Tamil Nadu Electricity Regulatory Commission



Similar documents
Jammu & Kashmir State Electricity Regulatory Commission

PR. No. 2/ Press Release

02 July VIPL Response to balancedata gaps 1 / Queries Set Case 36 of 2015 Data Gaps/Deficiencies on the Petition submitted by VIPL

BIHAR ELECTRICITY REGULATORY COMMISSION

Jammu & Kashmir State Electricity Regulatory Commission

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************

Detailed Vetting Report

Jharkhand State Electricity Regulatory Commission

T.P. No. 1 of 2013 Order dated: (effective from )

Section 4-Tariff proposals and approved tariff

DAKSHIN HARYANA BIJLI VITRAN NIGAM. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33 Dated: 9/6/2014

Determination of cost of power generation for Dongamahua captive power plant of Jindal Steel & Power Ltd. from FY till FY

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY to FY Assam Power Generation Corporation Limited (APGCL)

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR Petition No. RERC 456/14, 457/14, 458/14, 442/14, 444/14 & 447/14

Press Release on Tariff Orders FY for PSPCL & PSTCL

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR ***************** Secy/Tariff/ Date..03.

Year A perspective

Torrent Power Limited Distribution, Ahmedabad Truing Up for FY and Determination of Tariff for FY

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Suo Motu Case No. 04 of 2013

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

Tamil Nadu WiNd ENErgy ProfilE

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Notification No. TNERC/RPO/ 19/1 dated

Review relating to Statutory Corporation

Andhra Pradesh Electricity Regulatory Commission Hyderabad

BRIHANMUMBAI ELECTRIC SUPPLY AND TRANSPORT UNDERTAKING (BEST)

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DELHI ELECTRICITY REGULATORY COMMISSION Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi

PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR

BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO , SECTOR 4, PANCHKULA HARYANA

THE HARYANA STATE ELECTRICITY BOARD TARIFF AWARD A CRITICAL REVIEW

ANNEXURE TO TARIFF PETITION FOR FINANCIAL YEAR PROPOSED TARIFF SCHEDULES FOR LOW TENSION CONSUMERS. Table of Contents. Tariff Category No

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 53 / 11 12

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) Assam Power Distribution Company Limited (APDCL) TARIFF ORDER FY to

DELHI ELECTRICITY REGULATORY COMMISSION

Fixed/Demand Charge per month (Rs./Connection) First 15 kwh Balance above 15 kwh Energy/Variable Charges (Rs.

S. No. Year Obligation expressed as percentage of energy consumption (%)

INTRODUCTION Tariff Objective Factors

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

Retail Supply Tariff Order FY TARIFF SCHEDULES. Madhya Pradesh Electricity Regulatory Commission Page 156

THE JHARKHAND GAZETTE

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 7/MP/2013

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

Case No. 47 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member ORDER

ARR & Tariff for FY , Review for FY , Provisional true-up FY and True-up for FY & FY for EDP

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore

IREDA-NCEF REFINANCE SCHEME

MAHARASHTRA STATE ELECTRICITY BOARD

G.O.MS.No. 8 Dated Read the following:-

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

Electricity Tariff Fixation Rules, 2050 (1994)

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines

ADVT No.CMRL/HR/01/2016

INDEX S. No. PARTICULARS Note:

TAMIL NADU ARASU CABLE TV CORPORATION LIMITED - Chennai. (A Government of Tamil Nadu Undertaking) TENDER NOTICE

APPLICATION CUM AGREEMENT FORM FOR DOMESTIC/COMMERCIAL

FILING OF RETURNS AND ALLIED COMPLIANCE UNDER INCOME TAX

GOVERNMENT OF INDIA MINISTRY OF TOURISM

ELECTRICITY TARIFF (Effective from September 1, 1999.)

