Professional Qualifications Supplement (PQS) Instructions



Similar documents
Submittal Guidelines RFQ Building 230 Remodel

5. Whether the timely completion of the project is critical to the university s ability to repay debt service or to meet grant obligations.

REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years

Policy & Procedure #10

REQUEST FOR QUALIFICATIONS

Request for Qualifications (RFQ) Number PUBLIC WORKS CONTINUING CONSTRUCTION AND ENGINEERING INSPECTION AND PROJECT MANAGEMENT SERVICES

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid

REQUEST FOR QUALIFICATIONS

Requirements for Qualifications Package Submittals

Florida International University Project Fact Sheet Landscape Architecture Continuing Services Contact

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117

Capital Projects Construction Manager At-Risk (CMR) Guaranteed Maximum Price (GMP) Best Value Selection Procedure Manual

REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES SMALL BUSINESS CONSULTING PROGRAM

REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES FOR A FIRE STATION

CREOL EXPANSION PHASE II UCF-581 Architect/Engineer (A/E) and Construction Manager (CM) Project Fact Sheet

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

REQUEST FOR PROPOSALS ( RFP ) FOR FINANCIAL ADVISOR TO IMPLEMENT USE AGREEMENT(S) PROCESS AS DESCRIBED IN STRATEGIC AND CAPITAL NEEDS STUDY

GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

Request for Proposal No. RFP Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition

GREATER ORLANDO AVIATION AUTHORITY NOTICE OF PROFESSIONAL SERVICES W IA SOUTH CELL LOT ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

This request for qualifications seeks the following type of service providers:

REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT

Paralegal CORE Competency Exam (PCCE) Scholarship

Ambulatory Electronic Health Record Equipment/System (EHR) Project Infrastructure Upgrade

Awards. Call For Entries

REQUEST FOR QUALIFICATIONS Environmental and/or Industrial Hygiene Consultants September 2013 September 2016

CHAPTER PUBLIC IMPROVEMENT BIDS AND CONTRACTS

REQUEST FOR QUALIFICATIONS PROFESSIONAL ARCHITECTURAL SERVICES

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Proposals Community Engagement and Business Development Consultant Contractor Loan Fund May 16, 2016.

The School Board of Miami-Dade County, Florida Department of Contractor Prequalification Frequently Asked Questions and Answers

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT S. Marion Avenue, Mail Station 2015 Lake City, Florida

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Program/Construction Management Request for Qualifications

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

AMERICAN SOCIETY OF APPRAISERS. Appraisal Review and Management Guide to Professional Accreditation

REQUEST FOR PROPOSALS BENEFITS INSURANCE BROKERAGE SERVICES STOREY COUNTY, NEVADA

Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Questions and Answers

5. Firm is Corporation Partnership Sole Proprietorship Joint Venture Other

TOWN OF GLASTONBURY PROFESSIONAL SERVICES PROCUREMENT NOTICE REQUEST FOR PROPOSAL MERCHANT PAYMENT PROCESSING SERVICES RPGL #

SALARY $ $29.89 Hourly $1, $2, Biweekly $4, $5, Monthly $50, $62, Annually PARALEGAL

PRIVATE PROVIDER REQUIREMENTS General Information and Checklist Rev

REQUEST FOR PROPOSALS DESIGN OF COMMUNTIY SKATE PARK FREDERICK, COLORADO

TO ALL TENDERERS, PLEASE NOTE THE FOLLOWING VERY IMPORTANT NOTICE: YOU MUST SUBMIT YOUR TENDER OFFER BY THE CLOSING TIME INDICATED BELOW

HMSA BEHAVIORAL HEALTH FACILITY/PROGRAM CREDENTIALING DOCUMENT CHECKLIST

Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern:

Request for Service. Business and Technical Consulting Services Senior Business Analyst OntarioMD EMR Physician Dashboard

Request for Qualifications ( RFQ ) For. Consulting Services. For a. Needs Assessment for Houston Forensic Science Center, Inc.

Request for Qualifications & Proposal. Architectural Team. Lake County School District R-1. On-Call Services. For

Renewal Unit (RU) Provider Handbook and Application

The Department intends to select one team. The contract will be for two years with a one year extension at the discretion of the Department.

North American Development Bank. Model Bidding Document: Consultant Services

Mondays 9:00 a.m. 4:30 p.m. Tuesdays 9:00 a.m. 4:30 p.m. Wednesdays 9:00 a.m. 1:00 p.m. Thursdays 9:00 a.m. 4:30 p.m. Fridays 9:00 a.m. 4:30 p.m.

