Power Plant Economics Carl Bozzuto

Similar documents
GENERATION TECHNOLOGY ASSESSMENT

The Future of Coal-Based Power Generation With CCS UN CCS Summit James Katzer MIT Energy Initiative web.mit.edu/coal/

Levelised Cost of Electricity for a Range of New Power Generating Technologies. Sciences and Engineering (ATSE)

PROJECT FINANCIAL EVALUATION

Introduction to Project Finance Analytic Methods

CHP - The Business Case

Financing New Coal-Fired Power Plants

Making Coal Use Compatible with Measures to Counter Global Warming

Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets. Jared Moore and Jay Apt.

The Cost of CCS for Natural Gas-Fired Power Plants

Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario

H LEVELISED COST OF ELECTRICITY - PV

Gas-Fired Power HIGHLIGHTS

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Draft Electric Resource Plan Technical Workshop. Technology Screening Analysis

Electricity Generation Cost Model Update Revision 1. Department for Energy and Climate Change

Present and Future Cost of New Utility- Scale Electricity Generation

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

Pulverized Coal Oxycombustion Power Plants Final Results

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2010 Monitoring Report

LAZARD'S LEVELIZED COST OF ENERGY ANALYSIS VERSION 8.0 SEPTEMBER 2014

Estimating Future Costs of CO 2 Capture Systems

Sixth Annual Conference on Carbon Capture & Sequestration

WHEN AN EFFECTIVE EU ENERGY POLICY?

CLEAN ENERGY PROJECT ANALYSIS WITH RETSCREEN SOFTWARE

Cost and Performance Assumptions for Modeling Electricity Generation Technologies

Financial and Cash Flow Analysis Methods.

CO 2 Regulation and Electricity Pricing

CHP in the Ethanol Industry: The Business Case. April 1st, 2004 Bruce Hedman Energy and Environmental Analysis, Inc

EPA Clean Power Plan and Impact on Texas and the Country. Scott D. Deatherage

How To Reduce Coal Power Plant Emissions

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA

Next Generation Nuclear Plant Business Models for Industrial Process Heat Applications

Biocoal for Renewable. Copyright Bepex International 2011 All Rights Reserved

Alstom Development of Oxyfuel PC and CFB Power Plants

1: Levelized Cost of Energy Calculation. Methodology and Sensitivity

What Coal Technologies Can Do to Reduce Global CO2 Emission

Economics of Traditional Planning Methods

Content Chapter 3.5. Role of business Planning today. Basic concepts. Telecom business modeling. Typical evaluation results

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

The Market-Determined Cost of Inputs to Utility-Scale Electricity Generation

How To Run A Power Plant

Draft consolidated baseline and monitoring methodology ACM00XX

The Economics of Nuclear Power: Is New Nuclear Competitive?

A Review of the Costs of Nuclear Power Generation

ITU / BDT- COE workshop. Network Planning. Business Planning. Lecture NP Nairobi, Kenya, 7 11 October 2002

How To Make A Mine Guard Fosil Process

Sixth Annual Conference on Carbon Capture & Sequestration

Electricity Generation Costs

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN

Greenhouse gas abatement potential in Israel

Biomass-to-Fuel-Cell Power For Renewable Distributed Power Generation

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

Smarter Energy: optimizing and integrating renewable energy resources

SIEMENS technologies compatible with environmental requirements like reduction of CO 2 emissions. ISBF conference. Bratislava, 9-10 February 2009

OBSTACLES TO GREEN ELECTRICITY GENERATION BUSINESS

The Effect of EPA s Proposed NSPS on. Carbon Capture and Storage Technology

GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products

Low Load Operational Flexibility for Siemens G-class Gas Turbines

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Putting a chill on global warming

Carbon Capture. Investment for the Future

Simple project evaluation spreadsheet model

Economic Outcomes of a U.S. Carbon Tax. Executive Summary

8. Financial Assumptions

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2012 Monitoring Report

LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING

Evolving Gasification technology to provide Innovative Low Carbon Solutions for the European Market

David Mezzacappa, P.E. SCS Engineers Contractor to U.S. EPA on LMOP

John KW Hou, Ph.D. World- Wide Director, Industry Solutions Member of IBM Industry Academy IBM Corporation. José R. Favilla Jr

The Cost of Power Generation

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

DATA CENTRE DESIGN AND

DOE/NETL-2010/???? DOE/NETL-2011/1455

Pet Coke Consulting, LLC. Phil Fisher Argus Conference, Houston September 19-21, 2012

Fact Sheet on China s energy sector and Danish solutions

Growing your greenhouse business faster with gas engines.

