ROAD PROJECT LONGITUDINAL DE LA SIERRA SECTION 2
LOCATION Location Cajamarca and La Libertad regions SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA-TRUJILLO AND CHILETE DEVIATION -PE-3N JUNCTION
CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA- TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION
SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA-TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION Description of concession Modality Concession period Competetion factor Funding It includes sub-sections Ciudad de Dios Cajamarca-Chiple, Cajamarca -Trujillo and Chilete Deviation PE-3N Junction (870 km approximately) Co-financed Special Public Bidding 25 years. Low PAO (annual payment for works), PAMPI (annual payment for initial periodic maintenance) and PAMO (annual payment for maintenance and operation) Initially by the Concessionaire for the execution of the Works, Initial and Periodic Maintenance and Operation and Maintenance. Recovery by PAO, PAMPI and PAMO.
SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA-TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION Guarantees It includes Guarantees of Validity Term and Seriousness of the Proposal, Contract Compliance as well as implementation of Initial Periodic Maintenance of Works. Strategic Partner The Strategic Partner will be the Operator, who must have and maintain a minimum share of thirty-five percent (35%) of the Concessionaire s subscribed capital. Project Award It will be granted if at least two (02) valid Economic Proposals are submitted. Toll units The existing (1) shall be delivered to the Concessionaire at the date of commencement of Operation.
SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA-TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION The Grantor is running interventions in certain sub sections of the project and at the end thereof they will be delivered to the Concessionaire. The Grantor will define the sub sections that the Concessionaire will finally operate. The Grantor will deliver Engineering Definitive Studies for Rehabilitation and Improvement interventions that the Concessionaire will carry out. The Grantor will deliver Technical Files for Initial Periodical Maintenance interventions that the Concessionaire will carry out.
SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA- TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION Chiple Toll Units Ciudad de Dios UP Ciudad de Dios Chilete Deviatio n Trujillo PE-3N Junction Cajamarca As of the FSC in the Ciudad de Dios Toll Unit: Current Toll + VAT Upon receipt and/or completion of interventions in sub sections: installation of toll units US$ 1.5 plus VAT The project includes 9 toll units in total
SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA-TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION Short-listing Requirements Operation Is operating or has operated in the last ten (10) years, one or more paved road concessions totaling at least 100 kilometers, or is operating or has operated in the last five (5) years one or more paved road concessions totaling at least 50 kilometers, in both cases, for a minimum period of two (02) accumulated years. Financial Minimum net worth: to be determined, audited financial statements of the last 3 available years or similar documents. Reference letter issued by a Bank or International Financial Entity, according to the Bidding documents.
SECTION 2: CIUDAD DE DIOS CAJAMARCA-CHIPLE, CAJAMARCA-TRUJILLO AND CHILETE DEVIATION - PE-3N JUNCTION Short-listing Requirements Social Capital To be determined. No experience is necessary to prove the Constructor s experience to be declared as a Short-listed Bidder. Accreditation will be carried out from date of Project award until 30 Calendar Days after that date. Construction The Constructor must certify having carried out, in the past fifteen(15) years, at least 100 km, between "New Road Projects", "Rehabilitation", and "Improvement" works, being allowed to accumulate the length of both directions of the road, only in case of different lanes (highway). From this experience, at least 10% must correspond to work performed at heights at or above 2,400 masl.
PROJECT SCHEDULE Call February 5, 2013 Submission of Envelope No. 1 (Credentials for short-listing process) From the call until 30 Calendar Days before the submission of Envelopes No. 2 and No. 3. Delivery of the Final Version of the Contract approved by the Board of PROINVERSIÓN IV QUARTER OF 2013 Submission of Envelopes No. 2 and No. 3 (technical and financial proposals) IV QUARTER OF 2013 Opening of Envelope No. 3 and contract award Closing Date Up to 10 calendar days after the previous event. It will be communicated through Circular Letter
QUESTIONS AND SUGGESTIONS LONGITUDINAL HIGHWAY IN THE HIGHLANDS Section 2 Road Projects Telephone number 6121233 (direct) fax [511] 2212935 E-mail tramo2delalongitudinaldelasierra @proinversion.gob.pe Important Note This presentation has been prepared by PROINVERSION and is only provided as information for potential investors to assist in determining their interest in participating in the comprehensive project tender for the concession of Section 2 of the Longitudinal Highway in the Highlands. The access this document constitutes acceptance by potential investors that the Peruvian State, PROINVERSIÓN and Consultants, are not subject to any current or future liability or any legal liability arising from this document.