ADDENDUM #2 to RFP# Financial Aid Call Center Services

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

REQUEST FOR PROPOSAL

EMPIRE STATE DEVELOPMENT

NABL NATIONAL ACCREDITATION

Mid Michigan Community College

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

International Student Admission Information

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP Notice No. Notice

Form 42 Instructions for Completing Form 41 (Application for INCOSE ESEP)

PART V PROPOSAL REQUIREMENTS

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

CAFM APPLICATION and CRITERIA. Give yourself a competitive edge

Maine Fire Chiefs Association. Chief Fire Officer Certification Application Packet

Architectural Consulting Services for a New Automotive Building. Lakes Region Community College, Laconia, NH

NABET Accreditation Criteria for QMS Lead Auditor Training Course

LUZERNE COUNTY COMMUNITY COLLEGE

Date Submitted: October 1, Unit: The Office of Institutional Research, Planning, and Effectiveness I. MISSION STATEMENT

14-ITN-001-KH Workforce Services IT Procurement Project Questions and Answers

PROCEDURES AND GUIDELINES FOR FACULTY AND DEPARTMENTS The Graduate School of NMSU Revised on March 19, 2013

Registration Guide. Alternative Registration Requirements - Grandparenting Route

Application for Accreditation

Transcription:

BUSINESS AFFAIRS PLANNING DESIGN & CONSTRUCTION www.facilities.ufl.edu Professional Qualifications Supplement (PQS) Instructions GENERAL INSTRUCTIONS UF-615, Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) A) Submit one (1) hard copy of the proposal plus one electronic (PDF) copy as outlined in the Project Fact Sheet by the time and date stated on the Project Fact Sheet. B) Assemble proposals in a manner that facilitates disassembly & recycling and minimizes the use of plastic covers, binders, and dividers. C) Include a Letter of Interest and (7) tabbed & divided sections as follows, attaching additional pages for each section as necessary: Company Information and Certification (PQS 0) Services (PQS 1) and Personnel (PQS 2) including resumes and, if necessary, an organization chart Experience & References (PQS 3) Design and Project Management Questions (PQS 4-6) Project-Specific Questions (PQS 7-9) Joint Venture Information (PQS 10) if applicable Attachments / Supplements including license(s), proof of corporate status, and proof of professional liability insurance coverage D) Forms may be retyped or re-sized to provide additional information or pictures, provided that the requested information is provided, and in the order requested. These Instructions need not be submitted. E) Number each page consecutively, including the letter of interest, PQS forms, questions & answers, and all attachments, licenses, résumés, supplemental information, etc. The entire proposal shall be limited to twenty (20) double-sided 8½ X 11 pages. Covers, table of contents, and divider tabs will not count as pages, provided no additional information is included on those pages. Any pages over the stated limit will not be considered as part of the application. F) The Letter of Interest should concisely outline both your understanding of the Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) project and the characteristics of your firm(s) and proposed team that make them uniquely qualified for it. Address the letter to the attention of the UF Project Manager. G) Use the project-specific PQS 0 form to provide general company information and to formally certify the proposal. H) For PQS 1, 2, and 3, use the enclosed forms and follow the Submittal Instructions. For the questions in PQS 4-6 and 7-9, precede each answer with a re-statement of the given question. If the question on joint ventures (PQS 10) does not apply, simply state NOT APPLICABLE. PDC REVISED: NOVEMBER 2014 PAGE 1

I) Enclose resumes and other pertinent credentials such as LEED accreditation, BICSI/RCDD certificates, etc. for all proposed staff (applicant and consultants). J) Applicants operating as a corporation, limited liability company, or partnership must be registered to operate in the State of Florida by the Department of State (Division of Corporations) at the time of application. Provide proof of such status (if applicable) for the applicant. Such proof shall take the form of a Certificate of Corporate Status from the Florida Department of State. If paid fees due this office through date has passed, ensure certificate print date is within 10 calendar days of the proposal due date. K) Enclose copies of current Florida licenses for the applicant firm (not individuals) and all consulting firms (not individuals). For architecture and landscape architecture firms, this means a valid license from the Department of Business and Professional Regulation. For engineering firms, this means a valid Certificate of Authorization from the Board of Professional Engineers. L) Provide proof of the electrical engineering consultant ability to provide Professional liability insurance coverage in the amount of $1,000,000. Such proof may take the form of a draft ACORD certificate or a letter of intent from the respective carrier or agent. Proof of other insurance coverage is not required at this time. M) Applicants should take care in assembling the proposals, as professionalism and attention to detail are among the intangible qualities the Selection Committee will consider. N) Incomplete proposals will be disqualified. This includes, but is not limited to: Failure to submit proposal by the stated time and date Failure to sign the PQS 0 certification form Missing, invalid, or expired firm licenses Missing, invalid, or expired proof of corporate status in the State of Florida Insufficient proof of insurance coverage O) See the UF-615 page of the Planning Design & Construction website (www.facilities.ufl.edu) for more information on this project and the A/E selection process. PDC REVISED: DECEMBER 2014 PAGE 2