Praxair, Inc. Ray Roberge Sr. VP and Chief Technology Officer

Power Plant Operations and Maintenance. Maximize Your Plant s Bottom-Line Results

Energy Projections Price and Policy Considerations. Dr. Randy Hudson Oak Ridge National Laboratory

POLICY ON COAL-FIRED POWER GENERATION

COST OF GREENHOUSE GAS MITIGATION [21jun, 10jul 1pm]

SMR Financing and Economics. The Nuclear Option: Is Small Scale Nuclear Energy an Option for Alaska?

Transcription:

Power Plant Economics Carl Bozzuto ALSTOM 2006. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden

Overview Economic Terms Economic Methodologies Cost Models Pitfalls Cost Studies Results Some words about CO2 Conclusions 2

Economic Terms Return on Sales = Net after tax/sales revenue Asset turnover = Sales revenue/assets Leverage = Assets/Equity PE Ratio = Stock Market Price (per share)/net after tax (per share) Market/Book Ratio = Stock Market Price (per share)/equity (per share) Return on Assets = Net/Assets Return on Equity = Net/Equity Discount Rate = Time value of Money Net Present Value = Present Value of Future Returns @ Discount Rate Internal Rate of Return = Discount Rate which yields an NPV of zero 3

Why do we care? ROS x Turnover x Leverage x PE = Market/Book Listed firms want to increase stock price (shareholder value) The Discount Rate considers risk as well interest rates and inflation The discount rate is often a project hurdle rate Many firms use IRR for project evaluation Return on Equity is a key consideration for any investment 4

Economic Methodologies A Power Plant is a long lived asset that is capital intensive. It also takes a long time to acquire the asset. Construction times range from 2 years for a combined cycle plant to 3 4 years for a coal plant to 10 years for a nuclear plant. A key issue is treating the time value of money. Depreciation is a key consideration. Different entities treat these considerations differently. 5

Plant Cost 6 Plant Cost is exceptionally site specific. Labor costs Shipping and material costs Environmental costs Site preparation costs Site impacts on performance Fuel costs Cooling water type and availability Connection costs Today, we really don t know what the final cost of a plant will be. Raw material escalation Shipping costs Labor costs

Plant Cost Terminology 7 There are numerous ways to talk about plant cost. Engineered, Procured, and Constructed (EPC cost) Most commonly used today Fits best with Merchant Plant model Does not included Owner s Costs Ø Land, A/E costs, Owner s Labor, Interconnection, Site Permits, PR, etc. Can often be obtained as a fixed price contract for proven technology Equipment Cost Generally the cost to fabricate, deliver, and construct the plant equipment Overnight Cost Either the equipment cost or the EPC cost with the NPV of interest during construction. This was used in the 70s and 80s to compare coal plants with nuclear plants due to the difference in construction times. Total Installed Cost (TIC) The total cost of the equipment and engineering including interest during construction in present day dollars. This is the cost that a utility would record on its books without the cost of land and other home office costs. Total Plant Cost (TPC) includes all costs

Economic Methodologies Simple payback 8 The number of years it takes to pay back the original investment Return on Equity For regulated utilities, the ROE is set by the regulatory body. The equity is determined by the total plant cost being allowed in the rate base. The equity portion is determined by the leverage of the company. The ROE is applied to the equity and added to the cost in determining the cost of electricity and thus the rate to be charged to the customer. Capital Charge Rate This is the rate to be charged on the capital cost of the plant in order to convert capital costs (ie investment) into operating costs (or annual costs). This rate can be estimated in a number of ways. This rate generally includes most of our ignorance about the future (ie interest rates, ROE, inflation, taxes, etc.) Discounted Cash Flow Analysis This method is preferred by economists and developers. A spread sheet is set up to estimate the cash flows over the life of the project. An IRR can be calculated if an electricity price is known (or estimated).

