TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station)



Similar documents
CHARACTERISTIC EQUATIONS FOR HYDROPOWER STATIONS OF MAIN BARRAGES IN EGYPT

Frequently Asked Questions (FAQs) on Hydropower

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

Exercise (4): Open Channel Flow - Gradually Varied Flow

Micro-Hydro. Module Introduction. Tokyo Electric Power Co. (TEPCO)

Small-Micro Hydro Facilitation & Innovative Technologies in Japan

Technologies Applied in the Toshka Project of Egypt

Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience

SECTOR ANALYSIS. Egypt: Energy Sector. The Embassy of Denmark in Cairo

Manage water resources for on site hydro-electricity generation

HYDROMATRIX Jebel Aulia - Sudan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

Study of hybrid wind-hydro power plants operation and performance in the autonomous electricity system of Crete Island

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

APPLICATION OF GIS AND REMOTE SENSING IN IRRIGATION NETWORKS MANAGEMENT

How To Store Pumped Hydro Energy Storage

Chapter 9. Steady Flow in Open channels

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company

Solar and Hydroelectric Power. Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert

SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID

Black Mountain Reservoir Land Rezoning

EARS 5 Problem Set #3 Should I invest in flood insurance? Handed out Friday 1 August Due Friday 8 August

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Hybrid Micro-Power Energy Station; Design and Optimization by Using HOMER Modeling Software

Methodology for Merit Order Dispatch. Version 1.0

Design of open channel

INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

Design Considerations for Addressing Climate Change Vulnerabilities of Dams and Reservoirs

Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010

CHAPTER 3 STORM DRAINAGE SYSTEMS

Capacity planning for fossil fuel and renewable energy resources power plants

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by:

Station #1 Interpreting Infographs

Hybrid Renewable Energy Systems for North-Eastern Poland

China s Small Hydropower in Rural Energy Development

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM

XI SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Colorado Water Bar December 13, 2012

The function of a power station is to deliver

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community.

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Index-Velocity Rating Development for Rapidly Changing Flows in an Irrigation Canal Using Broadband StreamPro ADCP and ChannelMaster H-ADCP

Assessment of hydropower resources

Water Distribution Solution for More Efficient Operation of Water Supply

...Eq(11.6) The energy loss in the jump is dependent on the two depths y 1 and y 2 3 = E =...Eq(11.7)

Sample Micro Hydro Initial Report

S.1 Introduction to the Case Study on Micro-Hydro Power Plants

Energy transformations

Performance of Gangrel Hydroelectric Power Plant A Case Study

Feasibility Study of Brackish Water Desalination in the Egyptian Deserts and Rural Regions Using PV Systems

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

2D Modeling of Urban Flood Vulnerable Areas

Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems

VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR

US Army Corps of Engineers BUILDING STRONG

Battery Energy Storage

HOMER Software Training Guide for Renewable Energy Base Station Design. Areef Kassam Field Implementation Manager

Wind Turbine Power Calculations

Open Channel Flow Measurement Weirs and Flumes

SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM

3 Work, Power and Energy

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015

Generation Expansion Planning under Wide-Scale RES Energy Penetration

WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN

Public Works Engineering Technician: Speciality Civil Constructions

Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China

XAYABURI HYDRO POWER PLANT, LAO PDR

Ladies and Gentlemen, let me introduce myself and give you some information about my office.

gasnetworks.ie Methodology for forecasting gas demand

Flat-land large-scale electricity storage (FLES) Lecture at the European Energy Conference 2012, Maastricht

Name Class Date. You do twice as much work. b. You lift two identical books one meter above the ground.

Pumps: Convert mechanical energy (often developed from electrical source) into hydraulic energy (position, pressure and kinetic energy).

Power System review W I L L I A M V. T O R R E A P R I L 1 0,

GRAND ETHIOPIAN RENAISSANCE DAM

Section III. (School of Applied Technology) Breadth Course Proposal. Renewable Energy Systems. Lower Level. Upper Level. None.

