ANNEXURE TO TARIFF PETITION FOR FINANCIAL YEAR PROPOSED TARIFF SCHEDULES FOR LOW TENSION CONSUMERS. Table of Contents. Tariff Category No

Size: px
Start display at page:

Download "ANNEXURE TO TARIFF PETITION FOR FINANCIAL YEAR 2011-12 PROPOSED TARIFF SCHEDULES FOR LOW TENSION CONSUMERS. Table of Contents. Tariff Category No"

Transcription

1 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited ARR/TARIFF PETITION FY-12 PROPOSED TARIFF SCHEDULE - LT

2 ANNEXURE TO TARIFF PETITION FOR FINANCIAL YEAR PROPOSED TARIFF SCHEDULES FOR LOW TENSION CONSUMERS Table of Contents Tariff Category Page No LV - 1 Domestic 3 LV 2 Non-Domestic 8 LV 3.1 Public Water works 12 LV 3.2 Street Lights 12 LV 4.1 LT Industry (Non-Seasonal) 14 LV 4.2 LT Industry (Seasonal) 14 LV 5.1 Irrigation pumps for agriculture 21 LV-5.2 Agriculture other than irrigation 21 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 2

3 Schedules for Low Tension Consumers Tariff Schedule-- LV-1 DOMESTIC:- Applicability: This tariff is applicable for light, fan and power for residential use only. Dharamshalas run by registered trustees, old age houses, rescue houses, orphanages, places of worship and religious institutions will also be covered under this category. Domestic sub-category LV-1.1 [Consumers having sanctioned load not more than 100Watts (0.1KW) Tariff and consumption not more than 45 units per month] (a) Energy Charge For actual consumption of metered connection Monthly consumption Energy charges (Rs. per unit) Urban/ Rural areas Minimum charges (Rs. per connection per month) Up to 45 units (b) Fixed Charge No fixed charge is applicable to this category of consumers. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 3

4 Domestic sub-category LV-1.1 Tariff LV-1.2: (a) (i) Energy Charge For actual consumption of metered connection Slabs of monthly consumption Energy charges with telescopic benefit (Rs. per unit) Urban/Rural area Up to 50 units to 100 units to 200 units 5.25 Above 200 units 5.50 Demand Based 4.00 Temporary connection for construction of own house (max. up to one Temporary year) connection for social/ marriage purposes and religious functions. Supply through DTR meter for clusters of Jhuggi/Jhopadi till individual meters are provided Minimum charges (Rs. per connection per month) Urban area Rural area Annual minimum consumption based on 480 units per KW or part thereof of billing demand Annual minimum consumption based on 240 units per KW or part thereof of billing demand NIL NIL Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 4

5 (ii) Energy charge for un-metered domestic connections: Particulars Un-metered connection in urban areas Un-metered connection in rural areas Units and Energy charges to be billed per month for unmetered connections (Rs. per unit) per unit per unit Minimum charges (Rs. per connection per month) NIL NIL (b) Fixed Charge This charge is recoverable per month at the rate given in the table below in addition to energy charge. This charge shall also be applicable for temporary /un-metered connections. This charge is, however, not applicable to consumers receiving supply through DTR meter. For Slabs of monthly consumption for permanent individual connection/ temporary/dtr meter connection Monthly Fixed Charges (in Rs) Urban areas Rural areas Up to 50 units 30 per connection 21 per connection 51 to 100 units 50 per connection 35 per connection 101 up to 200 units 75 for each 0.5 KW of authorised load 53 for each 0.5 KW of authorised load Above 200 units 100 for each 0.5 KW of authorised load 70 for each 0.5 KW of authorised load Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 5

6 For Slabs of monthly consumption for permanent individual connection/ temporary/dtr meter connection Monthly Fixed Charges (in Rs) Urban areas Rural areas Demand Based (for Above 10 KW Load) 40 per KW or part thereof or per kva or part thereof of billing demand 28 per KW or part thereof or per kva or part thereof of billing demand Temporary connection for construction of own house (max. up to one year) Temporary connection for social / marriage / religious functions 150 for each 0.5 KW of sanctioned or connected or recorded load whichever is highest. Rs 10/- for each 0.5 KW of sanctioned or connected or recorded load, whichever is highest, for each 24 hours duration or part thereof. 105 for each 0.5 KW of sanctioned or connected or recorded load whichever is highest. Rs 6/- for each 0.5 KW of sanctioned or connected or recorded load, whichever is highest, for each 24 hours duration or part thereof. Un-metered connection 50 per connection 20 per connection Through DTR meter for clusters of Jhuggi/Jhopadi till individual meters are provided Nil Nil Note: The authorized load shall be as defined in the Electricity Supply Code (Every 75 units consumption per month or part thereof shall be considered equal to 0.5 KW of authorised load. Example: If consumption during the month is 125 units, then the authorised load will be taken as one KW. In case the consumption is 350 units then the authorised load will be taken as 2.5 KW.) Terms and conditions: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 6

7 a) The energy charges corresponding to consumption recorded in DTR meter shall be equally divided amongst all consumers connected to that DTR for the purpose of billing. The licensee will obtain consent of such consumers for billing as per above procedure. b) In case energy charges for actual consumption are less than minimum charges, minimum charges shall be billed towards energy charges. All other charges, as applicable, shall also be billed. c) Other terms and conditions shall be as specified under General Terms and Conditions. d) Tariff Schedule-- LV-2 NON-DOMESTIC:- Non-Domestic sub-category LV-2.1 Applicability: This tariff is applicable for light, fan and power to Dharamshalas other than registered trustees Educational Institutions including workshops & laboratories of Engineering Colleges / Polytechnics/ITIs (which are registered with /affiliated/ recognized by the relevant Govt. body or university), Hostels for students or working women or sports persons (run either by Govt. or individuals) Tariff: Tariff shall be as given in the following table: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 7

8 Sub category Energy charges (Rs. per unit) Monthly Fixed Charges (in Rs.) Urban / Rural areas Urban areas Rural areas Sanctioned load based tariff OPTIONAL Demand based tariff for Contract demand above 10KW per KW 56 per KW per kw Or 150 per kva of billing demand 131 per kw Or 105 per kva of billing demand Non-Domestic sub-category LV-2.1 Applicability: This tariff is applicable for light, fan and power to Railways (for purposes other than traction and supply to Railway Colonies/water supply), Shops/showrooms, Parlours, Government Offices, Government Hospitals and Government medical care facilities including Primary Health Centres, offices belonging to public/private organisations, public buildings, guest houses, Circuit Houses, Government Rest Houses, X-ray plant, recognized Small Scale Service Institutions, clubs, restaurants, eating establishments, meeting halls, Telecom Towers of Licensed Infrastructure Companies, places of public entertainment, circus shows, hotels, cinemas, professional's chambers (like Advocates, Chartered Accountants, Consultants, Doctors etc.), private clinics, nursing homes and private hospitals, bottling plants, marriage gardens, marriage houses, advertisement services, advertisement boards/ hoardings, training or coaching institutes, petrol pumps and service stations, tailoring shops, Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 8

9 laundries, gymnasiums and health clubs and any other establishment (except those which are covered in LV 2.1), who is required to pay Commercial tax/service tax/value added tax (VAT)/entertainment tax/luxury tax under any Central/State Acts. Tariff: Tariff shall be as given in the following table: Sub category Energy charges (Rs. per unit) Monthly Fixed charges ( in Rs.) Urban/Rural areas Urban area Rural On all units if monthly consumption is not more than 50 units On all units in case monthly consumption exceeds 50 units per KW 35 per KW per KW 53 per KW Sub category Energy charges (Rs. per unit) Monthly Fixed charges ( in Rs.) Urban/Rural areas Urban area Rural OPTIONAL Demand based tariff for contract demand above 10 KW per KW Or 144 per kva of billing demand 126 per KW Or 101 per kva of billing demand Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 9

10 Temporary connections including Multi point temporary connection at LT for Mela* per KW or part thereof of sanctioned or connected or recorded load whichever is highest 140 per KW or part thereof of sanctioned or connected or recorded load whichever is highest Temporary connection for marriage purposes at marriage gardens or marriage halls or any other premises covered under LV 2.1 and 2.2 categories 7.00 (Minimum consumption charges shall be 6 Units per KW or part thereof of Sanctioned or Connected or Recorded Load whichever is highest for each 24 hours duration or part there of subject to a minimum of Rs.800/- in Urban area and Rs.600/- in Rural area ) Rs. 30 for each KW or part thereof of sanctioned or connected or recorded load whichever is highest for each 24 hours duration or part thereof Rs. 21 for each KW or part thereof of sanctioned or connected or recorded load whichever is highest for each 24 hours duration or part thereof For X-Ray plant Additional Fixed charges (Rs. per machine per month) Single Phase Three Phase *In case permission for organizing Mela is granted by Revenue Authorities of Government of Madhya Pradesh. Terms and Conditions: a) Minimum consumption: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 10