Economic Methodologies All of these methods can be made equivalent to one another for any given set of assumptions. A simple payback time can be selected to give the same cost of electricity (COE) as the other methods. A return on equity can be selected to give the same COE. A capital charge rate can be selected to give the same COE. The Discounted Cash Flow method is considered the most accurate. However, there are still a considerable number of assumptions that go into such a model such as the discount rate, inflation rate, tax rate, interest rates, fuel prices, capacity factors, etc. that the accuracy is typically less in reality. The Independent Power Producer pioneered the use of the DCF model for smaller power projects. In this model, the developer attempted to fix as many costs as possible by obtaining fixed price contracts for all of the major cost contributors. These included the EPC price, the fuel contract, the Operations & Maintenance Contract (O&M), and the Power Purchase Agreement. 9

Cost Models Capital Charge Rate Model The goal is to select a capital charge rate that typically covers most of the future unknowns. This rate is applied to the EPC cost in order to provide an annual cost that will provide the desired return on equity. In its simplest form, one can use the following: Interest rate on debt - 8-10% for utility debt ROE - 10 12 % for most utilities Inflation rate - 3 4% Depreciation - 2 4% Taxes and Insurance - 3 5% Risk -? (typically 3% for mature technologies, higher for others) Another approach would be to run a number of DCF cases with different assumptions and then assess a capital charge rate that is consistent. A reasonable number for a regulated utility is 20% (one significant figure) 10

Discounted Cash Flow Model The goal is to estimate the cash flows of the project over the life of the plant. A significant number of variables are involved and must be estimated or assumed in order to make the spread sheet work. 11 Input variables include net output, capacity factor, availability, net plant heat rate (HHV), degradation, EPC price, construction period, insurance, initial spares/consumables, fixed O&M, variable O&M, fuel price, fuel heating value (HHV), financial closing date, reference date, depreciation, analysis horizon, owner s contingency, development costs, permitting costs, advisory/legal fees, start up fuel, fuel storage, inflation rates, interest rates, debt level, taxes, construction cash flow, discount rate, and ROE. A detailed cash flow analysis is set up for each year of the project. For shorter term projects, these estimated cash flows are more realistic. For longer term projects, the accuracy is debatable. Since the cash generation may be variable, it is often desirable to perform some kind of levelizing function to generate an average that is understandable. There are risks associated with this step. The most common application is to assume a market price for electricity and then try to maximize the IRR for the project.

Discounted Cash Flow Model The model assumes that we know a lot about the project and the number of variables. What if we don t know very much about the future project? For example, what if we don t know where the plant will be located? What if we don t know which technology we will use for the plant? What if we want to compare technologies on a consistent basis? One approach is to run the DCF model backwards. In this approach, we stipulate a required return and calculate an average cost of electricity needed to generate that return. We still need to make a lot of assumptions, but at least we can be consistent. One advantage of having such spread sheet programs is that a wide range of scenarios and assumptions can be tested. This approach gives us a little more insight into the decision making process and helps us understand why some entities might chose one technology over another. 12

Typical Construction Period w/cash Drawdown 1. Cumulative Drawdown 0 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47-100,000-200,000-300,000-400,000-500,000-600,000 13

Typical Levelized Cash Flow 4. Ending Equity Cashflow 50,000 0 1 (50,000) 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 (100,000) (150,000) (200,000) (250,000) (300,000) (350,000) 14

Pitfalls The biggest pitfall is thinking that these numbers are real. They are only indicative. Just because a computer can calculate numbers to the penny does not mean that the numbers are accurate. There is a lot of uncertainty due to the number of assumptions that have to be made. It is important to understand what the goal and/or objective of the analysis is. In the following study, the goal was to compare technologies that might be used in the future. This goal is different from looking at a near term project where the site, technology, fuel, customer, and vendors have already been selected. There is no substitute for sound management judgement. The analysis itself does not identify the risks. The analyzer must consider the risks and ask the appropriate what if questions. In the following study, over 3,000 spread sheet runs were made in order to analyze the comparisons effectively. Avoid the Swiss Watch mentality. 15

