ELECTRICITY TARIFF (Effective from September 1, 1999.)



Similar documents
Torrent Power Limited Distribution, Ahmedabad Truing Up for FY and Determination of Tariff for FY

12 COSTS OF DOING BUSINESS IN THAILAND 2014

Commercial Use Tariffs. Codes 15, 16, 17, 60, 61, 62, 63, 64 and 66

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

COMPARISON OF PROPOSED TARIFFS

DAKSHIN HARYANA BIJLI VITRAN NIGAM. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33 Dated: 9/6/2014

COMPARISON OF PROPOSED TARIFFS

COMPARISON OF PROPOSED TARIFFS

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

Fixed/Demand Charge per month (Rs./Connection) First 15 kwh Balance above 15 kwh Energy/Variable Charges (Rs.

Domestic Prepaid Energy charge: 94c/kWh

NEVADA POWER COMPANY dba NV Energy P.O. Box Las Vegas, NV Tariff No. 1-B cancels Tariff No. 1-A (withdrawn)

MIDVAAL LOCAL MUNICIPALITY

Press Release on Tariff Orders FY for PSPCL & PSTCL

NERSA APPROVED TARIFFS

THE BEST UNDERTAKING (Of the Brihan Mumbai Mahanagarpalika) SCHEDULE OF ELECTRICITY TARIFFS (With Effect from 1 September, 2013)

Energy Tariffs and Associated Charges

City of Aspen. Electric Utility Revenue and Rate Structure Study. December 8, Todd Cristiano Senior Consultant. Pathways to Lasting Solutions

How To Get A Better Deal On Power From Powerline Power From Pse

CITY OF CUERO ELECTRIC RATE -- SCHEDULE R (Residential)

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR ***************** Secy/Tariff/ Date..03.

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015

TARIFF AND GOVERNANCE ASSESSMENT

ARR & Tariff for FY , Review for FY , Provisional true-up FY and True-up for FY & FY for EDP

Network Price List (excludes GST)

Tariff Booklet The Tata Power Company Limited (W ith effect from May 1,2007) THE TATA POWER COMPANY LIMITED TARIFF BOOKLET

SIERRA PACIFIC POWER COMPANY dba NV Energy 6100 Neil Road Reno, NV Tariff No. Electric No. 1

INTRODUCTION Tariff Objective Factors

Our ACT electricity prices

The function of a power station is to deliver

A Service of the City of Lancaster RATE CLASS SCE RATE SCHEDULE LCE RATE SCHEDULE COMMERCIAL AND INDUSTRIAL GS-1 GS-1

Schedule of Tariff and. (Applicable w.e.f )

TARIFF SCHEDULE FOR THE 2014/2015 FINANCIAL YEAR

ANNEXURE TO TARIFF PETITION FOR FINANCIAL YEAR PROPOSED TARIFF SCHEDULES FOR LOW TENSION CONSUMERS. Table of Contents. Tariff Category No

ANNEXURE II THE TATA POWER COMPANY LIMITED. SCHEDULE OF ELECTRICITY TARIFFS (With Effect from June 1, 2009)

Tariff Category (1 June 2011) (1 January 2014)

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************

Understanding Network Tariff Reform

NERSA APPROVED TARIFFS

CITY OF MATLOSANA ELECTRICITY - SUPPLY TARIFF STRUCTURE ELECTRICITY - SUPPLY

Retail Supply Tariff Order FY TARIFF SCHEDULES. Madhya Pradesh Electricity Regulatory Commission Page 156

Standard Electricity Prices and Charges*

ORDINANCE NUMBER An ordinance to establish electric utility rates in the City of Beatrice, Nebraska, in

Schedule 2 (Taken in conjunction w/ Schedules 1 or 3)

DELHI ELECTRICITY REGULATORY COMMISSION Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi

Network Price List and Explanatory Notes

Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles

We Energies Electric Rates

How To Get A Fixed Charge For Electricity

Standard Electricity Prices and Charges *

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

SA Power Networks Network Tariffs - Residential APPLIES TO USAGE FROM 1 JULY 2015

