1 Tariffs approved and applicable for implementation from 1 July 2010 Name of Municipality Abaqulusi 19% Yes (partially) Domestic Low (indigent) Energy charge: 54.00c/kWh Domestic Prepaid Energy charge: 94c/kWh Domestic Conventional Basic charge: R32.34/month Energy charges: Block 1: (0-50kWh) =60.00c/kWh Block 2: ( kwh) =64.00c/kWh Block 3: ( kwh) =79c/kWh Block 4: (>600 kwh) =93c/kWh Commercial (Business) Conventional Basic charge: R310.50/month Energy charge: 72c/kWh Commercial Prepaid Energy charge: 96c/kWh Industrial (KVA) Basic charge: R456.90/month Energy charge: 48.00c/kWh Demand charge: R109.72/KVA Domestic Low (indigent) Energy charge: 54.00c/kWh Domestic Prepaid Energy charge: 94c/kWh Domestic Conventional Basic charge: R32.34/month Energy charges: Block 1: (0-50kWh) =60.00c/kWh Block 2: ( kwh) =64.00c/kWh Block 3: ( kwh) =79c/kWh Block 4: (>600 kwh) =93c/kWh Commercial (Business) Conventional Basic charge: R310.50/month Energy charge: 72c/kWh Commercial Prepaid Energy charge: 96c/kWh Industrial (KVA) Basic charge: R456.90/month Energy charge: 48.00c/kWh Demand charge: R109.00/KVA
2 AECI (Modderfontein) 24.8% No Commercial Tariffs: Heartland<100 kw (Summer) 69.57c/kWh Heartland<100 kw (Winter) 93.12c/kWh Industrial Tariffs: Heartland > 100 kw (Summer) 65.89c/kWh Heartland >100kW (Winter) 90.67c/kWh Commercial Tariffs: Heartland<100 kw (Summer) 69.57c/kWh Heartland<100 kw (Winter) 93.12c/kWh Industrial Tariffs: Heartland >100 kw (Summer) 65.89c/kWh Heartland >100kW (Winter) 90.67c/kWh AECI Heartland (Umbogintwini) 25.00% No (private distributor thus no domestic customers) Business and General Energy charge: c/kWh Users 2 Part 1 Energy charge: c/kWh Demand charge: R132.70/KVA Business and General Energy charge: c/kWh Users 2 Part 1 Energy charge: c/kWh Demand charge: R132.70/KVA H.V.1 3 Part Energy charge: 30.74c/kWh Demand charge: R152.72/KVA kw restriction (discount): R34.50/KVA H.V.1 3 Part Energy charge: 30.74c/kWh Demand charge: R152.72/KVA kw restriction (discount): R34.50/KVA H.V.1 2 Part H.V.1 2 Part
3 Energy charge: 30.74c/kWh Demand charge: R158.96/KVA kw restriction (discount): R36.15/KVA Energy charge: 30.74c/kWh Demand charge: R158.96/KVA kw restriction (discount): R36.15/KVA AECI Heartland Somerset West (Private Distributor) 25.00% No Medium Basic Charge: R845.00/month Energy Charge: 69.00c/kWh Small Basic Charge: R420.00/month Energy Charge: 59.00c/kWh Very Small Basic Charge: R280.00/month Energy Charge: 59.00c/kWh NON STANDARD TARIFFS Industrial Time-Of-Use Basic Charge: R /month Energy Charge: High Demand - Peak: c/kWh - Standard: 48.90c/kWh - Off Peak: 23.50c/kWh Low Demand - Peak: 52.00c/kWh - Standard: 34.50c/kWh - Off Peak: 20.40c/kWh Medium Basic Charge: R845.00/month Energy Charge: 69.00c/kWh Small Basic Charge: R420.00/month Energy Charge: 59.00c/kWh Very Small Basic Charge: R280.00/month Energy Charge: 59.00c/kWh NON STANDARD TARIFFS Industrial Time-Of-Use Basic Charge: R /month Energy Charge: High Demand - Peak: c/kWh - Standard: 48.90c/kWh - Off Peak: 23.50c/kWh Low Demand - Peak: 52.00c/kWh - Standard: 34.50c/kWh Off Peak: 20.40c/kWh
4 Albert Luthuli 19% No DOMESTIC TARIFFS Domestic pre-paid (indigent) Weighted average price: 76.00c/kWh Domestic Conventional Weighted average price: 93.00c/kWh COMMERCIAL TARIFFS Commercial Prepaid Energy Charge : 95.94c/kWh Basic Charge : R280.55/month Energy Charge : 70.21c/kWh INDUSTRIAL TARIFFS Basic Charge:R641.24/month Demand Charge:R117.98/kVA Energy Charge: 41.25c/kWh Amahlathi 22% No Domestic Low 20A (indigent) & 60A Prepaid Energy charge: 87.5c/kWh Domestic Low 20A Prepaid (Subsidized) Energy charge: 98.8c/kWh DOMESTIC TARIFFS Domestic pre-paid (indigent) Weighted average price: 76.00c/kWh Domestic Conventional Weighted average price: 93.00c/kWh COMMERCIAL TARIFFS Commercial Prepaid Energy Charge : 95.94c/kWh Basic Charge : R280.55/month Energy Charge : 70.21c/kWh INDUSTRIAL TARIFFS Basic Charge:R641.24/month Demand Charge:R117.98/kVA Energy Charge: 41.25c/kWh Domestic Low 20A (indigent) & 60A Prepaid Energy charge: 85.40c/kWh Domestic Low 20A Prepaid (Subsidized) Energy charge: 96.38c/kWh
5 Domestic Conventional 20A-30A (Single Phase 60A) Basic charge: R131.87/month Energy charge: 87.4c/kWh Domestic Conventional 20A-30A (Single Phase 60A) Basic charge: R131.87/month Energy charge: 80.00c/kWh Domestic Conventional 20A-30A (Three Phase 20A) Basic charge: R201.25/month Energy charge: 87.4c/kWh Domestic Conventional 20A-30A (Three Phase 20A) Basic charge: R201.25/month Energy charge: 80.00c/kWh Commercial/Business Conventional (Single & Three Phase) Basic charge SP: R353.98/month Basic charge 3P: R662.69/month Commercial/Business Conventional (Single & Three Phase) Basic charge SP: R353.98/month Basic charge 3P: R662.69/month Energy charge: 0 500kWh: 103.8c/kWh >500kWh: 91.8c/kWh Energy charge: 0 500kWh: 93.00c/kWh >500kWh: 81.00c/kWh Commercial/Business Prepaid Energy charge: 111.7c/kWh Commercial/Business Prepaid Energy charge: 111.7c/kWh Industrial/Bulk Demand Basic charge: R656.75/month Energy charge: 214.0c/kWh Demand charge: R106.01/kVA Industrial/Bulk Demand Basic charge: R525.4/month Energy charge: 171c/kWh Demand charge: R84.81/kVA Time of Use Bulk Supply Time of Use Bulk Supply Basic Charge: R656.75/month Basic Charge: R656.75/month
6 Demand Charge: R106.01/kVA Demand Charge: R106.01/kVA Energy charge: Winter Energy charge: Winter Peak: 1.467c/kWh Peak: 1.467c/kWh Standard: 0.620c/kWh Standard: 0.620c/kWh Off peak: 0.038c/kWh Off peak: 0.038c/kWh Energy charge: Summer Energy charge: Summer Peak: 1.002c/kWh Peak: 1.002c/kWh Standard: 0.293c/kWh Standard: 0.293c/kWh Off peak: 0.256c/kWh Off peak: 0.256c/kWh Ba-Phalaborwa 28% No Domestic Low 20A (indigent) Prepaid Energy Charge: 91.52c/kWh Domestic Low (Prepaid) Energy Charge: 91.52c/kWh Domestic Conventional (16kVA: 80A) Basic charge: R112.00/month Energy charge: 92.70c/kWh Dom Basic Charges for 3Phase 25 kva 3Phase (45A):R224.00/month 50 kva. 3Phase (80A):R336.00/month 75 kva 3Phase (100A):R448.00/month Energy Charge: 67.80c/kWh Domestic Low 20A (indigent) Prepaid Energy Charge: 63.88c/kWh Domestic Low (Prepaid) Energy Charge: 91.52c/kWh Domestic Conventional(16kVA: 80A Basic charge: R80.00/month Energy charge: 92.70c/kWh Dom Basic Charges for 3Phase 25 kva 3Phase (45A):R112.00/month 50 kva. 3Phase(80A):R150.00/month 75 kva 3Phase (100A):R220.00/month Energy Charge: 67.80c/kWh
7 Commercial Prepaid Meters (Single Phase) Energy Charge : 91.50c/kWh Commercial Prepaid Meters (Single Phase) Energy Charge : 91.50c/kWh Prepaid Meters (3Phase) Energy Charge : 91.50c/kWh Prepaid Meters (3Phase) Energy Charge : 91.50c/kWh Commercial Conventional meters Basic Charge : R310.00/month Energy Charge : 92.70c/kWh Commercial Conventional meters Basic Charge : R126.00/month Energy Charge : 92.70c/kWh Comm Basic Charges for 3Phase 25 kva 3Phase (45A) : R392.00/month 50 kva. 3Phase (80A): R616.00/month 75 kva 3Phase (100A): R672.00/month Energy Charge: 67.80c/kWh Comm Basic Charges for 3Phase 25 kva 3Phase (45A) : R300.00/month 50 kva. 3Phase (80A): R500.00/month 75 kva 3Phase (100A): R550.00/month Energy Charge: 67.80c/kWh Industrial Basic Charge: R326.93/ month Energy Charge: 92.70c/kWh Demand Charge: R115.61/kVA Industrial Basic Charge: R326.93/ month Energy Charge: 92.70c/kWh Demand Charge: R115.61/kVA Bulk Supply Basic Charge: R90.35/ month Service Charge: R Energy Charge: 43.52c/kWh Bulk Supply Basic Charge: R85.16/ month Service Charge: R Energy Charge: 54.30c/kWh
8 Energy Charge: 54.30c/kWh(Off Peak) Demand Charge: R115.61/kVA Demand Charge: R34.38/kVA (off peak) Energy Charge: 43.52c/kWh(Off Peak) Demand Charge: R115.61/kVA Demand Charge: R34.38/kVA (off peak) Baviaans 12% No Domestic Credit - BHHM Basic charge: R76.50/month Energy charge: 62.00c/kWh Domestic Prepaid BHHPP Energy charge: 82.00c/kWh Zaaimanshoek Energy charge: 90.00c/kWh Small Business Credit Single meters <60A - BBESL Basic charge: R98.97/month Energy charge: 67.00c/kWh Small Business Credit <30A - BBESM Basic charge: R196.87/month Energy charge: 60.00c/kWh Small Business Credit 60A - BBESH Basic charge: R305.77/month Energy charge: 60.00c/kWh Small Business Prepaid BBPP Energy charge: 84.00c/kWh Domestic Credit - BHHM Basic charge: R76.50/month Energy charge: 62.00c/kWh Domestic Prepaid BHHPP Energy charge: 82.00c/kWh Zaaimanshoek Energy charge: 90.00c/kWh Small Business Credit Single meters <60A - BBESL Basic charge: R98.97/month Energy charge: 67.00c/kWh Small Business Credit <30A - BBESM Basic charge: R196.87/month Energy charge: 60.00c/kWh Small Business Credit 60A - BBESH Basic charge: R305.77/month Energy charge: 60.00c/kWh Small Business Prepaid BBPP Energy charge: 84.00c/kWh
