Infrastructure Requirements and Costs Update for Strategic Locations

Similar documents
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Major and Minor Schemes

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

6. Social & Community Facilities

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

Framework Pinhoe Area Access Strategy

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

A number of key guiding principals underline the approach to transportation within the plan area. These include:

Delivery Plan. Service Delivery Plan 2007/08 Template 1. Desired Outcome

Shannon Corner Service Centre, Burlington Road, New Malden, KT3 4NP

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

DROMANTINE. Driving Directions. Please print or use the following guide to locate Dromantine Retreat And Conference Centre.

Prince Michael of Kent Court

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

1 in 30 year surface water flooding assessment Environment and Transport Department

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

Energy and. Resources

Offers In Excess Of 175,000


Lawson Outline Plan External Traffic Analysis Working Paper

Travel and Transport Plan

Tewkesbury. March 2015

OVERARCHING SPATIAL POLICIES

Dorset Green SANGs Report

Infrastructure Plan. Scoping Report

Facilities and Prices

74 Rivington Street. Planning Statement JULY 2013 DP Pall Mall. London SW1Y 5NQ. Tel: Fax:

Southwark. Directions to ABC Selfstore Ossory Road London SE1 5AN

Town of Amherst Flood Plan Annex

Infrastructure Development Plan (IDP)

LLITM Public Transport Supply Model

Sector Design Concepts

Leicester and Leicestershire Local Investment Plan

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

Local

CITY MEETS CENTRE. Be part of the Cardiff Exciting Hotel Development Opportunity

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Block C Borthwick Street, London, SE8 3JY

Traffic Management During Construction

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

The Mersey Gateway Project

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Stowmarket Area Action Plan (AAP) Examination

Vale of Glamorgan Local Development Plan Contents. Page. 2. Infrastructure Requirements Site Viability 4

Site Layout & Traffic Plan

21.03 SETTLEMENT AND HOUSING

Planning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Investment Partnership for South Leeds

Land at Cofton Lake Road Cofton Hackett

Footpath Extension Policy

LODE WITH LONGMEADOW ACTION PLAN

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY

STADIUM PLACE. Atrractive 1, 2, 3 and 4-bedroom homes available through L&Q s Shared Ownership scheme

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November with

Clean, Green, Fun! Cady Way. Trail

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE

Site Proposal 15. suitable modern space. The design of any proposals will need to be sensitive to the railway line.

Student Travel Options

Alternatives and Design Evolution: Planning Application 1 - RBKC

retail ideas refreshing communities regenerating HOME REGENERATION COMMUNITIES DESTINATIONS PORTFOLIO SCHEMES CONTACT

Key Themes for Langham s Neighbourhood Plan

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

For more information, visit: rethinkingstreets.com

4.6. ECOCITY Tübingen - Derendingen

Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. Persimmon Homes October 2013

POSITIVELY+ LOCATED. Everglade Campus 82 Waterloo Road, Macquarie Park, NSW

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

TO COLCHESTER A120 A138 JUNCTION 19 BOREHAM INTERCHANGE A12 TO M25 AND LONDON

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Parks, Forestry & Recreation

office space available now 1,750-29,300 sq ft

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Richmond upon Thames College. Draft Planning Brief. May 2008

What lessons for future urban regeneration in East London can be learnt from projects in the past? Year 11 Geography fieldtrip.

East Staffordshire Borough Council Infrastructure Delivery Study Part 1 Growth options assessment

Kelham Hall. Nottinghamshire NG23 5QX. To.: Agenda. South of

An Introduction to Haarlemmermeer

Transcription:

Infrastructure Requirements and Costs Update for Strategic Locations This note provides an update to the infrastructure costs submitted in the Council s statements to Matters 9, 10, 12, and 14. North East of Leicester Sustainable Urban Extension CORE STRATEGY EMERGING PROPOSAL ESTIMATED COST New main road through the development from Barkby Thorpe Lane at the north to Sandhills Avenue to the south, performing the function of a high street where it passes through the new main centre. New link road westwards to link Melton Road and A607 north of the A607 / Barkby Thorpe Lane Junction TRANSPORT REQUIREMENTS New spine road within the SUE, performing the function of a high street where it passes through the new main centre (including bridge over the Midland Mainline). New link to Sandhills Avenue to the south (including bridge over the Melton Brook). New highway infrastructure to facilitate northern access - westwards to link Melton Road and A607 north of the A607 / Barkby Thorpe Lane Junction 23.5m Capacity improvements to Barkby Thorpe Lane and the A607/ Barkby Thorpe Lane Roundabout Other network improvements Improvements to Barkby Thorpe Lane and ASDA Roundabout / A607 Other network improvements New and enhanced bus services walking routes High quality bus corridors between the SUE and Leicester City Centre Network of cycle routes including access to Syston Railway Station and surface improvements to footpaths between the SUE and surrounding villages. COMMUNITY FACILITY REQUIREMENTS 3.5m 2m Primary School 3 Primary Schools 13.6m Secondary School Contributions Options or Contributions 13.4m Local centre including community facilities and a community centre Post 16 New Health Facility Police Workstation 2.8m 2.25m 1.4-1.8m Library 273,000 OPEN SPACE REQUIREMENTS