11 i. The consumer shall guarantee a minimum annual consumption of 480 units per KW or part thereof in urban areas and 240 units per KW or part thereof in rural areas of sanctioned load or contract demand (in case of demand based charges). However, the load of X-Ray unit shall be excluded while considering the load of the consumer for calculation of minimum consumption. ii. The consumer shall be billed one twelfth of guaranteed annual minimum consumption (KWH) specified for his category each month in case the actual consumption is less than above mentioned minimum consumption. iii. During the month in which actual cumulative consumption equals or greater than the annual minimum guaranteed consumption, no further billing of monthly minimum consumption shall be done in subsequent months of the financial year. iv. In the month in which cumulative actual or billed monthly consumption of the consumer exceeds the cumulative monthly prorated minimum annual guaranteed consumption and if the consumer was charged in earlier months for tariff minimum consumption on account of his actual consumption being less, then such tariff minimum difference of energy charge shall be adjusted in the month in which cumulative actual or billed monthly consumption exceeds cumulative monthly prorated minimum guaranteed annual consumption. If such tariff Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 11

12 minimum difference does not get fully adjusted in that month, such adjustments shall be continued to be done in subsequent months of the financial year. b) Additional Charge: Shall be as per following: i. Consumers opting for demand based tariff: The consumers availing supply at demand based tariff shall, restrict their actual maximum demand within the contract demand. The consumer shall pay 2 times the tariff for fixed charges and energy charges for consumption corresponding to excess demand in case the maximum demand recorded exceeds the contract demand and while doing so, the other terms and conditions of tariff, if any, shall also be applicable on the said excess demand. The tariff minimum charge on account of excess demand recorded in a particular month shall not be adjusted in subsequent months. Example: If a consumer having a contract demand of 50 KW records a maximum demand of 60 KW, the billing of fixed charges and energy charges for excess demand of (60 KW- 50KW)= 10 KW shall be as follows: 1. Fixed charges for excess demand= (fixed charges for contract demand*10 KW*2)/contract demand 2. Energy charges for excess demand = (total consumption recorded during the month* excess demand/ maximum recorded demand)*2* energy charge unit rate Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 12

13 ii. The above billing for Excess Demand at 2 times the normal tariff, applicable to consumers is without prejudice to the licensee s right to ask for revision of agreement and other such rights that are provided under the regulations notified by the Commission or under any other law. c) Other terms and conditions shall be as specified under General Terms and Conditions. d) Tariff Schedule LV-3 PUBLIC WATER WORKS AND STREET LIGHTS Applicability: The tariff LV-3.1 is applicable for Public Utility Water Supply Schemes, Sewage Treatment Plants, Sewage Pumping Installations run by P.H.E. Department or Local Bodies or Gram Panchayats or any other organization authorised by the Government to supply/ maintain public water works / sewerage installations and shall also be applicable to electric crematorium maintained by local bodies/trusts. Note: Private water supply scheme, water supply schemes run by institutions for their own use/employees/townships etc. will not fall in this category but billed under the appropriate tariff category to which such institution belongs. In case water supply is being used for two or more different purposes then the highest tariff shall be applicable. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 13

14 The tariff LV-3.2 is applicable to traffic signals and lighting of public streets or public places including parks, town halls, monuments and its institutions, museums, public toilets, public libraries, reading rooms run by Government or Local Bodies and Sulabh Shochalaya. Tariff: The tariff for the sub-categories shall be based on current monthly consumption as per following table: Category of consumers / Area of applicability LV-3.1: Public Water Works Monthly Fixed Charges (in Rs. per KW) Urban area Rural area Energy Charges (Rs. per unit) Minimum Charges Municipal Corporation/ Cantonment board Municipality/ Nagar Panchayat Gram Panchayat No Minimum Charges Temporary LV-3.2: Street light Municipal Corporation/ Cantonment board Municipality/ Nagar Panchayat No Minimum Charges Gram Panchayat Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 14

15 Terms and Conditions: (a) Incentives for adopting Demand Side Management An incentive equal to 5 % of energy charges shall be given on installation and use of energy saving devices (such as ISI energy efficient motors for pump sets and programmable on-off/ dimmer switch with automation for street lights). Incentive will be admissible only if full bill is paid within due dates failing which all consumed units will be charged at normal rates. Such incentive will be admissible from the month following the month in which energy saving devices are put to use and its verification by a person authorized by the licensee. This incentive will continue to be allowed till such time these energy saving devices remain in service. The licensee is required to arrange wide publicity of above incentive. (b) Other terms and conditions shall be as specified under General Terms and Conditions. (c) Tariff Schedule LV-4 (d) LT INDUSTRIAL (e) Applicability: (f) Tariff LV-4 is applicable to light, fan and power for operating equipment used by printing press and any other industrial establishments and workshops (where any processing or manufacturing takes place including tyre re-treading). These tariffs are also applicable to cold storage, gur (jaggery) making machines, flour mills, Masala Chakkies, hullers, khandsari units, ginning and pressing units, Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 15

16 sugar cane crushers (including sugar cane juicing machine), power looms, dal mills, besan mills, and ice factories and any other manufacturing or processing units (excluding bottling plant) producing/processing food items or processing agriculture produce for preservation/increasing its shelf life and Dairy units ( where milk is processed other than chilling, pasteurization etc to produce other end products of milk.) Tariff: For Non seasonal and seasonal consumers Category of consumers Monthly Fixed Charges (in Rs.) Energy Charges (Rs. per unit) Urban Areas Rural Areas Urban/Rural Areas 4.1 Non seasonal consumers 4.1 a LT industries having connected load up to 25 HP per HP per HP b(i) Demand based tariff (Contract demand and connected load up to 100HP) 180 per KW Or 144 per kva 126 per KW Or 101 per kva 5.00 of billing demand of billing demand 4.1b(ii) Demand based tariff (Contract demand up to 100 HP and connected load more than 100 HP but not exceeding 150 HP) 313 per KW Or 250 per kva of billing demand 219 per KW Or 175 per kva of billing demand c Demand based tariff (Contract demand more than 100 HP & up to 150 HP with connected load not exceeding 150HP*) (For existing consumers only) 375 per KW Or 300 per kva of billing demand 263 per KW Or 210 per kva of billing demand d Temporary connection 400 per HP 280 per HP 6.00 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 16

17 *In addition, these consumers are also liable to pay transformation 3% and transformer rent as per the MPERC ( Recovery of expenses and other charges for providing electric line or plant for the purpose of giving supply ) Regulations (Revision-I), Seasonal Consumers (period of season shall not exceed 180 days continuously). If the declared season or off-season spreads over two tariff periods, then the tariff for the respective period shall be applicable. 4.2 a During season Normal tariff as for Non seasonal consumers 4.2 b During Off -season Normal tariff as for Non-seasonal consumers on 10% of contract demand or actual recorded demand, whichever is more Normal tariff as for Non seasonal consumers Normal tariff as for Non-seasonal consumers on 10% of contract demand or actual recorded demand, whichever is more Normal tariff as for Non seasonal consumers 120% of Normal Tariff as for non seasonal Terms and Conditions: (a) The maximum demand of the consumer in each month shall be reckoned as four times the largest amount of kilovolt ampere hours delivered at the point of supply of the consumer during any continuous fifteen minutes in that month. (b) Any consumer may opt for demand based tariff, however for the consumers having connected load above 25 HP, demand based tariff is mandatory and the licensee shall provide Tri vector/ Bi vector Meter capable of recording Demand in kva/ KW, KWH, kvah and Time of Use consumption (c) Demand based tariff for contract demand above 100 HP & up to 150 HP is for existing consumers only under LV 4.1 c category. No new connection under this category be released. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 17

18 (d) Minimum Consumption: Shall be as per following: (d.1) For connected load up to 100HP i. For LT Industries in rural areas: The consumer shall guarantee a minimum annual consumption (KWH) based on 240 units per HP or part thereof of contract demand irrespective of whether any energy is consumed or not during the year. ii. For LT Industries in urban areas: The consumer shall guarantee a minimum annual consumption (KWH) based on 480 units per HP or part thereof of contract demand irrespective of whether any energy is consumed or not during the year. iii. The consumer shall be billed monthly minimum 20 units per HP per month in rural area and 40 units per HP per month in urban area in case the actual consumption is less than above specified units. (d.2) For connected load more than 100HP up to 150HP i. For LT Industries in rural areas: The consumer shall guarantee a minimum annual consumption (KWH) based on 300 units per HP or part thereof of contract demand irrespective of whether any energy is consumed or not during the year. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 18

19 ii. iii. For LT Industries in urban areas: The consumer shall guarantee a minimum annual consumption (KWH) based on 480 units per HP or part thereof of contract demand irrespective of whether any energy is consumed or not during the year. The consumer shall be billed monthly minimum 25 units per HP per month or part thereof of contract demand in rural area and 40 units per HP per month or part thereof of contract demand in urban area in case the actual consumption is less than above specified units. (d.3) During the month in which the annual minimum guaranteed consumption is achieved, no further billing of monthly minimum consumption shall be done in subsequent months of the financial year. (d.4) In the month in which cumulative actual or billed monthly consumption of the consumer exceeds the cumulative monthly prorated minimum annual guaranteed consumption and if the consumer was charged in earlier months for tariff minimum consumption on account of his actual consumption being less, then such tariff minimum difference of energy charge shall be adjusted in the month in which cumulative actual or billed monthly consumption exceeds cumulative monthly prorated minimum guaranteed annual consumption. If such tariff minimum difference does not get fully adjusted in that month, Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 19

