Electric Boat Business Update



Similar documents
Naval Nuclear Propulsion Program

NNPP Enterprise Overview

Outline. Intro Navy at Large NUPOC Program. NUPOC Eligibility How to Apply. Job Options and Descriptions

The Nuclear Navy Today

Managing Change on Complex Programs VIRGINIA Class Cost Reduction

The tender Proteus (AS-19) was kept well-supplied with a full bill of stateside goods including everything from tasty ham hocks to electronic

Fleet Ballistic Missile Eastern Range Operations Supporting Navy Testing and Deployment

Statement of. Vice Admiral William A. Brown, United States Navy. Deputy Commander, United States Transportation Command

Newport RI Naval history

Virtual Reality Welder Training

Curriculum Vitae SAN FRANCISCO, USA, RESIDENT SURVEYOR. British Subject and USA permanent resident

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2007 BIENNIAL BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES FEBRUARY 2006 SHIPBUILDING AND CONVERSION, NAVY

Dept 425: Instrumentation and Electronic Systems Disciplines: Computer, Computer Science, Electrical, Mathematics

Ernest H. Joy II. Educational Background VPI AND STATE UNIVERSITY Blacksburg, VA. Ph.D. Education: Curriculum and Instruction

Guide to the Papers of Lydia G. Weld MC.0570

NATIONAL NUCLEAR SECURITY ADMINISTRATION

Setting the standard in nuclear reactor research and regulation NAVAL REACTORS ENGINEER

Captain Joseph Campbell Commander, Norfolk Naval Shipyard Portsmouth, Virginia. Statement A: Approved for public release; distribution is unlimited

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 9 R-1 Line #139

SPAR s Estimating Cost Models

World-Class. World-Wide.

Ms. Alyse C. Bullock DoN OSBP Assistant Director

DEFENSE ACQUISITION WORKFORCE

NAVAL SEA SYSTEMS COMMAND STRATEGIC BUSINESS PLAN

A Practical Approach for Ship Construction Cost Estimating

Curriculum Vitae John E. Gilmore, MBA, PMP. July 2009

ELECTRIC SHIP EDUCATION. 9 May 2006

THE SECRETARY OF THE NAVY WASHINGTON DC

Cost Management in Shipbuilding

Role of the Judge Advocate General s Corps. Uniformed Legal Advisor to Naval Leaders Title 10 Responsibilities

Advanced Integrated Technologies, LLC

Department of Defense Fiscal Year (FY) 2016 President's Budget Submission

Leading the silent service at all fathoms SUBMARINE OFFICER

USS Theodore Roosevelt

IN DEFENSE OF THE JONES ACT

The Challenge. Shipboard crew members need training because cadres are not expected to provide a long-term ConOps for UUV employment.

Venator -110 General Purpose Light Frigate Technical Brief

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership

Testimony of Matthew Paxton President, Shipbuilders Council of America

Flexible, Life-Cycle Support for Unique Mission Requirements

Public Law th Congress An Act

BSc Bachelor of Science Electrical Engineering Sciences (240ECTS)

U.S. Ships, Barges, And Platforms Market - Analysis And Forecast to 2020

RYMN J. PARSONS, A.B., J.D., LL.M., M.S.S.

Joint Operational Medicine Information Systems Program

CRS Report for Congress

CURRICULUM VITAE. Degree(s) or Diploma(s) obtained: BSc. (Naval Architecture and Marine Engineering)

Estimated Impacts of Sequestration-Level Funding

Strategic Design. To learn more about the Naval Facilities Engineering Command, please visit us at and

July & August Kalakala s News Letter

Navy and Marine Corps Have Weak Procurement Processes for Cost reimbursement Contract Issuance and Management

OVERVIEW CMPIC SHIPBUILDING CUSTOMERS AND PROJECTS

DODIG July 18, Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets

PRESENTERS AND STAFF

SHIP TO SHORE POWER: US NAVY HUMANITARIAN RELIEF? R DEREK SCOTT

Defense Contract Management Agency

Naval Energy. A Strategic Approach

MATTHEW FENTON. Telephone

Overview Brief May 2014

DEXTER. Ship Health Monitoring Software. Efficiency & Reliability. Smart Solutions for

DEPARTMENT OF DEFENSE

OVERVIEW OF NAVAL SHIPYARD s QUALITY, INNOVATION AND PRODUCTIVITY IMPROVEMENT EFFORTS

Department of Defense Regional Council for Small Business Education and Advocacy Charter

News January 27, 2016 Contact: Lucy Ryan Tel:

The Education of Naval Ship Designers in the U.S.A.

