EnMS (energy management systems) Package for Small Commercial Buildings



Similar documents
Accelerated aging of roofing surfaces

DOE Smart Grid Investment Grant Program: Dynamic Pricing & Consumer Behavior Studies

Commercial Building Energy Benchmarking and Labeling

Highly insulating Residential Windows Using Smart Automated Shading

City of Lynchburg. Information Technology Strategic Plan FY16 FY18

Consolidated Edison of New York: Residential HVAC Program Process Evaluation Summary

Pilot Program Description: Building EMIS

1.4 PUE The New Mandate for Federal Data Center Energy Efficiency. Strategic Sustainability Performance Plan (SSPP)

Energy Design Assistance Project Tracker (EDAPT) New Project 2014 Building Technologies Office Peer Review

JISC Brief Progress Report Template

BCSE Briefing: Driving US Economic Growth and Jobs. Chris Perrault, Vice President January 26, 2011

Integrated Technology Plan (FY10 FY12)

How To Get A Better Understanding Of Energy Efficiency

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

2014/ /17 ELECTRICITY EFFICIENCY PLAN

User interfaces: smart phone/web-based Control algorithms: schedule, optimization, demand response. Database (Time series service) smap driver

Title: DISASTER RECOVERY/ MAJOR OUTAGE COMMUNICATION PLAN

Managed Services Becoming a Vendor Lane Smith Ken Vanderweel

Using Organizational Change Management Principles to Create a Scalable OCM Methodology

1.) Would it be possible to receive an extension of at least 2 weeks for the proposal due date?

California Department of Mental Health Information Technology Attention: MHSA-IT th Street, Room 141 Sacramento, CA 95814

Project Management Guidelines

H 2 O Water Benchmarking Pilot Report. Performance of the Canadian Office Sector PREPARED BY

Building Energy Information Systems:

Submitted by: Christopher Mead, Director, Department of Information Technology

How To Understand Energy Management

Project Charter EMI Outreach July 25, OE Project Charter. 1.0 July 25, 2011 Draft w/ VC Denton comments included /02/2011 Proofed/edited

Energy and Water Efficiency Management Practice Guide

Introduction to the ITS Project Management Methodology

CDC UNIFIED PROCESS PRACTICES GUIDE

UNIVERSITY OF CALIFORNIA Office of Academic Personnel Academic Personnel Manual (APM) Policy Development Process Guide

State of XXXXX. Project Name/Phase (Planning Development Implementation) Status Report. Date Ending: Mm/dd/yy

A BIG DATA APPROACH TO ENERGY MANAGEMENT IN RETAIL

2.1 Initiation Phase Overview

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU

Date Approved by EMT: Version 1, approved 1 March Date Approved by GM: Version 1, approved 1 March 2014

CarbonSmart 商 界 減 碳 建 未 來

2003 Patricia Ensworth Page 1

PENNSYLVANIA GREEN ENERGY LOAN FUND

Effective reporting for construction projects: increasing the likelihood of project success

CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting

Application of King III Corporate Governance Principles

Request for Proposals Evaluation Guide

Weatherization COURSE CATALOG. Contents Weatherization Courses Energy Efficiency Courses

Creating Credible, Actionable Energy Audits

BWH & CEEH 2 - A Model of Strategic Energy Management

U.S. Postal Service s Delivering Results, Innovation, Value, and Efficiency Initiative 30 Achieve 100 Percent Customer and Revenue Visibility

Compass Working Capital Financial Stability and Savings (FSS) Program Growth Plan:

Essential Elements for Any Successful Project

E2E Project Management Process Governance (Electric Capital)

Department of Administration Portfolio Management System 1.3 June 30, 2010

Independent Evaluation of NRC s Implementation of the Federal Information Security Modernization Act of 2014 for Fiscal Year 2015

Manage Release and Deployment

Our risk management framework Reviewed quarterly by our executive committee

Green ICT Project. Project Management Plan. Project Manager: Samuel Fernandes. Date: March Version: 2.0

Identify Ways to Save with Energy Audits

Interpreting the HIPAA Audit Protocol for Health Lawyers

The Growing EE Workforce Infrastructure

USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan

Transcription:

BTO Program Peer Review EnMS (energy management systems) Package for Small Commercial Buildings Jessica Granderson Lawrence Berkeley National Laboratory JGranderson@lbl.gov 510.486.6792 April 4, 2013 1 Program Name or Ancillary Text eere.energy.gov

Purpose & Objectives Problem Statement: Small commercial buildings present two challenges for implementing energy efficiency strategies 1) high transaction cost relative to total savings 2) lack of personnel time or skill available for energy management Objective: Develop packaged, highly commoditized energy management systems (EnMS) for small commercial buildings that can be delivered with sufficiently low transaction costs, for 5-10% site energy savings 2 Building Technologies Office eere.energy.gov