20 such adjustments shall be continued to be done in subsequent months of the financial year. (e) Additional Charge: Shall be as per following: i. The consumer availing supply at demand based tariff shall, restrict his actual maximum demand within the contract demand. In case the maximum demand recorded exceeds the contract demand, the consumer shall pay 2 times the tariff for fixed charges and energy charges for consumption corresponding to excess demand and while doing so, the other terms and conditions of tariff, if any, shall also be applicable on the said excess demand. The tariff minimum charge on account of excess demand recorded in a particular month shall not be adjusted in subsequent months. Example: If a consumer having a contract demand of 50 KW records a maximum demand of 60 KW, the billing of fixed charges and energy charges for excess demand of (60 KW- 50KW)= 10 KW shall be as follows: o Fixed charges for excess demand= (fixed charges for contract demand*10 KW/contract demand)*2 o Energy charges for excess demand = (total consumption recorded during the month* 10 KW/Maximum recorded demand)*2* energy charge unit rate Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 20

21 ii. The above billing of Excess Demand at 2 times the normal tariff is without prejudice to the licensee s right to ask for revision of agreement and other such rights that are provided under the regulations notified by the Commission or any other law. (f) Other terms and conditions shall be as specified under General Terms and Conditions. (g) Other Terms and conditions for seasonal consumers: i. The consumer has to declare months of season and off season for the financial year within 60 days of issue of tariff order and inform the same to the licensee. ii. The seasonal period once declared by the consumer cannot be changed during the financial year. iii. This tariff is not applicable to composite units having seasonal and other category of loads. iv. The consumer will be required to restrict his monthly off season consumption to 15% of the highest of average monthly consumption during the preceding three seasons. In case this limit is exceeded in any off season month, the consumer will be billed under Non seasonal tariff for the whole financial year as per the tariff in force. v. The consumer will be required to restrict his maximum demand during off season up to 30 % of the contract demand. In case Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 21

22 the maximum demand recorded in any month of the declared off season exceeds this limit, the consumer will be billed under Non seasonal tariff for the whole financial year as per the tariff in force. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 22

23 Tariff Schedule LV - 5 AGRICULTURAL AND OTHER THAN AGRICULTURAL Applicability: The tariff LV-5.1 shall apply to agricultural pump connections, chaff cutters, threshers, winnowing machines, seeding machines and irrigation pumps of lift irrigation schemes including water drawn by agriculture pumps for use by cattle. The tariff LV-5.2 shall apply to connection for nurseries growing flowers/ plants/ saplings/ fruits, fisheries ponds, aquaculture, sericulture, hatcheries, poultry farms, cattle breeding farms, grasslands and mushroom growing farms and those dairy units only where extraction of milk and its processing such as chilling, pasteurization etc. is done. Tariff: S. No. Sub-Category Monthly Fixed charges ( in Rs.) Energy charges (Rs. per unit) 5.1 For agricultural use a) First 300 units per month NIL 4.30 b) Rest of the units in the month NIL 4.80 c) Temporary connections NIL 5.30 d) DTR metered group consumers NIL For other than agricultural use a) Up to 25 HP in urban areas 80 per HP 4.50 b) Up to 25 HP in rural areas 56 per HP 4.50 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 23

24 c) Demand based tariff ( Contract demand and connected load up to 100 HP) in urban areas d) Demand based tariff (Contract demand and connected load up to 100 HP) in rural areas 180 per KW Or 144 per kva of billing demand 126 per KW Or 101 per kva of billing demand Basis of billing of energy of un-metered consumption: Assessed consumption for billing of un-metered agriculture consumers shall be as under: Particulars No. of units per HP of sanctioned load per month Urban Area Rural Area Type of Pump Motor Nature of connection April 2011 May 2011 Apr to Sept Oct 2011 to Mar 2012 April 2011 May 2011 Apr to Sept Oct 2011 to Mar 2012 Three Phase Single Phase Permanent Temporary Permanent Temporary Terms and conditions: (a) Consumers opting for temporary supply shall have to pay the charges in advance for three months including those who request to avail connection for one month only subject to replenishment from time to time for extended period and adjustment as per final bill after Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 24

25 disconnection. Regarding temporary connection for the purpose of thrashing the crops, temporary connection for a period of one month can be served at the end of Rabi and Kharif seasons only with payment of one month s charges in advance. (b) Following incentive* shall be given to the metered agricultural consumers on installation of energy saving devices -- S. No. Particulars of Energy Saving Devices Rate of rebate in tariff 1. ISI / BEE star labelled motors for pump sets 15 paise per unit 2. ISI / BEE star labelled motors for pump sets and use of frictionless PVC pipes and foot valve 3. ISI / BEE star labelled motors for pump sets and use of frictionless PVC pipes and foot valves along with installation of shunt capacitor of appropriate rating 30 paise per unit 45 paise per unit *Incentive shall be allowed on the consumer s contribution part of the normal tariff (full tariff minus amount of Govt. subsidy per unit, if any) for installation of energy saving devices under demand side management. This incentive will be admissible only if full bill is paid within due dates failing which all consumed units will be charged at normal rates. Incentive will be admissible from the month following the month in which Energy Saving Devices are put to use and its verification by a person authorized by the licensee. The licensee is required to arrange wide publicity to above incentive in rural areas. The licensee is required to place quarterly information regarding incentives provided on its web site. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 25

26 (c) Minimum consumption (i) For Metered agricultural consumers (LV-5.1): The consumer shall guarantee a minimum consumption of 25 units per HP or part thereof of connected load per month for the months from July to September and 75 units per HP or part thereof of connected load per month for the remaining months irrespective of whether any energy is consumed or not during the year. (ii) For other than agricultural use (LV-5.2) : a) The consumer will guarantee a minimum annual consumption (KWH) based on 240 units/hp or part thereof of contract demand in rural areas and 480 units/hp or part thereof of contract demand in urban areas irrespective of whether any energy is consumed or not during the year. b) The consumer shall be billed monthly minimum 20 units per HP per month in rural area and 40 units per HP per month in urban area in case the actual consumption is less than monthly minimum consumption (KWH). c) During the month in which the annual minimum guaranteed consumption is achieved, no further billing of monthly minimum consumption shall be done in subsequent months of the financial year. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 26

27 d) In the month in which cumulative actual or billed monthly consumption of the consumer exceeds the cumulative monthly prorated minimum annual guaranteed consumption and if the consumer was charged in earlier months for tariff minimum consumption on account of his actual consumption being less, then such tariff minimum difference of energy charge shall be adjusted in the month in which cumulative actual or billed monthly consumption exceeds cumulative monthly prorated minimum guaranteed annual consumption. If such tariff minimum difference does not get fully adjusted in that month, such adjustments shall be continued to be done in subsequent months of the financial year. (d) Additional charge for other than agricultural use (LV-5.2): The consumer availing supply at demand based tariff shall, restrict his actual maximum demand within the contract demand. In case the maximum demand recorded exceeds the contract demand, the consumer shall pay 2 times the tariff for fixed charges and energy charges for consumption corresponding to excess demand and while doing so, the other terms and conditions of tariff, if any, shall also be applicable on the said excess demand. The tariff minimum charge on account of excess demand recorded in a particular month shall not be adjusted in subsequent months. Example: If a consumer having a contract demand of 50 KW records a maximum demand of 60 KW, the billing of fixed Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 27

28 charges and energy charges for excess demand of (60 KW- 50KW)= 10 KW shall be as follows: a) Fixed charges for excess demand= (fixed charges for contract demand*10 KW/contract demand)*2 b) Energy charges for excess demand = (total consumption recorded during the month* 10 KW/maximum recorded demand)*2* energy charge unit rate (e) Specific conditions for DTR metered consumers: a. All the consumers connected to the DTR shall pay the energy charges for the units worked out based on their actual connected load. b. The Licensee will obtain consent of such connected consumers for billing as per procedure specified in (a) above. (f) One lamp up to 40 W is permitted at or near the pump in the power circuit. (g) The use of three phase agriculture pump by installing external device during the period when the supply is available on single phase, shall be treated as illegal extraction of energy and action as per prevailing rules and regulations shall be taken against the defaulting consumer. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 28

29 (h) Other terms and conditions shall be as specified under General Terms and Conditions. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 29

30 GENERAL TERMS AND CONDITIONS OF LOW TENSION TARIFF 1. Rural Areas mean feeder declared by the Distribution Licensee for receiving supply as per rural discipline under load regulatory measures. 2. Rounding off: All bills will be rounded off to the nearest rupee i.e. up to 49 paise shall be ignored and 50 paise upwards shall be rounded off to next Rupee. 3. Billing Demand: In case of demand based tariff, the billing demand for the month shall be the actual maximum kva demand of the consumer during the month or 90% of the contract demand, whichever is higher. The billing demand shall be rounded off to the nearest integer number i.e. fraction of 0.5 or above will be rounded to next higher integer and the fraction of less than 0.5 shall be ignored. 4. Fixed charges billing: Fractional load for the purposes of billing of fixed charges shall be rounded off to next higher integer unless specified otherwise. The connected/sanctioned load for un-metered agricultural consumers will be rounded to next higher integer for the purpose of the assessment of energy. 5. Other Terms and Conditions: (a) For advance payment made before commencement of consumption period for which bill is prepared, a rebate of 1 % per month on the amount (excluding security deposit) which remains with the licensee at the end of calendar month shall be credited to Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 30

