The Rehab Inspector and LBP

Similar documents
Chapter 13: LEAD-BASED PAINT

Getting Started Different Ways of Deleading Other Options and Resources

Department of Veterans Affairs VHA DIRECTIVE Washington, DC November 4, 2015

LEAD MANAGEMENT PROGRAM

CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR. License Requirements & Work Practice Standards

Understanding the Lead Based Paint Requirements: Guidance for HPRP Grantees

INTERPRETIVE GUIDANCE ON HUD'S LEAD SAFE HOUSING RULE: THE HUD REGULATION ON CONTROLLING LEAD-BASED PAINT HAZARDS

PROGRAM DESCRIPTION HOMEOWNER REHABILITATION LOAN FOR INCOME ELIGIBLE CITY OF MOBILE HOMEOWNERS

CITY OF MOBILE COMMUNITY PLANNING & DEVELOPMENT DEPARTMENT

Rehab Inspection Report Page 1

City of Chicago Department of Public Health Control and Mitigation of Lead Bearing Substances

Landlord Handbook. Portland Housing Authority

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

City of Fort Worth Lead-Safe Program

Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel

ASBESTOS MANAGEMENT PROGRAM

CHAPTER 4 IDENTIFYING LEAD-BASED PAINT HAZARDS

City of Philadelphia

Enhancements to Streamlined (k) Limited Repair Program

LIST OF HUD-APPROVED LEAD SAFE WORK PRACTICES TRAINING CURRICULA (as of October 20, 2010)

CITY OF SAN DIEGO. Lead-Based Paint Hazard Awareness Seminar for Landlords, Property Owners, and Property Managers

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

Small Entity Compliance Guide to Renovate Right EPA s Lead-Based Paint Renovation, Repair, and Painting Program

Disclosure Requirements Concerning Lead-Based Paint in Housing: Questions and Answers

INSTRUCTIONS FOR LEAD DISCLOSURE IN THE DISTRICT OF COLUMBIA

Renovation, Repair and Painting Rule

ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT

University of Tennessee Safety Program

Asbestos Management Plan EC 45 Page 1

2640 Fountain View Drive Houston, Texas P TTY OCCUPANCY TECHNICIAN: PHONE NUMBER:

Renovation, Repair, and Painting (RRP) Rule Frequent Questions

Saxe Middle School Auditorium Renovation February 4, 2015

Draft ABCA : USEPA 2015 Brownfields Cleanup Grant Application for Former Hudepohl Brewery Site by Port of Greater Cincinnati Development Authority

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

Building Owners Responsibilities for Asbestos

Inspection Item COMMENTS

HUD Healthy Homes Grantee Program Sample Program Evaluation Plan

Financing Options to support Energy Efficiency & Contractors

How To Prevent Water Damage To A Home

ASBESTOS IN THE HOME

Maintenance Solutions For Property Managers. DANNY HARDEMAN Real Estate Broker Professional Property Manager

CONDITION OF QUALITY ITEMS

Lead Exposure Management Plan

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, Project #A2014/0406.

CARITAS MANAGEMENT CORPORATION CALIFORNIA ADDENDUM GENERAL

Former National Guard Armory Cherokee, Oklahoma Remediation Final Report

FHA 203k Inspections Changing climate in home buying markets: FHA 203k Inspections. FHA 203k Inspections. FHA 203k Inspections. FHA 203k Inspections

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

CITY OF YOUNGSTOWN. HOME Housing Rehabilitation Program. for Homeowners

Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

ASBESTOS MANAGEMENT POLICY

HOMEOWNER REHABILITATION

County of Santa Clara. Owner-Occupied Residential Rehabilitation Program REHAB PROGRAM GUIDELINES

Estimated Cost of Repair

HOUSING ASSISTANCE REHABILITATION PROGRAM (HARP)

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements Asbestos Abatement Project Exemptions

Guidance on the Lead-Based Paint Disclosure Rule: Part II

LEAD-BASED PAINT RESOURCES

COEUR D ALENE TRIBAL HOUSING AUTHORITY HOUSING REHABILITATION POLICY (CDTHA REHAB)

