Progress status of EMR Assembly @ Geneva



Similar documents
Progress status of EMR Geneva

EMR project Overview

Electron-Muon Ranger (EMR)

MICE detectors and first results. M. Bonesini Sezione INFN Milano Bicocca

Aerogel and Assembly. Aerogel shipped to US (IIT) in June; shipment to RAL after inspection. Counter 1: n=1.08; counter 2: n=1.12.

METHOD OF STATEMENT FOR STATIC LOADING TEST

The elements used in commercial codes can be classified in two basic categories:

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

MONDOATHENS BASKETBALL SET (Reference PK110)

TruLaser Tube: Optimal tube. and. profile cutting. Machine Tools / Power Tools Laser Technology / Electronics Medical Technology

CNC Tool Storage Solutions

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

The Basics of FEA Procedure

SIMRAD SD10 Sailboat Drive

EH-20 20m antenna. By VE3RGW

CNC Tool Storage Solutions

WPI Rapid Prototype Guidelines --Read entire document before submitting an order--

18. SKATES, PLATFORM HAND TRUCKS, LIFTING TABLES AND HAND TROLLEYS

CNC Tool Storage Solutions

Removable Aluminium posts

TopSky DLG Installation Manual

JP Tribander Owner Manual

The connector we use most in joining beams is the Technic pin. The Technic pin comes in several variants, as shown in Figure 1 below.

I BEAM TRACK INSTALLATION

Flextray - Installation. Installation

TECHNISCHE FICHE - TECHNISCHE FICHE - Chat Board: Classic

Re-board Accessories

How To Build A T7 Rack For Information Technology

Panduit 28 AWG Patch Cords Installation Guideline

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P

Reliable, Consistent, Quality

An introduction to 3D draughting & solid modelling using AutoCAD

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

A new extraction system for the upgraded AIC-144 cyclotron

Owner s Manual Gantry Cranes

AM/FM ANTENNA RELOCATION KIT

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Customer Training Material. Lecture 4. Meshing in Mechanical. Mechanical. ANSYS, Inc. Proprietary 2010 ANSYS, Inc. All rights reserved.

Preface nivtec.com 3

BRIO Modular scaffolding

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

Vehicle Design Summit Electric Hub Motor (V2) Eric Conner Harvey Tang Matthew Peddie

INJECTION MOLDING COOLING TIME REDUCTION AND THERMAL STRESS ANALYSIS

19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.

Simplifying Opto- Mechanical Product Development: How a new product reduces cost, stress, and time to market

DE Frame with C Series Sidelight

Technical handbook Panel Anchoring System

Rotation: Moment of Inertia and Torque

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

multi-axis system ROBOTRAX cable 3D cable carrier system carrier

Back to Elements - Tetrahedra vs. Hexahedra

INSTALLATION. General. Important Note. Design. Transport

Section 21. Telecommunication Hardware. BuyLog Catalog 21-1

CELO5. User & Installation Manual.

Tubular connection elements

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Technical Services & Capabilities

19 DYNAmax Free Standing Server C A B I N E T s

Quadrant Shower Enclosure. Telephone Cleaning. All chrome surfaces should be cleaned using a clean damp cloth.

We hope that every customer sets up CC-Link system easily by reading this documentation.

HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS

Terminating 25-Pair Cable and 4-Pair Cross Connects

Mechanical Design, Fabrication, and Installation

Bar Code Label Detection. Size and Edge Detection APPLICATIONS

CONTENTS 1. INTRODUCTION METHODOLOGY RESULTS & FINDINGS...9 APPENDIX

Application Report. Propeller Blade Inspection Station

If stepping is required, step at 180mm as seen in this picture.