31 the account of the consumer after adjusting any amount payable to the licensee. (b) (c) (d) (e) Incentive for prompt payment: An incentive for prompt 0.25% of the bill amount (excluding electricity duty and Cess) shall be given in case the payment is made at least 7 days in advance of the due date of payment where the current month billing amount is equal to or greater than Rs. One lac. The consumers in arrears shall not be entitled for this incentive. The Sanctioned load or Connected load or Contract Demand should not exceed 75 KW / 100 HP except where a higher limit is specified. If the consumer exceeds his load / demand beyond this ceiling on more than two occasions in two billing months during the tariff period, the Licensee may insist on the consumer to avail HT supply. Metering Charges shall be billed as per schedule of Metering and Other Charges as prescribed in MPERC (Recovery of expenses and other charges for providing electric line or plant used for the purpose of giving supply), Regulations (Revision-I),2009. Part of a month will be reckoned as full month for purpose of billing. In case the cheque presented by the consumer is dishonoured, without prejudice to Licensee s rights to take recourse to such other action as may be available under the relevant law, a service charge of Rs. 150 per cheque shall be levied in addition to delayed payment surcharge Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 31

32 (f) (g) (h) (i) Other charges as stated in schedule of miscellaneous charges shall also be applicable. Welding surcharge is applicable to installations with welding transformers, where the connected load of welding transformers exceeds 25% of the total connected load and where suitable capacitors of prescribed capacity have not been installed to ensure power factor of not less than 0.8 (80%) lagging. Welding Surcharge of 120 (one hundred twenty) paise per unit shall be levied for the consumption of the entire installation during the month. For purposes of computing the connected load in KW of the welding transformers, a power factor of 0.6 (60%) shall be applied to the maximum current or kva rating of such welding transformers. Existing LT power consumer shall ensure that LT capacitor of proper rating is provided. In this regard, Madhya Pradesh Electricity Supply Code 2004 may be referred for guidance. It shall be the responsibility of the consumer to ensure that overall average power factor during any month is not less than 0.8 (80%) failing which the consumer shall be liable to pay low power factor surcharge on the entire billed amount against energy charges during the month at the rates given below: 1. For the consumer whose meter is capable of recording average power factor: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 32

33 a. 1 % of energy charges for every 1% fall in power factor below 80% up to 75 %. b. Surcharge of 5% plus 1.25% of energy charges for every 1% fall in power factor below 75% up to 70%. c. The maximum limit of surcharge will be 10 % of the energy charges billed during the month. 2. For LT consumer having meter not capable of recording average power factor: The consumer shall ensure that LT capacitors of proper rating are provided and are in good working condition. In this regard, Madhya Pradesh Electricity Supply Code, 2004 may be referred for guidance. In case of failure to meet the above criteria, the consumer would be levied a low power factor surcharge of 10% on the entire billed amount against energy charges during the month and would be continued to be billed till such time the consumer meets the above criteria. (j) Levy of welding / power factor surcharge as indicated hereinabove shall be without prejudice to the rights of the Licensee to disconnect the consumer s installation, if steps are not taken to improve the power factor by installing suitable shunt capacitors. (k) Load Factor incentive: Following slabs of incentive shall be allowed for all the categories of consumers billed under demand based tariff: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 33

34 Load factor For load factor above 25% and up to 30 % load factor on contract demand For load factor above 30% and up to 40 % load factor on contract demand For load factor above 40% load factor on contract demand Concession in energy charges 12 paise per unit concession on the normal energy charges for all energy consumption over and above 25% load factor during the billing month In addition to load factor concession available up to 30% load factor, concession at the rate of 24 paise per unit on the normal energy charges for all energy consumption over and above 30 % load factor during the billing month In addition to load factor concession available up to 40% load factor, concession at the rate of 36 paise per unit on the normal energy charges for all energy consumption over and above 40% load factor during the billing month The load factor shall be calculated as per the following formula: Monthly consumption X 100 Load factor (%) = No. of hours in the billing month X Demand X PF i. Monthly consumption shall be units consumed in the month excluding those received from sources other than Licensee ii. iii. No of Hours in billing month shall exclude period of scheduled outages in hours. Demand shall be maximum demand recorded or contract demand whichever is higher Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 34

35 iv. Power factor shall be 0.8 or actual average monthly power factor whichever is higher Note: The load factor (%) shall be rounded off to the nearest lower integer. The billing month shall be the period in number of days between the two consecutive dates of meter readings taken for the purpose of billing to the consumer for the period under consideration as a month. (l) (m) (n) In case of any dispute on applicability of tariff on a particular LT category, the decision of the Commission shall be final. The tariff does not include any tax, cess or duty, etc. on electrical energy that may be payable at any time in accordance with any law then in force. Such charges, if any, shall also be payable by the consumer in addition to the tariff charges and applicable miscellaneous charges. Delayed payment Surcharge for all categories: Surcharge at the rate of 2% per month or part thereof on the amount outstanding (including arrears) will be payable if the bills are not paid up to due date subject to a minimum of Rs.5/- per month for total outstanding bill amount up to Rs. 500/- and Rs 10/- per month for amount of bill more than Rs.500/. The part of a month will be reckoned as full month for the purpose of calculation of delayed payment surcharge. The delayed payment surcharge will not be levied for the period after supply to the consumer is permanently disconnected. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 35

36 (o) (p) In case of conversion of LT connection into HT connection, it is mandatory on the part of both the consumer and the licensee to get the HT agreement executed before availing supply at HT. Power Factor Incentive: If the average monthly power factor of the consumer is above 85%, incentive shall be payable for each one percent by which the average monthly power factor exceeds 85 % as follows: Power Factor Above 85% up to 95% Above 95% Incentive payable 0.5 % (half percent) on the total amount of bill under the head of Energy Charges for each 1% increase in power factor. In addition to power factor incentive up to 95%, incentive of 1 % (one percent) on the total amount of bill under the head of Energy Charges for each 1% increase in power factor. e.g. 1. If the average monthly power factor is 92 %, the incentive payable shall be 3.5 % of energy charges. 2. If the average monthly power factor is 97 %, the incentive payable shall be 5 % plus 2%= 7% of energy charges. For this purpose, the average monthly power factor is defined as the ratio in percentage of total Kilo Watt hours to the total kilo volt Ampere hours recorded during the month. The power factor (%) shall be rounded off to the nearest lower integer. (q) Time of Day Surcharge / Rebate: This scheme is applicable to the categories of consumers where demand based tariff is Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 36

37 applicable. This is applicable for different periods of the day i.e. normal period, peak load and off-peak load period. The surcharge / rebate on energy charges according to the period of consumption shall be as per following table: S. No. Peak / Off-peak Period 1. Evening peak load period (6PM to 10 PM) 2. Off peak load period (10 PM to 6 AM next day) Surcharge / Rebate on energy charges on energy consumed during the corresponding period 20% of Normal rate of Energy Charge as Surcharge Normal rate of Energy Charge Note: Fixed charges shall always be billed at normal rates i.e. ToD Surcharge / Rebate shall not be applied on Fixed Charges (r) (s) Use of mix loads in one connection: Unless otherwise permitted specifically in the tariff category, the consumer requesting for use of mix loads for different purposes shall be billed for the purpose for which the tariff is higher. However, pursuant to interim order dated in W.P.no.6006/2008 by the Hon ble High Court of MP, LV-1 domestic tariff shall be applicable to the houses of advocates having professional chambers until further orders of Hon ble High court of M.P. Consumers receiving supply under urban discipline shall be billed urban tariff. (t) All conditions prescribed herein shall be applicable to the consumer notwithstanding if any contrary provisions exist in the agreement entered into by the consumer with the licensee. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 37

38 6. Additional conditions for Temporary Supply at LT: (a) (b) (c) Temporary supply cannot be demanded by a prospective/ existing consumer as a matter of right but will normally be arranged by the licensee when a requisition giving due notice is made. The temporary additional supply to an existing consumer also shall be treated as a separate service and charged subject to following conditions. However service under Tatkal Scheme shall be made available within 24 hours according to the charges specified in the order of the Commission regarding Schedule of Miscellaneous Charges. Fixed Charge and energy charge for temporary supply shall be billed at 1.5 times the normal charges as applicable to relevant category if not specified otherwise specifically. Estimated bill amount is payable in advance before serving the temporary connection subject to replenishment from time to time and adjustment as per final bill after disconnection. No interest shall be given to consumers for this advance payment. (d) The Sanctioned load or connected load shall not exceed 75 KW / 100 HP. (e) The month for the purpose of billing of charges for temporary supply shall mean 30 days from the date of connection. Any period less than 30 days shall be treated as full month for the purpose of billing. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 38

39 (f) (g) (h) Connection and Disconnection Charges and other Miscellaneous charges shall be paid separately as may be specified in the Schedule of Miscellaneous Charges. Load factor concession shall not be allowed on the consumption for temporary connection. Power factor incentive/penalty shall be applicable at the same rate as applicable for permanent connection. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 39

40 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited Indore ARR/TARIFF PETITION FY-12 PROPOSED TARIFF SCHEDULE-HT Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 40

41 ANNEXURE TO TARIFF PETITION FOR FINANCIAL YEAR PROPOSED TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Tariff Category Page HV 1 Railway Traction 43 HV 2 Coal Mines 46 HV 3 Industrial and Non Industrial 49 HV 3.1 Industrial 49 HV 3.2 Non-Industrial 49 HV 3.3 Shopping Mall 49 HV 4 Seasonal 52 HV 5 Irrigation and Public Water Works 56 HV 5.1 Public Water Works, Lift Irrigation Schemes and Group Irrigation 56 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 41

