International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies

Similar documents
Appendix A Use of Supporting Studies in Process for NI Documentation

MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE

Savannah North Scoping Study Looking into the future 3 February 2016

Mako Project, Eastern Senegal Completion of Scoping Study

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

Technical Due Diligence what do we look out for?

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

2015/01/04. New SAMREC Representative. Ken Lomberg. Group. Pr.Sci.Nat. Senior Principal Consultant. with Coffey. 30 years experience in South Africa

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

KOPY GOLDFIELDS AB. A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014

For personal use only

BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

C R A D L E / T R E M O N T J V A C Q U I R E S % O F P A N D A H I L L L I C E N C E S

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Establishing the feasibility of your proposed mining venture

Ironbark Zinc Limited

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Feasibility. A guide to feasibility planning for junior mining companies

D e c e m b e r Q u a r t e r l y A c t i v i t y R e p o r t

Consulting Services Mining & Metals

Report for the Quarter Ended 30 September 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

Earth Sciences 4211/6210! Putting the Economics Back in Economic Geology!

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Dumont Geometallurgical Modelling Do you know where your nickel is? AusIMM. Michelle Sciortino Johnna Muinonen John Korczak Alger St-Jean

How to Assess Your Financial Planning and Loan Proposals By BizMove Management Training Institute

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

FINANCIAL DUE DILIGENSE SERVICES

November 20, The key points included in the November 20, 2014 document are included below where necessary.

Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

London STOCK EXCHANGE

Cummins Range Rare Earths Project

Challenges of Investing in Junior Mining Companies and. Sotkamo Silver

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

For personal use only

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Exploration. Exploration methods

Positioned for Production: Exploring for Growth

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September Successful Share Issue Raises A$5.6 Million

GUYANA GOLDFIELDS INC.

Pathway to Production

Interim Financial Report for the half-year ended 31 December 2011

DECEMBER 2015 QUARTERLY REPORT

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

Corporate Presentation October 2015

Chapter 5. Rules and Policies

DEFIANCE SILVER CORP. (an exploration stage company) CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS FOR THE SIX MONTHS ENDED DECEMBER 31, 2015

Sabina Gold & Silver Corp.

Press Release 30 th October 2015

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

AngloGold Ashanti La Colosa Site Visit November, 2011

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Reorganising central government. Synergy reporting for Mergers and Acquisitions

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

International Financial Reporting Standards (IFRS)

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Financial Statement Analysis: An Introduction

Paladin Energy. Development & Expansion of the Langer Heinrich Operation in Namibia. June 2009

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

ALCYONE REPORTS JORC SILVER RESOURCES

This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.

Cannon Big Pit Given the Green Light

Management s Discussion and Analysis. Forward Looking Statements. August 7, 2012

(NYSE-MKT:XRA, TSX:XRC,

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

FOCUS MINERALS LIMITED

For personal use only

COMPANY PRESENTATION. Cape Town 2016

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Acquisition of Rice Lake. December 2015

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

FIJI GOLD LION ONE METALS

Report for the Quarter Ended 31 December 2015

CORPORATE FINANCE FINANCIAL INSTITUTIONS ENERGY AND INFRASTRUCTURE. Undertakings. Norton Rose LLP June PAR-# v1 1

September 2015 Quarterly Activities Report

Business Plan Basic Template

Preparation of Pro Forma Financial Information for Inclusion in Investment Circulars

Investing in an Underground Coal Mine in Indonesia

Guide from Raymond Benn & Co. Limited

2015 Investor Day CFO Presentation. June 25, 2015

International Financial Reporting Standards (IFRS)

CODELCO UPDATE April Copyrights 2014 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights 2014 by CODELCO-CHILE. All Rights Reserved.

Lydianinternational.co.uk TSX:LYD. Corporate Presentation June

ROCKGATE CAPITAL CORP. Corporate Presentation June, 2012

REX-005. Expert Technical Report of SRK Consulting. October 6, 2015

Evaluate Performance: Balance Sheet

GUYANA GOLDFIELDS INC.

Sixth Statutory Managers Report

Helping businesses source finance

International Tower Hill Mines Ltd.

Transcription:

International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies Sergei Sabanov, PhD, CEng MIMMM Date:10 December 2013 Location: Almaty, Kazakhstan SRK Consulting (UK) Ltd 2013All rights reserved.