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS

Carlon Bore-Gard and Boreable Multi-Gard Raceway

VBA Macro for construction of an EM 3D model of a tyre and part of the vehicle

Effect of Sleeve Shrink-fit on Bearing Preload of a Machine Tool Spindle: Analysis using Finite Element Method

Huwilift DUO, Huwilift DUO Forte Seite 4 3. Huwilift MAXI. Huwilift MAXI UP. Huwilift Senso, Huwilift E-Senso Page 4 17

FASTON Terminals and Connectors

MOUNTING INSTRUCTIONS

Drum Dispensing Stations

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

Accessories for GF and RA machines

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

(Seattle is home of Boeing Jets)

CHAPTER 4 4 NUMERICAL ANALYSIS

1976 McWilliams Wines Rail Tank Car Kit

CABLE SUPPORT SYSTEMS

High Power Connectors for Power Supply and Power Circuits

Wall Mounted Products

Atomic Force Microscope and Magnetic Force Microscope Background Information

18. CARGO TROLLEYS, LIFTING TABLES, HYDRAULIC TABLE TRUCKS, HAND TROLLEYS

Intelligent Cable Management Systems

3D Printing Design Guidelines Sierra College CACT

Coyote popup features

BLADE S-MAX Cabinet for Blade Server

Transcription:

Progress status of EMR Assembly @ Geneva MICE meeting March 25-26, 2010 1. 1. EMR EMR production status status 2. 2. EMR EMR simulations (FEA (FEA studies) 3. 3. EMR EMR @ RAL RAL University of Geneva: A.Blondel, J-S Graulich, V.Verguilov, Coralie Husi, F.Masciocchi, L.Nicola, R.Bloch, N.Geisig, P.Béné, F.Cadoux thanks to collaboration with Fermilab, Trieste and Ghislain Grégoire 1

Module M0 prototype under Testing Module/Plane assembly+testing @ DPNC. See JSG s talk for details/results. First test module (2 crossed planes, 2 0.8mm fibers/bar, earlier configuration). Wooden Black Box with scintillator underneath) Home made crane 2

New modules in production After bar re machining (within 0.1mm precision) + drilling + white painting, everything moves to the gluing facility (downstairs) Guide for fiber insertion and gluing (20 bars in a row) Everything foreseen for a safe handling Gluing Rack (20 bar each) Coiling system to limit the fiber bending radius 3

New modules in production Fiber distribution: big wheels received from the company and hooked up to the wall Makes the life easier (fiber insertion, cutting to length, pliers to hold fiber in position, ) Fiber wheel (received from company) Pliers row 4

New modules in production (organization) The 7 gluing stands awaiting in their rack (3 out of 7 will go to the Testing room soon ) 20 bar gluing per day Max! (due to preparation) Everything foreseen for a safe handling 3 stands ready for plane assembly (fiber bundle coiled around the jig, each fiber in a protective sleeve (black)) 4 stands already used for plane assembly (ready for fiber gluing) Organized in a way to damp the production flow (different job stands) 5

New modules in production (Plane assembly) Example of a module mounting (aluminum profile connected thru corner blocks) 1 stand for plane assembly / 1 stand for Module assembly and storage 6

New modules in production (Module assembly) Module being assembled (awaiting the PMT connector gluing and electronic integration). The first one with fibers of 1mm in diameter to be tested soon with cosmics! Alu profiles, CNC machined in house (totally:100 needed) Alu profile Corner block 7

The parts close to PMT s PMT, FEB electronics, shielding tube after a few iterations with Ghislain Gregoire to design the magnetic shielding! Design work can now be finalized right now Basic idea (FEB assembly to the plane) FEB PMT New FEB Silent blocks for FEB mounting New shielding tube 8

The whole EMR assembly KL As a recall to understand the shielding issue coming next! Shielding tubes EMR features: - 24 modules - 1 module is made of X&Y planes - Nearly 11 km of WLS fibers (1.2mm diam.) - 48 multianode PMT - 48 single pixel PMT - 28 Kg per plane (1,4 Ton totally) EMR Outer Box Movable frame (existing part) 9