9 Large Power Users - WKVA Demand charge: R78.37/kVA Energy charge: 52.00c/kWh Large Power Users - WKVA Demand charge: R78.37/kVA Energy charge: 52.00c/kWh Beaufort west 24.80% No Domestic Low Energy charge: 77.65c/kWh Domestic tariff (1phase- 60 Amp) Basic charge: R233.40/month Energy charge:57.00c/kwh Commercial tariff Basic charge: R197.02/month Energy charge: 77.11c/kWh Industrial tariff Basic charge: R461.92/month Energy charge: 62.30c/kWh Demand charge:r58.51r/kva Bela-Bela 19% No Domestic Low Prepaid Energy charge: 91.39c/kWh Domestic Conventional (40A) Basic charge: R172.22/month Energy charge: 64.70c/kWh Domestic Conventional (60A) Basic charge: R229.62/month Energy charge: 60.00c/kWh Domestic Low Energy charge: 77.65c/kWh Domestic tariff (1phase- 60 Amp) Basic charge: R233.40/month Energy charge:57.00c/kwh Commercial tariff Basic charge: R197.02/month Energy charge: 77.11c/kWh Industrial tariff Basic charge: R461.92/month Energy charge: 62.30c/kWh Demand charge:r58.51r/kva Domestic Low Prepaid Energy charge: 91.39c/kWh Domestic Conventional (40A) Basic charge: R172.22/month Energy charge: 64.70c/kWh Domestic Conventional (60A) Basic charge: R229.62/month Energy charge: 60.00c/kWh
10 Domestic Conventional (80A) Basic charge: R479.97/month Energy charge: 57.50c/kWh Domestic Conventional (80A) Basic charge: R479.97/month Energy charge: 57.50c/kWh Commercial Prepaid Energy charge: 91.40c/kWh Commercial Prepaid Energy charge: 91.40c/kWh Industrial/Bulk Demand Basic charge: R /month Energy charge:43.00c/kwh Demand charge: R91.39/kVA Industrial/Bulk Demand Basic charge: R /month Energy charge:43.00c/kwh Demand charge: R91.39/kVA Bergrivier 15% No Domestic Prepaid Low Energy Charge: 65.69c/kWh Domestic Prepaid High Energy Charge: 85.71c/kWh Domestic Conventional Energy Charge:87.78c/kWh Commercial Prepaid Energy Charge: 82.54c/kWh Basic Charge: R376.97/month Energy Charge:76.30c/kWh Domestic Prepaid Low Energy Charge: 65.63c/kWh Domestic Prepaid High Energy Charge: 85.56c/kWh Domestic Conventional Energy Charge:87.63c/kWh Commercial Prepaid Energy Charge: 82.54c/kWh Basic Charge: R376.97/month Energy Charge:76.30c/kWh
11 Industrial Basic Charge: R1097/month Energy Charge:47.22c/kWh Demand Charge: R /kVa Industrial Basic Charge: R1097/month Energy Charge:47.22c/kWh Demand Charge: R /kVa Bitou 22% No Domestic Low Energy charge: 63.00c/kWh Domestic tariff (1phase- 60 Amp) Basic charge: R233.40/month Energy charge:57.00c/kwh Commercial tariff Basic charge: R706.42/month Energy charge: 58.05c/kWh Industrial tariff Basic charge: R491.99/month Energy charge: 31.46c/kWh Demand charge:r110.67r/kva Blouberg 18% No DOMESTIC TARIFFS Domestic Low Weighted average price: 74.94c/kWh Domestic High Weighted average price: 76.77c/kWh COMMERCIAL TARIFF Domestic Low Energy charge: 63.00c/kWh Domestic tariff (1phase- 60 Amp) Basic charge: R233.40/month Energy charge:57.00c/kwh Commercial tariff Basic charge: R706.42/month Energy charge: 58.05c/kWh Industrial tariff Basic charge: R491.99/month Energy charge: 31.46c/kWh Demand charge:r110.67r/kva DOMESTIC TARIFFS Domestic Low Weighted average price: 74.94c/kWh Domestic High Weighted average price: 76.77c/kWh COMMERCIAL TARIFF
12 Basic Charge : R236.00/month Energy Charge : 62.95c/kWh Basic Charge : R236.00/month Energy Charge : 62.95c/kWh Commercial pre-paid Energy Charge: 84.96c/kWh Commercial pre-paid Energy Charge: 84.96c/kWh Blue Crane 22% Yes Inclining Block Tariffs Domestic Low Block 1 : 58.00c/kWh Block 2 : 62.00c/kWh Block 3 : 77.00c/kWh Domestic High Block1: 60.00c/kWh Block 2:64.00 c/kwh Block 3: 81.00c/kWh Block 4: 92.00c/kWh Service Charge: R85.00 Commercial Tariffs Basic charge: R267.00/month Energy charge: 82.00c/kWh Prepayment: 95.35c/kWh Industrial Tariff Basic charge: R605.00/month Inclining Block Tariffs Domestic Low Block 1 : 54.00c/kWh Block 2 :58.00c/kWh Block 3 :76.00c/kWh Domestic High Block 1: 63.00c/kWh Block 2: 64.00c/kWh Block 3: 77.00c/kWh Block 4: 92.00c/kWh Service Charge: R110.00/month Commercial tariffs Basic charge :R Energy charge :82.00c/kWh Prepayment :95.35c/kWh Industrial Tariff: Basic charge :R600.00/month
13 Energy charge: 45.00c/kWh Energy charge:40.26c/kwh kva charge: R110.00/kVA kva charge :R109.80/kVA Rural tariff <=50kVA Rural tariff <=50kVA: Basic charge:r320.00/month Basic charge :R305.00/ month Energy charge:82.00c/kwh Energy charge :76.80c/kWh Rural tariff >50kVA=<100kVA Rural tariff >50kVA=<100kVA Basic charge: R500.00/month Basic charge :R Energy charge: 82.00c/kWh Energy charge :71.98c/kWh Rural >100kVA Rural >100kVA Basic charge :R605.00/month Basic charge :R605.00/ month Energy charge :45.00c/kWh Energy charge :44.00c/kWh Demand charge:r110.00/kva Demand charge :R110.00/kVA Departmental tariff: 94.99c/kWh Departmental tariff : 94.99c/kWh Breede River Winelands 22% No Domestic Low Energy charge: 61.10c/kWh Domestic tariff Basic charge: R101.00/month Energy charge:60.00c/kwh Domestic Low Energy charge: 61.10c/kWh Domestic tariff Basic charge: R101.00/month Energy charge:60.00c/kwh
14 Commercial tariff(50kva) Basic charge: R367.00/month Energy charge: 62.10c/kWh Commercial tariff(50kva) Basic charge: R367.00/month Energy charge: 62.10c/kWh Industrial tariff( kva) Basic charge: R /month Energy charge: 39.81c/kWh Demand charge:r148.25/kva Industrial tariff( kva) Basic charge: R /month Energy charge: 39.81c/kWh Demand charge:r148.25/kva Breede Valley 19% No Domestic Prepaid Low Energy Charge: 52.63c/kWh Domestic Prepaid High Energy Charge: 80.70c/kWh Small Power User 2 Basic Charge: R254.39/month Energy Charge: 71.93c/kWh Small Power User 3 Basic Charge: R254.39/month Energy Charge: 70.18c/kWh Demand Charge: 10.53/kVA Commercial Prepaid Energy Charge: 91.23c/kWh Domestic Prepaid Low Energy Charge: 52.50c/kWh Domestic Prepaid High Energy Charge: 80.56c/kWh (Small Power User 2) Basic Charge: R254.39/month Energy Charge: 71.93c/kWh Small Power User 3 Basic Charge: R254.39/month Energy Charge: 70.18c/kWh Demand Charge: 10.53/kVA Commercial Prepaid Energy Charge: 91.23c/kWh
15 Small Power User 4 Basic Charge: R219.30/month Energy Charge:67.54c/kWh Demand Charge: R 18.42/kVA Small Power User 4 Basic Charge: R219.30/month Energy Charge:67.54c/kWh Demand Charge: R 18.42/kVA Industrial Large Power User 1 Basic Charge: R350.88/month Energy Charge:50.46c/kWh Demand Charge: R 70.18/kVA Industrial Large Power User 1 Basic Charge: R350.88/month Energy Charge:50.46c/kWh Demand Charge: R 70.18/kVA NON-STANDARD TARIFFS Schools 1 Prepaid Tariff Energy Charge:65.79c/kWh NON-STANDARD TARIFFS Schools 1 Prepaid Tariff Energy Charge:65.79c/kWh Schools 2 Single and Three Phase Basic Charge: R254.39/month Energy Charge:57.02c/kWh Schools 2 Single and Three Phase Basic Charge: R254.39/month Energy Charge:57.02c/kWh Buffalo City 22% No Domestic Low Prepaid (c/kwh) Energy charge: 62.59c/kWh Domestic High Prepaid (c/kwh) Energy charge: 86.30c/kWh Domestic Conventional Basic charge: R24.88/month Energy charge: 86.30c/kWh Domestic Low Prepaid (c/kwh) Energy charge: 62.59c/kWh Domestic High Prepaid (c/kwh) Energy charge: 86.30c/kWh Domestic Conventional Basic charge: R24.88/month Energy charge: 86.30c/kWh
16 Basic charge: R90.58/month Energy charge: 87.48c/kWh Basic charge: R90.58/month Energy charge: 87.48c/kWh Commercial Prepaid Energy charge: c/kWh Commercial Prepaid Energy charge: c/kWh Industrial Users Basic charge: Low Voltage : R414.99/Month High Voltage : R623.77/Month Demand charge: Low Voltage : R127.92/kVA High Voltage : R132.44/kVA Energy charge: Low Voltage : 34.77c/kWh High Voltage : 34.77c/kWh Industrial Users Basic charge: Low Voltage : R414.99/Month High Voltage : R623.77/Month Demand charge: Low Voltage : R127.92/kVA High Voltage : R132.44/kVA Energy charge: Low Voltage : 34.77c/kWh High Voltage : 34.77c/kWh Camdeboo 28.9% Yes- Partially Domestic Low - Town Conventional Meters (c/kwh) Block 1 (0-50kWh) : 47.17c/kWh Block 2 (51-350kWh) : 55.00c/kWh Block 3 ( kWh): 64.00c/kWh Block 4 (>600kWh) : 76.00c/kWh Basic charge: R77.81/month Domestic High - Town Conventional Meters (c/kwh) Block 1 (0-50kWh) : 54.00c/kWh Domestic Low - Town Conventional Meters (c/kwh) Block 1 (0-50kWh) : 47.17c/kWh Block 2 (51-350kWh) : 55.00c/kWh Block 3 ( kWh): 64.00c/kWh Block 4 (>600kWh) : 76.00c/kWh Basic charge: R77.81/month Domestic High - Town Conventional Meters (c/kwh) Block 1 (0-50kWh) : 54.00c/kWh
