

Aircraft Hacking Practical Aero Series

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region

Delivering the most complete avionics modernization solution for H-60 and S-70 helicopters.

Future Communications Study (FCS)

09 FLIGHT MANAGEMENT, NAVIGATION

AVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY

C-130 Investigators Handbook

With all of the new hype the

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

B777. Automatic Flight DO NOT USE FOR FLIGHT

ADS-B Webinar. Ted Lester. August 17, Avidyne Corporation. All rights reserved. 55 Old Bedford Road Lincoln, MA

Transcription:

C-130 Fleet CNS/ATM Solutions Steve Knoblock Lockheed Martin Flight Operations Stephen.a.knoblock@lmco.com 770-351-6353 INFORMATION CONTAINED IN THIS BRIEFING IS FOR REFERENCE PURPOSES ONLY AND DOES NOT NECESSARILY REFLECT THE LATEST AIRCRAFT MODEL(S) OR CONFIGURATION(S). THIS PRESENTATION IS FOR INFORMATION ONLY. NO US GOVERNMENT COMMITMENT TO SELL, LOAN, LEASE, CO-DEVELOP OR CO-PRODUCE DEFENSE ARTICLES OR SERVICES IS IMPLIED OR INTENDED.

Overview LM Aero Marietta has designed and tested several avionics packages which address Future Navigation Requirements Legacy C-130 glass cockpit upgrade Multi-national Program tested and undergoing retrofit for C-130H aircraft Adaptable to other C-130 types C-130J Block Upgrade program Phased approach in 2 Software Block builds to achieve full compliance

Mandate for Compliance Worldwide capacity is being stretched Global Economy continues to expand with aviation a key part Infrastructure is either outdated or non-existent Economics to maintain/replace legacy ground based navaids or radar systems is marginal Some locations (oceanic, polar, remote locations) are more advantageous for flight routing yet have no infrastructure to support increased traffic Technology allows for more flexibility, greener operations, and reduced costs Limited funds are better spent on expandable technologies than on outdated systems

Mandate for Compliance New/NextGen Aircraft are designed and built to use new technologies New/NextGen ground systems are designed and built to make use of the new technologies Older aircraft will become more and more of an outcast in the future Bottom Line: Either play by the new rules or you re out of the game

The Big Picture http://www.youtube.com/watch?v=zgpey4bopbw

The Parts C N S Communications: 8.33 Khz radios, CPDLC, VHF datalink, BLOS voice and data (HF, HFDL, Satcom (Inmarsat, Iridium) Navigation: Performance Based Navigation (PBN) for RNAV or RNP, RVSM, 4-D Nav (LNAV, VNAV, TNAV), P-ILS Surveillance: Enhanced Mode S Surveillance (EHS), TCAS, GPWS, TAWS, ADS-C and ADS-B A T M Ground Based Command and Control to perform Air Traffic Management Functions: CPDLC, Air Traffic Services (ATS), Airline (Airlift) Operations Center (AOC over ACARS)

Multi-National C-130H AMP Upgrade Highlights Glass cockpit upgrade based on the Rockwell Collins Flight2 System Dual CDU7000 Flight Management System Controls Honeywell SNU-764GU EGI with RAIM and SAASM GNLU-955M MMR with civil GPS (WAAS/LAAS upgradeable) Dual CMU-900 Comm Management Units Interfaces with VDL-2000 and HF-9550 for datalink operations Integrated displays for PFD, Navigation, and Digital Map Honeywell TPA-110A ETCAS, Universal Avionics TAWS Collins WXR-2100 Multiscan Radar and APS-85 Autopilot APX-119 transponder and 406Mhz ELT

Multi-National C-130H AMP Upgrade Highlights

C-130J Block 7 Highlights Architecture change from Honeywell CNI-SP to GE Aviation Flight Management System Architecture adapted from B-737 and common to USAF C-130AMP design Adds Dual Esterline CMA 5024 WAAS GPS receivers Worldwide RNAV and RNP operations Incorporates enhanced VNAV cues and coupling Expands worldwide database coverage for DP(SIDs), STARS, and approaches

C-130J Block 7 Highlights VNAV PATH Guidance VNAV Cueing commands FMS Mode, Deviation, commanded VVI, Target Speed and Altitude

