BEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD



Similar documents
Asbestos Survey Report

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT SURVEY REPORT

H2 Opening Statement Asbestos

Specimen Company The Roadway England trtrtrtr ASBESTOS REPORT AND REGISTER FOR. Some where House xxxxxxxx

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Policy for the Management of Asbestos in Buildings

HAVEBURY HOUSING PARTNERSHIP

Policy for the Management of Asbestos in the Workplace

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition

WYG Asbestos Demolition Survey Report

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

AsbestosSurveyingNationwide

Policy on the Management of Asbestos

Asbestos Management Policy

Asbestos Containing Materials Survey And Register Moil Shopping Centre

ASBESTOS POLICY MANAGEMENT PLAN

Policy on Asbestos Safety

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

ASBESTOS MANAGEMENT POLICY AND GUIDANCE

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

ASBESTOS CONTAINING MATERIALS POLICY

Asbestos Management Plan

Author G Morton July Newcastle University Asbestos Management Plan 2015

Managing Asbestos Policy

ASBESTOS POLICY AND PROCEDURES

The Management of Asbestos containing Materials

Asbestos Policy & Procedure

Beech Housing Association Asbestos Management Policy

SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN)

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room Newhall Street Birmingham B3 3PL

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Asbestos Management Policy and Action Plan

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November All Staff.

ASBESTOS MATERIALS IN SCHOOLS

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Update on Regulations, Risks, Management and Obligations

Policy for the Management of Asbestos

ASBESTOS MANAGEMENT PLAN

Asbestos Surveys Service INSTRUCTIONS TO TENDERERS

Northwards Housing. Asbestos Management Plan. October 2014

Detailed Survey Inspection Reports & Photographs. Material Assessment Algorithm & Asbestos Register

Asbestos Management Policy

Manage buildings? You must manage asbestos. Manage buildings? You must manage asbestos. Why manage asbestos?

POLICY Contents. 1.0 Introduction Statement

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)

Asbestos Management Procedure

Asbestos Awareness Training Requirements

The Control of Asbestos Regulations 2006

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE:

Asbestos at work guide

Asbestos Management Plan

Control of Asbestos Policy

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember

Asbestos Policy and Management Plan

Asbestos - Frequently Asked Questions

The asbestos crisis Why Britain needs an eradication law

asbestos in your home

Managing asbestos in buildings:

ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT

MANAGEMENT OF ASBESTOS POLICY

Tenants` Asbestos Handbook Guide

FREEPHONE: Asbestos Awareness. Toolbox Talk

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU

The asbestos crisis. Why Britain needs an eradication Law. Background. Levels of mortality

Asbestos Management Plan. Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose

A Guide to Asbestos in your Home

Asbestos Awareness Syllabus (Category A)

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

An Introduction to Asbestos, Legislation and Licensed

mceservices and environmental solutions at your disposal

Asbestos Management Plan. April 2011

Asbestos Management Policy (Version 3)

DECEMBER2012 Asbestos Update Report For the Rapid Creek Business Village.

Asbestos awareness. University of Brighton 2016

Policy for the Management of Asbestos in Council Premises (Corporate and Housing)

P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos

Facilities Management. Facilities Management Asbestos Policy & Management Plan

ASBESTOS in state and local government

Asbestos Safety Management Standard Issue 8 October

Approved Code of Practice. Management of Exposure to Asbestos in Workplace Buildings and Structures. Health and Safety at Work (Jersey) Law, 1989

UBC Plant Operations Asbestos Work Procedures April 2004

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG

Welcome to the *Special Asbestos* Edition of BSG Training News

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

Date of issue: January Date of next review: February Author: V Thornton. Service area applies to: Operations. Link to the 5 Pledges: Yes

UKATA. Certificate in Asbestos Awareness. Category A

Re Inspection of Asbestos Containing Materials

Report to Cabinet Item 25 June 2014

ABClean Frequently Asked Questions (FAQ)

Asbestos Management Plan. Policy. The whole of the Trust. Intranet. The Trust Board/Executive Management Team

Dealing with. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS

Frequently Asked Questions. What is asbestos? 2. How is asbestos harmful? 2. What illnesses does asbestos cause? 3

Asbestos in the home. for you - for your community - not for profit

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

Transcription:

BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD CARRIED OUT BY: VINTEC LABORATORIES LTD SURVEY DATE: 08-01-2009 PREPARED BY: JAMES BROTHERTON CHECKED BY: ANDREW STIRRAT

CONTENTS Section No. Section detail No. of pages 1. Objectives 1 2. Technique 1 3. Caveat 2 4. Notes 1 5. Summary 1 6. Recommendations 3 7. Excluded Areas 1 8. Drawings 4 SURVEYORS Name Qualifications Role N. Baskerville BOHS S301 certificate. Lead surveyor In house training passed. A. Stirrat BIOH S301 certificate. Lead surveyor In house training passed. J. Brotherton BOHS P402 certificate Lead surveyor In house training passed. R. Price BOHS P402 certificate Assistant surveyor In house training passed.