17 Block 2 (51-350kWh) : 58.00c/kWh Block 3 ( kWh): 71.00c/kWh Block 4 (>600kWh) : 83.00c/kWh Basic charge: R104.27/month Block 2 (51-350kWh) : 58.00c/kWh Block 3 ( kWh): 71.00c/kWh Block 4 (>600kWh) : 83.00c/kWh Basic charge: R104.27/month Domestic High - Farms Conventional Meters (c/kwh) Block 1 (0-50kWh) : 54.00c/kWh Block 2 (51-350kWh) : 58.00c/kWh Block 3 ( kWh): 71.00c/kWh Block 4 (>600kWh) : 83.00c/kWh Basic charge: R104.27/month Domestic High - Farms Conventional Meters (c/kwh) Block 1 (0-50kWh) : 54.00c/kWh Block 2 (51-350kWh) : 58.00c/kWh Block 3 ( kWh): 71.00c/kWh Block 4 (>600kWh) : 83.00c/kWh Basic charge: R104.27/month Domestic Low Indigent Prepaid Energy charge: 66.89c/kWh Domestic Low Indigent Prepaid Energy charge: 66.89c/kWh Domestic Prepaid 60A Energy charge: 82.93c/kWh Domestic Prepaid 60A Energy charge: 82.93c/kWh Business/Commercial Scale 2 Basic charge: Peak: R188.50/month Off-peak: R321.68/month Energy charge: Peak: 82.77c/kWh Off-peak: 57.52c/kWh Business/Commercial Prepayment Business/Commercial Scale 2 Basic charge: Peak: R188.50/month Off-peak: R321.68/month Energy charge: Peak: 82.77c/kWh Off-peak: 57.52c/kWh Business/Commercial Prepayment
18 Energy charge: 86.31c/kWh Energy charge: 86.31c/kWh Industrial Scale 3 & 4 Basic charge: R567.66/Month Demand charge: R116.37/kVA Energy charge: <100kVA: 42.36c/kWh >100kVA: 37.05c/kWh Industrial Bulk Power Scale 5 Basic charge: R567.66/Month Demand charge: <=600kVA: R116.37/kVA >600kVA: R92.40/kVA Energy charge: <=150000kWh: 35.95c/kWh >150000kWh: 21.78c/kWh Industrial Time Of Use Scale 6 (<=50kVA) Basic: R112.21/month Peak: 1.436c/kWh Standard: 55.59c/kWh Off-Peak: 31.85c/kWh Reactive: 5.74c/kWh Industrial Scale 3 & 4 Basic charge: R567.66/Month Demand charge: R116.37/kVA Energy charge: <100kVA: 42.36c/kWh >100kVA: 37.05c/kWh Industrial Bulk Power Scale 5 Basic charge: R567.66/Month Demand charge: <=600kVA: R116.37/kVA >600kVA: R92.40/kVA Energy charge: <=150000kWh: 35.95c/kWh >150000kWh: 21.78c/kWh Industrial Time Of Use Scale 6 (<=50kVA) Basic: R112.21/month Peak: 1.436c/kWh Standard: 55.59c/kWh Off-Peak: 31.85c/kWh Reactive: 5.74c/kWh (>50kVA) Basic: R224.41/month Peak: 79.23c/kWh Standard: 44.48c/kWh (>50kVA) Basic: R224.41/month Peak: 79.23c/kWh Standard: 44.48c/kWh
19 Off-Peak: 20.71c/kWh Reactive: 9.74c/kWh Demand: R49.37/kVA Off-Peak: 20.71c/kWh Reactive: 9.74c/kWh Demand: R49.37/kVA Cape Agulhas 22% No Domestic Low Energy charge: 81.09c/kWh Domestic tariff (1phase- 60 Amp) Basic charge: R233.40/month Energy charge:57.00c/kwh Commercial tariff(1phase) Basic charge: R6/amp/month Energy charge: 59.75c/kWh Commercial tariff(3phase) Basic charge: R17.16/amp/month Energy charge: 59.75c/kWh Industrial tariff Basic charge: R3.50/kVa/month Energy charge: 30.35c/kWh Demand charge:r74.33r/kva Cederberg 22% No Domestic Prepaid Low Energy Charge: 64.61c/kWh Domestic Conventional High Basic Charge: R139.55/month Energy Charge: 73.85c/kWh Domestic Low Energy charge: 81.09c/kWh Domestic tariff (1phase- 60 Amp) Basic charge: R233.40/month Energy charge:57.00c/kwh Commercial tariff(1phase) Basic charge: R6/amp/month Energy charge: 59.75c/kWh Commercial tariff(3phase) Basic charge: R17.16/amp/month Energy charge: 59.75c/kWh Industrial tariff Basic charge: R3.50/kVa/month Energy charge: 30.35c/kWh Demand charge:r74.33r/kva Domestic Prepaid Low Energy Charge: 62.75c/kWh Domestic Conventional High Basic Charge: R137.00/month Energy Charge: 73.81c/kWh
20 Basic Charge: R275.24/month Energy Charge: 81.33c/kWh Basic Charge: R275.24/month Energy Charge: 81.33c/kWh Commercial Prepaid Energy Charge: 96.00c/kWh Commercial Prepaid Energy Charge: 96.00c/kWh Industrial <=40kVa Basic Charge: R /month Energy Charge:37.45c/kWh Demand Charge: R /kVa Industrial <=40kVa Basic Charge: R /month Energy Charge:37.45c/kWh Demand Charge: R /kVa CENTLEC Kopanong, Mohokare & Naledi Industrial > 40kVa Basic Charge: R /month Energy Charge:46.01c/kWh Demand Charge: R /kVa 28.90% Yes Domestic IBT Block1: (0-50 ) c/kwh Block2 : (51-350) c/kwh Block3 : ( ) c/kwh Block4 : (>600) c/kwh Commflex Basic charge: R 51.56/month Capacity charge: R2.32 Energy high demand peak: c/kWh Industrial > 40kVa Basic Charge: R /month Energy Charge:46.01c/kWh Demand Charge: R /kVa Domestic IBT Block1: (0-50 ) c/kwh Block2 : (51-350) c/kwh Block3 : ( ) c/kwh Block4 : (>600) c/kwh Commflex Basic charge: R 51.56/month Capacity charge: R2.32 Energy high demand peak: c/kWh
21 Energy high demand standard: 83.80c/kWh Energy high demand off-peak: 61.20c/kWh Energy low demand peak: c/kwh Energy low demand standard: 67.00c/kWh Energy low demand off-peak: 58.00c/kWh Energy high demand standard: 83.80c/kWh Energy high demand off-peak: 61.20c/kWh Energy low demand peak: c/kwh Energy low demand standard: 67.00c/kWh Energy low demand off-peak: 58.00c/kWh Bulk tariffs (Feeding from MV Network) Bulk tariffs (Feeding from MV Network) TOU Elecflex2 TOU Elecflex2 Basic charge: R /month Access charge : R16.82 (R/kVA) Demand Charge: R64.59 Energy high demand peak: c/kWh Energy high demand standard : 59.10c/kWh Energy high demand off-peak: 38.20c/kWh Energy low demand peak : c/kwh Energy low demand standard: 48.60c/kWh Energy low demand off-peak: 36.80c/kWh Basic charge: R /month Access charge : R16.82 (R/kVA) Demand Charge : R64.59 Energy high demand peak: c/kWh Energy high demand standard: 59.10c/kWh Energy high demand off-peak c/kwh Energy low demand peak c/kwh Energy low demand standard c/kwh Energy low demand off-peak c/kwh
22 Bulk tariffs (Feeding from LV Network) Bulk tariffs (Feeding from LV Network) TOU Elecflex3 TOU Elecflex3 Basic charge : R /month Access charge : R (R/kVA) Demand Charge: R66.97 Energy high demand peak: c/kwh Energy high demand standard: 63.90c/kWh Energy high demand off-peak: 41.70c/kWh Energy low demand peak: c/kwh Energy low demand standard : 50.40c/kWh Energy low demand off-peak: 37.90c/kWh Basic charge R Access charge R (R/kVA) Demand Charge R66.97 Energy high demand peak c/kwh Energy high demand standard c/kwh Energy high demand off-peak c/kwh Energy low demand peak Energy low demand standard Energy low demand off-peak Non- standard tariff Business rate (declining block) Non- standard tariff Business rate (declining block) c/kwh c/kwh c/kwh > c/kwh c/kwh c/kwh c/kwh > c/kwh
23 CENTLEC Mangaung 28.90% Yes Domestic IBT Block 1 (0-50kWh) : 62.50c /kwh Block 2 (51-350kWh) : 66.50c/kWh Block 3 ( kWh): 74.00c /kwh Block 4 (>600kWh) : 85.00c /kwh Commflex Basic charge: R51.56/month Capacity charge : R2.32 Energy high: demand peak: c/kWh demand standard: 83.80c/kWh Energy high demand off-peak: 61.20c/kWh Energy low demand peak: c/kwh Energy low demand standard: 67.00c/kWh Energy low demand off-peak: 58.00c/kWh Bulk tariffs (Direct from Distribution Centre) TOU Elecflex1 Basic charge: R /month Access charge : R16.09 (R/kVA) Demand Charge R62.04 Energy high demand peak: c/kwh Energy high demand standard: Domestic IBT Block 1 (0-50kWh) : 62.50c /kwh Block 2 (51-350kWh) : 66.50c/kWh Block 3 ( kWh): 74.00c /kwh Block 4 (>600kWh) : 85.00c /kwh Commflex Basic charge: R51.56/month Capacity charge: R2.32 Energy high: demand peak:187.00c/kwh demand standard : 83.80c/kWh Energy high demand off-peak: 61.20c/kWh Energy low demand peak: c/kwh Energy low demand standard: 67.00c/kWh Energy low demand off-peak: 58.00c/kWh Bulk tariffs (Direct from Distribution Centre) TOU Elecflex1 Basic charge: R /month Access charge: R16.09 (R/kVA) Demand Charge : R62.04 Energy high demand peak: c/kWh Energy high demand standard:
24 55.90c/kWh Energy high demand off-peak : c/kwh Energy low demand peak c/kwh Energy low demand standard c/kwh Energy low demand off-peak c/kwh c/kwh Energy high demand off-peak c/kwh Energy low demand peak c/kwh Energy low demand standard c/kwh Energy low demand off-peak c/kwh Bulk tariffs (Feeding from MV Network) Bulk tariffs (Feeding from MV Network) TOU Elecflex2 TOU Elecflex2 Basic charge : R /month Access charge : R16.09 (R/kVA) Demand Charge : Energy high demand peak: c/kWh Energy high demand standard: c/kwh Energy high demand off-peak: 36.50c/kWh Energy low demand peak : c/kwh Energy low demand standard: c/kwh Energy low demand off-peak: c/kwh Basic charge R Access charge R (R/kVA) Demand Charge R Energy high demand peak c/kwh Energy high demand standard c/kwh Energy high demand off-peak c/kwh Energy low demand peak c/kwh Energy low demand standard c/kwh
