Out-of-box comparison between Dell, HP, and IBM blade servers

Similar documents
Out-of-box comparison between Dell and HP blade servers

Figure 1A: Dell server and accessories Figure 1B: HP server and accessories Figure 1C: IBM server and accessories

Summary. Key results at a glance:

How To Compare Two Servers For A Test On A Poweredge R710 And Poweredge G5P (Poweredge) (Power Edge) (Dell) Poweredge Poweredge And Powerpowerpoweredge (Powerpower) G5I (

RESOLVING SERVER PROBLEMS WITH DELL PROSUPPORT PLUS AND SUPPORTASSIST AUTOMATED MONITORING AND RESPONSE

Figure 2: Dell offers significant savings per chassis over HP and IBM in acquisition costs and 1-, 3-, and 5-year TCO.

SERVER POWER CALCULATOR ANALYSIS: CISCO UCS POWER CALCULATOR AND HP POWER ADVISOR

A QUICK AND EASY GUIDE TO SETTING UP THE DELL POWEREDGE C8000

Power Efficiency Comparison of Enterprise-Class Blade Servers and Enclosures

TEST REPORT Dell PERC H700 average percentage win in IOPS over FEBRUARY 2006 Dell PERC 6/i across RAID 5 and RAID 10. Internal HDD tests

VIRTUALIZATION-MANAGEMENT COMPARISON: DELL FOGLIGHT FOR VIRTUALIZATION VS. SOLARWINDS VIRTUALIZATION MANAGER

TEST REPORT OCTOBER 2008 Performance of Dell and HP servers running Windows Small Business Server 2008

TEST REPORT OCTOBER 2009 SMB Workload performance testing: PowerEdge T110 vs. an older small business desktop running typical small

Adaptec: Snap Server NAS Performance Study

A PRINCIPLED TECHNOLOGIES TEST REPORT WORKSTATION PRODUCTIVITY WITH THE DUAL-PROCESSOR LENOVO THINKSTATION D20 AUGUST 2011

Adaptec: Snap Server NAS Performance Study

How To Perform A File Server On A Poweredge R730Xd With Windows Storage Spaces

Digi International: Digi One IA RealPort Latency Performance Testing

WEB SERVER PERFORMANCE: DELL SERVERS

A PRINCIPLED TECHNOLOGIES TEST REPORT SHAREPOINT PERFORMANCE: TREND MICRO PORTALPROTECT VS. MICROSOFT FOREFRONT JULY 2011

Taurus - RAID. Dual-Bay Storage Enclosure for 3.5 Serial ATA Hard Drives. User Manual

System Configuration and Order-information Guide ECONEL 100 S2. March 2009

is605 Dual-Bay Storage Enclosure for 3.5 Serial ATA Hard Drives FW400 + FW800 + USB2.0 Combo External RAID 0, 1 Subsystem User Manual

A PRINCIPLED TECHNOLOGIES TEST REPORT VIDEO-RENDERING PERFORMANCE COMPARISON: DELL PRECISION MOBILE WORKSTATIONS VS. APPLE MACBOOK PROS MARCH 2012

Power Efficiency Comparison: Cisco UCS 5108 Blade Server Chassis and Dell PowerEdge M1000e Blade Enclosure

How To Write An Article On An Hp Appsystem For Spera Hana

Dynamic Power Variations in Data Centers and Network Rooms

JUNE 2009 File server performance comparison of three Dell PowerVault NX3000 configurations using Microsoft FSCT

HP reference configuration for entry-level SAS Grid Manager solutions

MICROSOFT SHAREPOINT CONSOLIDATION AND TCO: DELL POWEREDGE R720 VS. HP PROLIANT DL380 G7

EVGA Z97 Classified Specs and Initial Installation (Part 1)

HP 16/18-Port Cable Management Kit Installation Guide

How To Configure Your Computer With A Microsoft X86 V3.2 (X86) And X86 (Xo) (Xos) (Powerbook) (For Microsoft) (Microsoft) And Zilog (X