Purpose & Objectives Impact of Project: Based on CBECS data, small buildings targeted (office, retail, food) comprise 24% of commercial energy use representing 1570 TBtu Assuming just 5% market penetration within several years of the first pilot, and 5-10% site savings, 4-8 TBtu savings could be generated Project Focus: Supports midterm BTO goal of 40% savings in energy to operate existing commercial buildings, at less than the cost of energy saved Aligns with CBI strategies: accelerate advanced solutions into existing buildings, energy mgt and continuous improvement Aligns with CBI program role/priority: voluntary activities for increased efficiency, emphasizing market-viable yet under-utilized resources 3 Building Technologies Office eere.energy.gov

Approach Approach: Combine existing approaches, e.g., meter data analysis, incentive matching, into a single low-cost solution delivered by HVAC contractors Key Issues: Very low level of effort (~4 hours); business model development; identification of deployment channels for scaled dissemination; demonstration design to generate necessary proof points for adoption Distinctive Characteristics: Utilizes contractors who already serve small commercial market; creates new business value proposition for contractors and owners 4 Building Technologies Office eere.energy.gov

Approach Existing benchmarking tools (free) 5 Building Technologies Office eere.energy.gov

Approach Existing utility and interval data analysis tools (low/no cost) 6 Building Technologies Office eere.energy.gov

Approach Existing walk-through checklists and guides 7 Building Technologies Office eere.energy.gov

Accomplishments and Progress Accomplishments: Concept vetting and confirmation of intended approach with ~20 stakeholders contractors, tools vendors, utility reps w/ small commercial focus Partner commitments for pilot demonstration- 2 contractors and 4 buildings Progress on Goals: Project is progressing relative to goals, as planned draft package by May, demos in May/June Awards/Recognition: n/a 8 Building Technologies Office eere.energy.gov

Project Plan & Schedule Task Overview Task 1 Analyze market need and potential - completed Task 2 Develop technical and business approach, obtain pilot partner commitments - completed Task 3 Develop EnMS package and business model - in progress Task 4 Demonstrate in pilot, track impacts, disseminate results to seed deployment future task Fiscal Year 2013 November: January: August: September: Market need and potential Technical and business approach; pilot partners Full EnMS package; business model Final results for deployment 9 Building Technologies Office eere.energy.gov

Project Plan & Schedule Project initiated October 2012 Planned completion September 2013 2 go/no-go decision points, both have occurred Q1: Evidence of necessity and value of DOE investment in proposed EnMS (scoping study, stakeholder feedback) Q2: Commitment from providers and owners to participate in pilot demonstration On schedule, no slips 10 Building Technologies Office eere.energy.gov

EnMS Package Description EnMS Activity Peer benchmarking, monthly bill analysis Electric interval meter data analysis Walkthrough to identify operational or modest capital improvements Identify incentives to support capital improvements Savings assessment and continuous tracking Communication of results EnMS Package Contents Template and instructions for collecting data; Instructions on how to use existing tools, interpret and record results Audit checklists and guidelines; tracking sheet, and instructions on how to resolve issues Pointers to online tools and how to find local small commercial utility programs Instructions on how to use existing tools; what to quantify Guidelines on goal setting; template to compile results 11 Building Technologies Office eere.energy.gov

EnMS Package Description 12 Building Technologies Office eere.energy.gov

EnMS Activity Example: Interval meter data analysis 13 Building Technologies Office eere.energy.gov

Project Budget Project Budget: $250K Variances: None expected Cost to Date: $70K, expected increase in spend rate to support pilot demonstration Additional Funding: n/a Budget History FY2013 FY2014 DOE Cost-share DOE Cost-share $250K n/a TBD TBD 14 Building Technologies Office eere.energy.gov

Project Integration, Collaboration & Market Impact Partners, Subcontractors, and Collaborators: Demonstration partners Marina Mechanical and RRR Heating and Air Conditioning Technology Transfer, Deployment, Market Impact: 6 potential deployment pathways have been identified 1. Contractor training venues 2. Contractor professional orgs 3. Cities and states with energy use reporting requirements 4. Utility programs targeting small commercial 5. Building Owners and Managers Association (BOMA) 6. Environmental business certification bodies, e.g. Green Seal Communications: n/a 15 Building Technologies Office eere.energy.gov

Next Steps and Future Plans Next Steps and Future Plans: Following FY13 development and demonstration, potential next steps concern dissemination of pilot results engagement of deployment partners via high-priority pathways scaling/testing in diverse US markets 16 Building Technologies Office eere.energy.gov