COMPETITION COMMISSION OF INDIA Case No. 43 of 2015

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

INVITATION OF PROPOSAL

Bharti Airtel Limited

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

Andhra Pradesh Electricity Regulatory Commission 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Lakdi-ka-pul, Hyderabad

Delhi Electricity Regulatory Commission Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi 17

NGO APPLICATION FORM

The Rajasthan Electricity (Duty) Act 1962

TELECOM REGULATORY AUTHORITY OF INDIA

CENTRAL INFORMATION COMMISSION Club Building (Near Post Office) Old JNU Campus, New Delhi Tel: File No.CIC/DS/A/2011/001995/RM

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009

Consumer category. Name of the Tariff Scheme. Quarterly consumption in KWH. Fixed Charge/ Demand Charge * in Rs/KVA/mon NOT APPLICABLE.

Fixed Charge (In Rupees per kwh)

KERALA STATE ELECTRICITY REGULATORY COMMISSION

National Electricity Policy 03-Feb-2005

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

Electronics Corporation of Tamil Nadu Limited. Rate Contract Tender. Tender Ref. ELCOT/PROC/OT/32634/Oracle/

ASSOCIATION OF MUTUAL FUNDS IN INDIA LEVY OF SERVICE TAX VIS-À-VIS MUTUAL FUNDS A GUIDANCE NOTE

THE BEST UNDERTAKING (Of the Brihan Mumbai Mahanagarpalika) SCHEDULE OF ELECTRICITY TARIFFS (With Effect from 1 September, 2013)

ICICI PRUDENTIAL LIFE INSURANCE COMPANY LIMITED Registered Office: ICICI PruLife Towers, 1089 Appasaheb Marathe Marg Prabhadevi, Mumbai

Transcription:

1 Tamil Nadu Electricity Regulatory Commission No 19A, Rukmini Lakshmipathy Salai, Egmore, Chennai - 600 008. Phone:044-28411376, Website:http://www.tnerc.tn.nic.in/ Public Notice 1. The Tamil Nadu Generation and Distribution Corporation Ltd. (TANGEDCO) had last year filed its application before the Commission for final true-up and approval of Aggregate Revenue Requirement (ARR) for the year 2010-11, provisional true-up and approval of ARR for the year 2011-12, Annual Performance Review (APR) for the year 2012-13 based on estimates and its Multi Year Tariff petition for 2013-14 to 2015-16 along with tariff revision for 2013-14. Based on this petition and after considering views of the State Advisory Committee, the public and other stakeholders, Tamil Nadu Electricity Regulatory Commission had passed the Order in which the Aggregate Revenue Requirement for the 2 nd Control Period i.e. 2013-14 to 2015-16 was determined and revenue gap and tariff determination for 2013-14 was carried out. 2. As per provisions of Section 64 of the Electricity Act 2003, it is incumbent upon the Licensee to make an application to the State Regulatory Commission for determination of tariff in such manner as may be determined by Regulations framed. Regulation 5 of the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 lays down that licensee is required to file tariff application on or before 30th November each year, with the Commission. Accordingly TANGEDCO was expected to file a petition for the final true up and approval of ARR for 2011-12, provisional true up for 2012-13, APR for 2013-14 and ARR and Tariff petition for 2014-15 by 30 th November 2013. However TANGEDCO failed to file the petition before the said deadline. 3. Hon ble APTEL vide it s judgement dated 11th November, 2011 in the matter OP No. 1 of 2011, has directed the State Commissions that In the event of delay in filing of the ARR, truing-up and Annual Performance Review, one month beyond the scheduled date of submission of the petition, the State Commission must initiate suo-motu proceedings for tariff determination in accordance with Section 64 of the Act read with clause 8.1 (7) of the Tariff Policy. 4. TNERC Tariff Regulations 2005 under Regulation 6 stipulates that (8) In case the licensee does not initiate tariff filings in time, the Commission shall initiate tariff determination and regulatory scrutiny on suo motu basis. 5. Considering the directives of the Hon ble APTEL, the National Tariff Policy and in exercise of the powers vested in it under the Section 62 and Section 64 of the Electricity Act, 2003 (Act) and the Tariff Regulations 2005, TNERC has decided to take up the matter of Determination of ARR and Tariff for 2014-15 by initiating suo-motu proceedings.

