How To Migrate To Control-M



Similar documents
r12 Overview Business value

BMC Control-M Workload Automation

CA JCLCheck Workload Automation

IBM Tivoli Monitoring for Applications

Solution White Paper Connect Hadoop to the Enterprise

CA Workload Automation Agents Operating System, ERP, Database, Application Services and Web Services

Batch Scheduling in the SAP Environment

CA Scheduler Job Management r11

BMC CONTROL-M AUTOMATE AND INTEGRATE YOUR BATCH AND ONLINE PROCESSES ACROSS THE ENTERPRISE.

CA Workload Automation Agents for Mainframe-Hosted Implementations

Thought Leadership White Paper Strategies for Effective Job Scheduler Consolidation

POLAR IT SERVICES. Business Intelligence Project Methodology

CA Workload Automation CA 7 Edition r11.3

BROCADE PERFORMANCE MANAGEMENT SOLUTIONS

CA High Performance Recovery for IMS for z/os

CA TPX Session Management r5.3

Securing Your Microsoft SQL Server Databases in an Enterprise Environment

CA IT Client Manager. Desktop Migration

Unicenter Desktop DNA r11

Reduce IT Costs by Simplifying and Improving Data Center Operations Management

CA Deliver r11.7. Business value. Product overview. Delivery approach. agility made possible

Unifying IT How Dell Is Using BMC

agility made possible

Job Scheduling Magic Quadrant Reflects New Challenges

White paper: Unlocking the potential of load testing to maximise ROI and reduce risk.

PATROL From a Database Administrator s Perspective

CA Service Desk Manager

CA Process Automation for System z 3.1

IBM and ACI Worldwide Providing comprehensive, end-to-end electronic payment solutions for retail banking

CA Workload Automation Restart Option for z/os Schedulers r11

CA CMDB Connector for z/os version 2.0

CA Gener/OL r7.1. Overview. Business value

CA Explore Performance Management for z/vm

White Paper On Pilot Method Of ERP Implementation

A discussion of information integration solutions November Deploying a Center of Excellence for data integration.

ar Seri BMC Control M Workload Automation Roadmap

Control-M Conversion Tool Release Notes May 2013

CA SYSVIEW Performance Management r13.0

CA Service Desk On-Demand

CA Endevor Software Change Manager Release 15.1

Cisco Video Surveillance Services

COMPARISON OF VMware VSHPERE HA/FT vs stratus

Global Headquarters: 5 Speen Street Framingham, MA USA P F

SAP Managed Services SAP MANAGED SERVICES. Maximizing Performance and Value, Minimizing Risk and Cost

CA Librarian r4.3. Overview. Business value

IBM Virtual Server Services. A smarter way to support and grow your business

IBM DB2 Near-Line Storage Solution for SAP NetWeaver BW

Is it Time to Modernize Your Service Desk?

CA NetSpy Network Performance r12

CA Repository for z/os r7.2

solution white paper Patch Management The set-it-and-forget-it strategy

Atrium Discovery for Storage. solution white paper

Scheduling in SAS 9.3

5 Steps To Successful ERP Implementation

CA Service Desk Manager

NightOwlDiscovery. EnCase Enterprise/ ediscovery Strategic Consulting Services

Control-M Roadmap. BMC Control-M Seminar Series

Life insurance policy administration: Operate efficiently and capitalize on emerging opportunities.

Simplify Your Windows Server Migration

Consulting Services. Kiersted is proud to provide a. wide range of legal technology and. consulting services to meet the

Canon U.S.A., Inc. Service Schedule

Simplify survey research with IBM SPSS Data Collection Data Entry

getting started with digital asset management and creative workflow solutions

1 INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN

CA Telon Application Generator r5.1

VMware Consolidated Backup

Desktop Management, Profile Migration and Cross Platform Delivery. Technical Overview

Solution Approach Benefi ts Project Example

Select the right configuration management database to establish a platform for effective service management.