Information Technology

JOINT STATEMENT OF THE SECURITY CONSULTATIVE COMMITTEE

Cybersecurity Workforce Opportunities

Maritime High School Course Outline

Canada: Business opportunities in the maritime sector

HIGHLY ENRICHED URANIUM INVENTORY

United States Nuclear Forces

raytek, Inc. Background Information and Capabilities

PROJECT MANAGEMENT SERVICES

The New Program in Marine Engineering Technology

DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY

LIGHTWEIGHT INNOVATIONS FOR TOMORROW

Seapower Capability Systems is Raytheon Integrated Defense Systems business area dedicated to the development and delivery of critical seapower

Start Date Grad Date Course Name Sponsor Location October November December January February

Spring 2008 Industry Study. Final Report Shipbuilding Industry

TECHNOLOGY BRIEF. Business Benefits from Radio Frequency Identification (RFID)

Guam Fire Department. A Report to Our Citizens

Accurate Risk Assessment Using Multi-Relational Hazard/Mishap Pairings

Transcription:

Electric Boat Business Update Presentation to Commission for Connecticut s Future September 30, 2014 Copyright Electric Boat Corporation - Use Only With Permission Electric Electric Boat Proprietary Boat Proprietary Information Information #0247 #0247 TNP TNP 09-30-14 1 1

Agenda Electric Boat Overview Submarine Market Major Programs Business Environment Resource Deployment Summary GENERAL DYNAMICS Electric Boat Electric Electric Boat Boat Proprietary Information #0247 #0247 TNP TNP 09-30-14 2 2

Electric Boat Groton, Connecticut EB: New London Engineering & Design EB: Groton Construction and Repair EB: SUBASE NLON Maintenance and Modernization and Fleet Support Electric Boat Private Information #0247 #0247 TNP TNP 09-30-14 3 3

Electric Boat Groton, Connecticut Shipyard Operations began at site in 1910 - New London Ship and Engine Company Acquired 1911 1934: 1 st submarine built for US Navy at this site Final Assembly, Outfitting, Test and Delivery Land Level Hull Assembly Nuclear Fuel Loading Final Outfitting Ship System Testing Sea Trials and Delivery Post Delivery Support and Fleet Maintenance 4

New London Facility Engineering and Design Programs Max Staffing Level: 3,300 Former Pfizer builds Global Research Facility, GD purchased facility in 2010 700,000 ft2 interconnected buildings, 6 floors each, originally 2,200 work spaces - Concept Formulation - Ship Design and Integration - Component Development - Engineering Analysis - Systems Integration - Technology Development - Construction Support - Program Management 5

Electric Boat Quonset Point, RI Manufacturing Facility Established 1973 Flexible workforce in Factory Environment Module Manufacturing and Assembly Automated Manufacturing Automated Hull Frame & Cylinder Area Based Installation Vertical Outfitting Accuracy Control Transportation and Handling Air, Rail, Barge Transport 6

Lines of Business Electric Boat Construction Engineering & Design Overhaul and Repair Ship Operations VA-Class Block III VA-Class Block IV OHIO Replacement VA Payload Module Moored Training Ship Fleet Support Military Sealift LNG Tankers Staffing Connecticut Operations/Support 4,200 Engineering/Design 4,400 Rhode Island Manufacturing 3,400 Other Locations 500 Total 12,500 2014 Sales 63% Construction 28% 7% Engineering and Design Overhaul and Repair 2% Ship Operations 7

Submarine Market 8

The U.S. Submarine Force consists of: 40 Los Angeles class attack submarines (SSN) 3 Seawolf class attack submarines (SSN) 11 Virginia class attack submarines (SSN) 4 Ohio class Guided Missile Submarines (SSGN) 14 Ohio class Ballistic Missile Submarines (SSBN) 72 Nuclear Submarines 9

EB: Submarine Product Overview Current & Future VIRGINIA SSN Blocks I IV 17 More Ships Through End of Block IV Moored Training Ship (MTS) Trainer Modules for 2 Moored Training Ships VIRGINIA Block V Block V Block V and Follow Ships with VIRGINIA Payload Modules OHIO Replacement (OR) SSBN Design and Construction of 12 ships 10

Navy FY15 Shipbuilding Plan Procurement Forecast Navy FY15 Shipbuilding Plan and Submarine Block Buys FY 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Total VCS Block IV VCS Block V VCS Block VI VCS Block VII SSN(X) SSN SSN 2 2 2 2 2 2 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 36 OR Blk I OR Block II OR Block III Blk IV OR SSBN 1 1 1 1 1 1 1 1 1 1 1 1 12 Total 2 2 2 2 2 2 2 2 2 1 3 1 3 2 3 2 3 2 3 2 3 2 48 VPMs 2 2 1 2 1 2 1 2 1 2 1 2 1 2 1 23 VCS 2/Year (present to 2020) Transition Period (2019-2025) VCS w/ VPM, OHIO Replacement SSBN 1/Year SSN 1.5/Year (2026-2035) 11