SUBMITTAL INSTRUCTIONS UF-615, Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) NOTE: The numbers on these instructions correspond to the numbered items on the University of Florida Professional Qualifications Supplement (PQS) forms. 1. SERVICES TO BE PROVIDED: Using the form provided, list all disciplines listed to be provided as part of Basic Services, along with the firm providing each service and the firm s professional license number from the appropriate Florida Licensing Board. Use names and license numbers of the firms as a whole, rather than of individuals in the firms. Enter the number of previous projects on which the electrical design Applicant/consultant has worked with each sub-consultant. If the Applicant feels that its team will require the services of other specialty consultants or in-house specialty expertise, it should so indicate. 2. APPLICANT S PERSONNEL: Using the form provided, list by name and role the Applicant s and Consultants key staff and major discipline heads for the proposed team. Add, delete, or edit role/titles as needed and note non-applicable categories as needed. For all individuals listed, note whether or not they are registered, the disciplines of registration/training, and their city of residence. Enclose résumés for all key staff and discipline heads tailored to demonstrate their experience as it relates to this project. Provide an organization chart or diagram if necessary to clearly explain lines of authority, duties & responsibilities, continuity through design, construction, and post-occupancy, etc. Identify other nonessential positions planned for this project that are not, as yet, filled or named. The team proposed in the PQS must be available to provide the services for the project, throughout the project. If the Applicant discovers prior to the interview that any part of the listed team (either individual key staff or consultants) will not be available, it shall notify the selection committee immediately. The selection committee will determine whether the change in the team would have affected the Applicant's shortlist score. If the change would lower the score, the Applicant may be removed from the shortlist. Once awarded the contract, the Applicant will not be permitted to alter its team without the Owner's approval. 3. EXPERIENCE and REFERENCES: Submit up to eight most relevant projects for which the Applicant or its composing firms provided (or is providing) design and construction administration services. In determining which projects are most relevant to the Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) project, consider the unique aspects of this project, including replacing Medium Voltage Cabling and numerous Switchgear equipment, the delivery method, the demands of constructing on a bustling campus, and other project-specific issues as conveyed in the selection criteria outlined in the Project Fact Sheet. Also consider the Owner and location, relative size and cost, complexity, staffing (how many members of the proposed team worked on the listed project?), currency (how recently was the listed project completed?), and performance metrics (schedule, budget, quality). Use the attached form (one two-page form for each of the ten projects) and provide all requested information as follows: Indicate which firm(s) or staff the project is meant to illustrate the experience of, and state the firm s or person s role in that project as follows: "Principal" or Prime if the project was accomplished by the Applicant or design consultant firm "Consultant" or Sub-Contractor if the project was accomplished as a consultant to another firm "I.E." (Individual Experience) if the project represents experience of an individual on the Project Team while working for another firm PDC REVISED: NOVEMBER 2014 PAGE 3

Note the title and location of the project; indicate the services provided; and complete the other general project information (status, size, value, delivery method, etc.). Provide the names of all key staff whether construction, design, or both and check YES or NO to indicate whether each person is also on the proposed team for the Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) project. Provide brief narratives on the facility and its relevance to the Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) project. Provide contact information for the Owner, builder, and (3) design partners (consultants). Verify that the contact information is still valid (names and numbers). Add, where applicable, contact information for the current Owner s representative, if different from the Owner's representative at the time the applicant s services were provided. List the projects in priority order, with the most relevant project listed first and the least relevant project listed last. The (5) projects may include those accomplished by one or more of the proposed consultants, but INCLUDE NO MORE THAN 5 TOTAL PROJECTS. Applicants should note that the University is more interested in the staff proposed for this project than the corporate resumes of their respective firms. DESIGN and PROJECT MANAGEMENT QUESTIONS 4. Outline your understanding of the highly interactive design process at UF; provide examples of strategies and techniques for gathering and confirming programmatic information from user groups and other stakeholders; and explain the team s approach to developing, analyzing, and recommending design alternatives, concepts, and options. 5. Describe the team s approach to, and methods for, designing-to-budget and validating cost estimates by a CM, 3rd party estimator, or in-house capabilities 6. Analyze the schedule provided in the facilities program particularly the time allotted for design phases and design reviews. Does the team believe the schedule is overly optimistic, lengthier than necessary, or about right? Questions 7-8 are specific to the UF-615 Electrical Substation 2 Cable and Switchgear Replacement (SS2 North to HSC and Shands) project. 7. Explain your approach for removing a current service to a building and yet keep it energized while the building still needs to be in service. 8. Detail how you would manage the Phasing and Sequencing of critical construction work during the implementation and construction phase by utilizing one of your referenced projects. 9. Explain your means/methods of testing to assure the complete functionality of all electrical systems prior to turning them on with permanent power. 10. JOINT VENTURE APPLICANTS ONLY Duplicate the Certification form (PQS 0) signature block and have a principal or officer sign on behalf of each party to the joint venture. Enclose a copy of the joint venture agreement, which specifically states the percentage of fee to be earned by each party and each party's role in the project. Provide answers to the following questions: (a) Describe the division of responsibilities between the participating firms, the offices (location) that will be the primary participants, and the percent interest of each firm. (b) Why does the Applicant feel that a joint venture will best serve the needs of this project? PDC REVISED: DECEMBER 2014 PAGE 4

(c) How many projects has the joint venture performed together? PDC REVISED: DECEMBER 2014 PAGE 5