Small Hydropower in Jaén, Spain

466 P a g e. Fig. 1 GDP Real Growth Rate

Safety technique. Emergency stop module BO 5988 safemaster

FACT SHEET 6: HYDRO ELECTRICITY

Impact of Distributed Generation on Voltage Profile in Deregulated Distribution System

Prospects of the Renewable Energy in Egypt

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University

Identification and Mitigation of Difficulties in Hydro-Power Generation in Tripura using MCDM and Cost Effective Analysis

For the purposes of this article the Shannon can conveniently be divided into five sections:

Pump Storage Technology

Renewable Energy market in Egypt

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts

JICA s Assistance for Electricity Sector

What are the Benefits?

PowerPoint Energy Simulation For Clean Diesel

Transcription:

Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 1 TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station) N. M. Abdelsalam 1, M. M. Abdelaziz 2, A. F. Zobaa 3 and M. S. Aziz 4 1 Engineer, Researcher Assistant, Nile Research Institute, National Water Research Center, Cairo, Egypt 2 Prof., Head of Department, Machine & Electrical Power, Cairo University, Egypt 3 Assistant Prof., Machine & Electrical Power Department, Cairo University, Egypt 4 Prof., Deputy Director of Nile Research Institute, National Water Research Center, Cairo, Egypt ABSTRACT Electric power is one from the importance sources of energy. In the past few years, Egypt power requirements are increasing very tremendously due to the increasing of population, standards of livings, and the vital need for new major projects to face the economic challenges. This research is a part of serial research studying and evaluating power demand and potential supplies. This serial research has evaluated the electric power in Egypt especially hydropower and its future under different conditions and most unfavorable scenarios in addition to the effect of a major national project; Toshka Project; on the power in Egypt. This paper is focused on the effect of the project on the power generation from High Aswan Dam and the power requirements and operation of this major project. Two mathematical models have been developed by the author for the operation of the project. The first model is used to compute the effect of the project on HAD generation and the other model is used to determine the pump operation according to project water requirements all over the year. In addition, the software analyzes the hourly power demand for the Egyptian United Network historical data and to propose the optimum operation hours for the projects pumps hour the year. The research results are illustrated during this research and some important recommendations are highlighted for the decision makers. Keywords: Egyptian United Network, Toshka Project, Hydropower Generation, Power Demand in Egypt. I. GOAL Toshka Project is a national major project in Egypt. It is a major water project designed to irrigate about 540,000 new feddans = (56,700 Acres) by elevating water from Lake Nasser. The estimated required water discharge is about 5.5 BCM/year taken at 265 km upstream the High Aswan Dam. This extracted huge volume from the lake has a major and magic effect on irrigating the desert land. But it, also, has some

