29.10.2013 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 ISO 21930 EN 15804 Owner of the declaration Program holder Publisher Declaration number Issue date Valid to NEPD-00032E rev1 22.01.2013 22.01.2018 Protan SE 1.2 Roof Membrane Product
General information Protan SE 1.2 Roof Membrane Product Manufacturer Program holder: Owner of the declaration: Post Box 5250 Majorstuen, 0303 Oslo Contact person: Olav Haugerud Phone: +4723088000 Phone: 32 22 16 00 e-mail: post@epd-norge.no e-mail: olav.haugerud@protan.no Declaration number: NEPD-00032E rev1 Place of production: Post-box 420 Brakerøya N-3002, Drammen This declaration is based on Product Category Rules: CEN Standard EN 15804 serve as core PCR Roof Waterproofing NPCR 22 Declared unit: Production of 1 m 2 membrane Management system: ISO 9001 og ISO 14001 (NO 97-OSL-SYMI-8015) Org. No: NO 91 569 809 MVA Declared unit with option: Issue date: 22.01.2013 Functional unit: 1 m 2 installed membrane with a life time of 30 years. Valid to: 22.01.2018 The environmental product declaration has been worked out by: Kari Sørnes SINTEF Byggforsk P.O.Box 124 Blindern, NO-0314, Oslo Norway Verification: Independent verification of data and other environmental information has been carried out in accordance with Comparability: EPD of construction products may not be comparable if they not comply with EN 15804 Year of study: 2011-2012 Approved according to ISO14025, 8.1.4 externally internally Catherine Grini, Entro (Independent verifier approved by EPD Norway) Dr. ing. Sverre Fossdal (Chairman of the Verification Group of EPD-Norway) Declared unit: Production of 1 m2 membrane Key environmental indicators Global warming Energy consumption Dangerous substances Unit Cradle to gate Production site - A1 - A3 central warehouse Norway CO 2 -eqv 3,9 0,01 MJ 107,9 0,22 * * The product contains no substanses from the REACH Candidate list or the Norwegian priority list NEPD 00032E rev1 Roof membrane SE Protan.xlsm 2/7
Product Product description: The intended use for the Protan Roof Membrane is pitched and flat roofs. Product specification Protan SE 1,2 roofing membrane is made of plasticised PVC reinforced with a polyester textile. Technical data: Weight: 1420 g/m 2 Teknisk Godkjenning (Technical Approval) nr 2010 Market: Europe Reference service life: 30 years G = generic, S = Specific LCA: Calculation rules Functional unit: 1 m 2 installed membrane with a life time of 50 years. System boundary: Modules A1-A5, C2 and C3 (see table under subtitle LCA: Results) are considered relevant and are included in the assessment. Flowsheet, A1-A3: Data quality: Generic data are collected from Ecoinvent. Input-data from producer represents mean production for 2011/2012. Declared product based on available data: 93.3% Cut-off criteria: Based on criteria from EN-15804 (6.3.5) (according to PCR) Allocation: Not relevant NEPD 00032E rev1 Roof membrane SE Protan.xlsm 3/7
LCA: Scenarios and additional technical information The following information describe the scenaries in the different modules of the EPD. Average transport distance from production site to building site is 400 km. from prouction site to building site* (A4) Type Capacity utilisation (incl. return) % Gross density of products (/m3) Type of vehicle Truck 1,42 Trailer** Railway Boat Distance km 400 Fuel/Energy consumption 0,28 l/tkm kwh/tkm l/tkm Value (l/t) 112 **16-32ton, diesel, EURO 3. Additional information from production site to central warehouse in Norway 50 km Installation in the building (A5) End of Life (C1, C3, C4) Unit Value Auxiliary Hazardous waste disposed Water consumption m 3 Collected as mixed construction waste Electricity consumption kwh 0,07 Reuse Other energy carriers MJ Recycling Material loss 0,014 Energy recovery Output materials from waste treatment To landfill Dust in the air Unit Value 1,42 to waste processing (C2) Type Capacity utilisation (incl. return) % Truck Railway Boat Gross density of products (/m3) Type of vehicle Distance km 400 750 Fuel/Energy consumption 0,28 l/tkm kwh/tkm 0,01 l/tkm Value (l/t) 110,6 7,5 The distances in C2 represents transport to a recycling station in Germany. Additional technical information The calculations on emissions are based on the method ReCiPe midpoint v1.6 and CML 2001 (baseline). The primary energy calculations are done using the method of Cumulative Energy Demand (CED). Bacround data is gathered from the database Ecoinvent v2.2 hosted by the Ecoinvent Centre. NEPD 00032E rev1 Roof membrane SE Protan.xlsm 4/7