Dynamic Power Variations in Data Centers and Network Rooms

Highly Scalable Server for Many Possible Uses. MAXDATA PLATINUM Server 3200 I

CENTRALIZED SYSTEMS MANAGEMENT: DELL LIFECYCLE CONTROLLER INTEGRATION FOR SCCM VS. HP PROLIANT INTEGRATION KIT FOR SCCM

CLOUD NETWORKING WITH CA 3TERA APPLOGIC

HP recommended configuration for Microsoft Exchange Server 2010: HP LeftHand P4000 SAN

Schedule for supply of Server, Multifunction Printer, Laptop, Computer, Monitor and UPS:

Hydra Super-S Combo. 4-Bay RAID Storage Enclosure (3.5 SATA HDD) User Manual July 29, v1.3

Unpacking, Installation, and Customization

VERITAS Software - Storage Foundation for Windows Dynamic Multi-Pathing Performance Testing

COMPLEXITY COMPARISON: CISCO UCS VS. HP VIRTUAL CONNECT

HP ProLiant DL165 G7 Server. Installation Instructions

System Installation. 3-1 Socket 370 Celeron/Pentium-III Processor. Installing S370 CPU. Removing CPU. Configuring System Bus

Cascade Profiler Fibre Channel SAN Attached Storage Installation Guide. Version 8.2 March 2009

Dell PowerEdge Blades Outperform Cisco UCS in East-West Network Performance

Power Efficiency Comparison: Cisco UCS 5108 Blade Server Chassis and IBM FlexSystem Enterprise Chassis

ALIENWARE X51 PERFORMANCE COMPARISON: SAMSUNG SSD VS. TRADITIONAL HARD DRIVE

Chapter 5 Cubix XP4 Blade Server

Intel NUC Kit DC3217IYE User Guide. Intel NUC Kit DC3217IYE

Cisco MCS 7825-H3 Unified Communications Manager Appliance

Comtrol Corporation: Latency Performance Testing of Network Device Servers

5520UR 00UR 00UR 625UR 625URSAS 00UR URBRP 600URLX 625URLX

StorTrends 3400 Hardware Guide for Onsite Support

DD670, DD860, and DD890 Hardware Overview

TS500-E5. Configuration Guide

Intel Desktop Board D925XECV2 Specification Update

Brainlab Node TM Technical Specifications

Video Surveillance Storage and Verint Nextiva NetApp Video Surveillance Storage Solution

Home Theater PC Chassis

This Request for Proposal consists of providing the IT Server requirements outlined in this RFP.

HP Power Advisor utility: a tool for estimating power requirements for HP ProLiant server systems

VIRTUALIZED STORAGE IN CA APPLOGIC

Vendor and Hardware Platform: Fujitsu BX924 S2 Virtualization Platform: VMware ESX 4.0 Update 2 (build )

HP ProLiant DL585 G5 earns #1 virtualization performance record on VMmark Benchmark

How to configure Failover Clustering for Hyper-V hosts on HP ProLiant c-class server blades with All-in-One SB600c storage blade

Intel RAID Maintenance Free Backup Unit 4 Quick Installation User's Guide

Data Sheet Fujitsu PRIMERGY BX400 S1 Blade Server

SUN HARDWARE FROM ORACLE: PRICING FOR EDUCATION

Data Sheet FUJITSU Server PRIMERGY CX420 S1 Out-of-the-box Dual Node Cluster Server

The Motherboard Chapter #5

Optimizing SQL Server Storage Performance with the PowerEdge R720

Cisco 7816-I5 Media Convergence Server

Certification: HP ATA Servers & Storage

HP ProLiant BL460c achieves #1 performance spot on Siebel CRM Release 8.0 Benchmark Industry Applications running Microsoft, Oracle

Data Sheet FUJITSU Server PRIMERGY CX400 S2 Multi-Node Server Enclosure

HP ProLiant xw460c Blade Workstation Overview

QuickSpecs. What's New. Models. ProLiant Essentials Server Migration Pack - Physical to ProLiant Edition. Overview

A+ Guide to Managing and Maintaining Your PC, 7e. Chapter 1 Introducing Hardware

A PRINCIPLED TECHNOLOGIES TEST REPORT EXCHANGE PERFORMANCE: TREND MICRO SCANMAIL SUITE VS. MICROSOFT FOREFRONT SEPTEMBER 2011