Technology Position and Experience Experience Base Major Competitors Technology Maturity Sub-Critical PC 1,200 GW Alstom,MHI, B&W, FW and Several Others Mature Super-Critical PC 265 GW Alstom,MHI, B&W Proven PFBC 0.5 GW Demo IGCC 1 GW GE, Shell, Conoco Phillips Demo CFB 20 GW Alstom, FW Proven NGCC 200 GW GT 100 GW ST GE, Siemens, Alstom Mature 16

Baseline Economic Inputs 1997 400 MW Class Size (MW) Capital Cost ($/ kw) Heat Rate (Btu/ kwh) Availability (%) Cycle Time (months) Fixed O&M ($/ kw) Variable O&M (mills/ kwh) Subcritical Supercritical P800 PFBC IGCC 400 400 400 400 1,000 1,050 1,100 1,380 9,374 8,385 8,405 8,700 80 80 80 80 36 36 48 48 31.14 32.11 33.69 39.08 0.77 0.69 1.01 0.42 Source: Market Market ABB GE 17

Baseline Economic Inputs 1997 100 MW Class Size (MW) Capital Cost ($/ kw) Heat Rate (Btu/ kwh) Availability (%) Cycle Time (months) Fixed O&M ($/ kw) Variable O&M (mills/ kwh) CFB P200 PFBC NGCC 100 100 270 1,000 1,200 500 10,035 8,815 6,640 80 80 80 30 32 24 44.13 55. 41 16.92 1.18 1.06 0.01 Source: Market ABB PGT 18

Baseline Economic Inputs - 2005 400 MW Class Size (MW) Capital Cost ($/ kw) Heat Rate (Btu/ kwh) Availability (%) Cycle Time (months) Fixed O&M ($/ kw) Variable O&M (mills/ kwh) Subcritical Supercritical P800 PFBC IGCC 400 400 400 400 750 750 750 1,100 8,750 8,125 8,030 7,800 80 80 80 80 24 24 30 36 26.33 26.33 26.95 33.69 0.81 0.75 1.05 0.37 Source: BA Plan BA Plan SECAR GE 19

Baseline Economic Inputs 2005 100 MW Class Size (MW) Capital Cost ($/ kw) Heat Rate (Btu/ kwh) Availability (%) Cycle Time (months) Fixed O&M ($/ kw) Variable O&M (mills/ kwh) CFB P200 PFBC NGCC 100 100 270 725 850 325 9,350 8,530 6195 80 80 80 18 22 18 38.84 48.67 16.44 1.15 1.12 0.01 Source: BA Plan SECAR PGT 20

Financing Scenario Summary Loan structure Municipal Utility IPP 1 IPP 2 Industrial Horizon (years) 40 30 15 15 10 Interest rate (%) 5.75 7.75 8.75 8.75 8.25 Loan term (years) 40 30 9 9 10 Depreciation (years) 40 30 15 15 10 Equity (%) 0 50 30 50 75 Debt (%) 100 50 70 50 25 ROE (%) n/a 10 20 20 23 Taxes (%) 0 20 30 30 30 21

10.0 Comparison of Financing Scenarios 400 MW Subcritical PC Fired Plant Levelized Tariff, c/ kwh 9.0 8.0 7.0 6.0 5.0 4.0 3.0 Financial Fixed O&M Variable O&M Fuel Financial costs have major influence on COE 2.0 1.0 0.0 Municipal Utility IPP-1 IPP-2 Industrial Financing Arrangement 22

4.0 3.5 3.0 Financial Fixed O&M Variable O&M Fuel Comparison of Technologies Municipal Financing - 1997 (80% CF, $1.20 coal and $3.00 gas) Levelized Tariff, c/ kwh 2.5 2.0 1.5 1.0 0.5 0.0 Subcrit PC Super PC P-800 IGCC P-200 (100 MW) CFB (100 MW) NGCC (270 MW) 23

24 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Subcrit PC Super PC Comparison of Technologies Utility Financing - 1997 (80% CF, $1.20 coal and $3.00 gas) P-800 IGCC P-200 (100 MW) CFB (100 MW) Financial Fixed O&M Variable O&M Fuel NGCC (270 MW) NGCC looks better on total COE, but worse on dispatch basis. Higher financial cost increases influence on COE Levelized Tariff, c/ kwh