Asbestos Survey for at All Hallows Multi Storey Car Park Greenhill Bedford Page 1 of 1

Survey Objectives 1 2 3 Produce a report, in a database format, indicating areas containing identified and suspected asbestos based materials, including photographic records of asbestos occurences where possible. To carry out a survey to ascertain the presence of asbestos based materials. To include a risk assessment for each individual Sample. 4 Survey Objectives: Page 1 of 1

Survey Technique 1 2 3 4 Any materials, which the attending consultant considered suspicious, were sampled and the offending material rendered as safe as possible until the outcome of sample analysis was known. Where materials were obviously similar to those already encountered, further sampling was not necessarily carried out. The subsequent unsampled materials were awarded an 'X' number to indicate the likelihood of an asbestos content. Where an 'X' number appears, the numbers alongside it denote the number of the sample which is considered to be representative of the material. It should be assumed that the results of analysis would be comparable. This approach is designed to avoid the taking of large numbers of similar or non-asbestos samples. Where an 'X' sample is followed by a letter, this indicates a suspect material which has not been sampled for reasons of access or otherwise, but which the attending consultant believed may contain asbestos. In these instances, a representative sample has not been obtained. Photographs were taken at all of the sample locations (unless otherwise stated). Samples were returned to the Main Laboratory for analysis. Asbestos Bulk Sample Analysis is conducted by using Polarised Light and Dispersion Staining Techniques. Dispersion Staining is used to describe the colour effects produced when a transparent colourless particle or fibre is immersed in a liquid having a refractive index near to that of the particle or fibre, and is viewed under a microscope using transmitted white light (based on HSE Publication HSG 248). Survey Technique: Page 1 of 1

Survey Caveat 1 This report is based upon a non-destructive inspection of an unfamiliar site. During the course of the survey all reasonable efforts were made to identify the physical presence of materials containing asbestos within the areas of the building which are subject to future refurbishment works. It is known that asbestos materials are frequently concealed within the fabric of buildings or within sealed building voids so that it is not possible to regard the findings of any survey as being definitive. It must always remain a possibility that further asbestos containing materials may be found during refurbishment or demolition activities. For reasons set out in this report, the results cannot give an assurance that all asbestos materials have been found and must not be thought to do so. The nature of the survey was a non-destructive inspection at key locations of accessible voids and areas. From the evidence of the inspections and of the sampling and analysis undertaken, it is clear that asbestos containing materials are either present or within or associated with various areas as detailed in the report. We recommend that samples be taken of suspect materials which may be uncovered within the listed areas or within the areas of the site which were not included in this survey. Survey Caveat: Page 1 of 2

Survey Caveat 2 Every effort has been made to identify all asbestos materials so far as was reasonably practical to do so within the scope of the survey and the attached report. Methods used to carry out the survey were agreed with the client prior to any works being commenced. Survey techniques used involves trained and experienced surveyors using the combined approach with regard to visual examination and necessary bulk sampling. It is always possible after a survey that asbestos based materials of one sort or another may remain in the property or area covered by that survey, this could be due to various reasons: Asbestos materials existing within areas not specifically covered by this report are therefore outside the scope of the survey. Materials may be hidden or obscured by other items or cover finishes i.e. paint, over boarding, disguising etc. Where this is the case then its detection will be impaired. Asbestos may well be hidden as part of the structure to a building and not visible until the structure is dismantled at a later date. Debris from previous asbestos removal projects may well be present in some areas; general asbestos debris does not form part of this survey however all good intentions are made for its discovery. Where an area has been previously stripped of asbestos i.e. plant rooms, ducts etc. and new coverings added, it must be pointed out that asbestos removal techniques have improved steadily over the years since its introduction. Most notably would be the Control of Asbestos at Work Regulations (1987) or other similar subsequent Regulations laying down certain enforceable guidelines. Asbestos removal prior to this regulation would not be of today s standard and therefore debris may be present below new coatings. The survey will detail all areas accessed and all samples taken. Where an area is not covered by this survey it will be due to no access for one reason or other i.e. working operatives, sensitive location or just simply no access. It may have been necessary for the limits of the surveyor s authority to be confirmed prior to the survey. Access for the survey may be restricted for many reasons beyond our control such as height, inconvenience to others, immovable obstacles or confined space. Where electrical equipment is present and presumed in the way of the survey no access will be attempted to until proof of its safe state is given. Our operatives have a duty of care under Health & Safety at Work act (1974) for both themselves and others. In the building where asbestos has been located and it is clear that not all areas have been investigated, any material that is found to be suspicious and not detailed as part of the survey should be treated with caution and sampled accordingly. Certain materials contain asbestos to varying degrees and some may be less densely contaminated at certain locations (Artex for example). Where this is the case the sample taken may not be representative of the whole product throughout. Where a survey is carried out under the guidance of the owner of the property, or his representative, then the survey will be as per his instruction and guidance at that time. Vintec Laboratories Ltd. cannot accept any liability for loss, injury, damage or penalty issues due to errors or omissions within this report. Vintec Laboratories Ltd. cannot be held responsible for any damage caused as part of this survey carried out on your behalf. Due to the nature and necessity of sampling for asbestos some damage is unavoidable and will be limited to just that necessary for the taking of the sample. Survey Caveat: Page 2 of 2