FIXED CHARGE: This is a cost that goes towards making the service available, including

Energy Price Fact Sheet

TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015

GENERAL CONDITIONS OF TARIFF

The Art of Turning Wholesale Rates into Retail Rates. Paul Garcia The Prime Group, LLC

Daily Daily Network Network Network Energy Rates Step Rates Capacity. Price Rates Rates

Section 4-Tariff proposals and approved tariff

Large Power -Secondary 46,50,51 Monthly Charge $ All kwh All kw 18.50

How To Charge For Non Domestic Service

Domestic Use Tariffs. Codes 05, 06, 07 and 08

Solar Power Frequently Asked Questions

Energy Price Fact Sheet

REQUEST FOR PUBLICATION OF REVISED TARIFF ORDER IN THE SIKKIM GOVT. GAZETTE.

First Revised Sheet No. D-13.01

Price Fact Sheet Lumo Advantage QLD Residential Electricity Energex Prices included in this document are correct as at 3 September 2013.

ELECTRIC RATE SCHEDULES

Electricity PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

Sewer System Charges By-law

Ministry of Power & Energy

Electric Rate Book Revision: 13 ( ) Page No. 1 Effective date: SMALL COMMERCIAL

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

Gibraltar Electricity Authority ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010

DRAFT DELHI ELECTRICITY SUPPLY CODE AND PERFORMANCE STANDARDS REGULATIONS, 2012

STANDARD ELECTRICITY PRICES AND CHARGES *

EPCOR Energy Alberta GP Inc. Acting in its capacity as the general partner of EPCOR Energy Alberta Limited Partnership

Transition Usage Charge (per kwh)

Re: Case Nos. 9056/9064: Supplement 488 to P.S.C. Md. E-6: Rider 29 Rate Mitigation and Recovery Charge Adjustment

STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing

RESIDENTIAL SERVICE SCHEDULE R

MAHARASHTRA STATE ELECTRICITY BOARD

Notified on

SCHEDULE OF RATES FOR ELECTRIC SERVICE

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE

(ix) Interstate recognition of supervisor certificate issued 360/- by other states (x) Late fee for renewal after grace period 60/-

COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No.

Fixed Charge (In Rupees per kwh)

CIRCULAR INTRODUCING AND GUIDING THE ELECTRICITY PRICES

AFRICAN UTILITY WEEK March 2011 Challenges with electricity supply: The role of the City of Cape Town

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

SCHEDULE OF RATES FOR ELECTRIC SERVICE

Electric Gas Reliability Workshop April 2012

Schedule 6VP LARGE GENERAL SERVICE VARIABLE PRICING

THE MINISTRY OF INDUSTRY AND TRADE No. 19/2013/TT-BCT. SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness

I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015

CITY OF AUSTIN ELECTRIC RATE SCHEDULES

Transcription:

ELECTRICITY TARIFF (Effective from September 1, 1999.) * Payment period of electricity bill without surcharge is 30 days. * For late payment, surcharge @ 2% per month is applicable to all classes consumers. * The maximum load-sanction for LT consumers is 50 KW. * Govt. electricity duty is 15 paisa per unit. Bangladesh Power Development Board

TARIFF CATEGORIES AND RATES RATE : CATEGORY - A : RESIDENTIAL LIGHT & POWER To the electricity service through a single watthour meter for lighting and appliances used in a dwelling place including related grounds and buildings, having sanctioned load upto 50 KW. (i) Monthly consumption upto 300 KWh : Tk. 2.05 per KWh (ii) (iii) Monthly consumption from 301 Kwh upto 500 Kwh Monthly consumption from 501 Kwh upto 700 Kwh : Tk. 3.20 per KWh : Tk. 4.25 per KWh (iv) Monthly consumption in excess of 700 KWh : Tk. 5.45 per KWh 3. Demand Charge : : Tk. 10.00 per KW of sanctioned 4. Service Charge : (i) For single phase supply : Tk. 5.00 per month (ii) For three phase supply : Tk. 25.00 per month 5. Minimum Charge : Tk. 100.00 per month RATE : CATEGORY - B : AGRICULTURAL PUMPING To the electricity service through a single watthour meter for irrigation and drainage of the land for the purpose of cultivation, having sanctioned load upto 50 KW. For all units consumed per month : Tk. 1.75 per KWh 1