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

CITY OF HICKORY HOUSING REHABILITATION LOAN PROGRAM

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Lead Licensing and Certification Q & A s

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

MEMORANDUM. General: Foundation:

CITY OF IRON RIVER RENTAL REHABILITATION PROGRAM GUIDELINES

CHAPTER IV REQUIRED DOCUMENTS FOR HOUSING PROJECT MANAGEMENT

Date: March 7, 2006 Report for [removed]

Lead-Safe Housing Policy Guidance

Loss Control TIPS Technical Information Paper Series

Restoration Services Company

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

ASBESTOS MANAGEMENT INTRODUCTION

Presents. FHA Streamlined(K) & 203(k) Training. July 20, /18/2011. FHA Streamlined(k) Rehab Program


Transcription:

The Rehab Inspector and LBP 2013 Housing Conference OCD/OCCD Sawmill Creek Resort and Conference Center November 20-22, 2013 GH Runevitch- Presenter

The Rehab Inspector and LBP The Rehab Specialist has an important role in all phases of the rehabilitation process. Understanding the rules and responsibilities regarding lead- based paint (LBP) is very important during all phases of the project. Authorities having jurisdiction concerning lead issues: HUD ODH EPA OCD

The Rehab Inspector and LBP Lead issues in rehab begin with the age of the home. Pre 1978 homes are considered The scope of work is an important consideration Projects under $5000 Home Repair $5000- $25,000 Over $25,000

Over $5000 In Excess of $5000: All painted surfaces to be disturbed shall be presumed to contain lead or be tested. Clearance shall be conducted per OAC 3701-32- 12.

$5000- $25000 Jobs totaling over $5000 and less than $25000 shall have a risk assessment. De minimis does not apply. Standard treatments are not an option. HUD specifies treatment of all deteriorated paint. Deteriorated paint in non- friction or impact areas may be repainted (paint film stabilization). Lead- specific cleaning is a hazard reduction activity.

Rehab/$5000- $25000 On rehab projects, lead hazards may be addressed through interim controls. Deteriorated friction and impact surfaces shall be treated so as to reduce deterioration using durable materials. Component replacement during rehab shall be performed only when repair is not feasible or cost- effective. All work performed on lead- painted or suspected lead- painted surfaces shall be done in a lead- safe manner.

Rehab/$5000- $25000 Licensed abatement personnel are required only when activities are conducted for the express intent to permanently eliminate lead- based paint hazards. An organization may choose to use an abatement contractor to perform certain functions. Set- up, containment, clean up and clearance are performed in the same way by both abatement professionals and RRP certified personnel.

Risk Assessment Risk assessments determine the presence of lead- based paint hazards and suggest appropriate hazard control measures. Hazards are determined by visual identification of deteriorated paint and testing. The risk assessment shall also include any painted surfaces to be disturbed by the rehab activity

Risk Assessment A risk assessor recommends abatement options for identified lead hazards and recommends prioritization for addressing each hazard in a risk assessment report. (Ref. Frequently Asked Questions for the Ohio Administrative Code Chapters 3701-32 and 3701-82)

Risk Assessment Hairline cracks and nail holes are not considered to be deteriorated paint. A chewable surface is a hazard if there is evidence a child has chewed there. If the child is over 6 years old or moved, the surface need not be treated. (ref. Interpretive Guidance: Subpart R 22-23)

Risk Assessment Hazard Control Options: Stabilization of any deteriorated paint, including correction of any moisture leaks or other obvious causes of paint deterioration through interim controls. Stabilization is not required if the deteriorated paint is not found to be lead- based. Repainting shall be performed on those surfaces. Clearance to ensure the work was completed, and that dust levels are sufficiently low.

Risk Assessment Only a licensed lead abatement contractor or licensed lead project designer may prepare specifications for the pre- abatement plan. Any detailed specifications shall be created by licensed person. Scope of Work General description of work to be performed. Need not be written by licensed contractor. May be developed by rehab inspector from risk assessment. (ref. Frequently Asked Questions for the Ohio Administrative Code Chapters 3701-32 and 3701-82)

Risk Assessment A copy of the entire risk assessment shall be included in the job file.

