References on railways infrastructures
New railway path along the Lunghezza Guidonia railway tracks, Rome Assignment: Design of the new railway tracks along the existing railway Location: Guidonia (RM) Year of implementation: 2003-2009 Construction cost: 82.075.000 euro
Redesign of the new railway path along the Casilina road, Roma Client: RFI S.p.A. Assignment: Design of the new railway path along the via Casilina Location: Rome (RM) Year of implementation: 2005-2008 Construction cost: 19.238.000 euro Progress: Design completed
New Internal RIngroad along the railway tracks inside the New Railway Station Tiburtina, Rome Team members: Proger SpA, VIA ingegneria SrL Assignment: Design of the new internal ringroad inside the New Tiburtina Railway Station Mission: Detailed design full stages up to completion Location: Rome Year of implementation: 2002-2010 Construction cost: 103.000.000 euro Progress: Works completed
Redesign of parkings and infrastructures inside of Roma Termini Railway station Location: Rome (RM) Year of implementation: 2005-2007 Construction cost: 84.642.000 Euro Redesign of the new facilities inside Rome Termini station and Palermo station Construction cost: 56.730.000 Euro Location: Rome (RM) Year of implementation: 2004 Assignment: Design of the new bus station Mission: Detailed design (architectural, structural and services) Location: Palermo, Italy Year of implementation: 2004 Redesign of the new facilities inside Bari Centrale, Napoli Centrale, Genova P.P. e Genova Brignole, Turin and Verona Porta Nuova railway stations Construction cost: 60.537.000 Euro Parkings and infrastructures in Piazza XXV Aprile, Verona Location: Verona (VR) Year of implementation: 2004 - ongoing
Facilities and infrastructures nearby Porta Nuova Railway station, Turin Location: Turin (TO) Year of implementation: 2004 - ongoing Facilities and infrastructures nearby Central Railway station, Bari Location: Bari (BA) Year of implementation: 2005 - ongoing Facilities and infrastructures nearby Genova Piazza Principe Railway station Location: Genoa (GE) Year of implementation: 2004 - ongoing Facilities inside the Central Railway station Piazza Garibaldi, Napoli Location: Naples (NA) Year of implementation: 2005-2007
Extension of the railway road Trento - Malè from Marilleva 900 to Mezzana Client: Trentino Trasporti S.p.A., Systra S.A., IC SrL, Systra Sotecni SpA, Geologia Applicata Studio Associato Assignment: Design of the new railway station along the Trento - Malè/Mezzana Location: Malè (TN) Year of implementation: 2011-ongoing Construction cost: 15.540.000 euro Contact: Autorimessa - Piazza Garibaldi 38027 Malè (TN) Tel. 0463-901587 New intervention for the suppression of the rail crossing along the railway Naples - Battipaglia Client: Fergos SrL Assignment: Design of the new underpass substitute to existing rail crossing Mission: Detailed design up to completion Location: Province of Naples Year of implementation: 2011-ongoing Construction cost: 7.500.000 euro Contact: Fergos SrL - tel. 0522/961111 New intervention for the suppression of the rail crossing along the railway Alessandria - Ovada Assignment: Design of the new underpass subsitute the existing rail crossing Mission: Detailed design up to completion Location: Province of Alessandria Year of implementation: 2011-ongoing Construction cost: 8.300.000 euro New intervention for the suppression of the rail crossing along the railway Firenze- Pisa Assignment: Design of the new underpass subsitute the existing rail crossing Mission: Detailed design up to completion Location: Province of Empoli (FI) Year of implementation: 2011-ongoing Construction cost: 10.430.000 euro
Urban interchange transport link inside the new railway station facilities, Bagni di Tivoli Client: Comune di Tivoli/Provincia di Roma up to completion Role: Head designer Assignment: Fully design and build contract Location: Tivoli (RM), Italy Year of implementation: 2010 - ongoing Progress: Design completed Urban interchange transport link facilities inside the new Railway station Roma Tiburtina Client: Risorse per Roma S.p.A. up to completion Role: Head designer Assignment: Design of new paking and building facilities Location: Roma, Italy Year of implementation: 2007 Progress: Works completed New underpass and railway facilities along the Bari-Lecce railway up to completion Role: Head designer Assignment: Fully design and build contract Location: Puglia Year of implementation: 2006-2011 Construction cost: 9.900.000 Euro New intervention for the suppression of the rail crossing along the railway Bari - Lecce Assignment: Design of the new underpass subsitute the existing rail crossing up to completion Location: Province of Bari Year of implementation: 2011-ongoing Construction cost: 4.400.000 euro