2 6. As per Financial Restructuring Plan (FRP) requirement, the tariff is to be revised every year covering the ARR. Under such circumstances TNERC has decided to proceed with the suo-motu determination of ARR and Tariff for FY 2014-15 on the basis of information available from TANGEDCO s submissions to the Commission. With the available information with the Commission, the following decisions have been taken by the Commission: a. The 2011-12 and 2012-13 expenses will be provisionally trued up based on the audited accounts. b. The APR for 2013-14 and ARR for FY 2014-15 will be taken up based on available information and audited accounts for FY 2011-12 and 2012-13. c. The revenue gap and regulatory asset determined will be provisional in nature and will be trued-up in the next year. 7. Hence, notice is hereby given to all that TNERC now has decided to proceed on suo-motu basis on the provisional true up for 2011-12 and 2012-13, APR for 2013-14 and ARR and Tariff determination for 2014-15. 8. Based on the information available, Commission has provisionally determined Aggregate Revenue Requirement of Rs.39,818 Cr and total revenue of Rs. 32,964Cr at existing tariff (revenue from sales and Non Tariff Income) for 2014-15. Componentwise details of the ARR and revenue at existing tariff for FY 2014-15 are as below and the Commission has arrived at a revenue gap of Rs.6854 Crores for FY 2014-15. Table 1: Componentwise ARR and determination of revenue gap for 2014-15 - in Rs. Crore Approved in June 2013 Tariff Order Expenses in respect of Generation 8,851 12,687 Power Purchase Cost 17,949 17,946 Annual Transmission payable to TANTRANSCO 2,850 2,259 Operation and Maintenance Expenses 4,068 4,304 Depreciation 435 661 Interest on Long term loan 1,740 1,956 Other Debits & extra ordinary items 26 6 Reasonable Return / Return on Equity 0 - Interest on Working Capital 0 - Gross Aggregate Revenue requirement 35,918 39,818 Revenue Revenue from sale of power (including 32,238

3 Approved in June 2013 Tariff Order NTI and Other Income 1,021 726 Total Revenue 32,964 Revenue Gap 6,854 Considering the above revenue gap of Rs. 6,854 Cr, Commission proposes to bridge this gap through tariff hike across all consumer categories. The following table summarizes the incremental revenue and the revised gap for FY 2014-15. The proposed tariff schedule for FY 2014-15 is appended as Annexure I. Table 2: Revised revenue gap after tariff revision for FY 2014-15 - in Rs. Crore Gross Aggregate Revenue requirement 39,818 Less: Other income and Non-Tariff Income 726 Net Revenue Requirement 39,092 Revenue from Tariffs including subsidy (at existing tariff) 32,238 Revenue Gap (at existing tariff) 6,854 Incremental revenue through tariff revision 6,805 Revised Revenue Gap (at revised tariff) 49 9. The summary of the ARR for 2014-15 is available on the website of the Commission www.tnerc.tn.nic.in. Any person who intends to file objections / suggestions on the above ARR determination, may file so with the Secretary, Tamil Nadu Electricity Regulatory Commission (TNERC), 19-A, Rukmini Lakshmipathy Salai, Egmore, Chennai 600 008 in person or through post so as to reach by 23-10-2014. 10. The objections/suggestions should be filed with the Hon ble Commission in three copies and should carry full name and postal address of the person sending the objection. If the objections/suggestions are filed on behalf of an organisation / association / category of consumers etc., it should be so mentioned. The person intending to file objections/suggestions should also mention if they want to be heard in person. TNERC, after perusing the objections/suggestions received to this notice may invite such persons / organisations as it considers appropriate for the public hearing on the dates to be notified. Secretary Tamil Nadu Electricity Regulatory Commission