C-130J Block 7 Highlights Approach and missed approach depicted

C-130J Block 8 Highlights Expands on Block 7 capabilities by improving pilot-vehicle interface (PVI) and implementing inherent system capabilities Expanded alerting and flight mode annunciations Enables LPV functions in CMA 5024 GPS Implements BARO-VNAV operations Adds datalink functionality and ADS-B/C CPDLC, ATS, and AOC Design achieves FANS-1A compliance

C-130J Block 8 Highlights Vertical Profile Display - New Overlay Option - Range tied to Nav display - Vertical Range selectable - New Special alert for Below Path - Altitude restrictions depicted - VNAV Phase, speed/alt targets, and commanded VVI displayed - Digital VDEV shown - Vertical Path predictor

C-130J Block 8 Highlights Baro Vnav - New FMA - New path deviation indication - New Special alert for Below Path BELOW PATH LPV RDY LPV - New FMA - Existing ILS path deviation indication - LPV READY Status - New CDI Source Label - Exisiting GCAS Mode 5 GLIDESLOPE callout

C-130J Block 8 Highlights

Bottom Line Legacy C-130 Summary Table C 130H CNS/ATM Capabilities CNS Criteria Category Example Legacy AMP d NAV MNPS NAT tracks RNP 10 (RNAV 10) PACOTS, WATRS, PACOTS, AFI RNAV 5 Europe, North Africa, SW Asia RNP 4 (datalink required) SOPAC (Australian/New Zealand FIR specific) RNAV 2 US Q and T routes RNAV 1 STARs, SIDs, RNAV DP RNP 1 RNAV(RNP) DP RNAV < 1 RNAV(GPS) LNAV only RNP 0.3 RNAV(GPS) LNAV only RNP<0.3 RNAV(RNP) LPV RNAV(GPS) LPV BARO VNAV RNAV(GPS) LNAV/VNAV RVSM Above FL 290 P ILS Schiphol NL = dependent on each version/operator

Bottom Line Legacy C-130 Summary Table C 130H CNS/ATM Capabilities CNS Criteria Category Example Legacy AMP d Comm Surveillance 8.33 Khz Europe Datalink AOC and ATS messaging CPDLC FANS Airspace TAWS/GPWS Mode S EHS Europe TCAS ADS C FANS Airspace Future Rqmt ABS B FAA 2020 Rqmt = dependent on each version/operator

Bottom Line C-130J Summary Table C 130J CNS/ATM Capabilities CNS Criteria Category Example NAV Block 6 and previous Block 7 Block 8 MNPS NAT tracks RNP 10 (RNAV 10) PACOTS, WATRS, PACOTS, AFI RNAV 5 Europe, North Africa, SW Asia RNP 4 (datalink required) SOPAC (Australian/New Zealand FIR specific) RNAV 2 US Q and T routes RNAV 1 STARs, SIDs, RNAV DP RNP 1 RNAV(RNP) DP RNAV < 1 RNAV(GPS) LNAV only RNP 0.3 RNAV(GPS) LNAV only RNP<0.3 RNAV(RNP) LPV RNAV(GPS) LPV BARO VNAV RNAV(GPS) LNAV/VNAV RVSM Above FL 290 P ILS Schiphol NL

Bottom Line C-130J Summary Table C 130J CNS/ATM Capabilities CNS Criteria Category Example Comm Surveillance Block 6 and previous Block 7 Block 8 8.33 Khz Europe Datalink AOC and ATS messaging CPDLC FANS Airspace TAWS/GPWS Mode S EHS Europe TCAS ADS C FANS Airspace ABS B FAA 2020 Rqmt

Summary C-130 Legacy C-130H AMP design provides commonality, a modern digital architecture, and an integrated cockpit Delivers full RNAV and RNP capability down to 0.3nm Provides Cat 2 ILS and RNAV(GPS) approach capability to LNAV/VNAV minima FANS-1A capability Mode S EHS compliant Growth path to GLS and ADS-B

Summary C-130J C-130J Block 7 is a first step to CNS/ATM compliance Delivers full RNAV and RNP capability down to 0.3nm New FMS contains all terminal and approach procedures VNAV integration increased over Block 6 RNAV(GPS) approach capability to LNAV only minima with advisory VNAV

Summary C-130J C-130J Block 8 completes CNS/ATM compliance Approach capability expanded to include RNAV(GPS) to LPV and LNAV/VNAV minima Datalink implemented with AOC, ATS, and CPDLC ADS-C and ADS-B out implemented

Discussion