CA Endevor Software Change Manager Version 15.0

Scheduler Job Scheduling Console

z/os Curriculum Job Control Language (JCL) Curriculum JES Curriculum WebSphere Curriculum TSO/ISPF for z/os Curriculum

IBM InfoSphere Information Server Ready to Launch for SAP Applications

Driving workload automation across the enterprise

IBM Virtualization Engine TS7700 GRID Solutions for Business Continuity

CA Capacity Manager. Product overview. agility made possible

Cisco Change Management: Best Practices White Paper

CA MICS Resource Management r12.7

Keep Your Business InTune. Application Quality Management

IBM Global Technology Services November Successfully implementing a private storage cloud to help reduce total cost of ownership

What s new in Teamcenter Service Pack

Guidelines for Choosing Records Management Software

F Cross-system event-driven scheduling. F Central console for managing your enterprise. F Automation for UNIX, Linux, and Windows servers

for Java Applications solution WHITEPAPER

CONTROL-M Business Service Management Solution

CA MICS Resource Management r12.6

A Data Warehouse Case Study

Datasheet. FUJITSU Storage ETERNUS SF Storage Cruiser V16.0 ETERNUS SF AdvancedCopy Manager V16.0 ETERNUS SF Express V16.0

WHITE PAPER ON TECHNICAL DEVELOPMENT APPROACH FOR SAP IMPLEMENTION PROJECTS

Cloud Server. Parallels. Key Features and Benefits. White Paper.

Unprecedented Performance and Scalability Demonstrated For Meter Data Management:

IBM Data Center Services. Building or upgrading your data center, while helping to minimize cost, risk and delay

Windows Server 2008 R2 Hyper-V Live Migration

Implementation of PeopleSoft 8.9

Avelo solutions for intermediaries

Mayur Dewaikar Sr. Product Manager Information Management Group Symantec Corporation

IBM Cognos 8 Controller Financial consolidation, reporting and analytics drive performance and compliance

TSM (Tivoli Storage Manager) Backup and Recovery. Richard Whybrow Hertz Australia System Network Administrator

This software agent helps industry professionals review compliance case investigations, find resolutions, and improve decision making.

DEDICATED SUPPORT IS ESSENTIAL TO YOUR SUCCESS

Transcription:

Migration Methodology to CONTROL-M

Introduction Over 1,800 satisfied customers have migrated from their existing scheduling solution to CONTROL-M Business Integrated Scheduling, and over five million job definitions have been automatically converted to CONTROL-M using BMC Software s automatic conversion tools. When considering a replacement of an existing scheduling system, a fast and efficient conversion process is vital. To ensure a successful conversion and reduce risks, BMC Software offers a proven combination of knowledge and know-how, skilled professional services, a dedicated migration team, and high-level automatic conversion tools. CONTROL-M s automatic conversion tools support the conversion of all common schedulers, such as CA-7, AutoSys, Tivoli TWS, Zeke, and CA-Jobtrac. If needed, BMC Software Professional Services can manage and execute the entire conversion process for you, providing onsite training and support, and integrating the knowledge and experience of your data center with our industry-proven conversion methodology. Also, CONTROL- M is capable to run in parallel with your existing scheduler to guarantee the uninterrupted continuation of your production environment during the test phase of CONTROL-M. The following information is based on extensive experience based on hundreds of CONTROL-M conversions. This overview describes the migration methodology, capabilities and support provided by BMC software for users planning a migration to CONTROL-M. This overview will better prepare you for the conversion process, save you on unnecessary expenses, and highlight the stages required for a smooth and safe process.