Torpedo Design Concept Storage Server for Open Rack Hardware v0.3 ST-draco-chimera-0.3

HP ProLiant BL660c Gen9 and Microsoft SQL Server 2014 technical brief

QuickSpecs. HP ProLiant xw460c Blade Workstation. Overview

Cisco MCS 7816-I3 Unified Communications Manager Appliance

DATABASE PERFORMANCE: DELL SERVERS

Fusionstor NAS Enterprise Server and Microsoft Windows Storage Server 2003 competitive performance comparison

EVGA X99 Classified Specs and Initial Installation (Part 1)

HP recommended configurations for Microsoft Exchange Server 2013 and HP ProLiant Gen8 with direct attached storage (DAS)

Visual UpTime Select Server Specifications

IMPROVE YOUR SUPPORT EXPERIENCE WITH DELL PREMIUM SUPPORT WITH SUPPORTASSIST TECHNOLOGY

Minimum Hardware Specifications Upgrades

Samsung KIES Online User Update Procedure **

How To Buy An Fujitsu Primergy Bx400 S1 Blade Server

QuickSpecs. What's New. At A Glance. Models. HP StorageWorks SB40c storage blade. Overview

Minimum Hardware Specifications Upgrades

Application Note SigC667x-64 Cards Power and Thermal Evaluation

A Smart Investment for Flexible, Modular and Scalable Blade Architecture Designed for High-Performance Computing.

TOTAL COST OF OWNERSHIP: DELL LATITUDE E6510 VS. APPLE 15-INCH MACBOOK PRO

HP ProLiant BL460c takes #1 performance on Siebel CRM Release 8.0 Benchmark Industry Applications running Linux, Oracle

Transcription:

Out-of-box comparison between Dell, HP, and IBM blade servers TEST REPORT DECEMBER 2007 Executive summary Dell Inc. (Dell) commissioned Principled Technologies (PT) to compare the out-of-box experience of the following three blade systems: Dell PowerEdge M600 Blade System HP BladeSystem c-class IBM BladeCenter H We received each chassis and set of blades in the manufacturer s original packaging. We then compared the amount of time it took us to set up each system. Due to differences in packaging and design, there was a considerable difference in setup times for the three systems. Figures 1A, 1B, and 1C show the components of the three server arrays after we unpacked them. These photographs illustrate the difference in the time and effort required to set up the three blade servers. The Dell blades arrived preconfigured and all necessary components were up and running as soon as we plugged in the enclosure and inserted the blades. HP and IBM shipped the second KEY FINDINGS The 16-blade Dell PowerEdge M600 Blade System took 14 minutes, 13 seconds to assemble; the 16-blade HP BladeSystem c- Class took 3 hours, 13 minutes, 15 seconds to assemble, while the IBM BladeCenter H took 1 hour, 56 minutes, 24 seconds to assemble. The Dell PowerEdge M600 Blade System shipped with the blades already assembled and installed in the enclosure; the HP BladeSystem c-class and IBM BladeCenter H chassis arrived unassembled and required us to install a processor, memory, and hard disk in each blade. The Dell PowerEdge M600 Blade System arrived in one box, the HP BladeSystem c- Class arrived in 78 boxes, and the IBM arrived in 62 boxes. processor, extra RAM, and hard drives separately; the total of 78 and 62 boxes, respectively, made the unpacking and setup time for the HP and IBM blade servers much longer than that for the Dell blade servers. Figure 1A: The Dell equipment immediately after we unpacked it. Figure 1B: The HP equipment immediately after we unpacked it. Figure 1C: The IBM equipment immediately after we unpacked it. Figure 2 summarizes the amount of time we spent unpacking each system and installing it in the server rack. Compared to the process for the Dell system, the process for the HP system took more than 12 times as long and the process for the IBM system took more than seven times as long. Dell PowerEdge M600 Blade System HP BladeSystem c-class IBM BladeCenter H Task executed Removing items from shipping boxes 00:06:22 01:00:45 00:49:42 Installing the server in the rack 00:07:51 02:12:30 01:06:02 Total time required 00:14:13 03:13:15 01:56:24 Figure 2: Time to unpack and install the three systems. Times are in hours: minutes: seconds. Shorter times are better.