EMR area: Magnetic field issue [1] 2 months ago: Information given about Magnetic stray field around EMR stopped the design progress (thanks to Ghislain Gregoire). Worst case at 1200 Gauss (nearby KL) to 300 Gauss for the last PMT location downstream!! NO INDIVIDUAL Shielding tube could withstand such a field (saturation of a single Armco tube near 300 Gauss, 1mm thick tube) EMR thickness 3D model from Ghislain (OPERA 3D) Plot Field vs PMT location z 1200 Gauss Meshing of KL, Virostek plate, Tof2 Nota: 10 cm downstream 400 Gauss less! 10

EMR area: Magnetic field issue [2] Situation today after several iterations: see below the whole FE model (which includes a new deflecting plate, the so called Blondel s plate 50mm thick, upstream EMR and ) 190 Gauss (without any individual shielding tube) Blondel s plate (for EMR) This part not needed 11

EMR area: Magnetic field issue [3] Situation today after several iterations: Latest proposal (Blondel s plate as simple as it is here) Simplified model in order to add individual shielding for EMR (see next) EMR PMT axis NOTA: Following studies with the simplified model to see the effect of adding an individual shielding tube @ PMT location (knowing the factor of safety we have between blue and red plots ) The complete model (config. without details on individual shielding tibes for EMR due to huge number of meshs) 12

EMR area: Magnetic field issue [4] Situation today after several iterations: Latest proposal (B field at PMT location inside a tube of 1mm thick). Simplified model. Strange effect due to saturation with Mumetal (better results with Armco) Multipixel PMT is sensitive / tube axis (Y axis here ) We still need to get info on the single pixel PMT Baseline for EMR shielding: -1 global plate (50mm thick in Armco or equivalent) - Individual tube for each PMT (1mm thick in Armco) doesn t change our design! Slight adaptations only 13

EMR simulations (FEA studies on mechanics) FEA model of the whole EMR 3D model (shell and beams) Meshing 14

EMR simulations (FEA studies) Sagging and stresses look good (60x60mmx3mm cross section beams). It showed the need of reinforcing the 4 corners (connections between modules) by means of aluminum corner beams. Several configurations studied: - Transportion loads (horizontal) - Rotation to get it upright @ RAL - 1G Loading when vertical (in situ) Case1: Horizontal Max stress here (good margin of safety) Simply supported on 2 sides (boundary conditions) Used for EMR rotation 1G Total Weight: 1450 Kg from FEA model 15

EMR simulations (FEA studies) Case2: Vertical load (in situ @ RAL). Nota: no «contact» taken into account here (conservative approch) 1G 16

EMR simulations (FEA studies) NEXT STEP: add the new Blondel s plate to the EMR outer box (1,9x1,9m) FEA s to be updated accordingly. The idea: make the EMR box as a structural support for Blondel s plate (it s a 2mx2mx1m block / about 1,5 Tons!) But this plate will be assembled separately in situ (onto the EMR box, interfaces to be foreseen). About 1 ton to be fixed get an estimate of the magnetic load!) Downstream part to be removed 17

Building/platform issues EMR Integration @ RAL EMR Box Thanks to Tim for the «environnement» STEP file 18

EMR Integration @ RAL Building/platform issues (close up on EMR we need about 1900mmx1900mmx1000mm) EMR Box 1900 mm 1000 mm EMR active area INTERFERENCES 19

Building/platform issues (seen from one side ) Cable tray EMR Integration @ RAL EMR Box 310mm 500mm + the Blondel s plate to be inserted and supported!! So, there is a pb /Trolley EMR active part 815 mm Could it be modified or removed? Trolley 20

EMR Integration @ RAL Building/platform issues (seen from the Top ) EMR Box Useful to anticipate/accomodate with crane works (sling fixations, rotations, mouvements, ) Platform edge 1800mm EMR active part 21

EMR Integration @ RAL Building/platform issues (anticipation / differents STEPS of MICE) EMR Box The EMR Outer Box will comply with the differents STEPS (moving downstream) So, we have to work closely with Tim, Andy, to make sure that no interference with platform occurs anytime! CAD works first and soon (to freeze the Outer Box) STEP xx STEP yy 22