Parks totalling around 3.6 ha Around 23 ha of natural and semi-natural green space Around 5 ha of amenity green spaces Around 22 sites providing facilities for children Around 22 sites providing facilities for young people Around 29 ha of outdoor sports provision including around 13 ha of playing pitches and around 5 tennis courts Parks - open parkland and linear parks. Natural and semi-natural green space Amenity green spaces Smaller number of larger well equipped sites Smaller number of larger well equipped sites Outdoor sports provision including playing pitches and courts 1.34m 1.42m 0.71m 0.4m 0.4m 2.1m Around 4 indoor courts Indoor courts 1.8m Around 4ha of allotments Allotments 0.26m TOTAL COST 71.15m North of Birstall Direction of Growth CORE STRATEGY EMERGING PROPOSAL ESTIMATED COST New roundabout on the A6, north of the A46 interchange TRANSPORT REQUIREMENTS Primary access junction on the A6 (signalised roundabout) 8.2 million Appropriate access arrangements including a connection to the A6 and Rothley A two way connection with Loughborough Road, Rothley Appropriate capacity improvements at the A46 interchange. walking routes Bus service enhancements Improvements to A6/A46 junction and provision of bus gate and emergency access. walking routes, including a new underbridge to A6, connecting Broadnook with Wanlip, Birstall and Watermead Park via a nonvehicular route. Services 126/127 and 22A/22B as diverted and extended will deliver connections with key destinations at Birstall, Leicester and other settlements in Charnwood. COMMUNITY FACILITY REQUIREMENTS

Primary School Secondary School Contributions Local centre including community facilities and a community centre Providing an accessible, comprehensive and high quality network of multi-functional green spaces. 1 Primary School including dual use Hall Sufficient capacity to meet all of the generated places at nearest high school and upper school 5.5m 0 Post 16 places 579,810 Health facilities 594,184 Civic Amenity Site 77,505 Police 583,766 Libraries 81,525 OPEN SPACE REQUIREMENTS Emerging Masterplan includes a package of green infrastructure including a new Broadnook Park with maintenance and management overseen by a Broadnook Garden Suburb Trust including play facilities and sports pitches. 23.7m TOTAL COST 40.2 West of Loughborough Sustainable Urban Extension CORE STRATEGY EMERGING PROPOSAL ESTIMATED COST New strategic distributor road through the development to connect to the A512 at the south and the A6 (south of Hathern) to the north TRANSPORT REQUIREMENTS Strategic Link Road from the A512 to A6 (including A6 Site Access and a link to Hathern Road and providing a high street where it passes through the main centre) 15.2m New road providing the function of a high street where it passes through the main centre New road link from the distributor road to Hathern Road Dualling of the A512 between Snell s Nook Lane and M1 motorway J23 Capacity improvements to Dualling of the A512 between Snell s Nook Lane and M1 motorway J23. Capacity improvements to M1 motorway J23 fully signalled 50% Contribution of 3.7m of the total cost of 7.4m

M1 motorway J23 controlled scheme. Site access from signalled controlled roundabout to serve SUE and SEP. Other network improvements New and enhanced bus Services New and improved cycling and walking routes Junction Improvements in Loughborough Bus Service Provision New and improved cycling and walking routes off site 275,000 1.58m 445,000 COMMUNITY FACILITY REQUIREMENTS Two Primary Schools Two Primary Schools 10.3m Secondary School Contributions Secondary Contribution 321,771 Post 16 places 0 Local Centre Health facilities 1.6m - 2.5m for an expansion of existing or provision of a new facility Libraries 273,000 Policing 1.3m OPEN SPACE REQUIREMENTS Public access to, restoration and long term management of Garendon Historic Park and Gardens Around 3.4 ha of amenity green space Registered Park Restoration and Public Access Listed Buildings - to level of repair and restoration Around 3.4 ha of amenity green space 2.7m 2.072 466,000 Sites providing facilities for children and Young People Play facilities 512,000 Around 22.8 ha of outdoor sports provision including around 9 hectares of playing pitches and around 4 tennis courts Outdoor sports provision 1.5m Around 3 indoor courts Indoor Sports facility 1.5m

Around 2.5 ha of allotments Around 2.5 ha of allotments 266,000 Other Abnormal cost for Power substation anticipated 4m contribution to the total cost of 8m TOTAL COST 48m Shepshed Direction of Growth CORE STRATEGY EMERGING PROPOSAL DEVELOPER CONTRIBUTIONS (from 1,260 homes) walking routes Routes provided within approved sites. Bus service enhancements to Shepshed and Loughborough Provision of bus passes for residents of new development Other road infrastructure and network improvements as identified by an appropriate Transport Assessment Contributions to travel information packs for new residents Provision of bus shelters, bus stops, information cases and real time information systems. Contributions towards: M1 Junction 23 Improvements A512 Duelling 471,986 Found not to be necessary upon preparation of a Transport Assessment Improvements to the A512 / Tickow Lane junction 277,760 Improvements to the A512 / Charnwood Road junction Improvements to the A512 / Leicester Road junction 26.9% from site 6 25.3% from site 8 6.4% from site 9 Gap funding subject to LLEP application 23.1% from site 6 20.6% from site 8 7.2% from site 9 Gap funding subject to LLEP application

CORE STRATEGY EMERGING PROPOSAL DEVELOPER CONTRIBUTIONS (from 1,260 homes) Traffic calming on Belton Street Primary and Secondary school places Other local junction improvements Contribution towards primary school places Contribution towards secondary school places 73,064 5,060,559 Small range of shops services and facilities Development that contributes to the regeneration of Shepshed Other Contributions (Civic amenity, public art and off site recreation) Health facilities 297,724 Policing 314,289 Libraries 44,758 Contributions towards public realm improvements identified through the Town Centre Master Plan 173,800 394,231 TOTAL CONTRIBUTIONS 7,108,171 (plus the costs of junction improvements to A512)