Amendment 1 Preliminary Engineering Report for the City of Salida



Similar documents
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

Introduction to Pressure Pipe Rehabilitation with CIPP

CHAPTER 6 - SANITARY SEWER

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SANITARY SEWER SPECIFICATIONS

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

SOLVING SECONDARY CONTAINMENT PROBLEMS

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Suffolk County Department of Health Services. Division of Environmental Quality

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

Chapter 7 Plumbing Connections

Section SEWER PIPE INSTALLATION AND TESTING

Meeting the Challenge of Pipeline Emergency Repair

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION 603 SANITARY SEWER FORCE MAINS

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Secondary Containment Comparison ATI Ultra COAT vs HDPE

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment

MEMORANDUM. General: Foundation:

INSTALLATION OF INSITUFORM LINER

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

INDEX. Sec. No. Items Page Nos.

SECTION POLYVINYL CHLORIDE (PVC) PIPE

Basement & Foundation Damage

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

Building Foundation and Structure

CLEANING, INSPECTION, AND TESTING OF SEWERS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

DEPARTMENT OF ENVIRONMENTAL QUALITY

pvc well casing & drop pipe

SECTION FACILITY STORM DRAINAGE PIPING

PC-Concrete Injectable Concrete Anchoring and Repair System

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

BULK WATER HAULING GUIDELINES

SECTION STORM DRAINAGE SYSTEM

SECTION 724 PIPE CULVERTS

AC Tech Project Survey

SECTION SANITARY SEWER PIPE

Sewer Rehabilitation Design Requirements

SECTION STORM DRAIN SYSTEM

How To Safely Handle A Spill

IS THAT LINER THICK ENOUGH?

Repair and Disinfection of Water Mains Water Protection Program fact sheet

Royal Seal Gasketed Sewer Pipe

PIPE INSPECTION AND REPAIR. Larry Ritchie

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

ATTACHMENT 12 CONTAINERS

Radioactive Waste Storage Facility and Tank System Design Criteria Standards

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

Dealing With RADON in Real Estate Transactions

PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT

RECOATING AND RENEWING SPF ROOFING SYSTEMS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Section 2100-Trenching and Tunneling

Prestressed Concrete Pipe Fitness for Service and Repair

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Essential Performance Attributes of Preapplied waterproofing

Guidelines for Precast Concrete Grease Interceptors

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Division 9. SignaFlor Pad and Pour Flooring System

SikaProof A Technology

Concrete Repair. Applications and Procedures

Element D Services Plumbing

GUIDE TO WINDOW REPAIR & REPLACEMENT FOR HISTORIC PROPERTIES

1. Conductivity < 15 micro ohms/cm 2. ph of 6.0 to Nonvolatile TOC content < 1.0 ppm

SECTION FIRE HYDRANTS

CA-48 TECHNICAL SPECIFICATION

WEKO-SEAL Internal Joint Sealing WEKO-SEAL. internal pipe-joint sealing

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Automotive Engineered Attachment Systems

Reference: BRM A0 July 18 th, Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Design Criteria & Service Goals

Corrosivity of Water Supplies

TECHNICAL REQUIREMENTS AND SPECIFICATIONS

The Original Carbon Fiber Reinforced Polymer System

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Vision Home Inspection

SECTION GROUND WATER STORAGE TANKS

SECTION 5: SANITARY SEWER SYSTEM DESIGN

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Transcription:

Amendment 1 Preliminary Engineering Report for the City of Salida Galleries Water Tank Rehabilitation Project February 11, 2010 Prepared by