Overview Comparison of technical studies Geology Geotechnics Mining Hydrogeology Processing Processing Tailings Environmental Economics Types of analysis Key problems Устраните оператор

Comparison of Technical Studies SCOPING TED Technical and economic scoping report PREFEASIBILITY OBIN Investment Justifications Report FEASIBILITY DETAILED DESIGN Contains the OOS and has more detailed design than a typical FS PROYEKT DETAILED DESIGN TEO Konditsy Technical and economic justification of conditions, prepared at any time. Two types: temporary for exploration and permanent for mining period. Reserves are estimated and justified with cut off grade and technical work. Reserves are formally approved. CONSTRUCTION Устраните оператор CONSTRUCTION

Mineral Resources and Ore Reserves Устраните оператор

Key Features of Project Development Stages Scoping Study Preliminary Feasibility Study Feasibility Study Usually based on an Inferred Resource or less Called a PEA in Canada Conceptual study could ask what if questions First attempt to join the dots Would expect to make a start in each discipline make the assumptions reasonable Large variation between consultants No clear definition +/- 30 to 50% accuracy Minimum level of work to report Reserves under JORC or CIM Codes Must be based on an Indicated Resource or more Option studies are completed Fieldwork starts to obtain proper data enviro, hydro + geotech etc Tighter definition Not generally reviewed by an IE +/- 25 to 30% accuracy Must be based on an Indicated Resource or more This is the stage where design is completed on the chosen option Field and lab work is completed enviro, hydro + geotech etc Tight definition Will be reviewed by an Independent Engineer +/- 10 to 15% accuracy First Take question Away to Statement ask is is there any Indicated?

What is Feasibility Study? a comprehensive study of a deposit in which all geological, engineering, operating, economic and other relevant factors are considered in sufficient detail that it could reasonably serve as the basis for a final decision by a financial institution to finance the development of the deposit for mineral production (NI 43-101). On a mining project only Measured and Indicated Resources are used. No inferred is generally included in the base case. It is sometimes included to demonstrate potential Устраните оператор

What is a Bankable Feasibility Study? No such thing It is the project that becomes bankable when it has permits, offtake agreements, ECPM contract etc The bank decides what is bankable What people mean when they say BFS is a bankable level study For SRK there should be not be much difference between what we do for an FS and a BFS only in environmental matters Bankability generally requires an ESIA prepared in accordance with the World Bank Guidelines / IFC performance standards Banks want a detailed study that has a proper audit trail Not all banks are signed up to the Equator Principles - China If it says Bankable Feasibility Study on the front and weights less than 1kg, it probably isn't at a bankable level Take Away Statement

Geology Geology Competent Person classifies the Resource Scoping Study (SS): Review of available data, preliminary resource model. Develop the exploration programme, recommendations. Require Measured and Indicated Resources for FS / PFS A FS may have more up to date drilling results and a revised geological model To verify the project economics it is necessary to be able to model the annual production schedule with reasonable accuracy. If an annual schedule mines a small part of several polygons each year and if the grades within these polygons varies then the schedule is unlikely to be accurate. If the project is marginal then the CP may judge that accuracy of geological modelling is insufficient for declaring reserves. To determine the mining method and to estimate mining losses and dilution, the geological model needs to be sufficiently detailed to determine the variability of width, continuity of ore bodies, the grade of any dilution. Classify Resource Take Away in accordance Statement with a CRIRSCO template (Committee for Mineral Reserves International Reporting Standards)

Geotechnical FS and international approaches are similar SS: Review of available data, possible site visit, core logging based on photos, limited preliminary analysis and reporting PFS requires a preliminary assessment of - some fieldwork, laboratory tests and analysis is needed. Similar to the TEO Konditsy approach but less detailed. An FS requires a detailed assessment in the same way as a Proyekt. Technical approach small differences in protocols. International studies focus on local details and rock quality and use computerised software to assess the appropriateness of the design CP needs to consider if the slope angle, selection of mining method or mine design parameters are likely to change when more data is collected and a more detailed analysis is done. Are these changes likely to be material? The CP must Take consider Away Statement the materiality of geotech issues on the project

Mining SS would include review of available data, possiblesite visit, preliminary analysis and reporting, assumptions, mine design option 1, production schedule developed on a transparent basis, cost estimate on the basis of Infomine database or similar projects PFS would include an option study and require the annual production schedule and cost estimates for the selected option. This follows the TEO Konditsy approach. An FS would be a more detailed design and would probably involve advanced planning software such as XPAC. The Proyekt would typically require norms to be followed. Work would typically include: Open Pit: definition of pit limits, detailed mine design including ramps, equipment selection, definition of modifying factors to match the equipment used, production schedule, equipment requirements and costs Underground: selection of mining method, dimensions of stable stopes and pillars, selection of ground support, definition of modifying factors to match the mining method Does not have to be optimal, but does need to be reasonable. Issues to consider: Mine design must reflect the variability in geology Modifying factors need to be supported Level of detail Take that Away is Statement acceptable depends on project type