42 HV 5.2 Other than Agricultural Users 56 HV 6 Bulk Residential Users 59 HV-7 Bulk Supply to Exemptees 61 Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 42

43 Schedules for High Tension Consumers Tariff Schedule-- HV-1 RAILWAY TRACTION:- Applicability: This Tariff shall apply to the Railways for Traction loads only. Tariff: S. No. Category of consumer Monthly Fixed charges (Rs. per kva of billing demand per month) Energy charges (Rs. per unit) 1 Railway Traction on 132kV / 220 kv Specific Terms and Conditions: (a) In order to give impetus to electrification of Railway network in the State, a rebate of 10% in energy charges for new Railway traction projects shall be allowed for a period of five years from the date of connection for such new projects for which agreements for availing supply from licensee are finalized during FY The rebate provided in earlier orders shall remain in force at the rate and for the duration as mentioned in those tariff orders. (b) The dedicated feeder maintenance charges shall not be applicable. (c) Guaranteed Annual Minimum Consumption shall be 1500 units (Kwh) per kva of contract demand. The method of billing of Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 43

44 minimum consumption shall be as given in General Terms and Conditions of High Tension tariff. (d) Power Factor Penalty: i. If the average monthly power factor of the consumer falls below 90 percent, penalty will be levied at the rate of one percent of total energy charges for the month for each one percent fall in the average monthly power factor below 90 percent. ii. If the average monthly power factor of the consumer falls below 85 percent, the consumer shall be levied a penalty of 5% (five percent) 2% (two percent) for each one percent fall in his average monthly power factor below 85 percent, on the total amount of bill under the head of Energy Charges. This penalty shall be subject to the condition that overall penalty on account of low power factor does not exceed 35%. iii. For this purpose, the average monthly power factor is defined as the ratio expressed in percentage of total Kilo Watt hours recorded to the total kilo volt Ampere hours recorded during the billing month. This ratio (%) shall be rounded off to the nearest integer figure and the fraction of 0.5 or above will be rounded to next higher integer and the fraction of less than 0.5 shall be ignored. iv. Notwithstanding what has been stated above, if the average power factor of a new consumer is found to be less than 90% at any time during the first 6 (six) months from the date of Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 44

45 connection, the consumer shall be entitled to a further maximum period of six months to improve it to not less than 90% subject to following conditions: This further period of six months shall be reckoned from the date on which the average power factor was found for the first time to be less than 90%. In all cases, the consumer will be billed penal charges for low power factor, but in case the consumer maintains the average power factor in any consecutive four months during the said further period of 6 months to not less than 90%, the charges on account of low power factor billed during the said initial six months period, shall be withdrawn and credited in next monthly bills. The facility, as mentioned herein, shall be available not more than once to new consumers whose average power factor is less than 90% at any time during initial 6 months from the date of connection. Thereafter, the charges on account of low average power factor, if found less than 90%, shall be payable as by any other consumer. v. Other terms and conditions shall be as mentioned in the General Terms and Conditions of High Tension Tariff. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd, Indore P a g e 45

Retail Supply Tariff Order FY 2013-14 TARIFF SCHEDULES. Madhya Pradesh Electricity Regulatory Commission Page 156

Retail Supply Tariff Order FY 2013-14 TARIFF SCHEDULES. Madhya Pradesh Electricity Regulatory Commission Page 156 TARIFF SCHEDULES Madhya Pradesh Electricity Regulatory Commission Page 156 Annexure-2 (Tariff Schedules for Low Tension Consumers) ANNEXURE TO THE TARIFF ORDER PASSED BY MPERC FOR FINANCIAL YEAR 2013-14

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2006-07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

Fixed Charge (In Rupees per kwh)

Fixed Charge (In Rupees per kwh) 1. TARIFF SCHEDULE The detailed schedules of approved tariff are as given in this part. Tariff Schedule for Low Tension (LT) Consumers This tariff schedule is applicable to all LT consumers as follows:

More information

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015 ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, GENERAL AND EXTRA HIGH TENSION Effective from 1 st April, 2015 1. The tariff figures indicated in this tariff schedule

More information

Torrent Power Limited Distribution, Ahmedabad Truing Up for FY 2012-13 and Determination of Tariff for FY 2014-15

Torrent Power Limited Distribution, Ahmedabad Truing Up for FY 2012-13 and Determination of Tariff for FY 2014-15 ANNEXURE: TARIFF SCHEDULE FOR FY 2014-15 TARIFF SCHEDULE EFFECTIVE FROM 1 st May, 2014 TARIFF SCHEDULE FOR AHMEDABAD - GANDHINAGAR LICENSE AREA OF TORRENT POWER LIMITED- AHMEDABAD TARIFF FOR SUPPLY OF

More information

Fixed/Demand Charge per month (Rs./Connection) First 15 kwh 1.00 20.00 Balance above 15 kwh 1.50 20.00. Energy/Variable Charges (Rs.

Fixed/Demand Charge per month (Rs./Connection) First 15 kwh 1.00 20.00 Balance above 15 kwh 1.50 20.00. Energy/Variable Charges (Rs. APPENDEX Tariff schedule 1. LT Supply Category -1: Kutir Jyoti Applicability: Applicable to all households who have been given connection under Kutir Jyoti Scheme or similar connection under any scheme

More information

MAHARASHTRA STATE ELECTRICITY BOARD

MAHARASHTRA STATE ELECTRICITY BOARD MAHARASHTRA STATE ELECTRICITY BOARD LOW TENSION TARIFF BOOKLET APPLICABLE WITH EFFECT FROM 01/12/2003 COST: Rs. 20/- 1 MAHARASHTRA STATE ELECTRICITY BOARD (WITH EFFECT FROM 1 st December 2003) The Maharashtra

More information

THE BEST UNDERTAKING (Of the Brihan Mumbai Mahanagarpalika) SCHEDULE OF ELECTRICITY TARIFFS (With Effect from 1 September, 2013)

THE BEST UNDERTAKING (Of the Brihan Mumbai Mahanagarpalika) SCHEDULE OF ELECTRICITY TARIFFS (With Effect from 1 September, 2013) THE BEST UNDERTAKING (Of the Brihan Mumbai Mahanagarpalika) SCHEDULE OF ELECTRICITY TARIFFS (With Effect from 1 September, 2013) The Maharashtra Electricity Regulatory Commission, in exercise of the powers

More information

Tariff Booklet The Tata Power Company Limited (W ith effect from May 1,2007) THE TATA POWER COMPANY LIMITED TARIFF BOOKLET

Tariff Booklet The Tata Power Company Limited (W ith effect from May 1,2007) THE TATA POWER COMPANY LIMITED TARIFF BOOKLET (W ith effect from May 1,2007) THE TATA POWER COMPANY LIMITED TARIFF BOOKLET APPLICABLE WITH EFFECT FROM MAY 1,2007 Price:Rs.20/-(Twenty)only Page 77 of 93 The Maharashtra Electricity Regulatory Commission

More information

How To Charge For Non Domestic Service

How To Charge For Non Domestic Service JPR5-629 JAIPUR VIDYUT VITRAN NIGAM LIMITED (COMMERCIAL WING) No. JPD/SE(C)/C-I/F. /D. 1328 Dated: 7.10.2011 TARIFF FOR SUPPLY OF ELECTRICITY 2011 In pursuance of the order dated 8 th September, 2011 of

More information

ARR & Tariff for FY 2013-14, Review for FY 2012-13, Provisional true-up FY 2011-12 and True-up for FY 2010-11 & FY 2009-10 for EDP

ARR & Tariff for FY 2013-14, Review for FY 2012-13, Provisional true-up FY 2011-12 and True-up for FY 2010-11 & FY 2009-10 for EDP 15. Tariff Schedule TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION AND HIGH TENSION GENERAL 1. The tariff indicated in this tariff schedule is the tariff rate payable by the consumers of Union Territory

More information

Schedule of Tariff and. (Applicable w.e.f. 1-4-2013)

Schedule of Tariff and. (Applicable w.e.f. 1-4-2013) Schedule of Tariff and Schedule of General & Services Charges (Applicable w.e.f. 1-4-2013) Himachal Pradesh State Electricity Board Ltd. Vidyut Bhawan, Shimla-171004 1 SECTION -I HIMACHAL PRADESH STATE

More information

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** Secy/Tariff/ Date..03.

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** Secy/Tariff/ Date..03. ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** From To The Managing Director, NESCO At/Po : Januganj Dist : Balasore - - - - - - - - - -

More information

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 *****************

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** Case Nos. 61,62,63,64, 69, 70, 71 & 72/2014/ 348 Date.23.03.2015 To The Authorized Officer,

More information

DAKSHIN HARYANA BIJLI VITRAN NIGAM. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33 Dated: 9/6/2014

DAKSHIN HARYANA BIJLI VITRAN NIGAM. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33 Dated: 9/6/2014 DAKSHIN HARYANA BIJLI VITRAN NIGAM Sales Circular No. D- 26/2014 From To CE/Commercial, DHBVN, Hisar. All CEs/SEs/XENs/SDOs/OP, JEs-I, Incharge Sub office, in DHBVN. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33

More information

ELECTRICITY TARIFF (Effective from September 1, 1999.)