25 Bulk tariffs (Feeding from LV Network) TOU Elecflex3 Basic charge : R /month Access charge: R17.89 (R/kVA) Demand Charge: R Energy high demand peak: c/kwh Energy high demand standard: 63.90c/kWh Energy high demand off-peak: 41.70c/kWh Energy low demand peak: c/kwh Energy low demand standard : 50.40c/kWh Energy low demand off-peak: 37.90c/kWh Non- standard tariff Business rate (declining block) Energy low demand off-peak c/kwh Bulk tariffs (Feeding from LV Network) TOU Elecflex3 Basic charge: R /month Access charge : R17.89 (R/kVA) Demand Charge : R Energy high demand peak: c/kWh Energy high demand standard: 63.90c/kWh Energy high demand off-peak: 41.70c/kWh Energy low demand peak: c/kwh Energy low demand standard: 50.40c/kWh Energy low demand off-peak: 37.90c/kWh Non- standard tariff Business rate (declining block) c/kwh c/kwh c/kwh > c/kwh c/kwh c/kwh c/kwh > c/kwh
26 Central Karoo 19.00% No Domestic Prepaid Energy Charge: 94.00c/kWh Domestic Conventional Basic Charge: R25.00/month Energy Charge:92.00c/kWh Commercial Prepaid Energy Charge: 94.00c/kWh Basic Charge: R75.00/month Energy Charge:80.00c/kWh City of Cape Town 24.58% Yes Inclining Block Tariffs (IBT) Indigent Prepaid (c/kwh) Block 1 (0-50kWh) : Block 2 (50-150) : Block 3 ( : Commercial tariff Basic charge: R444.85/month Energy charge: 77.66c/kWh Industrial tariff Basic charge: R740.09/month Energy charge: 40.72c/kWh Demand charge:r121.16r/kva Domestic Prepaid Energy Charge: 93.94c/kWh Domestic Conventional Basic Charge: R25.00/month Energy Charge:86.88c/kWh Commercial Prepaid Energy Charge: 94.00c/kWh Basic Charge: R75.00/month Energy Charge:80.00c/kWh Inclining Block Tariffs (IBT) Indigent Prepaid (c/kwh) Block 1 (0-50kWh) : Block 2 (50-150) : Block 3 ( : Commercial tariff Basic charge: R444.85/month Energy charge: 77.66c/kWh Industrial tariff Basic charge: R740.09/month Energy charge: 40.72c/kWh Demand charge:r121.16r/kva
27 City of Matlosana 22% Yes - Partially Domestic Conventional Fully (c/kwh) Block 1 (0-50kWh) : Block 2 (51-350) : Block 3 ( : Block 4 (>600kWh) : Basic charge: R84.37/month Domestic Low Prepaid Energy charge: 67.00c/kWh Domestic High Prepaid Energy charge: 91.00c/kWh Domestic Conventional Fully (c/kwh) Block 1 (0-50kWh) : Block 2 (51-350) : Block 3 ( : Block 4 (>600kWh) : Basic charge: R84.37/month Domestic Low Prepaid Energy charge: 65.00c/kWh Domestic High Prepaid Energy charge: 85.00c/kWh Commercial Basic charge: R162.50/month Energy charge: 83.00c/kWh Commercial Prepaid Energy charge: 91.00c/kWh Industrial High Basic charge: R409.20/month Energy charge: 46.00c/kWh Demand charge: R114.37/kVA Industrial Low Basic charge: R409.20/month Commercial Basic charge: R162.50/month Energy charge: 83.00c/kWh Commercial Prepaid Energy charge: 91.00c/kWh Industrial High Basic charge: R409.20/month Energy charge: 46.00c/kWh Demand charge: R114.37/kVA Industrial Low Basic charge: R409.20/month
28 Energy charge: 46.00c/kWh Demand charge: R118.19/kVA Energy charge: 46.00c/kWh Demand charge: R118.19/kVA Industrial Time Of Use Industrial Time Of Use Off-Peak: 40.00c/kWh Standard: 58.00c/kWh Peak: c/kWh Off-Peak: 40.00c/kWh Standard: 58.00c/kWh Peak: c/kWh Demand Charges: High Tension: R61.62/kVA Low Tension: R54.38/kVA Demand Charges: High Tension: R61.62/kVA Low Tension: R54.38/kVA City of Tshwane 19% No Domestic Low Prepaid ( Lifeline) Energy charge: 92.93c/kWh Domestic Single & 3Phase (Prepaid & Conventional Energy Charge: 88.30c/kWh Domestic Bulk Energy Charge: 78.23c/kWh Basic Charge : R419.86/month Energy Charge : 69.20c/kWh Commercial Prepaid Basic Charge: R398.50/month Energy Charge : 68.90c/kWh Domestic Low Prepaid Energy charge: 92.93c/kWh Domestic Single & 3Phase (Prepaid & Conventional Energy Charge: 88.30c/kWh Domestic Bulk Energy Charge: 78.23c/kWh Basic Charge : R419.86/month Energy Charge : 69.20c/kWh Commercial Prepaid Basic Charge: R398.50/month Energy Charge : 68.90c/kWh
29 Industrial Basic Charge: R953.12/ month Energy Charge: 32.63c/kWh Demand Charge: R106.89/kVA Industrial Basic Charge: R953.12/ month Energy Charge: 32.63c/kWh Demand Charge: R106.89/kVA City of Umhlathuze 28% No Domestic low - indigent Energy charge 61.29c/kWh Domestic prepaid Energy charge 72.56c/kWh Domestic Conventional Basic charge R136.51/month Energy charge 61.81c/kWh Commercial conventional Basic charge R242.31/month Energy charges: 80.84c/kWh Commercial prepaid Energy charge 90.90c/kWh Industrial seasonal tariffs: 400 Volts Network access charge 17.44/KVA Network demand charges: high demand season: R126.12/KVA low demand season:r106.53/kva Domestic low - indigent Energy charge 52.79c/kWh Domestic prepaid Energy charge 70.11c/kWh Domestic Conventional Basic charge R109.33/month Energy charge 61.61c/kWh Commercial conventional Basic charge R194.06/month Energy charges: 71.80c/kWh Commercial prepaid Energy charge 83.42c/kWh Industrial seasonal tariffs: 400 Volts Network access charge 16.65/KVA Network demand charges: high demand season: R121.24/KVA low demand season:r102.81/kva
30 Energy charges: high demand season: 29.41c/kWh low demand season:23.32c/kwh Transmission network surcharge: R5.16 Energy charges: high demand season: 24.93c/kWh low demand season:21.06c/kwh Transmission network surcharge: R kv Network access charge 16.21/KVA Network demand charges: high demand season: R166.48/KVA low demand season:r83.48/kva Energy charges: high demand season: 33.17c/kWh low demand season:22.80c/kwh Transmission network surcharge: R kv Network access charge 15.61/KVA Network demand charges: high demand season: R163.30/KVA low demand season:r82.51/kva Energy charges: high demand season: 30.12c/kWh low demand season:21.14c/kwh Transmission network surcharge: R kv Network access charge 13.03/KVA Network demand charges: high demand season: R144.16/KVA low demand season:r53.20/kva Energy charges: high demand season: 33.75c/kWh low demand season:21.94c/kwh Transmission network surcharge: R kv Network access charge 13.03/KVA Network demand charges: high demand season: R144.16/KVA low demand season:r53.20/kva Energy charges: high demand season: 28.59c/kWh low demand season:20.35c/kwh Transmission network surcharge: R4.06 Industrial Time-of-Use (TOU) Tariffs 400 Volts: Network access charge: R10.06/KVA Industrial Time-of-Use (TOU) Tariffs 400 Volts: Network access charge: R9.22/KVA
31 Network demand charge: 19.08/KVA Transmission network surcharge: R5.08 Network demand charge: 17.47/KVA Transmission network surcharge: R4.65 Active Energy charges: Active Energy charges: High demand season: Peak c/kWh Standard 52.98c/kWh Off-Peak 28.28c/kWh High demand season: Peak c/kWh Standard 48.98c/kWh Off-Peak 25.78c/kWh Low demand season: Peak 56.92c/kWh Standard 34.82c/kWh Off-Peak 24.34c/kWh Low demand season: Peak 51.56c/kWh Standard 32.23c/kWh Off-Peak 21.91c/kWh Industrial Time-of-Use (TOU) Tariffs 11 kv: Network access charge: R8.71/KVA Network demand charge: 16.52/KVA Transmission network surcharge: R4.38 Industrial Time-of-Use (TOU) Tariffs 11 kv: Network access charge: R8.31/KVA Network demand charge: 15.78/KVA Transmission network surcharge: R4.19 Active Energy charges: Active Energy charges: High demand season: Peak c/kWh Standard 48.51c/kWh Off-Peak 25.90c/kWh High demand season: Peak c/kWh Standard 46.40c/kWh Off-Peak 24.49c/kWh Low demand season: Low demand season:
32 Peak 52.12c/kWh Standard 31.91c/kWh Off-Peak 22.31c/kWh Peak 50.27c/kWh Standard 30.94c/kWh Off-Peak 21.91c/kWh Industrial Time-of-Use (TOU) Tariffs 132 kv: Network access charge: R7.91/KVA Network demand charge: 15.01/KVA Transmission network surcharge: R3.99 Industrial Time-of-Use (TOU) Tariffs 132 kv: Network access charge: R7.59/KVA Network demand charge: 14.41/KVA Transmission network surcharge: R3.83 Active Energy charges: Active Energy charges: High demand season: Peak c/kWh Standard 43.88c/kWh Off-Peak 23.48c/kWh High demand season: Peak c/kWh Standard 42.54c/kWh Off-Peak 21.91c/kWh Low demand season: Peak 47.14c/kWh Standard 28.89c/kWh Off-Peak 20.22c/kWh Low demand season: Peak 45.12c/kWh Standard 28.36c/kWh Off-Peak 19.34c/kWh Levies and Admin charges (Applicable to all seasonal and TOU customers): Levies and Admin charges (Applicable to all seasonal and TOU customers): Electrification & Rural subs: Environmental levy: Service charge: R2,268.00/month Electrification & Rural subs: Environmental levy: Service charge: R2,268.00/month