Survey Notes 1 2 3 4 5 6 7 8 Whilst every effort was made to locate the ceiling panels, wall partitions and other panels, which may have been constructed from asbestos boarding, none other than those detailed were found. Some may have been missed due to repairs, alterations etc, where false and other finishes have been applied or where different specifications (including a possible mixture of asbestos and non-asbestos) panels have been used in the same area. Only by sampling each panel would the composition of all the materials be known. This was clearly not practical in terms of cost or time. No air monitoring was carried out whilst the survey was undertaken and therefore care was taken not to cause disturbance of fibre or contamination of clean surfaces. This report has been written with reference to MDHS 100, HSG 248 and our in house quality manual and the various other Guidance Notes etc, current at the date of this report and describes circumstances at the site on the date the investigation took place. Where similar items exist in the building, only one or two samples have been taken to ascertain the material content. It was assumed that similar products were of the same material. Only random sampling was carried out. Any person undertaking work within the buildings should be told of the presence of asbestos. This briefing also applies to any other person associated with the site, including staff, sub-contractors and others. The diagrams in the report are not to scale and are illustrative only to indicate approximate locations. The descriptions used are for location identification purposes All the recommendations described in this report are based upon assumptions made after consideration of the type of material, condition of the material, its location, analysis result and type of use the area is thought to be subjected to. However, statutory authorities or others, could require amendments based on local knowledge, change in legislation, change in use or indeed, other conditions of criteria. Equipment, machinery, ducting etc were not moved, opened up or examined for the purpose of this investigation except in the odd occasion where hatches were available. Survey Notes: Page 1 of 1

Survey Summary 1 2 For positive identification of asbestos bearing materials please refer to the individual sample data sheets. No suspected ACM's were noted during this survey therefore no sampling was conducted. Survey Summary: Page 1 of 1

Survey Recommendations 1 Material Assessment and Algorithm The material assessment is an assessment of the condition of the ACM, or the presumed ACM, and the likelihood of it releasing fibres in the event of it being disturbed in some way. This material assessment will give a good initial guide to the priority for management, as it will identify the materials, which will most readily release airborne fibres if disturbed. However, there are other factors to take into account when prioritising action. MDHS100 recommends the use of an algorithm to carry out the material assessment, and contains an example. The algorithm is a numerical way of taking into account several influencing factors, giving each factor considered a score. These scores can then be totaled to give a material assessment score. The use of algorithms is not infallible, but the assessment process is clear for all to see, so if discrepancies arise, it should be possible to track back through the assessment process to find the root of the error. The algorithm shown in MDHS100 considers four parameters that determine the risk from ACM: that is the ability to release fibres if disturbed. These four parameters are: Product type; Extent of damage; Surface treatment; and Asbestos type Each of the parameters is scored and added to give a total score between 2 and 12: Materials with scores of 10 or more should be regarded as high risk with a significant potential to release fibres if disturbed; Those with a score between 7 and 9 are regarded as medium risk; Materials with a score between 5 and 6 are low risk; and Scores of 4 or less are very low risk. PRIORITY ASSESSMENT AND ALGORITHM The material assessment identifies the high-risk materials, that is, those which will most readily release airborne fibres if disturbed. It does not automatically follow that those materials assigned the highest score in the material assessment will be the materials that should be given priority for remedial action. Management priority must be determined by carrying out a risk assessment which will also take into account factors such as: Maintenance activity; Occupant activity; Likelihood of disturbance; Human exposure potential. THE RISK ASSESSMENT INCLUDES A MATERIAL ASSESSMENT AND A PRIORITY ASSESSMENT. THE MATERIAL ASSESSMENT LOOKS AT THE TYPE AND CONDITION OF THE ACM AND THE EASE WITH WHICH IT WILL RELEASE FIBRES IF DISTURBED. THE PRIORITY ASSESSMENT LOOKS AT THE LIKELIHOOD OF SOMEONE DISTURBING THE ACM. The risk assessment can only be carried out with detailed knowledge of all the above. Although a surveyor may have some of the information which will contribute to the risk assessment and may be part of an assessment Recommendation: Page 1 of 3