ELECTRICITY TARIFF (Effective from September 1, 1999.) ELECTRICITY TARIFF (Effective from September 1, 1999.) * Payment period of electricity bill without surcharge is 30 days. * For late payment, surcharge @ 2% per month is applicable to all classes consumers.

More information

(Annexure A ) Approved Tariff Schedule MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.

(Annexure A ) Approved Tariff Schedule MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. (Annexure A ) Approved Tariff Schedule MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. (WITH EFFECT FROM AUGUST 1, 2012) The Maharashtra Electricity Regulatory Commission, in exercise of the powers

More information

Notified on 30.08.2013

Notified on 30.08.2013 Notified on 30.08.2013 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Dated 07 th August, 2013 MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2013 No. 2164 /MPERC/2013. In exercise of powers conferred

More information

COMMERCIAL CIRCULAR No. 175. Revision in Electricity Tariff Implementation thereof.

COMMERCIAL CIRCULAR No. 175. Revision in Electricity Tariff Implementation thereof. Maharashtra State Electricity Distribution Co. Ltd. Prakashgad, Plot No.G-9, Bandra (East), Mumbai 400 051 (P) 26474753, (O) 26474211 / 26472131, Fax- 26472366, E-Mail: cecomm@mahadiscom.in REF. PR-3 /

More information

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM BY AUTHORISED PERSONS Effective from 1 October 2011 to 30 September

More information

DELHI ELECTRICITY REGULATORY COMMISSION Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi- 110017.

DELHI ELECTRICITY REGULATORY COMMISSION Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi- 110017. DELHI ELECTRICITY REGULATORY COMMISSION Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi- 110017. F.11(1065)/DERC/2013-14/ Petition No. 01/2014 In the matter of: Petition for Truing up of

More information

Consumer category. Name of the Tariff Scheme. Quarterly consumption in KWH. Fixed Charge/ Demand Charge * in Rs/KVA/mon NOT APPLICABLE.

Consumer category. Name of the Tariff Scheme. Quarterly consumption in KWH. Fixed Charge/ Demand Charge * in Rs/KVA/mon NOT APPLICABLE. WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ( A Government of West Bengal Enterprise) Vidyut Bhawan, Block-DJ, Sector II, Bidhannagar, Kolkata 700091 Gist of Order dated 28.07.2009 passed

More information

ANNEXURE II THE TATA POWER COMPANY LIMITED. SCHEDULE OF ELECTRICITY TARIFFS (With Effect from June 1, 2009)

ANNEXURE II THE TATA POWER COMPANY LIMITED. SCHEDULE OF ELECTRICITY TARIFFS (With Effect from June 1, 2009) ANNEXURE II THE TATA POWER COMPANY LIMITED SCHEDULE OF ELECTRICITY TARIFFS (With Effect from June 1, 2009) The Maharashtra Electricity Regulatory Commission, in exercise of the powers vested in it under

More information

Gibraltar Electricity Authority ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010

Gibraltar Electricity Authority ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010 Legislation made under s. 10 and 14. ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010 (LN. ) Commencement 1.7.2010 Amending enactments None Relevant current provisions Commencement date EU Legislation/International

More information

Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL

Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL The revised tariff rates for supply of electricity in the State of Punjab during the year 2014-15 have been determined and the Tariff Orders

More information

GENERAL CONDITIONS OF TARIFF

GENERAL CONDITIONS OF TARIFF 1. General GENERAL CONDITIONS OF TARIFF Annexure-I Supply of electric energy to various categories of consumers shall be chargeable under the relevant Schedule of Tariffs. The particular Schedule applicable

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM SCHEDULE OF TARIFF AND TERMS AND CONDITIONS FOR RETAIL SUPPLY BY KSEB WITH EFFECT FROM 01.05.2013 to 31-3-2014 (Vide order No.OP 2 of 2013

More information

The Rajasthan Electricity (Duty) Act 1962

The Rajasthan Electricity (Duty) Act 1962 The Rajasthan Electricity (Duty) Act 1962 (1) Short title and extent.- (1) This Act may be called the Rajasthan Electricity (Duty) Act, 1962. (2) It extends to the whole of Rajasthan. (2) Definitions.-

More information

Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Regulatory Commission 1 Tamil Nadu Electricity Regulatory Commission No 19A, Rukmini Lakshmipathy Salai, Egmore, Chennai - 600 008. Phone:044-28411376, Website:http://www.tnerc.tn.nic.in/ Public Notice 1. The Tamil Nadu Generation

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION Order on Performance Review for FY 2013-14 and Determination of Aggregate Revenue Requirement And Tariff for Retail Sale of Electricity for FY 2014-15 of SOUTH BIHAR

More information

Our ACT electricity prices

Our ACT electricity prices Our ACT electricity prices Schedule of charges from 1 July 2015 Our ACT electricity prices The following rates apply from 1 July 2015. Accounts issued on or after that date will be charged on a pro-rata

More information

RESIDENTIAL SERVICE SCHEDULE R

RESIDENTIAL SERVICE SCHEDULE R SOUTH CENTRAL POWER COMPANY Lancaster, Ohio RESIDENTIAL SERVICE SCHEDULE R AVAILABILITY AND APPLICABILITY: This South Central Power Company (Cooperative) rate schedule is available and applicable for electric

More information

TARIFF SCHEDULE FOR THE 2014/2015 FINANCIAL YEAR

TARIFF SCHEDULE FOR THE 2014/2015 FINANCIAL YEAR TARIFF SCHEDULE FOR THE 2014/2015 FINANCIAL YEAR MBOMBELA LOCAL MUNICIPALITY CHARGES FOR ELECTRICITY Mbombela Local Municipality hereby gives notice in terms of Section 75A of the Local Government Municipal

More information

M.P. Electricity Regulatory Commission

M.P. Electricity Regulatory Commission CONSUMER S CHARTER The Consumer s Charter is a synopsis of rights available under the Electricity Act, 2003 to consumers of electricity. The objectives of the Consumer s Charter is to enable the consumers

More information

ELECTRICITY TARIFF - 2015

ELECTRICITY TARIFF - 2015 ANNEX - III ELECTRICITY TARIFF - 2015 K.E.R.C. ORDER DATED: 12.05.2014 Effective for the Electricity consumed from the first meter reading date falling on or after 01.05.2014 Bangalore Electricity Supply

More information

TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015

TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015 TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015 A SERVICE CONNECTION CHARGES Note : All charges in this Schedule are exclusive of GST. 1 Service Connection This includes cables, associated

More information

ELECTRICITY TARIFF - 2014

ELECTRICITY TARIFF - 2014 ANNEX - III ELECTRICITY TARIFF - 2014 K.E.R.C. ORDER DATED: 06.05.2013 Effective for the Electricity consumed from the first metering date falling on or after 01.05.2013 Bangalore Electricity Supply Company

More information

MIDVAAL LOCAL MUNICIPALITY

MIDVAAL LOCAL MUNICIPALITY MIDVAAL LOCAL MUNICIPALITY Determination of Charges Payable for Electricity July 2011 to Jun 2012 Tariff of Charges PART I: SUPPLY OF ELECTRICITY 1. BASIC CHARGES 1.1 Except as provided in 1.2 the following

More information

I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015

I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015 I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015 Contracted Capacity Peak Period ( /kwh) Off-Peak Period ( /kwh) Reactive Power ( /kvarh) Uncontracted Capacity 7 Uncontracted Standby Capacity CCS 8

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of

More information

RETAIL SUPPLY TARIFF RATES

RETAIL SUPPLY TARIFF RATES RETAIL SUPPLY TARIFF RATES (applicable with effect from 01-04-2013 to 31-03-2014 in respect of the four distribution licensees in the State of A.P. and the four rural electricity cooperatives in the State)

More information

THE JHARKHAND GAZETTE

THE JHARKHAND GAZETTE No. 385 THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY 6 Shrawan 1927 (s) Ranchi, Thursday the 28 th July, 2005 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI NOTIFICATION (ELECTRICITY

More information

COMPARISON OF PROPOSED TARIFFS

COMPARISON OF PROPOSED TARIFFS COMPAISON OF POPOSED TAIFFS WITH EFFECT FOM 1 JULY 2012 SCHEDULE 1 ELECTICITY 1. Domestic residential indigent consumers These tariffs are applicable to all residential indigent consumers with an ampere

More information

T.P. No. 1 of 2013 Order dated: 20-06-2013 (effective from 21-06-2013)

T.P. No. 1 of 2013 Order dated: 20-06-2013 (effective from 21-06-2013) TAMIL NADU ELECTRICITY REGULATORY COMMISSION ---------------------------------------------------------------- Determination of for Generation and Distribution ---------------------------------------------

More information

CITY OF MATLOSANA ELECTRICITY - SUPPLY TARIFF STRUCTURE ELECTRICITY - SUPPLY

CITY OF MATLOSANA ELECTRICITY - SUPPLY TARIFF STRUCTURE ELECTRICITY - SUPPLY CITY OF MATLOSANA ELECTRICITY - SUPPLY TARIFF STRUCTURE ELECTRICITY - SUPPLY PART A: Monthly charges for availability and use of Council's electricity supply system: 1 BASIC CHARGES (including pre-paid

More information

Customer Service Standards. for the. Supply of Electricity. Permanent Residents of. Residential Parks