Test results In this section, we detail our experience setting up the Dell PowerEdge M600 Blade System, HP BladeSystem c- Class enclosures, and IBM BladeCenter H chassis, from the time each system arrived through our installation of all of its blades in the chassis and the chassis in a server rack. We discuss this process in the following stages: Receiving the system Removing system components from their packaging o Opening and removing parts from shipping boxes o Removing components and server from outer shipping box o Removing plastic wrap and foam pieces from server o Removing chassis from pallet Installing the system in the server rack o Installing rails and mounting chassis into server rack o Installing blades into chassis For each stage and sub-stage after we received the systems, we enumerate the steps we executed, note the amount of time (hours:minutes:seconds) each step took, and provide representative photographs. Receiving the system As Figure 3A shows, the Dell shipment consisted of one large box strapped to a pallet. The shipping service delivered the box to our second-floor lab. As Figure 3B shows, the HP shipment consisted of 78 boxes. Upon arrival at our building, the large box was strapped to a pallet and the 77 smaller boxes were attached to a large pallet with plastic wrap. Because the large pallet could not fit into the elevator to our second-floor lab, we had to unwrap the pallet in the lobby and make multiple elevator trips to bring the smaller boxes up to our lab. (Note: We did not time the process of transporting the 77 smaller boxes.) The IBM shipment consisted of one large box on a pallet and 3 smaller boxes, which were not on a pallet. The smaller boxes contained additional boxes inside. After unpacking these boxes, we had counted 62 total boxes for the IBM installation. Figure 3C shows these 62 boxes. Figure 3A: The Dell box upon delivery in our lab. Figure 3B: The HP boxes after we brought them up to our lab. Figure 3B: The IBM boxes after we unpacked them from the shipping boxes. 2

Removing the system components from their packaging Opening and removing parts from shipping boxes 1. Cut off the straps, and then cut through the tape to open the top of the box. (00:00:22) 1. Opened the hard disk boxes and placed them on the table. (00:17:00) 2. Opened the blade server boxes and placed the blade servers on the table. (00:10:30) 3. Opened the blade kit boxes and placed the processors and heat sinks on the table. (00:15:00) 4. Opened the RAM box and placed the RAM on the table. (00:01:45) 5. Opened the Ethernet switch box and placed the switch on the table. (00:02:00) 6. Opened the fan boxes and placed the fans on the table. (00:06:00) 7. Opened the PDU boxes and placed items on the table. (00:03:00) 8. Cut off the straps, and then cut through the tape to open the top of the box. (00:00:30) 1. Opened the hard disk boxes and placed them on the table. (00:13:10) 2. Opened the processor boxes and placed the processors and heat sinks on the table. (00:13:35) 3. Opened the IBM BladeCenter Copper Pass-thru Module boxes and placed the modules and cables on the table. (00:02:35) 4. Opened the IBM BladeCenter blade server boxes and placed the blade servers on the table. (00:12:27) 5. Opened the 2900W AC power module box and placed the modules on the table. (00:01:02) 6. Removed the white box locks from the bottom of the box. (00:00:45) 7. Read the outside of the box to determine unpacking steps. (00:00:30) 8. Cut off the straps, and then cut through the tape to open the top of the box. (00:00:22) Total time: 22 seconds Total time: 55 minutes, 45 seconds Total time: 44 minutes, 26 seconds Figure 4A: Opening the Dell server box. Figure 4B: Opening the HP server box. Figure 4C: Opening the IBM server box. 3