Smooth Migration to CONTROL-M BMC Software has developed a robust suit of automatic conversion tools (ACTs) and professional services methodologies that enhance and standardize the conversion process. Each package contains a detailed conversion manual, and dedicated conversion tools developed specifically to the converted product. Using our tools and methodologies, the conversion from old systems to CONTROL-M s new technology is achieved fast and in a cost-efficient manner. A free ACT package is available for migrating to CONTROL-M from the following products: CA: AutoSys, CA-7, CA-11, CA-JobTrac, CA-RunTrac, CA-Scheduler, CA- Manager, CA-ADC2 ASG: ZEKE, ZEBB IBM s Tivoli: TWS (formally Maestro), TWS for OS/390 (formally OPC), DJC Home grown: Home-grown scheduling solutions The migration process is completed in five phases: 1. Migration plan 2. CONTROL-M Installation and Tuning 3. Migration Process 4. Parallel Testing 5. CONTROL-M Activation

Phase 1 Migration Plan Designing the overall migration process is the first step to a successful CONTROL-M implementation. All relevant information is gathered, potential logic conflicts and distinct situations analyzed, and the site s underlying configuration and infrastructure thoroughly assessed. This initial assessment prevents the conversion of inaccurate data by allowing database cleanup and problem resolution to occur, and enables the data center to begin the conversion process. During this phase, the following issues should be addressed: Formation of the Migration Team The first step, and one of the most important ones in the migration project, is to allocate the human resources that will be in charge of the migration project. A solid team with the best individuals that cover all aspects of administration, implementation and operation of the scheduling solution is key to a successful migration. The migration team is organized and a team leader designated. This team should include those who support the current environment, such as operators, production control administrators, product administrators, production analysts, application support and programming personnel, and security administrators. Migration Team Profile The conversion team should be familiar with the features and operation of the old scheduling product, CONTROL-M, BMC Software s ACTs, and the site s rules, procedures, naming conventions and work environment. Old Scheduler Assessment Identify the exact release of the old scheduling product and the operating system. Identify the users of the old scheduling product. List all user or system exits, reports and software interfaces that were customized in the data center. Amount of jobs defined. Number of jobs that run on a daily, weekly and monthly basis. Number of job definitions that are in use, and number of obsolete job definitions. Unsatisfactory scheduling definitions and executions. Data Center s Scheduling Environment Identify major applications running in the site, considering size, complexity and value to the business. Also, look for bottlenecks or constraints in the scheduling implementations of the applications. List all production-related products that are available in the site, such as job restart, console automations, tape management, output management, etc.

Identify all manual scheduling-related actions. Identify the way resources are managed (i.e. tape drives, initiators, etc.). Identify peak times, and the number of jobs that run during these times. Number of jobs that use JCL automation features and the type of automation used. Identify jobs that are scheduling using dataset triggering, job arrival, etc. Phase 1 Results A list of the conversion team, including a team leader. Software/hardware configuration map. Definition of product component sizing. Identification of required functional options. Identification of conversion tool options. Identification of functionality gaps between CONTROL-M and the product being replaced. Completed security matrix. Outline of implementation strategy.

Phase 2 CONTROL-M Installation and Tuning During this phase, all components of the BMC Software solution are installed on the site s target platforms. The system administration group members are the key figures in this phase. They should become familiar with the installation procedures and considerations of CONTROL-M, and learn the similarities and differences between the original scheduler and CONTROL-M. If BMC Professional Services are involved in this process, this is the time to conduct technical training sessions to ensure optimal results of the installation, and that the administration skills are well acquired by the data center s members. As part of the installation process, all required administrative jobs and tasks should be created and scheduled to maintain proper operation of CONTROL-M. Special consideration is taken for the site s standards, security aspects, SMP/E regulations, space allocation, etc. Phase 2 Results CONTROL-M installation. All required administrative jobs tasks tailored and running. All local tuning/tailoring completed. All product components tested. All exits tailored and in place. Product security interfaces activated and tested.