Major Programs 12

Virginia Class SSN Program 30-Ship SSN Program Summary Design Build Program (1992 2004) Current Plan (1998 Construction Start) Procured with multi-year contracts Submarine ordered in 5 year blocks Takes 10 years to build a block of submarines Acquisition Program $93B VCS Program - 66% Authorized 2 ships/ year authorized 2011-2018 Expect VA-Class to be increased to ~50 SSNs Block V in 2019, proposed payload module USS VIRGINIA, Delivered 2004 13

Virginia Class Program Summary Shipyard Material 30% 31% GFE Shipyard Labor 39% 5 year construction span Ship bid on Learning Curve Each shipyard builds same modules for each VA-Class 2/3 of hours assigned to delivery yard 1/3 of hours to non-delivery yard 14

VIRGINIA Class Submarine Program Recent Accomplishments Copyright Julius Tolentino, used with permission Block IV contract signed on 4/28/14 10 ships ordered over 2014 2018 Maintains 2 ships/year build rate $17.8B total contract value Continues co-production with Newport News Shipbuilding 15

Maintenance and Modernization Maintenance Availabilities Completed four submarine availabilities in first half of year New London Subase and Naval Shipyard Support Submarine Planning Yard and Life Cycle Support 16

S6G Moored Training Ship (MTS) Conversion Project Description Objective Replace two existing training platforms at NPTU Charleston, SC Site Purpose Operating reactor plant for training naval nuclear plant operators Scope Convert USS La Jolla (SSN701) and USS San Francisco (SSN711) into waterborne nuclear propulsion plant (S6G) training platforms Design, major hull module construction and engineering support Includes required shore-based safety systems and a shielded Auxiliary Control Room Forward to monitor and control the plant Adds safety features to meet the intent of NRC regulations Conversion to occur at Norfolk Naval Shipyard 17

OHIO Replacement (OR) Program Program Description and Development Plan Program Description 12 OHIO Replacement SSBNs to replace 14 OHIO Class SSBNs #1 priority for US Navy Most survivable leg of the TRIAD Development Program Technology development phase in process Driving EB s future; tools, processes, facilities, people EB OR staffing projected to increase to 2,500 by end of the year Lead ship authorization FY2021, delivery in 2027 Lead ship on patrol in 2030, Ships in service until 2080 OHIO Replacement Program is critical to the future of EB 18

Business Environment 19

Washington Legislative Outlook Uncertain Budget Environment - All Federal Spending Decline in defense spending is a reality Budget Control Act is the law of the land DOD top-line budget exceeds BCA by $115B, FY16 FY19 Public sentiment on other issues Despite this, Submarine Programs Strongly Supported Pivot to Asia - Pacific Attack Submarine Mission Requirements Unmet Strategic Nuclear Deterrent Critical to National Security Our Goal: Well Executed Programs That Remain Affordable and Relevant 20

Business Environment Overview DOD Budget Pressures Internal Excess infrastructure & aging equipment Dwindling war funding (OCO) Rising personnel & healthcare costs External Increasing entitlement program costs Growing interest expense Future across-the-board sequester cuts Is Putting a Squeeze on DoD Investment Accounts 21

Resource Deployment 22

Business Imperatives 20000 15000 10000 5000 Trident & 688 Construction ORP & VA Construction 0 Low Rate Construction 1969 1972 1975 1978 1981 1984 1987 1990 1993 1996 1999 2002 2005 2008 2011 2014 2017 2020 2023 2026 2029 2032 2035 2038 EB will be facing growth it has not seen for 40 years Short term challenges Retention of critical skills Long term challenges Preparing for growth Resource Master Plan (RMP) is an approach to address both challenges Key to competitiveness is onboarding people and making them productive quickly 23

EB: Facility Master Plan 18 Projects by Program 11 15 10 1 3 7 5 8 6 13 9 12 17 18 4 Transportation Equipment 2 14 16 # # # VA-Class 2/year and MTS: Projects 1, 2, 4 Refurbish / Replace Aged Assets: Projects 3, 11, 12 Support OHIO Replacement : Projects 5-10, 13-17, 18 (if required) 24

Summary 25

Summary Business outlook strong Employment outlook positive Long term growth expected across the business Electric Boat Priorities Continue to Perform Support the Integrated Undersea Future Strategy Platforms, Payloads, Payload Integration Electric Boat will continue to be Strong corporate citizen Key contributor to economic vitality of the region GENERAL DYNAMICS Electric Boat #0247 #0247 TNP TNP 09-30-14 26 26