8.0 7.0 Financial Fixed O&M Variable O&M Fuel Comparison of Technologies IPP(1) Financing - 1997 (80% CF, $1.20 coal and $3.00 gas) 6.0 Levelized Tariff, c/ kwh 5.0 4.0 3.0 2.0 1.0 0.0 Subcrit PC Super PC P-800 IGCC P-200 (100 MW) CFB (100 MW) NGCC (270 MW) 25

9.0 8.0 7.0 Financial Fixed O&M Variable O&M Fuel Comparison of Technologies IPP(2) Financing - 1997 (80% CF, $1.20 coal and $3.00 gas) Levelized Tariff, c/ kwh 6.0 5.0 4.0 3.0 2.0 1.0 0.0 Subcrit PC Super PC P-800 IGCC P-200 (100 MW) CFB (100 MW) NGCC (270 MW) 26

16.0 Comparison of Technologies Industrial Financing - 1997 (80% CF, $1.20 coal and $3.00 gas) 14.0 Financial Fixed O&M Variable O&M Fuel 12.0 Levelized Tariff, c/ kwh 10.0 8.0 6.0 4.0 2.0 0.0 Subcrit PC Super PC P-800 IGCC P-200 (100 MW) CFB (100 MW) NGCC (270 MW) 27

Capacity Factor Effect on COE Municipal Financing - 1997 ($1.20 coal and $3.00 gas) 8.0 Levelized Tariff, (c/ kwh) 7.0 6.0 5.0 4.0 Dispatch rate and/or capacity factor have major influence on COE Subcrit PC Supercrit PC P-800 IGCC P-200 CFB NGCC 3.0 2.0 20% 30% 40% 50% 60% 70% 80% 90% 100% Capacity Factor, (%) 28

3.5 Impact of Availability on COE Municipal Financing - 1997 ($1.20 coal) 3.4 Levelized Tariff, (c/ kwh) 3.3 3.2 3.1 3.0 2.9 2.8 5 days lost availability makes sub and supercritical equal. ~5 days Subcrit PC Supercrit PC 2.7 2.6 2.5 6,500 6,600 6,700 6,800 6,900 7,000 7,100 7,200 7,300 7,400 7,500 Capacity, (hrs/ year) 29

20% 15% Sensitivity Analysis Subcritical PC 1997 IPP1 Financing - $1.20 coal In %, change in availability and EPC price have highest influence on COE 10% Change in COE, (%) 5% 0% -5% -10% -15% -20% Availability EPC price Plant heat rate Fixed O&M Cycle time Var O&M -20% -15% -10% -5% 0% 5% 10% 15% 20% Percent Variable Change 30

20% 15% 10% Sensitivity Analysis NGCC 1997 IPP1 Financing - $3.00 gas For NGCC %, change in availability and efficiency have highest influence on COE Change in COE, (%) 5% 0% -5% -10% -15% Availability EPC price Plant heat rate Fixed O&M Cycle time Var O&M -20% -20% -15% -10% -5% 0% 5% 10% 15% 20% Percent Variable Change 31

NGCC high due to fuel cost 32 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Subcrit PC Comparison of Technologies China 1997 Municipal Financing Conditions ($1.80 coal and $5.00 LNG) Financial Fixed O&M Variable O&M Fuel Supercrit PC P-800 IGCC P-200 CFB NGCC First cost less important fuel sensitive due to high cost Levelized Tariff, (c/ kwh)

7.00 Comparison of Technologies China 1997 IPP Financing Conditions ($1.80 coal and $5.00 LNG) 6.00 Levelized Tariff, (c/ kwh) 5.00 4.00 3.00 2.00 1.00 Financial Fixed O&M Variable O&M Fuel 0.00 Subcrit PC Supercrit PC P-800 IGCC P-200 CFB NGCC 33

Comparison of Technologies Japan Market Conditions - 1997 ($2.90 coal and $5.00 LNG) 5.0 4.5 4.0 Levelized Tariff, c/ kwh 3.5 3.0 2.5 2.0 1.5 1.0 First cost less important fuel sensitive due to high cost Financial Fixed O&M Variable O&M Fuel 0.5 0.0 Subcrit PC Super PC P-800 IGCC P-200 (100 MW) CFB (100 MW) NGCC (270 MW) 34