33 Key customer service charge: R3,768.55/month Admin charge:r934.50/month Online metering charge: R650.00/month Key customer service charge: R3,768.55/month Admin charge:r934.50/month Online metering charge: R650.00/month City Power 22% Yes (As per City Power Proposal) Domestic Tariffs: Life-Line tariffs(energy Only): Life-Line 1 (0 < 300kWh): 65.30c/kWh Life-Line 2 (300<500kWh): 65.30c/kWh Life-Line Tariffs (Conventional): Life-Line 1 (0 < 300kWh): 68.78c/kWh Life-Line 2 (300<500kWh): 68.78c/kWh Prepaid: 500<1000kWh: 90.30c/kWh 1000<2000kWh: 92.14c/kWh 2000<3000kWh: 94.37c/kWh >3000kWh: 95.55c/kWh Domestic Single Phase( Conventional): 60 Amp: Basic Charge: R274.14/month Energy Charges: 0<500kWh: 58.75c/kWh 500<1000kWh: 59.74c/kWh 1000<2000kWh: 60.74c/kWh 2000<3000kWh: 62.21c/kWh Domestic Tariffs: Life-Line tariffs(energy Only): Life-Line 1 (0 < 300kWh): 65.30c/kWh Life-Line 2 (300<500kWh): 65.30c/kWh Life-Line Tariffs (Conventional): Life-Line 1 (0 < 300kWh): 68.78c/kWh Life-Line 2 (300<500kWh): 68.78c/kWh Prepaid: 500<1000kWh: 90.30c/kWh 1000<2000kWh: 92.14c/kWh 2000<3000kWh: 94.37c/kWh >3000kWh: 95.55c/kWh Domestic Single Phase( Conventional): 60 Amp: Basic Charge: R274.14/month Energy Charges: 0<500kWh: 58.75c/kWh 500<1000kWh: 59.74c/kWh 1000<2000kWh: 60.74c/kWh 2000<3000kWh: 62.21c/kWh
34 >3000kWh: 62.95c/kWh >3000kWh: 62.95c/kWh 80 Amp: Basic Charge: R286.82/month Energy Charges: 0<500kWh: 58.75c/kWh 500<1000kWh: 59.74c/kWh 1000<2000kWh: 60.74c/kWh 2000<3000kWh: 62.21c/kWh >3000kWh: 62.95c/kWh 80 Amp: Basic Charge: R286.82/month Energy Charges: 0<500kWh: 58.75c/kWh 500<1000kWh: 59.74c/kWh 1000<2000kWh: 60.74c/kWh 2000<3000kWh: 62.21c/kWh >3000kWh: 62.95c/kWh Commercial (Business) Tariffs: Conventional: Basic Charges: <50kVA: R374.72/month <100kVA: R437.77/month <500kVA: R587.99/month >500kVA: R869.23/month Commercial (Business) Tariffs: Conventional: Basic Charges: <50kVA: R342.00/month <100kVA: R437.77/month <500kVA: R587.99/month >500kVA: R869.23/month Energy Charges: Summer: 0<500kWh: 83.24c/kWh 500<1000kWh: 87.28c/kWh 1000<2000kWh: 83.81c/kWh 2000<3000kWh: 90.42c/kWh >3000kWh: 91.05c/kWh Winter: 0<500kWh: c/kWh 500<1000kWh: c/kWh Energy Charges: Summer: 0<500kWh: 83.24c/kWh 500<1000kWh: 87.28c/kWh 1000<2000kWh: 83.81c/kWh 2000<3000kWh: 90.42c/kWh >3000kWh: 91.05c/kWh Winter: 0<500kWh: c/kWh 500<1000kWh: c/kWh
35 1000<2000kWh: c/kWh 2000<3000kWh: c/kWh >3000kWh: c/kWh 1000<2000kWh: c/kWh 2000<3000kWh: c/kWh >3000kWh: c/kWh Prepaid: <50kVA: c/kWh <100kVA: c/kWh Prepaid: <50kVA: c/kWh <100kVA: c/kWh Industrial Tariffs: Low Voltage: Basic Charge: R /month Energy Charges: Summer: 44.28c/kWh Winter: 65.50c/kWh Demand Charges: Summer: R136.80/kVA Winter: R143.65/kVA Industrial Tariffs: Low Voltage: Basic Charge: R /month Energy Charges: Summer: 44.28c/kWh Winter: 65.50c/kWh Demand Charges: Summer: R136.80/kVA Winter: R143.65/kVA Medium Voltage: Basic Charge: R /month Energy Charges: Summer: 41.32c/kWh Winter: 61.12c/kWh Demand Charges: Summer: R136.80/kVA Winter: R142.15/kVA Medium Voltage: Basic Charge: R /month Energy Charges: Summer: 41.32c/kWh Winter: 61.12c/kWh Demand Charges: Summer: R136.80/kVA Winter: R142.15/kVA Non-Standard Tariffs: Domestic Three Phase: Non-Standard Tariffs: Domestic Three Phase:
36 Basic Charges: 60 Amp: R315.48/month 80 Amp: R336.72/month Energy Charges: 0<500kWh: 58.75c/kWh 500<1000kWh: 59.74c/kWh 1000<2000kWh: 60.74c/kWh 2000<3000kWh: 62.21c/kWh >3000kWh: 62.95c/kWh Basic Charges: 60 Amp: R315.48/month 80 Amp: R336.72/month Energy Charges: 0<500kWh: 58.75c/kWh 500<1000kWh: 59.74c/kWh 1000<2000kWh: 60.74c/kWh 2000<3000kWh: 62.21c/kWh >3000kWh: 62.95c/kWh Domestic Single Phase (Seasonal): Basic Charges: 60 Amp: R274.14/month 80 Amp: R286.82/month Energy Charges: Summer: 0<500kWh: 61.62c/kWh 500<1000kWh: 62.57c/kWh 1000<2000kWh: 63.53c/kWh 2000<3000kWh: 64.48c/kWh >3000kWh: 65.43c/kWh Winter: 0<500kWh: 92.73c/kWh 500<1000kWh: 94.17c/kWh 1000<2000kWh: 95.60c/kWh 2000<3000kWh: 97.04c/kWh >3000kWh: 98.48c/kWh Domestic Single Phase (Seasonal): Basic Charges: 60 Amp: R274.14/month 80 Amp: R286.82/month Energy Charges: Summer: 0<500kWh: 61.62c/kWh 500<1000kWh: 62.57c/kWh 1000<2000kWh: 63.53c/kWh 2000<3000kWh: 64.48c/kWh >3000kWh: 65.43c/kWh Winter: 0<500kWh: 92.73c/kWh 500<1000kWh: 94.17c/kWh 1000<2000kWh: 95.60c/kWh 2000<3000kWh: 97.04c/kWh >3000kWh: 98.48c/kWh Domestic Three Phase (Seasonal): Domestic Three Phase (Seasonal):
37 Basic Charges: 60 Amp: R315.48/month 80 Amp: R336.72/month Energy Charges: Summer: 0<500kWh: 61.62c/kWh 500<1000kWh: 62.57c/kWh 1000<2000kWh: 63.53c/kWh 2000<3000kWh: 64.48c/kWh >3000kWh: 65.43c/kWh Winter: 0<500kWh: 92.73c/kWh 500<1000kWh: 94.17c/kWh 1000<2000kWh: 95.60c/kWh 2000<3000kWh: 97.04c/kWh >3000kWh: 98.48c/kWh Basic Charges: 60 Amp: R315.48/month 80 Amp: R336.72/month Energy Charges: Summer: 0<500kWh: 61.62c/kWh 500<1000kWh: 62.57c/kWh 1000<2000kWh: 63.53c/kWh 2000<3000kWh: 64.48c/kWh >3000kWh: 65.43c/kWh Winter: 0<500kWh: 92.73c/kWh 500<1000kWh: 94.17c/kWh 1000<2000kWh: 95.60c/kWh 2000<3000kWh: 97.04c/kWh >3000kWh: 98.48c/kWh Time of Use Tariffs: Low Voltage: Basic Charge: R /month Energy Charges: Summer: Peak: 69.02c/kWh Standard: 50.94c/kWh Off-Peak: 42.20c/kWh Winter: Peak: c/kWh Standard: 62.20c/kWh Off-Peak: 44.56c/kWh Time of Use Tariffs: Low Voltage: Basic Charge: R /month Energy Charges: Summer: Peak: 69.02c/kWh Standard: 50.94c/kWh Off-Peak: 42.20c/kWh Winter: Peak: c/kWh Standard: 62.20c/kWh Off-Peak: 44.56c/kWh
38 Demand Charge: Summer: R112.59/kVA Winter: R119.00/kVA Demand Charge: Summer: R112.59/kVA Winter: R119.00/kVA Medium Voltage: Basic Charge: R /month Energy Charges: Summer: Peak: 62.08c/kWh Standard: 45.80c/kWh Off-Peak: 37.97c/kWh Winter: Peak: c/kWh Standard: 55.90c/kWh Off-Peak: 40.08c/kWh Demand Charge: Summer: R101.29/kVA Winter: R107.04/kVA Medium Voltage: Basic Charge: R /month Energy Charges: Summer: Peak: 62.08c/kWh Standard: 45.80c/kWh Off-Peak: 37.97c/kWh Winter: Peak: c/kWh Standard: 55.90c/kWh Off-Peak: 40.08c/kWh Demand Charge: Summer: R101.29/kVA Winter: R107.04/kVA High Voltage: Basic Charge: R /month Energy Charges: Summer: Peak: 49.07c/kWh Standard: 36.21c/kWh Off-Peak: 30.01c/kWh Winter: Peak: c/kWh Standard: 44.19c/kWh High Voltage: Basic Charge: R /month Energy Charges: Summer: Peak: 49.07c/kWh Standard: 36.21c/kWh Off-Peak: 30.01c/kWh Winter: Peak: c/kWh Standard: 44.19c/kWh
39 Off-Peak: 31.68c/kWh Demand Charge: Summer: R83.73/kVA Winter: R87.91/kVA Off-Peak: 31.68c/kWh Demand Charge: Summer: R83.73/kVA Winter: R87.91/kVA Agricultural Tariffs: Basic Charges: <50kVA: R354.75/month >50kVA: R414.64/month Energy Charges: Summer: 57.82c/kWh Winter: 87.06c/kWh Agricultural Tariffs: Basic Charges: <50kVA: R354.75/month >50kVA: R414.64/month Energy Charges: Summer: 57.82c/kWh Winter: 87.06c/kWh Dihlabeng % No Domestic low Energy charge: 71.57c/kWh Domestic High Basic charge: R c/kwh Energy charge: c /kwh Domestic prepaid Energy charge: c/kwh Commercial conventional Basic charge: R /month Energy charge: c/kwh Commercial prepaid Energy charge: c/kwh Domestic low Energy charge: R65.00c/kWh Domestic High Basic charge: R c/kwh Energy charge: c/kwh Domestic prepaid Energy charge: R95.86 c/kwh Commercial conventional Basic charge: R /month Energy charge: c/kwh Commercial prepaid Energy charge: R98.00 c/kwh
40 Commercial conventional -Business from home Basic charge: R /month Energy charge: c/kwh Commercial conventional -Business from home Basic charge: R /month Energy charge: c/kwh Industrial KVA and above Basic charge: R /month Energy charge: 35.11c/kWh Demand Charge: R /KVA Ditsobotla 21% No Domestic: Conventional: Basic Charge: R85.76/month Energy Charge: 74.69c/kWh Prepaid High: Energy Charge: 83.63c/kWh Prepaid Low: Energy Charge: 76.30c/kWh Commercial: Conventional: Basic Charge: R148.46/month Energy Charge: 91.67c/kWh Prepaid: Industrial KVA and above Basic charge: R /month Energy charge: c/kwh Demand Charge: R /KVA Domestic: Conventional: Basic Charge: R85.76/month Energy Charge: 74.69c/kWh Prepaid High: Energy Charge: 83.63c/kWh Prepaid Low: Energy Charge: 76.30c/kWh Commercial: Conventional: Basic Charge: R148.46/month Energy Charge: 91.67c/kWh Prepaid:
41 Energy Charge: c/kWh Energy Charge: c/kWh Industrial Tariff: Basic Charge: R433.30/month Energy Charge: 50.29c/kWh Demand Charge: R118.62/kVA Drakenstein 20% No Domestic Low Energy charge: 64.21c/kWh Domestic tariff (60Amp) Basic charge: R232.46/month Energy charge: 73.62c/kWh Domestic tariff ( 3 phase-40amp) Basic charge: R587.15/month Energy charge: 70.24c/kWh Commercial Prepaid Energy charge: c/kWh Commercial tariff (1 phase-40amp) Basic charge: R176.35/month Energy charge: 77.08c/kWh Commercial tariff (3 phase-40amp) Basic charge: R603.85/month Energy charge: 70.86c/kWh Large Commercial (agricultural Industrial Tariff: Basic Charge: R433.30/month Energy Charge: 50.29c/kWh Demand Charge: R118.62/kVA Domestic Low Energy charge: 61.60c/kWh Domestic tariff (60Amp) Basic charge: R232.46/month Energy charge: 73.62c/kWh Domestic tariff ( 3 phase-40amp) Basic charge: R587.15/month Energy charge: 70.24c/kWh Commercial Prepaid Energy charge: c/kWh Commercial tariff (1 phase-40amp) Basic charge: R176.35/month Energy charge: 77.08c/kWh Commercial tariff (3 phase-40amp) Basic charge: R603.85/month Energy charge: 70.86c/kWh Large Commercial (agricultural
42 >100kVA) Basic charge: R945.42/month Energy charge: 31.79c/kWh Demand charge:r116.68/kva >100kVA) Basic charge: R945.42/month Energy charge: 31.79c/kWh Demand charge:r116.68/kva edumbe 19% No Weighted Average -Domestic Indigent Energy charge: 63.78c/kWh Weighted Average -Domestic Prepaid Energy charge: 71.80c/kWh Domestic Conventional Basic charge: R101.67/month Energy charge: 56.60c/kWh Basic charge: R361.20/month Energy charge: 73.00c/kWh Industrial Basic charge: R1,867.11/month Energy charge: 43.50c/kWh Demand charge: R97.46/kVA Ekurhuleni 28.90% Yes Domestic conventional IBT Block 1: (0-50kWh)= c/kwh Block 2: ( kwh) = c/kwh Block 3: ( kwh) = c/kwh Weighted Average -Domestic Indigent Energy charge: 63.78c/kWh Weighted Average -Domestic Prepaid Energy charge: 71.80c/kWh Domestic Conventional Basic charge: R101.67/month Energy charge: 56.60c/kWh Basic charge: R361.20/month Energy charge: 73.00c/kWh Industrial Basic charge: R1,867.11/month Energy charge: 43.50c/kWh Demand charge: R97.46/kVA Domestic conventional IBT Block 1: (0-50kWh)= c/kwh Block 2: ( kwh) = c/kwh Block 3: ( kwh) = c/kwh
43 Block 4: (>600 kwh) = c/kwh Block 4: (>600 kwh) = c/kwh Domestic Prepaid low Energy rate: c/kwh Domestic Prepaid low Energy rate: c/kwh Lifeline Energy rate: c/kwh Lifeline Energy rate: c/kwh Fixed charge: R17.42/month Capacity charge :R1.94 Fixed charge: R17.42/month Capacity charge :R1.94 Energy charge High season :83.00 c/kwh Low season: c/kwh Energy charge High season :83.00 c/kwh Low season: c/kwh INDUSTRIAL Tariff C (Bulk supply) (i.e. INDUSTRIAL Tariff C (Bulk supply) (i.e. Fixed Charge :R769.50/month Demand Charge High season:67.20/kva Low season:56.00/kva Fixed Charge :R769.50/month Demand Charge High season:67.20/kva Low season:56.00/kva Network access: R19.49 Network access: R19.49 Energy rate Energy rate
44 High season:89.60 c/kwh Low season:53.80 c/kwh High season;89.60 c/kwh Low season:53.80 c/kwh from substation from substation Fixed Charge:R Fixed Charge:R Demand Charge High season :R66.00/kVA Low season :R55.00/kVA Demand Charge High season :R66.00/kVA Low season :R55.00/kVA Network access: R19.14 Network access: R19.14 Energy rate High season:88.00 c/kwh Low season:52.80 c/kwh Energy rate High season:88.00 c/kwh Low season:52.80 c/kwh but not exceeding 11kV but not exceeding 11kV Fixed Charge:R /month Demand Charge High season :R64.80/kVA Low season :R54.00/kVA Fixed Charge:R /month Demand Charge High season :R64.80/kVA Low season :R54.00/kVA Network access: R18.79 Network access: R18.79 Energy rate Energy rate
45 High season:86.40 c/kwh Low season:51.50 c/kwh High season:86.40 c/kwh Low season:51.50 c/kwh Non-Standard Tariffs Tariff E Time of Use (ToU) Non-Standard Tariffs Tariff E Time of Use (ToU) Basic charge :R Basic charge Demand charge High season :R56.00/kVA Low season Demand charge High season :R56.00/kVA Low season :R50.40/kVA High season Energy rate Peak : c/kwh Standard :82.90 c/kwh Off-peak :38.30 c/kwh High season Energy rate Peak : c/kwh Standard :82.90 c/kwh Off-peak :38.30 c/kwh Low season Energy rate Peak :88.50 c/kwh Standard :58.50 c/kwh Off-peak :47.30 c/kwh Low season Energy rate Peak :88.50 c/kwh Standard :58.50 c/kwh Off-peak :47.30 c/kwh Network access :R19.49 Network access :R19.49 Direct from substation Direct from substation
46 Basic charge :R769.50/month Basic charge :769.50/month Demand charge High season :R55.00/kVA Low season :R49.50/kVA Demand charge High season :R55.00/kVA Low season :R49.50/kVA High season Energy rate : Peak : c/kwh Standard :81.40 c/kwh Off-peak :37.60 c/kwh High season Energy rate : Peak : c/kwh Standard :81.40 c/kwh Off-peak :37.60 c/kwh Low season Energy rate Peak :86.90 c/kwh Standard :57.40 c/kwh Off-peak :46.40 c/kwh Low season Energy rate Peak :86.90 c/kwh Standard :57.40 c/kwh Off-peak :46.40 c/kwh Network access :R19.14 Network access but not exceeding 11kV Basic charge but not exceeding 11kV Basic charge :R Demand charge High season :54.00/kVA Low season :48.60/kVA Demand charge High season :54.00/kVA Low season :48.60/kVA High season Energy rate High season Energy rate
47 Peak : c/kwh Standard :79.90 c/kwh Off-peak :36.90 c/kwh Peak : c/kwh Standard :79.90 c/kwh Off-peak :36.90 c/kwh Low season Energy rate Peak :85.30 c/kwh Standard :56.40 c/kwh Off-peak:45.60 c/kwh Low season Energy rate Peak :85.30 c/kwh Standard :56.40 c/kwh Off-peak:45.60 c/kwh Network access :R18.79 Network access :R18.79 Elias Motsoaledi 19% No Domestic Low Prepaid (Indigent) Energy Charge: 81.30c/kWh Domestic Low Prepaid Energy Charge: 81.32c/kWh Domestic High Basic Charge: R61.40/month Energy Charge :47.40 c/kwh(non Indigents) Energy Charge :58.80 c/kwh(51-200) Energy Charge :69.70 c/kwh(above 201) Basic Charge : R103.88/month Energy Charge : 69.50c/kWh Domestic Low Prepaid (Indigent) Energy Charge: 63.88c/kWh Domestic Low Prepaid Energy Charge: 81.32c/kWh Domestic High Basic Charge: R61.40/month Energy Charge :47.40 c/kwh(non Indigents) Energy Charge :58.80 c/kwh(51-200) Energy Charge :69.70 c/kwh(above201) Basic Charge : R103.88/month Energy Charge : 69.50c/kWh
NERSA APPROVED TARIFFS
NERSA APPROVED TARIFFS WESTERN CAPE PROVINCE Low High 1. AECI Heartland Somerset West 20.13% Very Small Basic Charge: R280.00 Summer : 65.00 Winter : 85.00 Small Basic Charge: R420.00 Summer : 65.00 Winter
More informationNERSA APPROVED TARIFFS
NERSA APPROVED TARIFFS GAUTENG PROVINCE ) Block1(0-50 ) Block2(50-350 1. AECI Modderfon tein 26.7% 2. City of Tshwane 22.38% N/A N/A N/A Heartland
More informationCOMPARISON OF PROPOSED TARIFFS
COMPAISON OF POPOSED TAIFFS WITH EFFECT FOM 1 JULY 2012 SCHEDULE 1 ELECTICITY 1. Domestic residential indigent consumers These tariffs are applicable to all residential indigent consumers with an ampere
More informationCOMPARISON OF PROPOSED TARIFFS
COMPAISON OF POPOSED TAIFFS WITH EFFECT FOM 1 JULY 2013 all tariffs are VAT exclusive SCHEDULE 1 ELECTICITY PESENT POPOSED 1. Domestic residential indigent consumers These tariffs are applicable to all
More informationCOMPARISON OF PROPOSED TARIFFS
5. ELECTICITY COMPAISON OF POPOSED TAIFFS WITH EFFECT FOM 1 JULY 2016 all tariffs are VAT exclusive SCHEDULE 1 5.1 Domestic residential indigent consumers These tariffs are applicable to all residential
More informationFor the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:
SCHEDULE OF STANDARD PRICES FOR ESKOM TARIFFS 1 APRIL 2013 TO 31 MARCH 2014 FOR NON-LOCAL AUTHORITY SUPPLIES AND 1 JULY 2013 TO 30 June 2014 FOR LOCAL AUTHORITY SUPPLIES 1. STANDARD PRICES The standard
More informationFor the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:
SCHEDULE OF STANDARD PRICES FOR ESKOM TARIFFS 1 APRIL 2014 TO 31 MARCH 2015 FOR NON-LOCAL AUTHORITY SUPPLIES, AND 1 JULY 2014 TO 30 JUNE 2015 FOR LOCAL AUTHORITY SUPPLIES 1. Standard prices The standard
More informationTariffs & Charges Booklet 2012/13
Charges for non-local authorities effective from 1 April 2012 to 31 March 2013 Charges for local authorities effective from 1 July 2012 to 30 June 2013 Tariffs & Charges Booklet 2012/13 DISCLAIMER The
More informationTARIFF SCHEDULE FOR THE 2014/2015 FINANCIAL YEAR
TARIFF SCHEDULE FOR THE 2014/2015 FINANCIAL YEAR MBOMBELA LOCAL MUNICIPALITY CHARGES FOR ELECTRICITY Mbombela Local Municipality hereby gives notice in terms of Section 75A of the Local Government Municipal
More informationNetwork Price List (excludes GST)
Network Price List (excludes GST) Effective from 1 July 2007 Monthly Monthly Monthly Network Network Network Energy Rates Step Rates Demand Capacity Capacity Price Network Price DLF Access Rates Rates
More informationELECTRICITY TARIFF (Effective from September 1, 1999.)
ELECTRICITY TARIFF (Effective from September 1, 1999.) * Payment period of electricity bill without surcharge is 30 days. * For late payment, surcharge @ 2% per month is applicable to all classes consumers.