Phase 3 Migration Process The third phase involves the actual data conversion from the old scheduler to CONTROL-M. Utilizing ACTs that use the old scheduler reports, JCL libraries and other databases as input, the scheduling definitions are converted into CONTROL-M standard scheduling definitions. The tools are tuned and adjusted using existing program parameters and executed in accordance with the site s standards and needs. ACT documentation can be obtained prior to the conversion process please contact your local BMC representative for details. This automatic process eliminates manual conversion work and streamlines resource requirements. In cases where the automatic conversion process does not cover all scheduling definitions, additional manual conversion actions are performed. It is strongly recommended to choose one or two applications as pilots. By implementing a pilot, the employees involved in the conversion have the opportunity to learn and get familiar with CONTROL-M on a smaller scale than the whole production environment. The amount of scheduling jobs in the pilot applications should be relatively small, yet reflecting typical applications of the site in terms of scheduling complexity, such as resources utilized, job flow structure and interactions with other products (tape management, console automation, etc). A successful pilot implementation is the foundation for the replacement of the rest of the site s applications. Additionally, CONTROL-M supports either phased or full conversions, providing the ability to convert one application at a time or the entire data center at once according to your specific business requirements. With CONTROL-M s thorough training, analysis and testing process, the actual conversion is simply a matter of how much to convert and when. If needed, this phase may also include local modifications to the base conversion tools, or the creation of site-specific conversion software to complete the conversion of exceptional scheduling requirements.

BMC Software s automatic conversion utilities use the data-center JCL libraries and standard reports generated by the original scheduler to create CONTROL-M s databases. Phase 3 Results Internal product elements from old product converted to CONTROL-M using automatic conversion tools and, if needed, manual processes: o Job schedule tables. o Calendar definitions. o Old scheduler documentations to job documentation. o Old scheduler specific JCL automation to CONTROL-M Auto-Edit variables. o Conversion of third party product interfaces and batch job utility processes.

Phase 4 Parallel Testing In order to assure integrity of the scheduling flow, it is highly recommended to perform this simulation process for each of the applications prior to the activation in production. As mentioned before, it is also recommended to execute a phased conversion process instead of converting all applications at one time. Testing separately each one of the converted applications by activating CONTROL-M in parallel is also recommended. First, one or two pilot applications should be chosen. The amount of jobs in the pilot should be small, yet reflect a typical application in the data-center in complexity, interfacing with external application and utilizing resources (e.g. tapes, initiators, databases). Following the actual conversion process, CONTROL-M should be activated in parallel to the old scheduling product and only simulate execution of jobs. In this phase, CONTROL-M simulates the execution of the production applications without actually executing the jobs. Use the CONTROL-M mass update utility (CTMTBUPD) to create a copy of the scheduling definition tables. This copy should contain dummy jobs instead of real jobs. These dummy jobs consume negligible CPU time and therefore do not interfere with the production flow. By scheduling the dummy jobs instead of the real ones, the production managers can validate that CONTROL-M will schedule the production applications in the right order and timing as the original scheduling system did. The Utilities Guide should be used in order to assure the accuracy of the scheduling flow. Phase 4 Results Activation of converted elements in simulation mode to process production data in parallel with the old product. Adjustment and validation of converted elements. Review of data center s support staff capabilities. Data-center staff is familiar with CONTROL-M.

Phase 5 CONTROL-M Activation After finalizing all previous phases, the data center should have a complete CONTROL- M scheduling environment, similar to the old scheduler production environment. At this stage, the data center should switch from the old scheduling product to CONTROL-M. Phase 5 Results Activation of converted elements in production mode. Onsite support and fine-tuning during the transition phase. Finalization and delivery of operation guide. Summary As the leader in automated conversions, BMC Software has the tools, expertise and experience to ensure a smooth and successful migration. CONTROL-M s strong and proven methodology, along with the BMC Software s skilled Professional Services has already helped many sites migrate to the market s best-of-breed scheduling solution. BMC Software s Professional Services assures a fast and reliable migration process utilizing its vast experience and proven methodology. In-house migration assistance guarantees an even faster return on your investment. For more information about BMC Software products and solutions, visit us at http://www.bmc.com/products/pm/ BMC Software, the BMC Software logos and all other BMC Software product or service names are registered trademarks or trademarks of BMC Software, Inc. IBM is a registered trademark of International Business Machines Corp. All other trademarks or registered trademarks belong to their respective companies. 2002 BMC Software, Inc. All rights reserved. 11/02 21712