ANNEXURE - I TARIFF FOR HIGH TENSION CONSUMERS FOR FY 2014-15 Sl.No Category Tariff EXISTING TARIFF PROPOSED TARIFF Demand Energy Demand Energy (Rs / kva / (Ps / Unit) (Rs / kva / (Ps / Unit) Month) Month) 1 Industries I A 300 550 350 722 2 Railway Traction I B 250 550 300 722 3 Govt. and Govt. aided educational institution 4 Private educational institutions and hostels run by them II A 300 450 350 722 II B 300 550 350 722 5 Commercial III 300 700 350 805 6 Lift Irrigation (*) IV 0 350 0 722 7 Temporary Supply V 300 950 350 1100 (*) Tariff charges are to be borne by the Government of Tamil Nadu as per the existing policy

ANNEXURE - I TARIFF FOR LOW TENSION CONSUMERS FOR FY 2014-15 Sl.No Category Tariff EXISTING TARIFF PROPOSED TARIFF Fixed Energy Fixed Energy 1 Domestic /Residential I A Consumption upto 50 units monthly or 100 units bi-monthly (Rs / bi monhtly) (Ps / Unit) (Rs / bi monhtly) (Ps / Unit) 0-100 units bi monthly 20 260 30 300 2 Consumption from 51 units to 100 units per month or 101 unitsto 200 units for two months 0-200 units bi monthly 20 280 30 325 Consumption of 101 units to 250 units per month (or) 201 units to units for two months 0-200 units bi monthly 300 350 201- units bi monthly 30 400 40 460 Consumption of 251 units and above per month (or) 501 units and above for two months 0-200 units bi monthly 300 350 201- units bi monthly 40 400 50 460 501 and above bi monthly 575 660 Rs.250/Service /bi-monthly Rs.290/Service/bi-monthly Huts (Till Installation of Energy Meters) (*) I B (borne by the Govt fully as (to be borne by Govt fully as Huts (On Installation of Energy Meters) (*) 0 430 0 495 3 Bulk supply I C 100 400 120 460 4 Public Lighting and Water Supply II A 0 550 120/Kw 635 5 Govt. and Govt. aided Educational Institutions II B (1) 100 /kw 120/Kw 575 6 Private educational Institutions II B (2) 100 /kw 650 120/Kw 750 7 Places of Pub. Worship II C 8 9 10 11 12 13 Upto 120 units bi-monthly 575 100 / kw 120/kW above 120 units bi-monthly 575 Cottage and Tiny Industries III A (1) 0- units bi monthly 350 400 30 / kw 40/kW 501 units and above bi monthly 400 460 Power Looms III A (2) (i) Consumers who consume upto 250 units per month (or) units for two months 0 to 250 units per month or 0 to units bimonthly (*) 0 to 250 units per month or 0 to units bimonthly (*) 251 to units per month or 501-1000 units bi monthly 501 to 750 units per month or 1001-1 units bi monthly From 751 units and above per month or 1501 units and above bi monthly Industries Commercial For consumer with consumption 50 units per month or 100 units bimonthly III B V 100/kW 450 (ii) For consumers who consume 251 units and above per month (or) 501 units and above for two months Rs.300/kW/ per month 450 120/kW 520 (for all units) 60 /kw 550 70/kW 722 Rs 2 / HP / Annum Rs.2875/HP/Annum Agriculture (Till Installation of Energy Meters) (borne by the Govt fully as (to be borne by the Govt (*) fully as IV Agriculture (On installation of Energy Meters) 0 280 0 322 (*) For consumers with consumption above 50 units per month or above 100 units bimonthly (for all units) Temporary supply for temporary activities, construction of buildings and lavish illumination VI 100/kW 120 /kw 520 430 495 700 120/kW 140/kW 1050 Rs.345/kW /per month 575 805 1210 (*) Tariff charges are to be borne by the Government of Tamil Nadu as per the existing policy