Removing components and server from outer shipping box 1. Removed the topmost box and set it aside. (00:00:12) 2. Removed the outermost cardboard covering. (00:00:08) 1. Removed the topmost boxes and the template for inserting the enclosure onto the rack and set them aside. (00:01:15) 2. Removed the foam padding from the top of the server. (00:00:30) 3. Removed the outermost cardboard covering. (00:00:30) 1. Removed the topmost cardboard inserts and the direction pack and set them aside. (00:000:15) 2. Read instructions and user guide to look for quick start guide (finding none). (00:00:45) 3. Removed the outermost cardboard covering. (00:00:09) Total time: 20 seconds Total time: 2 minutes, 15 seconds Total time: 1 minute, 9 seconds Figure 5A: The Dell server with outer cardboard covering removed. Figure 5B: The HP server with outer cardboard covering removed. Figure 5C: The IBM server with outer cardboard covering removed. Removing plastic wrap and foam pieces from server 1. Removed and opened the second box and set it aside. (00:00:18) 2. Removed the foam pieces from the Dell blade system. (00:00:57) 1. Removed the corner pieces and set them aside. (00:00:15) 2. Removed the plastic wrap around the server. (00:00:30) 1. Removed the foam corner pieces and set them aside. (00:00:15) 2. Removed the box of rack rails and set them aside. (00:00:04) 3. Removed the plastic wrap strap around the base of the server. (00:00:06) 4. Removed the cardboard insert (it had a 3 on it) from the end of server. (00:00:04) 5. Opened the top pieces of foam from the server bottom and set them aside. (00:00:14) 6. Removed the plastic wrap from around the server. (00:00:30) Total time: 1 minute, 15 seconds Total time: 45 seconds Total time: 1 minute, 13 seconds 4

Figure 6A: The Dell server with foam pieces removed. Removing chassis from pallet Figure 6B: The HP server with plastic wrap removed. Figure 6C: The IBM server with foam pieces removed. 1. Removed the blades and set them onto a table. (00:02:44) (Note: Step no. 2 on the server chassis mentions the use of anti-static sheets. These sheets did not arrive with the server.) 2. Removed the power supplies. (00:01:32) 3. Lifted the chassis off the pallet. (00:00:09) 1. Lifted the chassis from the pallet. (00:02:00) 1. Read the yellow instruction tabs on the top of the enclosure. (00:00:10) 2. Removed all items from the front of the enclosure to lessen the weight as per the yellow instructions and set the items to the side. (00:02:09) 3. Removed the two fan assemblies from the back of the enclosure to lessen the weight as per the yellow instructions and set the items to the side. (00:00:17) 4. Lifted the chassis from the pallet. (00:00:18) Total time: 4 minutes, 25 seconds Total time: 2 minutes, 0 seconds Total time: 2 minutes, 54 seconds Installing the system in the server rack Installing rails and mounting the chassis in the server rack Note: We followed the Getting Started with your System guide to install the chassis in the rack. Note: We followed the instructions on the template that was in the chassis box. Note: We followed the instructions on the rack template and BladeCenter H Rack Installation Guide. 1. Open and unpack the rails box and read the instructions. (00:00:48) 2. Read the rail installation guide and installed the rails into the rack. (00:01:31) 1. Removed the template and placed it on the rack. (00:01:00) 2. Opened the power supply boxes and placed the power supplies on the table. (00:06:00) 1. Opened the rail box (00:00:05) 2. Removed the rail parts from the box. (00:00:28) 3. Removed the rail parts from the plastic bags. (00:00:36) 4. Examined the rack template 5

3. Read the chassis installation instructions and installed the chassis onto the rails. (00:01:02) 3. Installed screw holders into the rack. (00:00:45) 4. Installed the rails into the rack. (00:06:30) 5. Installed the chassis onto the rails. (00:03:45) and BladeCenter H Rack Installation Guide (00:00:32) 5. Removed the template and placed it in the rack to determine front nut placement. Installed nuts as indicated in the BladeCenter H Rack Installation Guide steps 1 and 2. (00:01:53) 6. Placed template in the back of the rack to determine back nut placement. Installed nuts as above. (00:00:43) 7. Examined the BladeCenter H Rack Installation Guide and installed rails. Note: We had to remove the nuts from the step above in order to install the rails. (00:09:32) 8. Removed the two blue shipping screws from each side of the BladeCenter unit. (0:14) 9. Slid the BladeCenter unit into the rack. (00:00:25) 10. Inserted one M6 screw in the center hole of each rail on the front and back of the unit for a total of six screws. (00:01:11) 11. Reinstalled the fans in front the unit (which we had removed to lessen the weight earlier). (00:01:47) 12. Reinstalled the fan assemblies in the back of the unit (which we had removed to lessen the weight earlier). (00:00:58) Total time: 3 minutes, 21 seconds Total time: 18 minutes, 0 seconds Total time: 18 minutes, 24 seconds Figure 7A: The Dell chassis installed on the rails. Figure 7B: The HP chassis installed on the rails. Figure 7C: The IBM chassis installed on the rails. 6