Customer Service Standards. for the. Supply of Electricity. Permanent Residents of. Residential Parks Customer Service Standards for the Supply of Electricity to Permanent Residents of Residential Parks www.fairtrading.nsw.gov.au AUGUST 2006 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 PREAMBLE...1 1.2 LEGISLATIVE

More information

CIRCULAR INTRODUCING AND GUIDING THE ELECTRICITY PRICES

CIRCULAR INTRODUCING AND GUIDING THE ELECTRICITY PRICES THE MINISTRY OF INDUSTRY AND TRADE -------- No: 38/2012/TT-BCT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness ---------------- Hanoi, December 20, 2012 CIRCULAR INTRODUCING AND GUIDING

More information

COMPARISON OF PROPOSED TARIFFS

COMPARISON OF PROPOSED TARIFFS 5. ELECTICITY COMPAISON OF POPOSED TAIFFS WITH EFFECT FOM 1 JULY 2016 all tariffs are VAT exclusive SCHEDULE 1 5.1 Domestic residential indigent consumers These tariffs are applicable to all residential

More information

INTRODUCTION Tariff Objective Factors

INTRODUCTION Tariff Objective Factors TARIFF INTRODUCTION Tariff is the schedule or rates framed for supply of electrical energy to various consumers. Objective is to distribute the equitably the cost of generation amongst various consumers

More information

PR. No. 2/2012 30-03-2012. Press Release

PR. No. 2/2012 30-03-2012. Press Release TAMIL NADU ELECTRICITY REGULATORY COMMISSION No. 19-A, Rukmini Lakshmipathy Road, (TIDCO Complex), Egmore, Chennai 600 008 Phone: ++91-44-28411376 / 28411378 / 28411379 Fax: ++91-44-2841137 email: tnerc@nic.in

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA ELECTRICITY SUPPLY CODE, 2014 CHAPTER - I PRELIMINARY

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA ELECTRICITY SUPPLY CODE, 2014 CHAPTER - I PRELIMINARY KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 215/DD/T&D(Rev)2014/KSERC Dated, Thiruvananthapuram, 31.01.2014 PREAMBLE.- In exercise of the powers conferred by Section 50 read with Section

More information

Queensland Government Gazette

Queensland Government Gazette [555] Queensland Government Gazette Extraordinary PUBLISHED BY AUTHORITY ISSN 0155-9370 Vol. 366] Friday 18 July 2014 [No. 62 Electricity Act 1994 RETAIL ELECTRICITY PRICES FOR CUSTOMERS ON STANDARD RETAIL

More information

COMPARISON OF PROPOSED TARIFFS

COMPARISON OF PROPOSED TARIFFS COMPAISON OF POPOSED TAIFFS WITH EFFECT FOM 1 JULY 2013 all tariffs are VAT exclusive SCHEDULE 1 ELECTICITY PESENT POPOSED 1. Domestic residential indigent consumers These tariffs are applicable to all

More information

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire. AVAILABLE: Within established City Limits. AUSTIN UTILITIES Schedule (110) Issued 11/12/13 Supersedes (110) Issued 11/13/12 Sheet No. 1 of 1 RESIDENTIAL SERVICE APPLICABLE: To single-family residences

More information

may be prescribed by the Government, under the provisions of the sub section (1) of section 127 of the Act;

may be prescribed by the Government, under the provisions of the sub section (1) of section 127 of the Act; MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. CONDITIONS OF SUPPLY BASED ON THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE & OTHER CONDITIONS OF SUPPLY) REGULATIONS,

More information

Commercial Use Tariffs. Codes 15, 16, 17, 60, 61, 62, 63, 64 and 66

Commercial Use Tariffs. Codes 15, 16, 17, 60, 61, 62, 63, 64 and 66 Commercial Use Tariffs Codes 15, 16, 17, 60, 61, 62, 63, 64 and 66 Tariffs for Commercial Use Tariffs for Commercial Use are applicable to classes of customers whose economic activities are defined by

More information

RATLOU LOCAL MUNICIPALITY

RATLOU LOCAL MUNICIPALITY RATLOU LOCAL MUNICIPALITY CREDIT CONTROL AND DEBT COLLECTION POLICY Original Council Approval Date of Council Approval Resolution Number Effective Date Amended CONTENTS CREDIT CONTROL AND DEBT COLLECTION

More information

SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES

SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES TABLE OF CONTENTS SECTION I SECTION II SECTION III SECTION IV SECTION V SECTION VI SECTION VII SECTION VIII SECTION IX SECTION X SECTION

More information

AGANANG LOCAL MUNICIPALITY. Credit Control and Debt Collection Policy. Credit control and debt collection policy

AGANANG LOCAL MUNICIPALITY. Credit Control and Debt Collection Policy. Credit control and debt collection policy AGANANG LOCAL MUNICIPALITY Credit Control and Debt Collection Policy 1 1. PREAMBLE Whereas Section 96(a) of the Local Government: Municipal Systems Act, No 32 of 2000 (hereinafter referred to as the Systems

More information

ORISSA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR-751 012 N O T I F I C A T I O N

ORISSA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR-751 012 N O T I F I C A T I O N ORISSA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR-751 012 N O T I F I C A T I O N No. OERC/Engg-92/2003-In the exercise of powers conferred on it by Section 181 (2) (t), (v), (w) and (x) read with Part-VI

More information

ELECTRICITY DEPARTMENT

ELECTRICITY DEPARTMENT GOVERNMENT OF GOA CITIZEN'S CHARTER FOR ELECTRICITY DEPARTMENT......., CONTACT OFFICE:. Office of the Chief Electrical Engineer, Electricity Department, Govt. of Goa, Vidyut Bhavan, 3rd Floor, Panaji-Goa.

More information

ELECTRICITY [CH.194 35

ELECTRICITY [CH.194 35 ELECTRICITY [CH.194 35 ABACO ELECTRIC COMPANY LIMITED REGULATIONS (SECTION 60) [Commencement 15th May, 1972] 1. These Regulations may be cited as the Abaco Electric Company Limited Regulations. 2. In these

More information

Energy Act 2011 CHAPTER 1 CONTENTS PART 1 ENERGY EFFICIENCY GREEN DEAL

Energy Act 2011 CHAPTER 1 CONTENTS PART 1 ENERGY EFFICIENCY GREEN DEAL Energy Act 2011 CHAPTER 16 CONTENTS PART 1 ENERGY EFFICIENCY CHAPTER 1 GREEN DEAL Introductory 1 Green deal plans 2 Green deal plans: supplementary 3 Framework regulations Green deal plan 4 Assessment

More information

2.4 Information technology audit of Revenue Billing Software for low tension consumers in respect of Power Distribution Companies

2.4 Information technology audit of Revenue Billing Software for low tension consumers in respect of Power Distribution Companies 2.4 Information technology audit of Revenue Billing Software for low tension consumers in respect of Power Distribution Companies Highlights Due to inadequate input controls and lack of proper validation

More information

SCHEDULE OF RATES FOR ELECTRIC SERVICE

SCHEDULE OF RATES FOR ELECTRIC SERVICE Colo. PUC No. 9 105 South Victoria Original Sheet No. 1 1-888-890-5554 www.blackhillscorp.com SCHEDULE OF RATES FOR SERVICE BLACK HILLS/COLORADO UTILITY COMPANY, LP d/b/a BLACK HILLS ENERGY Title: Director

More information

SCHEDULE OF RATES FOR ELECTRIC SERVICE

SCHEDULE OF RATES FOR ELECTRIC SERVICE Colo. PUC No. 9 105 South Victoria Original Sheet No. 1 1-888-890-5554 www.blackhillscorp.com SCHEDULE OF RATES FOR SERVICE BLACK HILLS/COLORADO UTILITY COMPANY, LP d/b/a BLACK HILLS ENERGY Title: Director

More information

Review relating to Statutory Corporation

Review relating to Statutory Corporation Review relating to Statutory Corporation 6.2 Computerised energy billing system of Ranchi Electric Supply Circle of Jharkhand State Electricity Board Highlights Jharkhand State Electricity Board (JSEB)

More information

Standard Electricity Prices and Charges*

Standard Electricity Prices and Charges* Standard Electricity Prices and Charges* South West Interconnected System Effective 1 July 2012 *All prices quoted include GST and are subject to change. energy solutions you can use IMPORTANT: Customers

More information

CITY OF TRAVERSE CITY, MICHIGAN LIGHT AND POWER DEPARTMENT ELECTRIC SERVICE RATES

CITY OF TRAVERSE CITY, MICHIGAN LIGHT AND POWER DEPARTMENT ELECTRIC SERVICE RATES CITY OF TRAVERSE CITY, MICHIGAN LIGHT AND POWER DEPARTMENT ELECTRIC SERVICE RATES TABLE OF CONTENTS COMMUNITY SOLAR GARDEN PHASE I RATE... 1 POWER SERVICE COST RECOVERY... 2 RESIDENTIAL SERVICE... 3 RESIDENTIAL

More information

REQUEST FOR PUBLICATION OF REVISED TARIFF ORDER IN THE SIKKIM GOVT. GAZETTE.