Hydrogeology Scoping: Review of data, possible site visit, limited preliminary analysis and reporting PFS: Drilling on site, logging, sample collection, laboratory testwork, intermediate analysis and reporting FS: More drilling, logging, sample collection, laboratory testwork, final analysis and reporting Take Away Statement

Processing SS would include indicative flowsheet designed and costed. Review of data, some testwork (bottle rolls / batch tests) preliminary analysis and reporting. Infomine for costs. PFS normally requires more process and tailings design work than a TEO Konditsy. Requires work on the flowsheet and costing that wouldn't normally be part of a Konditsy. Establishment of probable flow sheet from preliminary test work data; major process flow diagrams; initial determinations of material and heat balances Estimates for unit rates and quantified estimates with some factoring Estimates from historic factors, percentages and vendor quotes based on materials volumes The design work for the Proyekt requirements is very similar to FS. The key difference is the way the study is presented. The Konditsy Take does Away not Statement address processing

Tailings Scoping: Review of data, possible site visit, limited preliminary analysis and reporting PFS: Site selection study, possibly start drilling on site, logging, sample collection, laboratory testwork, intermediate analysis and reporting FS: Detailed design on chosen option. More drilling, logging, sample collection, laboratory testwork, final analysis and reporting Take Away Statement

Environmental and Social SS includes review of available data, site visit, identification of key issues and reporting. Inputs data collection is started PFS requires substantially more environmental work than a TEO Konditsy. Requires a scan and baseline work that wouldn't normally be part of a Konditsy eg Public consultation. The OVOS work for the Proyekt requirement is similar to FS (there are significant differences) and would be sufficient to cover the JORC reporting of Reserves requirement. Local and international studies may be significantly different. CP must decide if environmental issues are material Take Away Statement

Financial SS includes a generalized model to join the dots The analysis of cash flows in a TEO Konditsy or Proyekt tends to be less detailed than PFS / FS. Needs annual cashflows based on production schedule Models equipment purchases (new, sustaining, replacement) Calculation of NPV is sensitive to annual cashflow Important to estimate initial capital investment, time until initial production and annual cashflows Greater detail may be needed for marginal projects The CP uses Take the Away financial Statement model to determine what the project is sensitive to

Purpose of a Review To verify the key facts and projections used to enable an investment decision to be made Resource-Reserve audit for annual reporting Stock exchange listing (CPR) to raise money Debt finance check if the Feasibility study is prepared to a Bankable level Merger & Acquisition what are we buying? Internal investment decision should we invest in the new project? Business Improvement technical or operational, save costs, improve efficiency Needs to clearly communicate: Available information Checks done by the reviewer Limitations in the work done Reviewer s opinion on the confidence of the projections Risks & opportunities Any proposed adjustments Report must be written in clear and simple language Avoid jargon, Focus on materiality Take A review Away can Statement be done for many purposes

Competent Persons Report (CPR) Objective: to enable investors to understand the: facts & projections Orebody type, operational challenges (location, climate, etc.), Mining method, processing method operational capacity, licence details Resource-reserve estimate; Production schedule; Capital investment projections confidence in the company s statements (conservative / optimistic / aggressive) Produced to present a plan for which finance is sought risks & opportunities (equity investors need to know this) : ensure probability & impact are clearly communicated Risks should ideally be quantified to demonstrate if material or not Best for clients to under promise / over deliver to build investor confidence Advise client if projections are unlikely to be achieved NPV calculation may not be made public Report Long form report: more detailed analysis shown to the client and other advisers but not included in the Listing Particulars Short form report: summarised version of key facts included in Listing particulars Wording often negotiated Whilst / However / But CPR should agree with statements in rest of Listing Particulars Need to review rest of LP Client usually has to adopt SRK adjustments Every Take stock Away exchange Statement is different! They all have different disclosure requirements

Debt finance Similar to CPR but more focused on risks Need to assign value to material risks Adjustments to the FS / LoMp are normally a key deliverable for banks considering debt Key issue is always the FS or LoMp. Are they bankable? A revision to the LoMp may be required Technical improvements / extra work may be necessary No interest in upside Bankers apply stress tests Ability to repay debts when prices lower / costs higher / production rates lower/later Mine life > reserves +30% Focused on the confidence in the initial years Project economics may have a bearing on the borrowing costs Providers Take Away of debt Statement need to know will the project pay the loan back?