Installing blades and power supplies in the chassis Returned to reading the instructions and installed the blades and power supplies. (00:04:30) 1. Removed the power supply fillers from the chassis. (00:00:30) 2. Inserted the power supplies into the chassis. (00:01:45) 3. Referred to the installation poster for the next step. (00:01:30) 4. Removed the fan fillers from the chassis. (00:00:45) 5. Installed the fans into the chassis. (00:01:00) 6. Removed the module filler from the chassis. (00:00:15) 7. Inserted the onboard administrator module into the chassis. (00:00:30) 8. Installed the processor, RAM, and hard disks in the first blade server. (00:10:30) 9. Inserted the first blade server into the enclosure. (00:00:30) 10. Installed system 2 in the chassis. (00:08:15) 11. Installed system 3 in the chassis. (00:07:00) 12. Installed system 4 in the chassis. (00:06:45) 13. Installed system 5 in the chassis. (00:06:30) 14. Installed system 6 in the chassis. (00:07:30) 15. Installed system 7 in the chassis. (00:08:00) 16. Installed system 8 in the chassis. (00:07:30) 17. Installed system 9 in the chassis. (00:06:45) 18. Installed system 10 in the chassis. (00:06:15) 19. Installed system 11 in the chassis. (00:05:45) 20. Installed system 12 in the chassis. (00:05:15) 21. Installed system 13 in the chassis. (00:04:30) 22. Installed system 14 in the chassis. (00:06:00) 23. Installed system 15 in the chassis. (00:05:45) 24. Installed system 16 in the chassis. (00:05:30) 1. Removed the power supply fillers from the chassis. (00:00:30) 2. Inserted the power supplies into the chassis. (00:01:45) 3. Referred to the installation poster for the next step. (00:01:30) 4. Removed the fan fillers from the chassis. (00:00:45) 5. Installed the fans into the chassis. (00:01:00) 6. Removed the module filler from the chassis. (00:00:15) 7. Inserted the onboard administrator module into the chassis. (00:00:30) 8. Installed the processor, RAM, and hard disks in the first blade server. (00:05:53) 9. Inserted the first blade server into the enclosure. (00:00:12) 10. Installed system 2 in the chassis. (00:03:21) 11. Installed system 3 in the chassis. (00:02:42) 12. Installed system 4 in the chassis. (00:02:36) 13. lnstalled system 5 in the chassis. (00:02:44) 14. Installed system 6 in the chassis. (00:02:46) 15. Installed system 7 in the chassis. (00:02:48) 16. Installed system 8 in the chassis. (00:02:14) 17. Installed system 9 in the chassis. (00:02:15) 18. Installed system 10 in the chassis. (00:02:23) 19. Installed system 11 in the chassis. (00:02:38) 20. Installed system 12 in the chassis. (00:02:04) 21. Installed system 13 in the chassis. (00:02:24) 22. Installed system 14 in the chassis. (00:02:32) 23. Unpacked and installed copper pass-thru cables. (00:02:31) Total time: 4 minutes, 30 seconds Total time: 1 hour, 54 minutes, 30 seconds Total time: 48 minutes, 18 seconds 7

Figure 8A: The Dell blades and power supplies installed in the chassis. (Power supplies in back are not visible.) Figure 8B: The HP blades and power supplies installed in the chassis. Figure 8C: The IBM blades and power supplies installed in the chassis. (Power supplies in back are not visible.) Test methodology We attempted to recreate the way a typical buyer would set up a chassis of blade servers. We generally followed the instructions the vendors provided in their packaging. Occasionally, such as when we were opening the boxes, we had to use our own judgment, but whenever possible, we followed the vendors instructions. As one person executed the tasks, another person documented the process by recording the steps, timing each step, and photographing as many steps as reasonably possible. 8