REQUEST FOR PUBLICATION OF REVISED TARIFF ORDER IN THE SIKKIM GOVT. GAZETTE. To SUBJECT: The Joint Secretary, Home Department, Govt.of Sikkim, Gangtok. REQUEST FOR PUBLICATION OF REVISED TARIFF ORDER IN THE SIKKIM GOVT. GAZETTE. Sir, The Sikkim State Electricity Regulatory Commission

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Draft Maharashtra Electricity Regulatory Commission (Net Metering for Rooftop Solar Systems) Regulations, 2015 Electricity Act, 2003 No. MERC / Legal

More information

STANDARD ELECTRICITY PRICES AND CHARGES *

STANDARD ELECTRICITY PRICES AND CHARGES * STANDARD ELECTRICITY PRICES AND CHARGES * SOUTH WEST INTERCONNECTED SYSTEM *Effective 1 July 2015 *All prices quoted include GST and are subject to change. IMPORTANT: Customers need to assess each tariff

More information

Queensland COMMUNITY AMBULANCE COVER ACT 2003

Queensland COMMUNITY AMBULANCE COVER ACT 2003 Queensland COMMUNITY AMBULANCE COVER ACT 2003 Act No. 34 of 2003 Queensland COMMUNITY AMBULANCE COVER ACT 2003 TABLE OF PROVISIONS Section Page PART 1 PRELIMINARY Division 1 Introductory provisions 1

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity

More information

Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL

Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Connexus Energy Section III - Business Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Availability Available to non-residential customers for either single-phase

More information

STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND

STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND NOTICE This is unofficial English translation of KYEPCO s STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND ( tokutei kibo juyo hyojun kyokyu joken

More information

Section 4-Tariff proposals and approved tariff

Section 4-Tariff proposals and approved tariff 18. Tariff proposals Section 4-Tariff proposals and approved tariff As discussed in the foregoing paragraphs, even after taking the effect of improved Transmission & Distribution Losses, allowing of interest

More information

DRAFT DELHI ELECTRICITY SUPPLY CODE AND PERFORMANCE STANDARDS REGULATIONS, 2012

DRAFT DELHI ELECTRICITY SUPPLY CODE AND PERFORMANCE STANDARDS REGULATIONS, 2012 Delhi Electricity Supply Code and Performance Standards Regulations 2012 DRAFT DELHI ELECTRICITY SUPPLY CODE AND PERFORMANCE STANDARDS REGULATIONS, 2012 Delhi Electricity Supply Code and Performance Standards

More information

INDICATIVE COST OF DOING BUSINESS

INDICATIVE COST OF DOING BUSINESS INDICATIVE COST OF DOING BUSINESS Start-UP costs Incorporation of Company All companies are registered in Mauritius under the Companies Act 2001. The costs of incorporating a company are as follows: Incorporation

More information

Network Price List and Explanatory Notes

Network Price List and Explanatory Notes Essential Energy Network Price List (Excluding GST) Effective 1 July 2014 Tariff Code Obsolete tariffs on same rate Description Network Energy Energy Energy Energy Energy Energy Energy Peak Shoulder OffPeak

More information

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED SALES MANUAL & OTHER CONDITIONS OF SUPPLY SECTION-I Grant of Electric connection. INSTRUCTION No.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED SALES MANUAL & OTHER CONDITIONS OF SUPPLY SECTION-I Grant of Electric connection. INSTRUCTION No. HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED SALES MANUAL & OTHER CONDITIONS OF SUPPLY SECTION-I Grant of Electric connection INSTRUCTION No.1 Receipt of Application and Acknowledgement: 1.1 All the

More information

THE POST OFFICE SAVINGS ACCOUNT RULES 1981

THE POST OFFICE SAVINGS ACCOUNT RULES 1981 THE POST OFFICE SAVINGS ACCOUNT RULES 1981 (Issued vide MOF (DEA) Notification No.F.3/15/81-NS.II dated 17-12-1981 and further amended from time to time) G.S.R. 220(E):- In exercise of the powers conferred

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2015-16

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2015-16 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2015-16 Petition Nos. Petition

More information

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT) DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,

More information

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI Guideline for Energy Efficient Electrical systems for building Presentation by TERI Objective of study The study highlights how BBMP can implement energy efficiency measures in building in co-ordination

More information

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2013 2014 CASE NO: TP 53 / 11 12

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2013 2014 CASE NO: TP 53 / 11 12 ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2013 2014 IN CASE NO: TP 53 / 11 12 IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED

More information

REVISION: 22 SHEET NO. E 10 POWER COMPANY SCHEDULE Rg-1 WISCONSIN WISCONSIN ELECTRIC RATE BOOK VOLUME NO. 7 AMENDMENT NO. 739 RESIDENTIAL SERVICE

REVISION: 22 SHEET NO. E 10 POWER COMPANY SCHEDULE Rg-1 WISCONSIN WISCONSIN ELECTRIC RATE BOOK VOLUME NO. 7 AMENDMENT NO. 739 RESIDENTIAL SERVICE NSP NOTHEN STATES EVISION: 22 SHEET NO. E 10 SCHEDULE g-1 ELECTIC ATE BOOK VOLUME NO. 7 AMENDMENT NO. 739 ESIDENTIAL SEVICE Availability: Available for single- or three-phase electric service for residential

More information

Local Government (Finance, Plans and Reporting) Regulation 2010

Local Government (Finance, Plans and Reporting) Regulation 2010 Queensland Local Government (Finance, Plans and Reporting) Regulation 2010 Subordinate Legislation 2010 No. 124 made under the Local Government Act 2009 Contents Page Chapter 1 Preliminary 1 Short title...........................................

More information

ISLAND FRESH PRODUCE ABN: 89 743 048 843 TRADING AS PRODUCE MERCHANTS HORTICULTURE PRODUCE AGREEMENT. DEFINITIONS In this Agreement

ISLAND FRESH PRODUCE ABN: 89 743 048 843 TRADING AS PRODUCE MERCHANTS HORTICULTURE PRODUCE AGREEMENT. DEFINITIONS In this Agreement ISLAND FRESH PRODUCE ABN: 89 743 048 843 TRADING AS PRODUCE MERCHANTS HORTICULTURE PRODUCE AGREEMENT DEFINITIONS In this Agreement Agreed Price shall mean the Purchase Price (inclusive of all taxes) of

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW IN THE MATTER OF: Suo - Motu Proceedings on matters of 1. Provisional Billing in case of defective meters / Normative Consumption for

More information

Electricity PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES

Electricity PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES Electricity VAT A DOMESTIC TARIFF SCALES PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES FREE BASIC ELECTRICITY For indigent consumers officially registered at the City of Tshwane Metropolitan Municipality

More information

How to Apply For Electricity Connection

How to Apply For Electricity Connection How to Apply For Electricity Connection This handbook is published by SP PowerGrid Ltd in collaboration with SP Services Ltd June 2015 Procedures and requirements highlighted in this handbook are correct

More information

The Borough Council hereby ordains:

The Borough Council hereby ordains: AN ORDINANCE OF THE BOROUGH DEFINING AND ESTABLISHING RATES AND REGULATIONS FOR WATER AND SEWER SERVICE TO PROPERTIES AND ESTABLISHMENTS THEREIN; REQUIRING AND REGULATING CONNECTIONS TO THE WATER AND SEWER

More information

THE BIHAR ELECTRICITY DUTY RULES,

THE BIHAR ELECTRICITY DUTY RULES, 1 THE BIHAR ELECTRICITY DUTY RULES, 1949 Notification No. 2240-F.I,. dated the 10 th February, 1949 In exercise of the powers conferred by sub-section (2) of section 10 of the Bihar Electricity Duty Act,

More information

Jammu & Kashmir State Electricity Regulatory Commission

Jammu & Kashmir State Electricity Regulatory Commission Jammu & Kashmir State Electricity Regulatory Commission Order on Annual Revenue Requirement for 3-Year Multi Year Tariff (MYT) period from FY 2013-14 to FY 2015-16 and Retail Tariff for FY 2013-14 for

More information

Standard Electricity Prices and Charges *

Standard Electricity Prices and Charges * Standard Electricity Prices and Charges * South West Interconnected System Effective *All prices quoted include GST and are subject to change. IMPORTANT: Customers need to assess each tariff and any associated

More information

How To Get A Fixed Charge For Electricity

How To Get A Fixed Charge For Electricity COMPAISON OF TAIFFS WITH EFFECT FOM 1 JULY 2015 all tariffs are VAT exclusive SCHEDULE 1 5. ELECTICITY 5.1 Domestic residential indigent consumers These tariffs are applicable to all residential indigent

More information

We Energies Electric Rates

We Energies Electric Rates We Energies Electric Rates for Michigan customers July 2015 The rates in this brochure reflect the authorized base rates of Wisconsin Electric Power Company, doing business under the name of We Energies,

More information

ORDINANCE NO. 1125 ELECTRIC RATES

ORDINANCE NO. 1125 ELECTRIC RATES ORDINANCE NO. 1125 ELECTRIC RATES AN ORDINANCE FIXING THE RATES TO BE CHARGED BY THE CITY OF ESCANABA FOR ELECTRIC ENERGY DEMAND AND AVAILABILITY OF SERVICE, TO BE IN FULL FORCE AND EFFECT ON THE BILLINGS

More information

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE PEND OREILLE COUNTY PUD Quality Service at Low Cost RATES FOR ELECTRIC SERVICE Effective July 1, 2015 Contents What Is a Public Utility District... 2 Services Offered By The District... 3 Residential Service...

More information