Asset Management and Maintenance Management



Similar documents
CHAPTER 7 Software Configuration Management

Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview

Project Management Plan Outline ITSC

IMO Systems Change Management Procedures. IMO Systems Change Management Procedures for Market Participants

How To Manage Change Management At Uni

Change Management Plan (CMP)

The Transportation Security Administration Does Not Properly Manage Its Airport Screening Equipment Maintenance Program

STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA

D R A F T. Resource Ordering and Status System (ROSS) Software Configuration Management Guidelines

TEMPLATE. U.S. Department of Energy. Project Name. Configuration Management Plan. September 2002 U. S. DEPARTMENT OF ENERGY

RIM TECHNICAL SUPPORT

Analytical Products and Solutions. Complete service and maintenance solutions for your analytical equipment. usa.siemens.com/analyticalproducts

Medical Equipment Management. Medical Equipment Management Activities (EC and EC )

GENERAL RECORDS SCHEDULE 3.1: General Technology Management Records

COUNTY OF ORANGE, CA Schedule 2D Service Desk Services SOW SCHEDULE 2D SERVICE DESK SERVICES SOW. for. Date TBD

CONTRACT ADMINISTRATION. Procedures

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE C: Missile Defense Integration & Operations Center (MDIOC) FY 2013 OCO

Property Manager V7.0 User Guide

DS0174 Recurring Billing

UPCOMING PROGRAMMES/COURSES APRIL, 2013 MARCH, 2014 (MIND KINGSTON & MANDEVILLE CAMPUSES) Hr s

Enterprise Asset Management made for Microsoft Dynamics AX

OSAs are non transferable to other Operator gateways or controllers or companies without the written authorization from RG Nets, Inc.

2015 Year-End Guide & Reply Form

ITIL Roles Descriptions

Request for Proposal Technology Services Maintenance and Support

PM eb. Software Report Technology in Construction Today

Medical Equipment Management. Medical Equipment Management Activities (EC and EC )

DEPARTMENT OF JUSTICE APPLICATION FOR A CLASS C OR D LICENSE TO OPERATE BINGO GAMES

NetDAHS Edge Software A proactive and centralized control hub for air compliance reporting

Content Sheet 3-1: Equipment Management Overview

PHASE 5: DESIGN PHASE

Novo Help Desk Software

Presented by Jeris Creasey. Information Technology Trainer, Information & Telecommunication Systems

Procedure for the Use of Forensic Advantage (FA)

Project Zeus. Risk Management Plan

Qualys API Limits. July 10, Overview. API Control Settings. Implementation

CounselorMax and ORS Managed Hosting RFP 15-NW-0016

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

Senior Accountant Position Description Housing Resources Group (HRG)

Policies of the University of North Texas Health Science Center

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

Classic Balances NewClassic ML Precise results Compact and portable Affordable for all budgets

DotNetNuke (DNN) Hosting Environment

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

Defense Acquisition Review Journal

Call us today Managed IT Services. Proactive, flexible and affordable

1200 Project Control System Procedures


STANDARD OPERATING PROCEDURE NO. CM

The Implementation Advance Planning Document (IAPD)

Maximizing return on plant assets

Adapted from the Managing Your Time Effectively handout by the Learning Assistance Center at Glendale Community College. TIME MANAGEMENT PACKAGE

4.4 Commissioning, Handover and Warranty

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM

Small Business Programs Conference. Technical, Engineering, Advisory, and Management Support (TEAMS)

Asset Management for the Public Sector with Total Accountability

Draft Copy. Change Management. Release Date: March 18, Prepared by: Thomas Bronack

Novo Help Desk Improve efficiency for faster support!

Agilent Life Sciences and Chemical Analysis Support Services: Extended Warranty and Advantage Service Plans. Exhibit 21X. 1.

Rev

neditor.html

Renewal Project Application

Change Request Process Overview

Certificate of Accounting, Billing and Property System Adequacy

INFORMATION SECURITY SPECIFIC VENDOR COMPLIANCE PROGRAM (VCP) ACME Consulting Services, Inc.

Prepared by: OIC OF SOUTH FLORIDA. May 2013

December 21, The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS.

SeeSOR.NET. Quality Management Approach and Technology of SeeSOR.NET.

ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION STATE POLICE EVIDENCE TECHNICIAN SERIES

IBM Maximo for Transportation. Don Beahm IBM Transportation and Government Product Manager

Dacorum Borough Council Final Internal Audit Report

Technology Readiness Assessment (TRA)

Fire Alarm System Submissions

YOUR INTERACTIVE SECURITY

Worship Facility Matching Grant Program 2010 Program Manual

Copy Exact Awareness Training. GT Supplier Change Control

In Brief. Smithsonian Institution Office of the Inspector General. Smithsonian Institution Information Security Program

City of Bismarck, ND Maintenance and Support for Mitel 3300 Voice System. Request for Proposal (RFP)

Municipality of Strathroy-Caradoc

CPE Monitor Update for ACPE-Accredited Providers November To hear the audio portion please dial: Dial: Passcode:

Configuration Management Practices

Sure Managed Networks Essential Level Support Service Terms & Conditions

Fire Alarm Systems Certification

Maintenance Service 1.1 ANNUAL PREVENTIVE MAINTENANCE 1.2 ON-SITE REMEDIAL SERVICES

Energy Price Fact Sheet

LED Lighting Program Program Manual. Overview. 1. Eligibility

Bigfoot CMMS. Cloud-Based Maintenance Software

The George Washington University

MARION COUNTY Information Technology. REQUEST FOR INFORMATION Integrated IT Help Desk Client Management Software Suite

LAMAR STATE COLLEGE - ORANGE INFORMATION RESOURCES SECURITY MANUAL. for INFORMATION RESOURCES

Electra Elite and InfoSet are registered trademarks of NEC America, Inc.

Transcription:

Asset Management and Maintenance Management 8 September 2010 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Asset Management 2

References for Reporting Requirements USSTRATCOM Instruction 538-1, Volume I, BMDS Description and Asset Management MDA 3000.02, BMDS Asset Management, Scheduling, Planning and Execution 3

The Asset Management Process Purpose - The process for planning, scheduling, and managing all missile defense-related assets to ensure an effective and efficient operational capability, while concurrently executing developmental improvements and enhancements, tests, and training related activities 4

Asset Management Tools and Players Asset Management Tools: - Event Objective Worksheet (EOW): Used to schedule events into the BMDS Annual Plan and BMDS Operations Schedule Event Name, Objectives, Methodology, Dates / Times Assets required for event - Schedule Change Request (SCR): Used to add, delete, change or modify an aspect of scheduled tasks on the Weekly Activity Message (WAM) Asset Management Players: - Event Owner: The entity responsible for scheduling an exercise, test, maintenance, operations, training, or upgrade event - Asset Manager: The intermediate echelon responsible for management of subordinate BMDS assets - Asset Owner: The entity with the authority to commit an asset to participate in an exercise, test, maintenance, operations, training, or upgrade event 5

Asset Management Products Today Thur Fri Sat Sun Next week Mon - Sun Weeks 2-8 Weeks 9 64+ WAM Current Week SCRs, as required WAM SCRs, as required Asset Management Products - BMDS Annual Plan (BAP): Contains BMDS scheduled activities out to 15 months. Uses place-holders for significant events and lacks detail of events - BMDS Operations Schedule (BOS): Long term. Rolling 8-week schedule. Contains all events anticipated to occur during the 8-week time period Weeks 5-8: some events may require additional de-confliction or detail Weeks 2-4: contain greatest granularity - Weekly Activity Message (WAM): Short term. The first week of the BOS. All anticipated events de-conflicted and executable as listed. - Schedule Change Request (SCR): Daily, as required, to change WAM. BOS BAP 6

Event Objective Worksheet (EOW) Where it all Starts Planning Tool Event Owner Develops Management Concurs and Quality Reviews GMD Coordinates and Quality Reviews Asset Owners Coordinate JFCC-IMD/J3 Approves and Posts to MDA Portal 7

Asset Management Process Flow DSC or Government Event Owner Drafts EOW with GM Test and Evaluation Inputs Recall and Down Times and Loads into BMDS Asset Management (BAM) On-line Tool (BOLT) MDA/DDWO Coordinates the EOW - Director for Test (DT) - Director for Engineering (DE) Approves EOW for planning at MDA Level DSC, GM, WF Weekly Schedule Coordination Meeting (SCM) Works Issues De-conflicts Informs Community Approves BOS/WAM GMD - Operations Support Reviews and Quality Controls Work Issues De-conflict in GM and external Validate recall/down time specific to SECDEF guidance and REDCON Validate event for ops availability Apply and enforce smart scheduling SI-538-1/MDA 3000.02 compliance Assess EOWs for Operations/ Development/Test Risk Ensure compliance with GMD Operational Configuration Baseline Ensure GM and MDA leadership decisions are contained in EOWs Coordinates with Asset Owners and approves or rejects EOW to next level or back to DSC or Government site in BOLT MDA BMDS Asset Manager Schedulers Reject/Return or Approve/Forward to JFCC-IMD JFCC-IMD/J3 Approves Posts EOW to MDA Portal Website using BOLT (JFCC- IMD Community) Asset Owner Accepts/ Rejects Each Task using Positive Control in BOLT BMDS Operations Schedule (BOS)/Weekly Activity Message (WAM) Posted on JFCC-IMD Website Event Owner Drafts Changes BOS (EOW Revision) WAM Schedule Change Request (SCR) MDA Action Event Owner Action Warfighter Action All Organizations Coordinate 8