Appendix A Enclosure configuration information This appendix provides detailed configuration information about the enclosures, which we present in alphabetical order. Enclosure Dell PowerEdge M1000e HP BladeSystem c- Class IBM BladeCenter H Type 8852 General dimension information Height (inches) 17.5 17.5 15.75 Width (inches) 19 19 19 Depth (inches) 30,5 31.0 28.0 U size in server rack 10 10 9 Number of blades 16 16 14 Power supplies Total number 6 6 2 Wattage of each 2,360 2,250 2,900 Cooling fans Total number 9 10 2 blowers Dimensions (H x W) of each 3.5 x 3 3.5 x 3 4.5x11.5 Voltage 12 volts 12 volts 200-240 volts Amps 7 amps 16.5 amps 5.5 amps Figure 9: Detailed configuration information about the enclosures. 9

Appendix B Blade system configuration information This appendix provides detailed configuration information about the blade server systems, which we present in alphabetical order. Servers Dell PowerEdge M1000e HP ProLiant BL460c IBM BladeCenter H Type 8852 General processor setup Number of processor packages 2 2 2 Number of cores per processor package 4 4 4 Number of hardware threads per core 1 1 1 System Power Management Policy Always on Always on Always on CPU Vendor Intel Intel Intel Name Quad-Core Intel Xeon Quad-Core Intel Xeon processor E5345 processor E5345 Stepping B 7 7 Socket type LGA 771 LGA 771 LGA 771 Core frequency (GHz) 2.33 GHz 2.33 GHz 2.33 GHz Front-side bus frequency (MHz) 1,333 MHz 1,333 MHz 1,333 MHz L1 cache L2 cache 32 KB + 32 KB (per core) 2 x 4 MB (each 4 MB shared by two cores) 32 KB + 32 KB (per core) 2 x 4 MB (each 4 MB shared by two cores) Quad-Core Intel Xeon processor E5345 32 KB + 32 KB (per core) 2 x 4 MB (each 4 MB shared by two cores) Platform Vendor and model number Dell PowerEdge M600 HP ProLiant BL460c BladeCenter HS21 Motherboard model number Dell 0MY736 HP 435458-B21 IBM 8853C2U Motherboard chipset Intel 5000P Intel 5000P Intel 5000P Motherboard revision number X31 91 B1 BIOS name and version Dell 0.2.11 HP I15 12/26/2006 IBM 1.07 10/26/2007 Disabled Hardware Disabled Hardware Disabled Hardware BIOS settings Prefetcher and Prefetcher and Prefetcher and Adjacent Cache Line Adjacent Cache Line Adjacent Cache Line Prefetch Prefetch Prefetch Chipset INF driver Intel 7.4.1005 HP 2.1.8 Intel 7.4.1005 Memory module(s) Vendor and model number Samsung M395T2953EZ4- CE65 Micron MT18HTF12872FDY Type PC2-5300 PC2-5300 PC2-5300 Speed (MHz) 667 MHz 667 MHz 667 MHz Speed in the system currently running 667 MHz 667 MHz 667 MHz Hynix HYMP512F72CP8D2 -Y5 @ (MHz) Timing/Latency (tcl-trcd-irptrasmin) 5-5-5-15 5-5-5-15 5-5-5-15 Size 4 GB (4 x 1 GB) 4 GB (4 x 1 GB) 4 GB (4 x 1 GB) Number of RAM modules 4 4 4 Chip organization Dual side Dual side Dual side 10