2 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt other major side effects since it is taken from the limited Egyptian share of 55.5 BCM/year and electric source for the project is depending on the united network. II. INTRODUCTION As a result of rapidly growing demands and a shortage of financial investment by governments, private power production is encouraged in the traditionally monopolistic power industry in developing countries [1]. The amount of distribution generation (DG) is increasing worldwide, and it is foreseen that in the future it will play an important role in electrical energy systems. An original approach and computational method to assess the impact of DG on investment deferral in radial distribution networks in the medium and long-term have been presented in [2]. Load profiles may vary from 24-h constant to only nighttime or oppositely only daytime load profiles. Article [3] presents on the system performance. Optimal dispatch systems at hydroelectric plants manage the energy conversion process such that under all conditions the station efficiency is maximized in [4]. The optimal operation of the reservoir for electric generation with varied conditions such that long and short term hydrothermal scheduling, distributed regional demand in order to analyze operation characteristics of electric utilities appropriately, is presented in [5, 6]. In bringing energy needs and energy availability into balance, there are two main elements such as energy demand and energy supply. In this regard, every country should put efforts to attain such a balance and hence conduct research and development studies to develop its own energy conservation programs for the existing and new energy resources [7]. In 1993 the World Energy Council (WEC) published the results of a major study it had undertaken of global energy supply and demand in the period 1990 to 2020 under the title "Energy for Tomorrow's World the Realities, the Real Option and the Agenda for Achievement" [8]. About 84 percent of Egypt's electric generating capacity is thermal power and the remaining 16 percent is hydroelectric power generated mostly from the Aswan High Dam. Electricity demand, in Egypt, is growing from 5%-7% and has reached about 11% during the past year due to the increasing power demand, we will study and manage the available resources to face the increasing requirements and economic challenges. III. TOSHKA PROJECT CHARACTERISTICS This project consists of three main parts: Canal intake, Mubarek Pump Station (MPS), and South Valley canal. The characteristics of MPS operation are as follow: 1- The required annual water for the total area of the project is 5.5*10 9 m 3 per year and the designed discharge capacity of a single pump is estimated to be about (17*10 6 m 3 /day). 2- Minimum and maximum suction levels (minimum and maximum operational water levels in Lake Nasser) are 147 m and 182 m, respectively, Figure 1.

(Level(m.) Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 3 3- Delivery level (South Valley Canal) is 201 m, consequently, minimum and maximum statically water raising heads are 19 m and 54 m respectively. The project consists of the following parts: 200 190 180 170 160 182m 175m W.L. (176.15) 150 140 130 147m 134m 120 110 100 0 500 1000 1500 2000 2500 3000 Distance (m.) 2002 2004 Fig. 1 Cross Section at Canal Intake with Different Water Levels A. Canal Intake It is an open channel with 4.5 km length and 10 m width at the bottom with side slopes 2:1 (horizontal, vertical), Figure 2. It extends from Lake Nasser to the suction basin of the pump station. The path of canal intake was designed to reach level of (+134.00 m) inside Lake Nasser by the minimum length and by the lowest cost. This design allows the operation of pump station at the minimum water level in Lake Nasser which is (+147.00 m). 1 (134) m 2 10 m Fig. 2 Intake of Sheikh Zayed Canal

4 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt B. Suction Basin It is a deep basin with 48 m depth from the natural ground level (+182.00 m) where its base level is (+134.00 m). The dimensions of that basin are 167 m * 75 m at base level and rises with side slopes 2:1 (horizontal, vertical). C. Pump House It is a concrete water resistant structure inside the suction basin. Its dimensions are 140 m*45 m and 60 m in height. It is designed to resist earthquakes and consists of nine vertical stores start at level (+132.30) and end at level (+188.30). IV. MUBARAK PUMP STATION (MPS) Mubarak pump station is located on the left bank of Lake Nasser about 8 km north of Toshka spillway. The pump station is designed to raise water from Lake Nasser to Sheikh Zayed main canal with maximum static raise of 54 meters to cover the difference between the lowest level of Lake Storage at elevation 147 meters, and main canal water level at elevation 200 meters. The withdrawal from the lake will be through tunnels and discharge through pipelines with a total designed discharge of 25 M.m 3 /day that could be raised to a maximum of 37 million m 3 /day using 24 pumps. The total annual volume required for the nominal irrigated perimeter over 540,000 feddans is 5.5 billion cubic meters. The peak discharge at the main pumping station is about 240 m 3 /sec, to be sustained about 2 months in June and July with an average raise of 38 meters. The existing equipment of the pumping station 334 m 3 /sec at maximum raise of 54 m will accommodate easily this discharge. The minimum requirements which would correspond to the mid-january period would be about 67 m 3 /sec, less than one third of peak requirements. This water will be diverted northwestward, pumped out at the largest pump station in the world just north of Toshka outfall. Fig. 3 represents the single line diagram from 220 KV substation to 11 KV SWG for Mubarak Pump Station where, sample motor in the drawing with rate 12 MW. Overall Power and Energy Requirement Many studies were performed to determine the required power and the energy for the project. Operation scenarios are different in each study; one scenario determines the peak power requirements for pumping stations by about 165 MW, of which 105 MW is allocated for main Mubarak Pumping Station. The associated annual energy requirements are about 950 GWh, of which 575 GWh is allocated for the main pumping station [9], Table 1.

Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 5 Fig. 3 Single Line Diagram for Mubarak Pump Station

6 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt Table 1 Mubarek Pump Station - Annual Energy & Peak Power [9] Hydrological Condition Weighted average raise (m) Annual energy (GWh) Peak raise (m) Peak Power (Mw) Drought 45 765 50 140 Average 34 575 38 105 Flood 23 390 26 70 In terms of power demand, total peak requirements of 315 MW would represent 15% of the installed capacity of the high dam; this percentage will rise during drought periods. V. DEVELOPED PROGRAMS There are many mathematical models that can be used to predict the relation between the electrical power and water. By using FORTRAN and VISUAL BASIC software, two models are developed; the first is a numerical developed with special conditions to achieve study requirements such. It is developed by the researcher particularly to study, analyze, and present the effect of the new SV project operation on the electric generation of the HAD power station. The special characteristics conditions of the model and the proposed simulation are considered as: 1- The release discharge should be controlled during all time steps. 2- The upstream Water level should be controlled to avoid any water level exceeding 182.00 m. 3- The unique simulation of dam operation conditions. 4- The evaporation loss functions are governed by both lake water levels and meteorological conditions. 5- Seepage losses are governed by lake water levels. 6- Toshka spillway and South Valley Canal located about 265 km from upstream the High Aswan Dam. Also, first model is developed based on multiple regressions of hydropower, discharges, and head relationships, with special conditions related to the nature of the location and other reasons such as: In this study the special complicated nature of the problem since the storage volume reach up to 162 BCM/year with a length of about 500 Km and the existence of many types of outflows (point and non-point outflows) at different locations. The major task is to simulate the actual occurring scenarios rather than indicating the optimal scenarios (for example by using dynamic programming) so the

Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 7 developed approach was used in this study to analyze the actual occurring conditions for different cases. It can be briefly summarized the as follows: Hydropower Module This module depends on a new equation for HAD turbines operation, this equation was created by multiple regression analysis using stat graph software. Multiple regression analysis, is a statistical technique that can be used to analyze the relationship between a single dependent is named criterion variable which is represented in our study as power P and two independent variables are named predictor variables which are represented as discharge through turbines Q and the pressure head H. 153 actual data record monthly for P, Q, and H from 1988 to 2000 are used to predict this relation, where these data contains measured power in GW, pressure head in m, and turbines discharges in M.m 3 /month. Formula for this relation was represented as linear equation "P = C 1 * Q + C 2 * H t + C" and given as: P = 689.41 + 0.167 * Q + 9.62 * H 1 MW (1) Where: H 1 is the head acting on the turbines (m). Q is the outflow discharge through the turbines (m.m 3 /month.), and it is the discharge for reservoir. The correlation factor for the equation was given as R 2 = 0.991 The results of the new equation were compared with actual generated power; the error is given as 2.3, also. Table 2 represents the range which it is valid to use and Table 3 represents the maximum and minimum for actual, computed power and maximum, minimum values for difference between them. This equation is valid for these data, where range of head, discharge through turbines and generated power are specific, Figure 4. Table 2 Range of application Equation P (MW) Q (M.m 3 /month) H (m) Max. 1247.48 7650.7 73.6 Min. 290.31 2206.28 48.18

P computed 8 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt Table 3 Maximum and minimum errors for computed power by equation Equation P actual P computed Error Max. 1247 1228 49 Min. 256 215-125 1400 1200 1000 800 600 400 200 0 0 200 400 600 800 1000 1200 1400 P actual Fig. 4 Power Computed by New Equation and Power Actual is closed Second Program Calculations The computations in the developed program are depending on one main function with three factors. The first factor is the electrical consumption of a single pump in the station, the second factor is the water discharge raising rate of a single pump, and the third factor is the number of daily working hours. Discharge distribution at the project is shown in Figure 5 and Table 4 for different months.