Pre Abatement Plan A pre- abatement plan is prepared prior to conducting a lead abatement project Unique to each project- kept on site. Part of job file Written occupant protection program Written compliance plan to protect personnel from exposure to lead hazards Respiratory protection plan Hazard communication plan (ref. OAC 3701-32- 08,1-4, a- d)

Interim Controls vs. Abatement Abatement methods of intentionally and permanently eliminating lead hazards Interim controls- typically performed in the context of maintaining a property to ensure that hazards that have been identified are controlled, at least temporarily

Rehab and Abatement Activities whose purpose is not to eliminate hazards, like many rehab projects, are not considered to be abatement. For example, a window replacement done for reasons other than to address lead hazards is not considered an abatement, even though it results in eliminating lead hazards from the window (ref. LSHR Interpretive Guidance, Subpart R- 24)

Rehab and Abatement On the other hand, covering a wall with new drywall is considered an enclosure type of abatement when the new drywall is installed with the intent of abating a lead- based paint hazard. (ref. LSHR Interpretive Guidance Subpart R- 24

Rehab and Abatement An abatement contractor is necessary when: Rehab costs exceed $25,000 (after lead- related costs are subtracted) An activity is carried out expressly for the elimination of a lead hazard A lead poisoned child resides in the home. The presence, or suspected presence, of lead- based paint does not in itself trigger abatement.

Rehab & Abatement If the rehab cost is greater than $25,000 Back out all eligible lead costs If removing those costs bring the rehab total to below $25,000, interim controls may be used (except in cases of designated lead hazards) If, after deducting eligible costs, the rehab cost still exceeds $25, 000, all interior hazards must be abated.

Rehab & Lead Whether the work is interim control or abatement: The specs and scope of work must specifically identify all work that must be done in a lead- safe manner Any abatement work within the scope of work must be clearly defined, and distinguished from non- abatement tasks Generic statements such as work lead- safe, or perform all work per the risk assessment are not acceptable as spec or scope of work directives

Relocation Relocation may be necessary during some rehab and abatement jobs. For residents to remain in their dwellings during the work, certain conditions must be met Residents must have an home entry/exit outside of the work area Residents must have a working bathroom not in the work area Residents must have a food preparation area outside the work area Residents must have a sleeping area outside the work area

Relocation There is no such thing as temporary or conditional clearance! Residents are not allowed back into a work area until successful clearance results have been received Because rehab is voluntary, the local program may require that homeowners be responsible for relocation However, the program must ensure that those persons having incomes below 50% AMI and no relatives or close friends nearby are not deterred from being in the program

Required Documents Any rehab projects that include lead- based paint activities must include the following documentation: Risk Assessment Report An Occupant Protection Plan Prior Notification of Abatement Work Confirmation of receipt of Renovate Right pamphlet by resident Confirmation of proper set- up, containment, and clean- up (photos) Clearance Report (copy to homeowner) Copies of licenses and/or certifications (Abatement and RRP)

Documents Required documents found in RRS: Rehabilitation Cost Computation Worksheet (pg. 153) Terms and Conditions (pg. 154) Interim Lead Inspection Report (pg. 155) Notice of Evaluation (pg. 156) Notice of Presumption (pg. 156) Notice of Hazard Reduction (pg. 158)

OCD & RRP Rule OCD requires all persons working on a pre- 1978 rehab job be RRP certified. Exception: Those persons who tasks fall under de minimis. The RRP contractor of record on that job shall ensure all work is done in a lead- safe manner.

OCD & RRP Rule Clearance HUD and OCD require clearance by dust wipe analysis. Dust wipe analysis shall be performed in accordance with OAC 3701-32- 12 by a licensed risk assessor. All jobs over $5000 shall have clearance testing. All jobs not exempt shall have clearance testing performed. Reoccupation of work areas is not allowed until successful clearance results are received.

Ohio Department of Health Granted authority by US EPA to oversee and regulate lead training, licensure and work practices (except RRP) in Ohio. Ohio rules and guidelines coincide with national standards. Policies and rules are codified in Ohio Administrative Code (OAC) 3701-32. These rules apply to all individuals and all programs

Clearance Testing In general, clearance must be of the entire unit, common area, or outbuilding, as applicable. Exceptions: non- abatement work (interim controls, paint stabilization, maintenance, and rehabilitation) when containment is used throughout the process.