12% 10% NPHR Improvement (%) 35 8% Net Plant Heat Rate Summary 8,750 9,375 8,385 8,125 8,405 8,030 8,700 7,800 8,815 8,530 6,640 6,195 9,350 10,035 12,000 10,000 8,000 6,000 4,000 2,000 0 7% Subcrit PC 3% Super PC 10% 4% 3% PFBC-P800 IGCC PFBC-P200 (100 MW) 7% 7% 1997 2005 Improvement CFB (100 MW) NGCC (270 MW) 6% 4% 2% 0% Net Plant Heat Rate (Btu/kW)

EPC Price ($/kw, net) $1,600 $1,400 $1,200 $1,000 $800 $600 $1,000 25% $750 $1,050 29% $750 Summary of EPC Prices $1,100 32% $750 $1,380 $1,100 $1,200 20% 29% $850 $1,000 1997 2005 % Decrease 28% $725 40% 35% 30% 25% 20% 15% EPC Decrease (%) $400 $350 $325 10% 7% $200 5% $0 Subcrit PC Super PC PFBC-P800 IGCC PFBC-P200 (100 MW) CFB (100 MW) NGCC (270 MW) 0% 36

2,000 Coal Technology Cost Trends Extrapolated to 2005 EPC Price ($/kw, net) 1,800 1,600 1,400 1,200 1,000 800 600 Subcritical PC Supercritical PC P800 P200 400 all 400 MW technologies have the same mid term target 200 0 1989 1991 1993 1995 1997 1999 2001 2003 2005 Year 37

Market Trends Carbon Steel Price Trends 175 Index Base 1982 150 125 100 01/02 01/03 01/04 01/05 01/06 Month 38

Market Trends Nickel Trend: 2000-2006 16.20 15.80 15.40 15.00 14.60 14.20 13.80 13.40 13.00 12.60 12.20 11.80 11.40 11.00 10.60 10.20 9.80 9.40 9.00 8.60 8.20 7.80 7.40 7.00 6.60 6.20 5.80 5.40 5.00 4.60 4.20 3.80 3.40 3.00 2.60 2.20 1.80 January February March April May June July August September October November December January February March April May June July August September October November December January February March April May June July August September October November December January February March April May June July August September October November December January February March April May June July August September October November December January February March April May June July August September October November December January February March April May June July August September October November December Spot Nickel 2000 2001 2002 2003 2004 2005 2006 Month / Year Low Ni Avg. Spot Ni High Ni 39

Today s Costs (Estimated) Today s debate centers around conventional pulverized coal plants (PC) and integrated gasification combined cycle plants (IGCC). As we have seen, the current level of development for IGCC makes it uncompetitive with PC, which explains why very few have been built. The claim for the future is that the cost of capture of CO2 to mitigate greenhouse gas concentrations in the atmosphere will be more expensive for PC than for IGCC. Further, as IGCC develops, its costs will come down (learning curve). As we are in a state of flux with regard to present day costs for plants, the best we can assume (to one significant figure) is that costs have escalated from their 1997 level to about double. That is, a PC plant is now about $2000/Kw and an IGCC is about $3000/Kw (EPC). Recall that the forecast in 1997 was for PC to be $750/Kw and the IGCC to be $1100/Kw. Unfortunately, that is one of the dangers of forecasting. 40

Today s Costs (Estimated) Fuel costs have also escalated. Recent data for fuel costs delivered to new plants is about $1.75/MMBTU for coal and $6.50/MMBTU for gas. We can input these new costs into the spread sheet model and get an estimate for the COE for a utility trying to make a decision today. Under these conditions, with no CO2 capture, the COE for the PC plant would be 6.55 cents/kwhr and the IGCC plant would be 9.41 cents/kwhr. The natural gas plant would again look competitive at 6.3 cents/kwhr with an 80% capacity factor. However, at a more typical 40% capacity factor, the COE is 8.30 cents/kwhr. As a result, we see a lot of utilities considering supercritical pulverized coal plants. What about the argument for CO2 capture? This is a subject of intense debate/argument. IGCC costs are expected to increase by 15-20% for CO2 capture. The range for PC is considerable. Old technology could increase by as much as 50%. Current technology ranges from 20 30%. New technology is estimated between 10 15%. Who s right? 41