Servers Dell PowerEdge M1000e HP ProLiant BL460c IBM BladeCenter H Type 8852 Hard disk Vendor and model number Fujitsu may2073rc Seagate St973402SS IBM 26K5777 Number of disks in system 2 2 2 Size 73 GB 72 GB 73.4 GB Buffer size 16 MB 16 MB 8 MB RPM 10,000 10,000 10,000 Type SAS SAS SAS Controller Dell SAS 6/iR Integrated Blades Controller Smart Array E200I controller LSI Adapter, SAS 3000 series Controller driver Dell 1.24.4.0 HP 6.6.0.64 LSI 1.21.28.0 Operating system Microsoft Windows Microsoft Windows Name server 2003, server 2003, Enterprise x64 Enterprise x64 Edition Edition Microsoft Windows server 2003, Enterprise x64 Edition Build number 3790 3790 3790 Service Pack SP 2 SP 2 SP 2 Microsoft Windows update date SP 2 plus updates through 11/29/07 SP 2 only File system NTFS NTFS NTFS Kernel ACPI Multiprocessor ACPI Multiprocessor x64-based PC x64-based PC Language English English English Microsoft DirectX version 9.0c 9.0c 9.0c Graphics Vendor and model number ATI ES1000 ATI ES1000 ATI ES1000 Chipset ATI ES1000 ATI ES1000 ATI ES1000 SP 2 plus updates through 11/29/07 ACPI Multiprocessor x64-based PC BIOS version BK-ATI BK-ATI VER008.005.031.000 VER008.005.013.000 Type Integrated Integrated Integrated Memory size 32MB 32MB 16MB Resolution 1024 x 768 1024 x 768 1024 x 768 Driver ATI 8.240.50.1000 ATI 8.24.3.0 ATI 8.24.3.0 Network card/subsystem Vendor and model number Broadcom BCM5708S NetXtreme II GigE HP NC373i Multifunction Gigabit Server Adapter BK-ATI VER008.005.031.000 Broadcom BCM5708S NetXtreme II GigE Type Integrated Integrated Integrated Driver Broadcom 3.5.8.0 HP 3.0.5.0 Broadcom 3.0.5.0 Optical drive Vendor and model number None installed None installed None installed USB ports Number 2 2 (with adapter attached) 2 Type USB 2.0 USB 2.0 USB 2.0 Figure 10: Detailed configuration information about the blade server systems. 11

Principled Technologies, Inc. 1007 Slater Rd., Suite 250 Durham, NC 27703 www.principledtechnologies.com info@principledtechnologies.com Principled Technologies is a registered trademark of Principled Technologies, Inc. All other product names are the trademarks of their respective owners Disclaimer of Warranties; Limitation of Liability: PRINCIPLED TECHNOLOGIES, INC. HAS MADE REASONABLE EFFORTS TO ENSURE THE ACCURACY AND VALIDITY OF ITS TESTING, HOWEVER, PRINCIPLED TECHNOLOGIES, INC. SPECIFICALLY DISCLAIMS ANY WARRANTY, EXPRESSED OR IMPLIED, RELATING TO THE TEST RESULTS AND ANALYSIS, THEIR ACCURACY, COMPLETENESS OR QUALITY, INCLUDING ANY IMPLIED WARRANTY OF FITNESS FOR ANY PARTICULAR PURPOSE. ALL PERSONS OR ENTITIES RELYING ON THE RESULTS OF ANY TESTING DO SO AT THEIR OWN RISK, AND AGREE THAT PRINCIPLED TECHNOLOGIES, INC., ITS EMPLOYEES AND ITS SUBCONTRACTORS SHALL HAVE NO LIABILITY WHATSOEVER FROM ANY CLAIM OF LOSS OR DAMAGE ON ACCOUNT OF ANY ALLEGED ERROR OR DEFECT IN ANY TESTING PROCEDURE OR RESULT. IN NO EVENT SHALL PRINCIPLED TECHNOLOGIES, INC. BE LIABLE FOR INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES IN CONNECTION WITH ITS TESTING, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. IN NO EVENT SHALL PRINCIPLED TECHNOLOGIES, INC. S LIABILITY, INCLUDING FOR DIRECT DAMAGES, EXCEED THE AMOUNTS PAID IN CONNECTION WITH PRINCIPLED TECHNOLOGIES, INC. S TESTING. CUSTOMER S SOLE AND EXCLUSIVE REMEDIES ARE AS SET FORTH HEREIN. 12