Clearance Testing Example 1: If the work involves exterior surfaces and does not disturb interior painted surfaces or involve elimination of an interior dust- lead hazard, and if the window, door, ventilation, and other openings are sealed during the exterior work, the interior clearance is not required.

Clearance Testing Example 2: If containment is used to ensure that the dust and debris generated by the work is kept within the worksite, clearance of only the worksite is permitted. Note: Clearance examiner must require proof of effective containment during all phases of the work.

Clearance Testing Ohio Administrative Code (O.A.C.) 3701-32- 12 See Appendix A for full explanation Interior work with no dust containment: A minimum of 12 samples shall be taken. Interior work with dust containment: A minimum of 13 samples shall be taken. This should be reflected in clearance report.

Clearance Testing All clearance testing documents shall be included in the job file.

Cost Breakouts Lead- related costs may be separated from pure rehab costs. In some cases, this may be helpful in calculating the category of assistance. The following two cases show examples of cost breakouts

Example #1 Jones Residence- Visual Inspection Deteriorated paint on siding Deteriorated paint on window casings (exterior) Rotten wood and deteriorated paint on front porch Evidence of teeth marks on some interior window sills Deteriorated paint in room B- wall/ceiling juncture

Example #1 Jones Residence- Testing Information Exterior siding contains lead in excess of standard (LBP) Exterior window casing contains LBP Porch pillars and porch decking contains LBP Interior window sills contain LBP Deteriorated paint in room B is not LBP

Example #1 Jones Residence Options Exterior siding: Paint film stabilization OR siding Exterior window casing: Paint film stabilization OR enclosure Front porch: Replacement of pillars and deck Interior sills: Encapsulation Deteriorated paint room B: repainting

Example #1 Jones Residence- Cost Breakouts Exterior siding: Lead Costs: include materials and labor for set- up and clean- up Rehab Costs: are materials and labor to side house

Example #1 Jones residence Options: Exterior window casings Paint film stabilization, enclosure or replacement Cost Breakout: There are no lead costs for this measure; preparation has been done for siding work

Example #1 Jones Residence- Cost Breakout Porch Lead Costs: include set- up, containment and clean- up as existing porch is dismantled. Rehab Costs: All time and materials to construct/rebuild porch.

Example #1 Jones Residence Options Interior sills: Lead Costs: Lead- safe set- up and cleaning Rehab Costs: Materials and labor to coat sill(s) with encapsulant product containing Bitrex or equivalent.

Example #1 Jones Residence- Cost Breakout Deteriorated Paint Room B: Lead Costs: none Rehab Costs: All work, including substrate repair and source of moisture repair and repainting.

Example #2 Williams Residence Visual Inspection Vinyl siding Roof damage 6 windows not feasible to repair Bathroom floor rotten (only bathroom in house) Paint deterioration ceilings

Example #2 Williams Residence Testing results Window sashes and casings contain LBP Bathroom floor contains LBP, baseboard contains LBP Ceiling paint is not LBP

Example #2 Williams Residence Actions Replace deteriorated windows Paint film stabilization Replace bathroom floor and baseboards Repair roof leaks Repaint water damaged ceilings, repair as necessary

Example #2 Williams Residence Cost Breakdown Windows: Lead Costs: Preparation to remove windows, clean- up for clearance Rehab Costs: Cost of window removal, cost of new windows, installation of new windows

Example #2 Williams Residence Cost Breakdown Window Casings Lead Costs: None (set- up done for window replacement) Rehab Costs: Preparation and painting of window casings

Example #2 Williams Residence- Cost Breakdown Bathroom floor and baseboard Lead Costs: Set- up, containment and cleaning Rehab Costs: All labor, materials, as well as cost of relocation of family while bathroom is unavailable

Example #2 Williams Residence Cost Breakdown Roof leaks Lead Costs: None if any work disturbing suspected LBP is below de minimis. Rehab Costs: All

Example #2 Williams Residence - Cost Breakdown Water damaged ceilings Lead Costs: None Rehab Costs: All materials and labor