More informationHow To Get A Fixed Charge For Electricity
COMPAISON OF TAIFFS WITH EFFECT FOM 1 JULY 2015 all tariffs are VAT exclusive SCHEDULE 1 5. ELECTICITY 5.1 Domestic residential indigent consumers These tariffs are applicable to all residential indigent
More informationSALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing
More informationTime-of-use tariffs in the Eskom Western region
Time-of-use tariffs in the Eskom Western region by D Ramsbottom, Eskom This is a case study into the application of time of use tariffs in the Eskom Western Region undertaken to determine the effect that
More informationRENEWABLE ENERGY INFEED R Herman, M Malengret and CT Gaunt University of Cape Town, South Africa
RENEWABLE ENERGY INFEED R Herman, M Malengret and CT Gaunt University of Cape Town, South Africa Technology and tariffs for renewable energy in-feed at LV and MV Ron Herman : Performance of LV feeders
More informationSTANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing
STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT Corporate Pricing For additional information, please call 602-236-5522 or 602-236-2950 TEMPORARY Prices Effective
More informationMIDVAAL LOCAL MUNICIPALITY
MIDVAAL LOCAL MUNICIPALITY Determination of Charges Payable for Electricity July 2011 to Jun 2012 Tariff of Charges PART I: SUPPLY OF ELECTRICITY 1. BASIC CHARGES 1.1 Except as provided in 1.2 the following
More informationSALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing Cycle AVAILABILITY:
More informationTARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents
Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2006-07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars
More informationENERGY PRICE FACTSHEET
The details in this Price Fact Sheet apply to you if you are a small business customer in the Endeavour Residential Electricity Endeavour N70 - Domestic Supply (IBT) 01/07/15 First 1750kWh per quarter
More informationREVISED CONSUMPTIVE TARIFFS, RATES AND BASIC CHARGES FOR ELECTRICITY SERVICES, WATER AND SANITATION SERVICES AND SOLID WASTE MANAGEMENT SERVICES
ANNEXURE 4 REVISED CONSUMPTIVE TARIFFS, RATES AND BASIC CHARGES FOR ELECTRICITY SERVICES, WATER AND SANITATION SERVICES AND SOLID WASTE MANAGEMENT SERVICES 1. ELECTRICITY 1.1 General The proposed revisions
More informationElectricity PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES
Electricity VAT A DOMESTIC TARIFF SCALES PART I: ENERGY, DEMAND AND FIXED DEMAND CHARGES FREE BASIC ELECTRICITY For indigent consumers officially registered at the City of Tshwane Metropolitan Municipality
More informationBusiness Rate Summary
Business Summary The following is a summary of Southern California Edison s (SCE) tariffs and programs for small, medium, and large power customers, typically called General Service (GS) customers. Eligibility
More informationDETERMINATION OF PROPERTY RATES AND REBATES FOR 2014/15 AS AMENDED IN ACCORDANCE WITH THE REGULATIONS
CITY OF JOHANNESBUG 2014/15 APPOVED TAIFFS ANNEXUE 1 DETEMINATION OF POPETY ATES AND EBATES FO 2014/15 AS AMENDED IN ACCODANCE WITH THE EGULATIONS That in terms of Sections 2, 7, 8 and 14 of the Local
More informationSALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29 EXPERIMENTAL PRICE PLAN FOR TIME-OF-USE SERVICE WITH SUPER OFF-PEAK FOR ELECTRIC VEHICLES Effective: April 2015 Billing Cycle AVAILABILITY:
More informationDaily Daily Network Network Network Energy Rates Step Rates Capacity. Price Rates Rates
Excludes GST Effective from 1 July 2010 Tariff Class Daily Daily Network Network Network Energy Rates Step Rates Capacity Capacity Price Rates Rates No. Network Price DLF Access Non-ToU Time of Use (ToU)
More informationNORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM
NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM BY AUTHORISED PERSONS Effective from 1 October 2011 to 30 September
More informationNetwork Tariff Guide for Standard Control Services. 1 July 2015 to 30 June 2016
Tariff Guide for Standard Control Services 1 July 2015 to 30 June 2016 Revision history Version Date Summary of changes 1.0 29 June 2015 Initial 2015 16 Tariff Guide. 1.1 7 August 2015 Corrected error
More informationSIERRA PACIFIC POWER COMPANY dba NV Energy 6100 Neil Road Reno, NV 89511 Tariff No. Electric No. 1
53 rd Revised PUCN Sheet No. 63G Cancelling 52 nd Revised PUCN Sheet No. 63G D-1 - Domestic Service Basic Service Charge, per month $15.25 $0.05793 $0.03616 $0.00105 ($0.00422) $0.00039 ($0.00500) $0.00198
More informationNetwork Price List and Explanatory Notes
Essential Energy Network Price List (Excluding GST) Effective 1 July 2014 Tariff Code Obsolete tariffs on same rate Description Network Energy Energy Energy Energy Energy Energy Energy Peak Shoulder OffPeak
More informationCITY OF MATLOSANA ELECTRICITY - SUPPLY TARIFF STRUCTURE ELECTRICITY - SUPPLY
CITY OF MATLOSANA ELECTRICITY - SUPPLY TARIFF STRUCTURE ELECTRICITY - SUPPLY PART A: Monthly charges for availability and use of Council's electricity supply system: 1 BASIC CHARGES (including pre-paid
More informationFOREWORD. Sandile Maphumulo Head: Electricity
FOREWORD The latter part 2007/08 financial year saw drastic shortages of electricity, resulting in rolling blackouts and the emergency shutdown of the country's largest users of electricity and load shedding
More informationHow To Get A Better Deal On Power From Powerline Power From Pse
ELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS Rates Effective January 1, 2010 If you would like information about our services, details about your rights and responsibilities, or a copy of
More informationEnergy Price Fact Sheet
Tariff 20 - ERG69764RS Small Business Electricity Ergon Single rate Regulated offer 01-Jul-2015 Tariff 20 Business General Supply 1st July to 30th June All consumption. Anytime All consumption 22.481 cents
More informationSA Power Networks Network Tariffs - Residential APPLIES TO USAGE FROM 1 JULY 2015
SA Power Networks Network Tariffs - Residential Low Voltage Residential - Single Rate DUOS excl TUOS excl PV JSO excl Total excl Total incl Block 1 Usage Rate $/kwh First 333.3 kwh/mth 0.0745 0.0300 0.0130
More informationCommercial Use Tariffs. Codes 15, 16, 17, 60, 61, 62, 63, 64 and 66
Commercial Use Tariffs Codes 15, 16, 17, 60, 61, 62, 63, 64 and 66 Tariffs for Commercial Use Tariffs for Commercial Use are applicable to classes of customers whose economic activities are defined by
More informationNETWORK PRICE LIST 2014/2015. Effective 1 July 2014
NETWORK PRICE LIST 2014/2015 Effective 1 July 2014 Document Amendment History Version No. Publication Date Comments 1.0 17 June 2014 AER Approved Pricing 2.0 15 July 2014 Updated Substation and Transformer
More informationElectricity Price Comparison. Namibia Manufacturers Association (NMA)
Electricity Price Comparison December 2012 Submitted to: Namibia Manufacturers Association (NMA) P O Box 20810 Windhoek Namibia Tel +264 (0)61 233206 Fax +264 (0)61 233360 Submitted by: EMCON (Pty) Ltd
More informationEnergy Price Fact Sheet
Business Electricity SA Power Networks E (Anytime) Standing Offer 8/07/2015 Electricity tariff rates (QBSR) Pty Ltd Momentum Standing Offer E 31.69 cents per kwh 34.859 cents per kwh 29.42 cents per kwh
More informationELECTRICITY 2015-2016
ELECTRICITY 2015-2016 Tariff Increases - Effective: 01 July 2015 (ALL PRICES EXCLUDE VAT) Description Tariff Increase Amount Residential Customers Scale 3, 4, 8, 9 12.2% Energy Charge 129.39(c/kWh) Residential
More informationMUNICIPAL TARIFF DETERMINATION PROCESS PRESENTATION TO PPC ON ENERGY 24 MAY 2013
MUNICIPAL TARIFF DETERMINATION PROCESS PRESENTATION TO PPC ON ENERGY 24 MAY 2013 1 1. Purpose and mandate 2. The tariff approval process and information requirements 3. Municipal Tariff Guideline and financial
More informationCommittee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation
Committee on the Northern Territory s Energy Future Electricity Pricing Options Submission from Power and Water Corporation October 2014 Power and Water Corporation 1. INTRODUCTION On 21 August 2014, the
More informationSchedule GS-3 LARGE GENERAL SERVICE SECONDARY VOLTAGE I. APPLICABILITY AND AVAILABILITY
I. APPLICABILITY AND AVAILABILITY A. Except as modified herein, this schedule is applicable only to a non-residential secondary voltage Customer (as defined in Paragraph XII.) who (1) elects (a) to receive
More informationPG&E MCE Commercial Joint Cost Comparisons
MCE Commercial Joint Cost Comparisons As part of our mutual commitment to support your energy choice, MCE and have partnered to create a comparison of our typical electric rates and average monthly charges.
More informationDepartment of Water and Power City of Los Angeles PROPOSED RATE RESTRUCTURING
Department of Water and Power City of Los Angeles PROPOSED RATE RESTRUCTURING 1 RATE RESTRUCTURING OBJECTIVES Provide accurate price signals that give customers an incentive to use electricity in an efficient
More information12 COSTS OF DOING BUSINESS IN THAILAND 2014
12 COSTS OF DOING BUSINESS IN THAILAND 2014 UTILITY COSTS Water Rates for Regional Areas Water Rates by User Types Type 1 Residence Type 2 Commerce, Government Agency, State Enterprise, and Industry Water
More informationPOWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends
POWER NETWORKS 2014-15 Electricity Network Tariffs and Charges and Future Price Trends August 2014 Power and Water Corporation Table of Contents 1 Business Characteristics... 3 2 2014 Network Price Determination...
More information7.2.3 Material amendments to original application prior to approval / refusal 50% of original application fee
1 ANNEXURE C 1 BYLAWS 1.1 For copies of any bylaws, per page 1.75 1.93 2.20 1.2 Extract of bylaws, per page or part thereof 1.75 1.93 2.20 2 LIBRARIES 2.1 Fine for overdue library material excluding videos
More informationElectricity. Introduction
9 Electricity Introduction Electricity services in South Africa are at a crossroads. National economic growth has outstripped available generation capacity, while regulatory uncertainty has undermined
More informationTariff Development II: REVIEW of Basic Allocation and Rate Design Principles
Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles Robert Manning Public Utility Commission of Texas Briefing for the NARUC/INE Partnership 1 Overview Steps in Setting Rates Establish
More informationThe Art of Turning Wholesale Rates into Retail Rates. Paul Garcia The Prime Group, LLC
The Art of Turning Wholesale Rates into Retail Rates Larry Feltner/ Paul Garcia The Prime Group, LLC Wholesale Rates are Important! Represent 60% - 70% of coops costs Based on structure, can promote or
More informationNIGERIAN ELECTRICITY REGULATORY COMMISSION CUSTOMER CLASSIFICATION IN NIGERIAN ELECTRICITY SUPPLY INDUSTRY
NIGERIAN ELECTRICITY REGULATORY COMMISSION CUSTOMER CLASSIFICATION IN NIGERIAN ELECTRICITY SUPPLY INDUSTRY BY Emeka O (Asst. Manager) MARKET,COMPETITION & RATES DIVISION Sept, 2010 Outline 1. Background
More informationElectric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL
Connexus Energy Section III - Business Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Availability Available to non-residential customers for either single-phase
More informationELECTRIC RATE SCHEDULES
LITTLETON WATER & LIGHT DEPARTMENT 65 LAFAYETTE AVENUE LITTLETON, NH 03561 ELECTRIC RATE SCHEDULES 1. Table of Contents 2. Residential Service Rate 3. Special Service Rate a. Churches b. Municipal Public
More informationSEP 2014 OCT 2014 DEC 2014 NOV 2014 HOEP* 3.23 1.70 2.73 2.25 2.06 1.41 0.62 1.52 2.02 2.86 4.97 2.42 1.57 1.42 1.42 2.41
Ontario Energy Report Q2 Electricity April June Electricity Prices Commodity Cost ( /kwh) Commodity cost comprises two components, the wholesale price (the Hourly Ontario Energy Price or HOEP) and the
More informationINTRODUCTION Tariff Objective Factors
TARIFF INTRODUCTION Tariff is the schedule or rates framed for supply of electrical energy to various consumers. Objective is to distribute the equitably the cost of generation amongst various consumers
More informationCitiPower 2016 Pricing Proposal
CitiPower 2016 Pricing Proposal This page is intentionally left blank. 2 CitiPower 2016 Pricing Proposal Table of Contents 1 INTRODUCTION... 5 1.1 Our business...7 1.2 Network and metering tariffs...8
More informationSouthern California Edison Revised Cal. PUC Sheet No. 57592-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 57592-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55646-E Schedule TOU-GS-2 Sheet 1 APPLICABILITY Applicable to single-
More informationCity Light Rates 101. Communications & Public Affairs. www.seattle.gov/light
City Light Rates 101 Communications & Public Affairs www.seattle.gov/light INTRODUCTION Conserving Energy for a Sustainable Future RATE SETTING PROCESS CONSISTS OF THREE STEPS Revenue Requirement Cost
More informationResidential. Tariff Supply/Usage Unit excl. GST incl. GST
Pricing information for electricity in Victoria, effective from 18 January 2016. AUSNET SERVICES DISTRIBUTION ZONE 1. Residential. Residential Single Rate (Domestic General) Peak consumption - first 1,020
More informationDescription Tariff Increase Amount Residential Customers Scale 3, 4, 8, 9 18.5% Energy Charge 93.71(c/kWh)
2011/2012 Tariff Increases (ALL PRICES EXCLUDE VAT) Description Tariff Increase Amount Residential Customers Scale 3, 4, 8, 9 18.5% Energy Charge 93.71(c/kWh) Residential Customers Free Basic Electricity
More informationJemena Electricity Networks (VIC) Ltd - Network Tariffs For The 2015 Calendar Year (Exclusive of GST)
Residential Only available to residential customers A100 / F100 a / T100 b General Purpose Single rate all times - Standing charge $/customer pa $26.785 - Unit rate /kwh 9.298 A10X / F10X a / T10X b Flexible
More information01 JULY 2014-30 JUNE 2015
ELECTRICITY TARIFFS FOR RESIDENTIAL & SMALL BUSINESS CUSTOMERS GENERAL All tariffs listed below, show VAT excl. The cross-over from existing tariffs to new tariffs will be billed pro rata. GENERAL TIPS
More informationPass Through Costs for Business Electricity Customers from 1 st October 2015
Pass Through Costs for Business Electricity Customers from 1 st October 2015 DOCUMENT TYPE: Information Note REFERENCE: CER 15/226 DATE PUBLISHED: 22 nd September 2015 The Commission for Energy Regulation,
More informationTariff Category (1 June 2011) (1 January 2014)
ELECTRICITY TARIFF SCHEDULE (This tariff is effective from 1 st January 2014 and supersedes the previous tariff schedule which was effective from 1 st June 2011) Schedule 1 TNB tariff rates are set out
More informationDISTRIBUTION CHARGES POLICY ELECTRICITY DEFINITIONS
DISTRIBUTION ELECTRICITY USE PRICING OF SYSTEM DEFINITIONS CHARGES (STANDARD) (DUoS) POLICY Electricity Pricing Definitions (standard) Page: 2 of 23 Terms and definitions For the purposes of this standard,
More informationSchedule 2 (Taken in conjunction w/ Schedules 1 or 3)
Rocky Mountain Power - State of Utah Price Summary - In Effect as of June 1, 016 Tariff Schedules Base Rate Schedule 195 Rate Schedule 94 1, Schedule 98 1, Schedule 193 1,3 Schedule 91 1 Schedule 1 - Residential
More informationUnderstanding SDG&E s Electric Rates
Understanding SDG&E s Electric Rates EPA Benchmarking Workshop June 23, 2009 Jim Spurgeon Manager Commercial & Industrial Customer Services Topics Electric Bill Components Key Definitions SDG&E s Electric
More informationPG&E MCE Commercial Joint Cost Comparisons
MCE Commercial Joint Cost Comparisons As part of our mutual commitment to support your energy choice, MCE and have partnered to create a comparison of our typical electric rates and average monthly charges.