Raw materials Manufacturing Construction installation stage Use Maintenance Repair Replacement Refurbishment Operational energy use Operational water use De-construction demolition Waste processing Disposal Reuse-Recovery- Recycling-potential LCA: Results System boudaries (X=included, MND=module not declared, MNR=module not relevant) Product stage Construction installation stage Use stage End of life stage Beyond the system boundaries A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 B7 C1 C2 C3 C4 D X X X X X MNR MNR MNR MNR MNR MNR MNR MND X X MND MND Environmental impact Parameter A1 - A3 A4 A5 C2 C3 GWP 3,90 0,11 0,01 0,15 0,00 ODP 2,31*10-7 1,67*10-8 1,05*10-9 2,13*10-8 0,00 OFP 0,01 5,12*10-4 4,20*10-5 8,40*10-4 0,00 EP 3,33*10-3 1,33*10-4 2,37*10-5 2,17*10-4 0,00 AP 6,62*10-4 1,60*10-5 1,90*10-6 2,24*10-5 0,00 ADPM 0,04 7,44*10-4 9,05*10-5 1,01*10-3 0,00 ADPE GWP Global warming potential ( CO 2 -eqv.); ODP Depletion potential of the stratospheric ozone layer ( CFC11-eqv.); POCP Formation potential of tropospheric photochemical oxidants ( C 2 H 4 -eqv.); AP Acidification potential of land and water ( SO 2 - eqv.); EP Eutrophication potential ( PO 4-3 -eqv.); ADPM Abiotic depletion potential for non fossil resources ( Sb eqv.); ADPE Abiotic depletion potential for fossil resources (MJ) Resource use Parameter RPEE FPEM TPE NRPE NRPM TRPE SM RSF NRSF W A1 - A3 A4 A5 C2 C3 4,49 0,02 0,18 0,03 0,00 1,58 6,06 0,02 0,18 0,03 0,00 101,54 1,72 0,37 2,34 0,00 0,32 101,86 1,72 0,37 2,34 0,00 0,04 4,62 0,12 0,05 0,16 0,00 FPEE Renewable primary energy resources used as energy carrier (MJ); FPEM Renewable primary energy resources used as raw materials (MJ); TPE Total use of renewable primary energy resources (MJ); NRPE Non renewable primary energy resources used as energy carrier (MJ); NRPM Non renewable primary energy resources used as materials (MJ); TRPE Total use of non renewable primary energy resources (MJ); SM Use of secondary materials (); RSF Use of renewable secondary fuels (MJ); NRSF Use of non renewable secondary fuels (MJ); W Use of net fresh water (m 3 ) NEPD 00032E rev1 Roof membrane SE Protan.xlsm 5/7
End of life - Waste Parameter A1 - A3 HW 0,01 NHW RW A4 A5 C2 C3 HW Hazardous waste disposed (); NHW Non hazardous waste disposed (), RW Radioactive waste disposed () End of life - Output flow Parameter A1 - A3 CR 0,04 MR MER EEE ETE A4 A5 C2 C3 0,14 1,42 CR Components for reuse (); RM Materials for recycling (); ERM Materials for energy recovery (); XEE Exported electric energy (MJ); XTE Exported thermal energy ( MJ) Specific Norwegian requirements Electricity Emissions connected to the electricity use at the production site in Norway is based on a mean value of the supply electricity mix for the years 2007-2011. Greenhouse gas emissions 0,013 CO 2 eqv/mj Dangerous substances None of the following substances have been added to the product: Substances on the REACH Candidate list of substances of very high concern (of 22.1.2013) substances on the Norwegian Priority list (pr.22.1.2013) and substances that lead to the product being classified as hazardous waste. The chemical content of the product complies with regulatory levels as given in the Norwegian Product Regulations. from production site to central warehouse in Norway is 50 km Indoor environment Not relevant Carbon footprint Carbon footprint has not been worked out for the product. NEPD 00032E rev1 Roof membrane SE Protan.xlsm 6/7
Bibliography ISO 14025:2006 ISO 14044:2006 EN 15804:2012 ISO 21930:2007 Environmental labels and declarations - Type III environmental declarations - Principles and procedures Environmental management - Life cycle assessment - Requirements and guidelines Sustainability of construction works - Environmental product declaration - Core rules for the product category of construction products Sustainability in building construction - Environmental declaration of building products PCR:2012 Roof Waterproofing NPCR 22 CML 2001. Institute of Environmental Sciences, Leiden University, The Netherlands. CED. Jungbluth, N., Cumulative Energy Demand, in Implementation of Life Cycle Impact Assessment, Data v2.2 (2010), R. Hischier and B. Weidema, Editors. 2007, ecoinvent centre: St. Gallen. p. 33 Ecoinvent Centre is a competence Centre of ETH Zürich, EPF Lausanne, PSI, Empa, ART. (web: www.ecoinvent.com) Publisher Phone: +4723088000 Post Box 5250 Majorstuen, 0303 Oslo e-mail: post@epd-norge.no Norway web www.epd-norge.no Program holder Phone: +4723088000 Post Box 5250 Majorstuen, 0303 Oslo e-mail: post@epd-norge.no Norway web www.epd-norge.no Owner of the declaration Phone: 32221600 Fax 32221700 Post-box 420 Brakerøya N-3002, Drammen e-mail: protan@protan.no Norway web www.protan.no Author of the Life Cycle Assessment Phone: 22965555 Kari Sørnes Fax 22699438 P.O.Box 124 Blindern, NO-0314, Oslo e-mail: kari.sornes@sintef.no Norway web www.sintef.no/byggforsk NEPD 00032E rev1 Roof membrane SE Protan.xlsm 7/7