3. Demand Charge for sanctioned load above 30 KW : Tk. 35.00 per KW per month 4. Service Charge : Tk. 25.00 per month 5. Minimum Charge : (i) Minimum charge per month during season : Tk. 125.00 per H. P. RATE : CATEGORY - C : SMALL INDUSTRIAL To the electricity service through a single watthour meter for small industry where articles or substances are produced, adopted, manufactured, altered, repaired, ornamented, finished, packed, or treated from raw materials with a view to their use, sale, transport, delivery and disposal, having sanctioned load upto 50 KW. a) Prior to installation of two part time of day meter. For all units consumed per month : Tk. 3.40 per KWh b) After installation of two part time of day meter (i) Off-peak hours use : Tk. 2.65 per KWh (ii) Peakhours use : Tk. 4.85 per KWh 3. Demand Charge for sanctioned load above 40 KW : Tk. 35.00 per KW per month 4. Service Charge : Tk. 60.00 per month 5. Minimum Charge : Not applicable 2

RATE : CATEGORY - D : NON-RESIDENTIAL LIGHT & POWER To the electricity service through a single watthour meter for hospitals, educational institutions, religious & charitable establishments and all classes of consumers other than those specified under category A, B, C, E & J having sanctioned load upto 50 KW. 2. Unit Rate : (i) For all units consumed per month : Tk. 2.80 per KWh 3. Demand Charge : Tk. 15.00 per KW of sanctioned 4. Service Charge : (i) For single phase supply : Tk. 5.00 per month (ii) For three phase supply : Tk. 25.00 per month 5. Minimum Charge : Tk. 100.00 per KW of sanctioned RATE : CATEGORY - E : L.T. COMMERCIAL To the electricity service through a single watthour meter for offices, trading and commercial enterprises such as shops, businesses, hotels & cinema halls, having sanctioned load upto 50 KW. 3

a) Prior to installation of two part time of day meter. For all units consumed per month : Tk. 4.55 per KWh b) After installation of two part time of day meter (i) Off-peak hours use : Tk. 3.20 per KWh (ii) Peak hours use : Tk. 7.20 per KWh 3. Demand Charge : Tk. 20.00 per KW of sanctioned 4. Service Charge : (i) Single phase, 230 volts : Tk. 5.00 per month (ii) Three phase, 400 volts : Tk. 25.00 per month 5. Minimum Charge : Tk. 125.00 per KW of sanctioned RATE : CATEGORY - F : MEDIUM VOLTAGE GENERAL PURPOSE (11 KV) To the electricity service through energy and demand meters for all classes consumers having sanctioned load upto 5 MW, where the consumer provides his own sub-station, including transformer, high tension control, protection and power factor correction equipment. a) Prior to installation of two part time of day meter. For all units consumed per month : Tk. 3.20 per KWh b) After installation of two part time of day meter (i) Off-peak hours use : Tk. 2.60 per KWh (ii) Peak hours use : Tk. 5.85 per KWh 4

3. Demand Charge : Tk. 40.00 per KW of maximum demand per month i) Prior to installation of demand meter : given bellow : The billing demand during the whole monthly billing period will be calculated as per formula Calculation of maximum demand : In absence of maximum demand meter, the maximum demand of the consumer s service may be determined by the following percentage factors : 100% for the first 75 KW of connected load. 85% for the next 75 KW of connected load. 75% for the next 75 KW of connected load. 65% for the next 75 KW of connected load. 60% for the rest of the connected load. ii) After installation of demand meter : The billing demand during the whole monthly billing period will be determined by suitable demand meter for 30 minutes intergrated period. 4. Service Charge : Tk. 350.00 per month 5. Minimum Charge : Tk. 80.00 per KW. per month of sanctioned load or major fraction thereof but not less than Tk. 8000.00 per month. The minimum charge is not applicable for potato preservation cold storage during off season i. e. for the month of December and January. For consumers having sanctioned load below 50 KW, supply at 11 KV may also be provided subject to the agreement between the Board and the consumer concerned, on cost allocation of the lines and other equipment. 5