Asset Management Process and Readiness Day-to-day Readiness - Follow Established BOS/WAM and SCR Coordination Procedures - WAM Executed as Published (with SCRs) - NORTHCOM/J31 Coordinates on All Scheduled Maintenance - NORTHCOM/J3 Approves Deviations Higher States of Readiness - Daily Asset Management Meeting - Established BOS/WAM Coordination Procedures continue; however, WAM May Not be Executed as Published - CDR or DCDR US NORTHCOM Briefed / Approves Highest State of Readiness - BOS/WAM Activities are NOT Executed as Published - CDR or DCDR USNORTHCOM Approves Any Scheduled Maintenance 9

GM and DSC Functions in Asset Management GM - Leadership direction, coordination with external agencies, and contractual insight / oversight, as well as scheduling non prime contractor activities DSC - Provide the resources necessary to execute and manage the planning, scheduling and controlling the use of GMD assets to include planned and corrective maintenance, both scheduled and unscheduled Asset management process supports maintenance execution, configuration management and transition management for the GMD Weapon System 10

Maintenance Management 11

References for Reporting Requirements STRATCOM Instruction (SI) 538-1, Volumes I and II GM Situational Awareness and Operations Reporting Directive, dated 1 March 2010 12

Preventive Maintenance Preventive Maintenance Scheduling - Scheduled via Event Objective Worksheets (EOW) generated at the sites - Approved EOWs forwarded to GM for approval, then to MDA for approval, and finally to USNORTHCOM and JFCC-IMD for approval - After all approvals, DDW adds item to the BMDS Operational Schedule (BOS) - Recurring events (i.e. Quarterly Maintenance activities) can be auto-scheduled via the Integrated Scheduling Tool (IST) using parameters given by the scheduler - Maintenance Built-in Tests (MBITs) are performed on fielded GBIs quarterly 13

Maintenance Management Scheduling Diagram Transmission of EOWs throughout this process is performed via the BMDS On-line Tool (BOLT) 14

Preventive Maintenance (PM) Preventive Maintenance Execution - Event execution is managed via the Weekly Activity Message (WAM) - Upcoming Maintenance Conferences (UMC) are initiated by the DSC Integration Cell (DSC Cell) at 40 minutes and 5 minutes prior to an event start time. The Cell monitors maintenance events from start to finish - The Cell conducts a Maintenance Conclusion Conference (MCC) the conclusion of the event to return asset to operational status 15

Maintenance Management Execution Diagram Site initiates intent to conduct scheduled maintenance prior to event and submit to DSC Cell DSC Cell QAs and approves proceeding with a scheduled maintenance event as documented on the WAM DSC Cell initiates UMC notification 40 minutes and 5 minutes prior to event Site notifies DSC Cell of event completion (or request for extension) DSC Cell conducts MCC, closes Work Access sheet and updates Work Access LOG 16

Unscheduled Corrective Maintenance (CM) Unscheduled Corrective Maintenance Execution - Unscheduled CM activities can result from PM activities, alarms, anomaly troubleshooting, etc. - If a CM required action is discovered during a PM activity, the CM can be conducted simultaneously with the PM if it can be performed within the scheduled PM timeframe (or reasonable extension) - If the CM activity does not meet the deadline for WAM update submission or needs to be conducted immediately, it becomes unscheduled and needs Warfighter approval 17

Scheduled Corrective Maintenance (CM) Scheduled Corrective Maintenance Execution - CM events that meet the current day WAM submission deadline or must be deferred due to lack of spares or technicians, to coincide with a scheduled event to limit system impact, etc., will become scheduled CM events - The request to schedule these events are generally submitted by the sites to the DSC Cell schedulers via an EOW which generates a schedule change request (SCR) - These requests are posted to the WAM update for approval - Scheduled CM actions still require Warfighter approval, but this approval is obtained through the routine WAM approval process 18

Fix or Fight Maintenance Execution Fix or Fight Maintenance Execution - Fix or Fight Maintenance decisions are based upon REDCON - DSC Cell provides recommendations and risks to GM for decision - GM will coordinate with the Warfighter for final disposition instruction - Warfighter makes final decision on fix, fight, remove from inventory or other option 19

Precision Measurement Equipment Laboratories (PMEL) Support 20

PMEL Support Industry Question - What calibration, maintenance, and proof load capabilities / facilities are available on site? Government Response - Calibration Calibration of standard equipment (i.e., torque wrenches, meters, etc.) is available through the host wing (VAFB) / garrison (FGA) PMEL contractor PMEL calibration will be provided for equipment identified in the BSRL by the government through ISAs Prime contractor coordinates and executes calibration requirements directly with the PMEL contractor Proof Load Facilities The host unit does not provide any proof load facilities or equipment for tenant units at either site 21