1.0 Executive Summary The work of this Preliminary Engineering Report is being amended to include the installation of an interior water tank liner system in addition to the replacement of the failed roofing material for the South Arkansas Gallery System (Galleries) Water Tank in the City of Salida Colorado (the City). The Gallery Water System consists of an infiltration gallery, chlorination system and a 1.25 million gallon water tank. Water from this tank is pumped into the City s distribution system. The City would like to implement this project as soon as possible. The water tank is a cast in place rectangular shaped concrete tank. The tank is partially buried with the upper 4 feet exposed. The roof structure is pre-cast structural twin tees. The exterior dimensions of the tank are 210 feet by 157 feet. The structural twin tees are located side by side with an approximate 1 inch gap between members. In July of 2009 SGM completed an interior condition assessment of this tank. This condition assessment in addition to numerous inspections and observations by City Staff identified additional needs. The new work consists of installing a liner system within the water tank. This is necessary due to cracks and problems sealing said cracks. Our amended proposal is to seal the cracks on the interior of the structure and to install a synthetic liner system meeting NSF and AWWA requirements for a potable water system. This project will protect Public Health and Safety by eliminating the potential for contamination to enter this potable water system and will eliminate an estimated 2.5M gallons of water leaking from the tank annually. 2.0 Planning Conditions (same as original PER, and not reproduced here) 3.0 Description of Existing Facilities (same as original PER, and not reproduced here) 4.0 Project Purpose and Need 4.1 Health and Compliance Currently all of the City of Salida s water systems are in compliance with the Colorado Primary Drinking Water Regulations. The failed condition of the roof structure over the Galleries water tank places this portion of the system at risk for contamination. Likewise, the leaking of the tank wastes treated water and could lead to groundwater infiltration. Groundwater could enter the tank if the groundwater table were to become higher than the water elevation in the tank itself. However, this has never posed a problem in the past. 4.2 Security A formal vulnerability assessment has not been completed. A cursory site evaluation has lead to the determination that the security fencing around the Gallery Water System needs to be upgraded and is part of the original PER. There are no other apparent security concerns, or vulnerabilities at the site. 4.3 Operation and Maintenance The Gallery water system as a whole functions very well. The priority concern at this site is the condition of the roof of the water tank and issues related to interior cracking and leaking and minor 1

concrete repairs. The tank does undergo a condition assessment on a yearly basis. System controls are adequate. 4.4 Growth Please refer to section 2.3 of the original PER for future growth projections and trends. This project is not about serving future growth; rather, it is about repair and rehabilitation of existing facilities. 5.0 Assessment of Alternatives 5.1 Description (Crack sealing and Interior Liner systems) For this project we looked at various National Sanitation Foundation (NSF) approved techniques to repair the interior cracking. Systems considered included: C.I.M. Industries, Inc. interior coatings (or equal) Crack sealing utilizing Sika Corporation or C.I.M. products Interior tank lining with a NSF approved 45 mil polypropylene liner Replace the tank with a new above ground steel tank Do Nothing Alternative (accept leakage as a cost of operating the tank and ignore water contamination risk) 5.2 Design Criteria The design criteria for this amended engineering report are to provide a sealed and leak proof water tank to the City of Salida. The selected alternative should provide at least 25 years of service life while also providing the best value to the City in regards to cost, durability and future maintenance. 5.3 Environmental Impacts There are no impacts on floodplains, wetlands, wildlife habitat or cultural resources related to this project. We will be working on the interior of the water tank and utilizing existing access roads. 5.4 Land Requirements All the work of this project will be within the existing footprint of the Galleries water system and within the existing boundary. The site is currently owned by the City. 5.5 Construction Problems We expect no construction problems associated with this project. The taking off line of this water tank will not pose a problem to the operations of this system. This is routinely done for maintenance purposes; however, the construction timeline does take into consideration peak water demand time. 5.6 Operational Aspects This project requires no additional staffing and does not impose other requirements to the operation. 2