Discharge m.m3/day Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 9 Monthly Discharge at Canal 25 20 15 10 5 0 January February March April May June Months July August September October November December Fig. 5 Monthly discharge for Toshka Project Table 4 Project Monthly Discharge in Toshka M.m 3 /day Month Discharge (M.m 3 /day) January 8 February 11.13 March 14.09 April 14.09 May 17.22 June 22.96 July 22.43 August 20.17 September 13.74 October 11.13 November 10.43 December 8 From Table 4, it can be shown that the required monthly discharge is different for each month. Maximum discharge occurred in three months; June, July, and August while the minimum discharge occurred in two months; January and December, these variance in the discharge gives work load on the pump station, where it should be manage this variability. Mubarak Pump Station (MPS) contains 24 pumps with 24 electric motors, 21 for base load and 3 as spare motors, the electrical rate for every motor is 12 MW per hour and its rate of raising the water is 17 m 3 /sec. Mubarak pump station program calculates number of working pumps, the number of working hours, and working period in day related this equation:

11 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt Q p N h Qreq (1) D h Where Q p = Rate discharge for every pump in the station = 17 m 3 /day N = number of working pumps (selected based on scenario) D h = represents hours of the day = 24 h Q = water discharge required for irrigation, where; it varies from month to another h req = No. of working hours. The authors used different scenarios by using MPS program to specify the numbers of working pumps, working period, and working hours, Figure 6. There are some conditions in the program, such that: 1. The electric power for working pumps as minimum as possible. 2. Avoid working for all pumps at the same time. 3. Working hours for pumps are continuous during one day to avoid the starting current effect. 4. Working hours for pumps at minimum hours load for united network daily load curve. By taking into consideration the above conditions, the program output gives the optimum number of pump for working as four pumps from the twenty one pumps at the station and after that the program computes when and for how long the selected pumps are working each day. No. of Working Hours (h) = MonthlyWater Requirmets (Q Pump Water Discharge Rate (Q req. p ) ) (2)

Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 11 Start Read Power Consumption for each pump Read Water Discharge for each pump Calculate no. of Pumps Q p * N/Dh * h = Q req Calculate no. of hours h = month req./ Pump Discharge If Water calculated < water Req. Write no. of Working Hours Draw Chart For Pump Station Load End Fig. 6 Flow Chart of Program

12 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt VI. RESULTS AND ANALYSIS The summary of the output of the developed program is shown in Table 5 and Figures from 7 to 9. Different scenario outputs were examined to select the best one to be used for the project. The scenario which was applied gives these results; numbers of working pumps are four pumps, this number is constant in all days but the working pumps are alternated every day from all pumps in the station. Also developed program depends on main relation between three elements, discharge required for the project, number of working pumps, and its working time in hours. By using this relation, developed program could specify the number of working hours every day throughout the year. It is found that the maximum power consumed by MPS occurs on June where the value reached to 9 x 48 = 432 MW/day and the minimum value for consumed power occurred on January and December it reached to 3 x 48 = 144 MW/day. It is noted that, consumed power for the station will rise in the drought periods because the required raising water level is increased. It can be concluded that during all days, the period from 1 am to 9 am form the minimum daily load, so the developed program used variable hours through these period to operate the pump station. Annual energy requirement for the total irrigated area at full development would therefore be in the order of magnitude of about 20% of the total output of the Aswan High Dam When the station works with full load. Table 5 Working Hours for Mubarak Pump Station Month Working Hours(Continuously) January 3 Hours, from 5 to 7 February 3 Hours, from 2 to 4 March 6 Hours, from 2 to 7 April 5 Hours, from 5 to 10 May 7 Hours, from 1 to 7 June 9 Hours, from 4 to 12 July 9 Hours, from 24 to 8 for next day August 8 Hours, from 1 to 8 September 6 Hours, from 2 to 7 October 5 Hours, from 3 to 7 November 4 Hours, 2 to 5