M & A More focused on scenarios what issues do the mines have? Eg dilution, declining grades etc Base Case (targets own projections) Upside Synergy Need to assign a value to risks & opportunities Results likely to be shared with target to explain reasons for any difference in valuation Model needs to be self-explanatory Parameters need to be obvious and easy to change Be aware of too many parameters changing final figure changes and reduces confidence in the model. Production Take Away History Statement is key they tend to continue the way they have in the past unless there is good reason

Internal Investment Decision Can be riskier eg client who wants to build a mine based on an inferred resource Key objective is to validate the methodology and assumptions used Have the alternatives been considered (including do nothing)? Are the parameters reasonable? Is the method of attributing impact reasonable? If there are alternative solutions the valuation should consider the NPV of each alternative Have the full impact on costs been considered? Take It can Away be tricky Statement internal decisions don t need to follow a standard eg JORC

Key Issues Encountered from Reviews (1) Part of the deposit lies outside the licenced area for extraction. There is no excuse for this. The FS or LoMp is been generated without the PFS stage and therefore no option studies have been carried out. Option studies are vital in order to extract the most value from a project. SRK disagrees with the Resource estimate. Eg the technical work may not follow the JORC Code even though the author claims that it is. Independent reviews of JORC estimates are vital SRK disagrees Reserve estimate. Eg consultants preparing estimates for dilution have no experience of that type of mining. Experienced and qualified professionals should be used Head office strategic mine plan has no reflection of the reality at that site. A good life of mine plan should be prepared in consultation with site staff. Life of mine plan has a schedule of tonnes and grade but no capital to support it. In order to report reserves there has to be plan detailed to a PFS level. Change in ore type eg oxide to sulphide does not have sufficient provisions in the model. Changes need to be planned for. LoMp not detailed enough to present development / preparation works required to start the project. Some consultants prepare documents labelled bankable when they are not. Good communication Take Away with Statement the team and client is essential

Key Issues Encountered from Reviews (2) Costs are not based on quotes or are in a format that cannot be audited. For a project to be considered bankable there must be an audit trail on all data. Financial model is not detailed enough to support project financing. The loan payback period needs to be presented monthly or quarterly. Metallurgical testwork is not representative of the orebody. In order to design the process flowsheet, the samples must reflect the material that will be processed. Insufficient site base fieldwork has been carried out to support the design work. Significant geological, geotechnical, hydrogeological and geochemical fieldwork needs to be completed to support an FS or LoMp Project not compliant with local or international environmental laws / best practices. Lenders are highly sensitive to environmental and social issues even if local laws are not broken. Good communication Take Away with Statement the team and client is essential

Thank you for your attention! Take Away Statement ssabanov@srk.co.uk

COPYRIGHT AND DISCLAIMER Copyright (and any other applicable intellectual property rights) in this document and any accompanying data or models is reserved by SRK Consulting (UK) Limited ("SRK") and is protected by international copyright and other laws. This document may not be utilised or relied upon for any purpose other than that for which it is stated within and SRK shall not be liable for any loss or damage caused by such use or reliance. In the event that the recipient of this document wishes to use the content of this document in support of any purpose beyond or outside that which it is expressly stated or for the raising of any finance from a third party where the document is not being utilised in its full form for this purpose, the recipient shall, prior to such use, present a draft of any report or document produced by it that may incorporate any of the content of this document to SRK for review so that SRK may ensure that this is presented in a manner which accurately and reasonably reflects any results or conclusions produced by SRK. The use of this document is strictly subject to terms licensed by SRK to its client as the recipient of this document and unless otherwise agreed by SRK, this does not grant rights to any third party. This document shall only be distributed to any third party in full as provided by SRK and may not be reproduced or circulated in the public domain (in whole or in part) or in any edited, abridged or otherwise amended form unless expressly agreed in writing by SRK. In the event that this document is disclosed or distributed to any third party, no such third party shall be entitled to place reliance upon any information, warranties or representations which may be contained within this document and the recipient of this document shall indemnify SRK against all and any claims, losses and costs which may be incurred by SRK relating to such third parties. SRK Consulting (UK) Limited 2013 Take Away Statement