More informationConsumer category. Name of the Tariff Scheme. Quarterly consumption in KWH. Fixed Charge/ Demand Charge * in Rs/KVA/mon NOT APPLICABLE.
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ( A Government of West Bengal Enterprise) Vidyut Bhawan, Block-DJ, Sector II, Bidhannagar, Kolkata 700091 Gist of Order dated 28.07.2009 passed
More informationUnderstanding Network Tariff Reform
Understanding Network Tariff Reform A guide for small to medium business and residential customers who use less than 100MWh of electricity a year Ergon Energy is restructuring the way it charges for the
More informationWe Energies Electric Rates
We Energies Electric Rates for Michigan customers July 2015 The rates in this brochure reflect the authorized base rates of Wisconsin Electric Power Company, doing business under the name of We Energies,
More informationSTATEMENT OF CHARGES FOR USE OF SP MANWEB s ELECTRICITY DISTRIBUTION NETWORK
STATEMENT OF CHARGES FOR USE OF SP MANWEB s ELECTRICITY DISTRIBUTION NETWORK This statement is effective from 1st October 2008 SP Energy Networks New Alderston House Dove Wynd Strathclyde Business Park
More informationELECTRICITY DISTRIBUTION TARIFFS The Chilean Experience. Hugh Rudnick Pontifícia Universidad Católica de Chile
ELECTRICITY DISTRIBUTION TARIFFS The Chilean Experience Hugh Rudnick Pontifícia Universidad Católica de Chile Brasilia, June 2009 Objective Describe the building of the electricity distribution tariff
More informationMANGAUNG METROPOLITAN MUNICIPALITY
MANGAUNG METROPOLITAN MUNICIPALITY REVENUE AND EXPENDITURE ESTIMATES AND DETERMINATION OF GENERAL ASSESSMENT RATE AND SANITARY FEES 1. Notice is given in accordance with the provisions of section 81 (1)
More informationMASSACHUSETTS ELECTRIC COMPANY
MASSACHUSETTS ELECTRIC COMPANY Residential Regular R-1 Effective M.D.P.U. No.1119 March 1, 2008 Adjusted By: Transition Cost Adjustment March 1, 2008 Transmission Service Cost Adjustment March 1, 2008
More informationSouth African Distribution Code
South African Distribution Code Glossary and Definitions Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact:
More informationPowerco Limited Pricing Guide 2015 ANNUAL REPORT 2015
ANNUAL REPORT 2015 PRICING GUIDE 2015 1 CONTENTS Introduction Page 03 Who we are Page 04 The Electricity Industry Page 05 Our Pricing Policy Page 08 How Powerco Performs Page 10 Pricing Methodology Page
More informationESB Networks Ltd Statement of Charges
ESB Networks Ltd Statement of Charges Revision Date: 9/2014 Revision No.: 11 Document No: DOC-101209-AXR Issued by: ESB NETWORKS LTD Approved by : CER Effective Date: 01/10/2014 Commercial and Renewable
More informationDAKSHIN HARYANA BIJLI VITRAN NIGAM. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33 Dated: 9/6/2014
DAKSHIN HARYANA BIJLI VITRAN NIGAM Sales Circular No. D- 26/2014 From To CE/Commercial, DHBVN, Hisar. All CEs/SEs/XENs/SDOs/OP, JEs-I, Incharge Sub office, in DHBVN. Memo No.Ch-26/SE/Comml./R-16/45/2010/S/C/F-33
More informationTECHNICAL REPORT ZA 2015. Energy. Potential for integration of distributed solar photovoltaic systems in Drakenstein municipality
TECHNICAL REPORT ZA 2015 Energy Potential for integration of distributed solar photovoltaic systems in Drakenstein municipality EXECUTIVE SUMMARY Using Drakenstein Municipality as a case study, this report
More informationSchedule 6VP LARGE GENERAL SERVICE VARIABLE PRICING
I. APPLICABILITY This Schedule is applicable, on a voluntary basis, to the supply of 10,000 kw or more to any Customer who has an annual average demand of 5,000 kw or more as determined by dividing the
More informationStandard Electricity Prices and Charges *
Standard Electricity Prices and Charges * South West Interconnected System Effective *All prices quoted include GST and are subject to change. IMPORTANT: Customers need to assess each tariff and any associated
More informationPress Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL
Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL The revised tariff rates for supply of electricity in the State of Punjab during the year 2014-15 have been determined and the Tariff Orders
More informationEnergy Price Fact Sheet Momentum Energy Pty Ltd Smile Power E
Pty Ltd Smile Power E Business Electricity SA Power Networks E (Anytime) Electricity pricing information (QBSR) 31.69 cents per kwh 34.859 cents per kwh 28.46 cents per kwh 31.306 cents per kwh 84.33 cents
More informationElectricity Tariff Structure Review: Alternative Tariff Structures. A Consultation Paper
Electricity Tariff Structure Review: Alternative Tariff Structures A Consultation Paper CER/04/239 July 1 st 2004 SUMMARY Since 2000, the Commission has reviewed customer tariff levels on an annual basis.
More informationPricing methodology Electricity distribution network. From 1 April 2014
Pricing methodology Electricity distribution network From 1 April 2014 Pursuant to: The Electricity Distribution Information Disclosure Determination 2012 1. TABLE OF CONTENTS 1. Table of contents... 2
More informationPrice Fact Sheet Lumo Advantage QLD Residential Electricity Energex Prices included in this document are correct as at 3 September 2013.
Residential Single Rate Before Discount After Discount Network Tariff Codes: 8400 Units Excl. GST Incl. GST Excl. GST Incl. GST Residential Single Rate with Controlled Load 1 Before Discount After Discount
More informationPG&E - MCE Joint Rate Comparisons
- MCE Joint Rate Comparisons As a part of our mutual commitment to support your energy choice, MCE and have partnered to create a comparison of our typical electric rates, average monthly charges and generation
More informationUnderstanding Time-of-Use and Demand. 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved.
Understanding Time-of-Use and Demand 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Agenda Rate Overview How do Time Of Use Rates Work? What is Demand? Tips on Managing
More informationSTRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA
STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) OUTLINE OF PRESENTATION (ECG) 2 Introduction Map of Operational Area Company Mandate,
More informationWhat is the Impact of Utility Demand Charges on a DCFC Host?
What is the Impact of Utility Demand Charges on a DCFC Host? June 2015 Key Conclusions Demand charges associated with 50 to 60-kW high power charging of a direct current (DC) fast charger (DCFC) can have
More informationA study into approaches to minimise the impact of electricity price increases on the poor
TRADE AND INDUSTRY CHAMBER FUND FOR RESEARCH INTO INDUSTRIAL DEVELOPMENT, GROWTH AND EQUITY (FRIDGE) A study into approaches to minimise the impact of electricity price increases on the poor Final Report
More informationCOMPILED BY: BM RAMOKGOPA
COMPILED BY: BM RAMOKGOPA CONTENTS 1. INTRODUCTION 3 2. PRE-DE VILLIERS COMMISSION 3 2.1 INDUSTRY STRUCTURE 3 2.2 GOVERNANCE 3 2.3 TARIFF PHILOSOPHY 7 2.3.1 Historical Development of Tariffs in SA 7 2.3.2
More informationTHE NARRAGANSETT ELECTRIC COMPANY OPTIONAL LARGE DEMAND BACK-UP SERVICE RATE (B-62) RETAIL DELIVERY SERVICE
Sheet 1 AVAILABILITY This service shall apply to Customers in the class identified below: (i) (ii) who receive all or any portion of their electric supply from non-emergency generation unit(s) with a nameplate
More informationAlice Miller Energy Consultant September 28, 2011
Rate Design and Billing Systems Alice Miller Energy Consultant September 28, 2011 What is Rate Design? Principal goals of rate design Meet revenue requirement Equity among service classes Customer impacts
More informationAUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.
AVAILABLE: Within established City Limits. AUSTIN UTILITIES Schedule (110) Issued 11/12/13 Supersedes (110) Issued 11/13/12 Sheet No. 1 of 1 RESIDENTIAL SERVICE APPLICABLE: To single-family residences
More informationSelling Renewable Energy in Michigan. Julie Baldwin Michigan Public Service Commission Michigan Wind Conference 2009 March 3, 2009
Selling Renewable Energy in Michigan Julie Baldwin Michigan Public Service Commission Michigan Wind Conference 2009 March 3, 2009 Michigan Public Service Commission Three Governor-appointed Commissioners
More informationFirst Revised Sheet No. D-13.01
First Revised Sheet No. D-13.01 Cancels Original Sheet No. D-13.01 SERVICE FOR COMMERCIAL & INDUSTRIAL LOADS AUTOMATED POWER MONITORING SCHEDULE D-APM (Contd) (Continued from Sheet No. D-13.00) Subject
More informationExhibit (DRD-1) Page 1 of 2 Qualifications of Panel. Henry Host-Steen
Exhibit (DRD-1) Page 1 of 2 Qualifications of Panel Henry Host-Steen I have been retained as a Contractor by New York State Electric & Gas Corporation ( NYSEG ). I am currently employed by Manpower Professional,
More information