Power Mw Power Mw Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 13 16,000 14,000 12,000 10,000 8,000 6,000 Load Pump X 100 Mw 4,000 2,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hours united network Pump load*100 Fig. 7 Daily Load Curve and Working Hours of PMS at January 16,000 14,000 12,000 10,000 8,000 6,000 Load Pump X 100 Mw 4,000 2,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hours united network pump load*100 Fig. 8 Daily Load Curve and Working Hours of PMS at May

Power Mw 14 Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 18,000 16,000 14,000 12,000 10,000 8,000 6,000 Load Pump X 100 Mw 4,000 2,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hours united network pump load*100 Fig. 9 Daily Load Curve and Working Hours of PMS at June VII. CONCLUSIONS This approach is part of serial research studying and evaluating power demand and potential supplies the hydropower in Egypt and its future under different conditions and most unfavorable scenarios. In addition to the effect of a major national project- Toshka Project, on the hydropower generation in Egypt it is focused on power requirements and operation of this major project. The approach divided into two main points; the first is the operation of High Aswan Dam Power Stations with Toshka project and second is effect of Toshka project power operation especial MPS on the daily load curve united network in Egypt, so two special computer programs were developed. By using the first program; new equation for High Aswan turbines was created and applied. The second program determines working pumps time. The minimum hours occur on two months January and December where the water required related to the crop types. The effect of working MPS with this approach is very low on the daily load curve. The electric load for the station is ranged between 144 MW at minimum load and 432 MW at maximum load that means; daily power required for the Mubarak Pump Station represents approximately third installed capacity of High Dam. REFERENCES [1] W. Xing, F. F. Wu, A game-theoretical model of private production: Renew. Energy 32 (2007) 2096-2115.

PUMP STILL INTA STATION ITE ING KE P STAT BASI CAN ION AL N SITE Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 15 [2] V.H. Mendez, J. Rivier, J.I. de la Fuente, T. Gomez, J. Arceluz, J. Marin, A. Madurga, Impact of distributed generation on distribution investment deferral: Electrical Power and Energy Systems 28 (2006) pp. 244-252. [3] A.N. Celik, Effect of different load profiles on loss-of-load probability of standalone photovoltaic systems, Renew. Energy 32 (2007) pp. 2096-2115. [4] R. A. Ponraiah, F. D. Galiana, "Systems to Optimize Conversion Efficiencies at Ontario Hydro's Hydoelectric Plants", IEEE Transactions on Power Systems, Vol. 13, No. 3, August 1998. [5] S. Soares, A.A.F.M. Carneiro, "Optimal Operation of Reservoir Electric Generation", IEEE Transactions on Power Systems, Vol. 6, No. 3, July 1991. [6] T. Nakata, and S. Ashina Optimization for the Operation of Electric Power Generation Taking Account of Distributed Regional Demand in Japan, Tohoku University. [7] Omer Yuksek, Murat Ihsan Komurcu, Ibrahim Yuksel and Kamil Kaygusuz," The role of hydropower in meeting Turkey's electric energy demand", Energy Policy, Volume 34, Issue 17, November 2006, pp. 3093-3103. [8] Bjornsson Jakob, Helgason Dr. Thorkell, and Others, " The Potential Role of Geothermal Energy and Hydropower in the World Energy Scenario in Year 2020", WEC Information, Energy Information, News & Events, Focus, Publication, Member Services, World Energy Congress. London, 2005. [9] Consulting Services for the South of EGYPT Development Project," Water Management Plan", Technical Assistance for Toshka Project, Volume 3, July- 2004.