5.7 Cost Estimates Table 1 Galleries Water Tank Leak repair alternatives 5.8 Advantages/Disadvantages Interior epoxy coatings: C.I.M. Industries Inc., and others, make NSF 61 approved coatings for the interior of potable water tanks. These products have a good track record of success. The C.I.M. products, similar to other spray and trowel applied coating systems come with a 5 year warranty. o Advantages for this alternative would include a relatively simple repair procedure should future maintenance activities damage the coating. o Disadvantages include initial cost and a short warranty period. Crack sealing utilizing Sika Corporation or C.I.M. products: The galleries water tank has a concrete floor (210 ft x 157 ft). This floor has approximately 7,180 linear feet of concrete control joints and an estimated 1800 linear feet of misc. concrete cracks. Although crack sealing products could be utilized and could be successful, the City is apprehensive of this option. Over the past 10 years the City has attempted numerous crack sealing operations that have not been successful. o Advantages for this alternative include lowest initial cost of the alternatives and relatively simply installation procedures. o Disadvantages include that this process has been tried unsuccessfully by the City numerous times. Also, the crack seal products only have a 1 year warranty. Crack sealing would be a continual maintenance problem. Interior tank lining with a NSF approved 45 mil polypropylene or PVC liner: We have found a number of synthetic liner systems that could work inside this tank. Both Polypropylene and Polyvinyl Chloride (PVC) liners in either 45 or 60 mil thicknesses would be suitable. Both are N.S.F./Ansi Standard 61 approved. Both have up to 20 year warranties. Our project estimate is based on a PVC liner system. o Advantages for this alternative include long warranty period and proven track record of success. Lower initial cost than the steel replacement tank option. Completely isolates all cracks from the potable water thereby eliminating leaking or potential infiltration. Existing tank life is extended out at least an additional 20 years. o Disadvantages include a somewhat complicated repair process should the liner be damaged due to maintenance activities in the future. 3

Replace the tank with a new above ground steel tank: For this alternative we analyzed the installation of an above ground steel tank to replace the concrete partially buried tank. We considered a glass lined tank but for cost comparison purposes elected to evaluate a less costly painted steel tank. o Advantages for this alternative are that a new tank can come with an extended warranty greater than 20 years. Also, being a new tank we would expect zero leakage and very low maintenance effort and costs. Tank life is 50 (plus) years. o Disadvantages include the high initial cost. Do Nothing Alternative (accept leakage as a cost of operating the tank and ignore water contamination risk): This alternative has been considered but rejected. Doing nothing will lead to excessive leaking and the eventual failure of the tank, not to mention the potential health risk. 6.0 Selected Alternative 6.1 Justification of Selected Alternative The alternative determined to provide the best value to the City is the synthetic interior tank lining system. Either the PVC or polypropylene liner system will be suitable. To assist with this determination we created a decision matrix as shown below. The decision matrix utilized the decision criteria developed by our team. The decision criterion was weighted in two manners. Analysis A placed equal weight on all criteria. Analysis B weighted the criteria based on criteria importance to the City. Based on discussions with the City and this decision matrix, the liner system was selected. 4

6.2 Technical Description This product consists of factory-made sheets that are applied on the job site using standard installation techniques for sheet membrane systems. For the Salida water tank we will specify a mechanically held system. The new liner will become the primary containment with the tank becoming the secondary containment. The liner system shall meet the following specifications (NSF/ANSI Standard 61 Approved) at minimum: Specific Gravity ASTM D 1505 1.27 Durometer (A-scale) ASTM D 676 76 Tensile Strength (PSI) ASTM D 683 2200 (minimum) Elongation, % ASTM D 683 400 (minimum) 100% Modulus, PSI Elongation (PSI) ASTM D 683 930 (minimum) Low Temperature Impact, C ASTM D 1043-26 Volatility (%) Activated Carbon 1.7 24 hours, 87 C Water Absorption (%) ASTM D 0.25 6.3 Costs For financing information please refer to section 3.5 of the original PER. This project requires no staffing, training, materials, electricity, lab expenses, residual disposal, or compliance monitoring. There will also be no replacement costs or a projected increase in the total average monthly user charges. The 20-year cash flow is projected to be sufficient. The cost estimate was based on research into comparable project costs for both PVC and Polypropylene potable water tank lining systems. 6.4 Project Implementation The following is a workable timeline for the bid document prep and construction of the Galleries water tank rehab. This timeline was set to avoid shutting this tank down during peak demand times of the year. Public Meeting Held: (Yes, already provided with original PER) Final Preliminary engineering report (30 day review period) January 16, 2009 Design approval package (60 day review period) June 3, 2009 Addendum to Preliminary Engineering Report February 12, 2010 Advertisement for Bids, Phase I February 17-24, 2010 Award Contract for Phase I March 16, 2010 Start Construction Phase I (roof) March 22, 2010 Complete Construction Phase I (roof) April 30, 2010 Advertisement for Bids, Phase II September 1-8, 2010 Award Contract for Phase II September 21, 2010 Start Construction Phase II (tank liner) October 4, 2010 Complete Construction Phas II (tank liner) November 30, 2010 5