Efficiency Critical to emissions strategy Source: National Coal Council From EPRI study 100% Coal Coal w/ 10% co-firing biomass Commercial Supercritical/ First of kind IGCC Existing US coal fleet @ avg 33% Net Plant Efficiency (HHV), % 42

Meeting the Goals for Coal Based Power - Efficiency Plant Efficiency % (HHV Basis) 50 40 30 20 10 0 POLK/WABASH IGCC Target for New IGCC* SCPC Today USC Target Next Gen IGCC 43

CO 2 Mitigation Options for Coal Based Power Increase efficiency Maximize MWs per lb of carbon processed Fuel switch with biomass Partial replacement of fossil fuels = proportional reduction in CO 2 Then, and only then.capture remaining CO 2 for EOR/Sequestration = Logical path to lowest cost of carbon reduction 44

CO2 Capture Post Combustion Technology CO 2 Scrubbing options ammonia based CO 2 Frosting Status Demonstration in 2006. Advantage of lower costs than Amines. Applicable for retrofit & new applications Uses Refrigeration Principle to Capture CO 2 from Flue Gas. Process Being Developed by Ecole de Mines de Paris, France, with ALSTOM Support CO 2 Wheel Use Regenerative Air-Heater-Like Device with Solid Absorbent Material to Capture ~ 60% CO 2 from Flue Gas. Being Developed by Toshiba, with Support from ALSTOM CO 2 Adsorption with Solids Being Developed by the University of Oslo & SINTEF Materials & Chemistry (Oslo, Norway), in Cooperation with ALSTOM Advanced Amine Scrubbing Further Improvements in Solvents, Thermal Integration, and Application of Membranes Technologies Focused on Reducing Cost and Power Usage Multiple suppliers driving innovations 45 Technology Validation & Demonstration

Post Combustion CO2 Capture Chilled Ammonia Without CO2 Removal MEA-Fluor Dan. Proc. NH3 Total power plant cost, M$ 528 652 648 Net power output, MWe 462 329 421 Levelized cost of power, c/kwh 5.15 8.56 6.21 CO2 Emission, lb/kwh 1.71 0.24 0.19 Avoided Cost, $/ton CO2 Base 51.1 19.7 46

Going Down The Experience Curve for Post Combustion CO2 Capture 3000 Heat of Reaction (BTU/lb) 2500 2000 1500 1000 500 1,350 BTU/lb 2001 Parsons Study (Fluor) ABB Lumnus Values From Current Projects ALSTOM s Chilled Ammonia Process 0 Process Optimization Advanced Amines Process Innovations 1990 1995 1995 2000 2000 2005 2005 2010 2010 2015 2015 2020 Significant Improvements Are Being Achieved 47

Levelized COE cents/kwhr 48 Multiple Paths to CO2 Reduction Innovations for the Future 10 8 6 4 2 0 SCPC No CO 2 Capture IGCC SCPC w/mea Oxyfiring w CO2 SCPC adv amines Note: Costs include compression, but do not include sequestration equal for all technologies Hatched Range reflects cost variation from fuels and uncertainty Technology Choices Reduce Risk and Lower Costs ------------------------------With CO 2 Capture--------------------------- IGCC F turbine SCPC NH3 USCPC adv CO2 IGCC H turbine w adv CO2

Economic Comparison Cost of Electricity (common basis) 9.00 8.50 8.00 7.50 Ref IGCC 7FA w/ capture spare Ref Air fired CFB w/o capture O2 fired PC w/ capture (Cents/kWhr) 7.00 6.50 6.00 5.50 5.00 4.50 4.00 0 10 20 30 40 50 CO2 Allowance Price ($/Ton CO2 Emitted) O2 fired CFB w/ capture Ammonia scrubbing Chemical Looping 49

Conclusions New coal fired power plants shall be designed for highest efficiency to minimize CO 2 and other emissions Lower cost, higher performance technologies for post combustion CO2 capture are actively being developed, and more are emerging There is no single technology answer to suit all fuels and all applications The industry is best served by a portfolio approach to drive development of competitive coal power with carbon capture technology 50