For medium voltage bulk consumers having predominently (about 80%) residential consumption as in the institution campus, cantonment and similar large complex where single point metering system is existing, the total energy recorded will be billed in two parts, as per schedule bellow : Prior to installation of bulk residential meter. 20% of consumption under category F 80% consumption under category A The 80% consumpton charged under category A shall be subdivided into two parts for the purpose of billing, as per schedule bellow : 90% of consumption under slab 1 of category A 10% of consumption under slab 3 of category A After installation bulk residential meter 90% of consumption under slab 1 category A 10% of consumption under slab 3 of category A RATE : CATEGORY - G-1 : EXTRA HIGH VOLTAGE DESA (132 KV) 1. Energy Charge : Flat Rate : Tk. 1.84 per KWh RATE : CATEGORY - G-2 : EXTRA HIGH VOLTAGE GENERAL (132 KV) To the electricity service through energy and demand meter for all classes of consumers other than DESA receiving power at 132 KV, having contracted load upto 150 MW other than DESA where the consumer provides his own sub-station, including transformer and high tension control, protective and power factor correction equipment 1. Energy Charge : i) Time 23.00-06.00 : Tk. 1.10 per KWh ii) Time 06.00-13.00 : Tk. 2.00 per KWh iii) Time 13.00-17.00 : Tk. 1.25 per KWh iv) Time 17.00-23.00 : Tk. 4.75 per KWh v) Flat Rate : Tk. 2.30 per KWh 6

RATE : CATEGORY - H : HIGH VOLTAGE GENERAL PURPOSE (33 kv) To the electricity service through energy and demand meter for all classes of consumers other than REB/PBS receiving power at 33 KV, having contracted load upto 15 MW other than REB/PBS where the consumer provides his own sub-station, including transformer and high tension control, protective and power factor correction equipment. a) Prior to installation of two part time of day meter. For all units consumed per month : Tk. 3.00 per KWh b) After installation of two part time of day meter (i) Off-peak hours use : Tk. 2.50 per KWh (ii) Peak hours use : Tk. 5.60 per KWh 3. Demand Charge : Tk. 35.00 per KW per month 4. Prior to installation of demand meter : The billing demand during the whole monthly billibg period will be calculated as per formula given under, Demand charge on page 5 in the booklet. 5. After installation of demand meter : The billing demand during the whole monthly billing period will be determined by suitable demand meter for 30 minutes intergrated demand. 6. Service Charge : Tk. 400.00 per month 7. Minimum Charge : Tk. 80.00 per KW of contracted 8. Late payment surcharge : 9. Govt. Electricity duty : Tk. 0.15 per KWh 7

RATE : CATEGORY - I : HIGH VOLTAGE BULK SUPPLY FOR RURAL ELECTRIFICATION OF BOARD/ PALLI BIDDYUT SAMITI To the electricity service through energy and demand meter for REB/PBS receiving power at 33 KV, having contracted load upto 15 MW, where the consumer provides his own transformer, high tension control, protective and power factor correction equipment. For all units consumed per month : i) From PDB to Rural Electrification Board : Tk. 1.77 per KWh ii) From DESA to Rural Electrification Board : Tk. 1.84 per KWh 3. Demand Charge : Not applicable 4. Service Charge : Tk. 400.00 per month 5. Minimum Charge : Not applicable @ 2% of the total billed amount per month or part thereof for the period of delay, if he does not pay the 8

RATE : CATEGORY - J : STREET LIGHT AND WATER PUMPS. To the electricity service through a single watt-hour meter for Pourasava, WASA and Public Health for the purpose of street lighting and drinking water pumping stations having sanctioned load upto 50 KW. For all units consumed per month : Tk. 3.25 per KWh 3. Demand Charge : Tk. 35.00 per KW of sanctioned. 4. Service Charge : Tk. 200.00 per month 5. Minimum Charge : Not applicable 9