Survey Recommendations team, you, as the duty holder under CAW, are required to make the risk assessment, using the information given in the survey report and your detailed knowledge of the activities carried out within your premises. The risk assessment will form the basis of the management plan, so it is important that it is accurate. MAINTENANCE ACTIVITY The first and most important factor which must be taken into consideration is the level of maintenance activity likely to be taking place in an area. Maintenance trades such as plumbers and electricians are the group who the duty to manage is primarily trying to protect. There are two types of maintenance activity, planned and unplanned. Planned work can be assessed and carried out using procedures and controls to reduce exposure to asbestos. Unplanned work requires the situation to be dealt with as found and the controls that can be applied may be more limited. The frequency of maintenance activities also need to be taken into account in deciding what management action is appropriate. OCCUPANT ACTIVITY The activities carried out in an area will have an impact on the risk assessment. When carrying out a risk assessment the main type of use of an area and the activities taking place within it should be taken into account. For example a little used storeroom or an attic will rarely be accessed and so any asbestos is unlikely to be disturbed. At the other end of the scale, in a warehouse lined with asbestos insulating board panels, with frequent vehicular movements, the potential for disturbance of ACMs is reasonably high and this would be a significant factor in the risk assessment. As well as the normal everyday activities taking place in an area, any secondary activities will need to be taken into account. LIKELIHOOD OF DISTURBANCE The two factors that will determine the likelihood of disturbance are the extent or amount of the ACM and its accessibility/vulnerability. For example, asbestos soffits outdoors are generally inaccessible without the use of ladders or scaffolding, are unlikely to be disturbed. The asbestos cement roof of a hospital ward is also unlikely to be disturbed, but its extent would need to be taken into account in any risk assessment. However if the same ward had asbestos panels on the walls they would be much more likely to be disturbed by trolley/bed movements. HUMAN EXPOSURE POTENTIAL The human exposure potential depends on three factors: the number of occupants of an area, the frequency of use of the area, and the average time each area is in use. For example, a school boiler room is likely to be unoccupied, but may be visited daily for a few minutes. The potential for exposure is much less than say in a classroom lined with asbestos insulating board panelling, which is occupied daily for six hours by 30 pupils and a teacher. PRIORITY ASSESSMENT ALGORITHMS Taking all these factors into account in a logical, consistent manner is difficult. Using an algorithm will help you to produce priority assessments that have taken the factors into account in a consistent way. The number of factors relevant at any one site needs to be carefully considered, as the more factors included in an algorithm, the lower the influence of the most important risk factors becomes, and this may produce anomalies. For this reason it is recommended that the number of factors that are scored is limited to four, the same as the number of factors in the material assessment. There is no single set of factors that can be recommended that will apply equally to all types of premises. Therefore four general headings have been used and one or more factors can be taken into account and averaged under each heading to suit the circumstances. If you choose to use more than one factor under a general heading, then average the scores under that heading, rounding up where necessary. Recommendation: Page 2 of 3

Survey Recommendations The scores from the material assessment (i.e. the condition of the ACM or presumed ACM) are added to the scores of the priority assessment (the likelihood of disturbance), to give the overall risk assessment. Risk assessment scores for different ACMs can then be compared to develop your action plan. In many circumstances the scores will be similar, making decisions more difficult. For example a boiler house with asbestos pipe work insulation in poor condition may get the same or similar risk assessment score to an office with asbestos insulating board in reasonably good condition. This is simply because the ACM in the boiler house received a higher score than the ACM in the office because the ACM in the boiler house was in poor condition. However, the priority assessment for the office will get a higher score than the boiler house since the office is occupied more often. Add the scores together for the material and priority assessments, and you get similar scores. If this is the case then you may decide that the office needs doing first because it is used daily. On the other hand you may decide that the poor condition of the ACM in the boiler house means that it should be done first. If the office was a classroom, the young age of the occupants may be a deciding factor. Algorithms are provided to help you, but they are best guesses and will often require you to make your own additional judgements. 2 3 On type 3 surveys a priority assessment may not be included if there are no ongoing asbestos management issues. If the building is to be demolished all asbestos occurences will need to be removed by licensed asbestos removal contractors. Recommendation: Page 3 of 3

Excluded Areas 1 2 Managers office on ground floor adjacent west ramp - locked Lift plant and lift shaft. Excluded Areas: Page 1 of 1

ASBESTOS SURVEY SAMPLE POINTS STORE PUBLIC TOILETS LIFT & STAIRWELL KEY TO ACM PROJECT REFERENCE NUMBER DATE OF SURVEY ADDRESS PICTURE REFERENCE NUMBER 01 08-01-2009 LOCATION GROUND ALLHALLOWS MULTI-STOREY CAR PARK 13 GREEN HILL BEDFORD NO ACCESS THIS DRAWING WAS PRODUCED BY V.E.M. THIS DRAWING IS NOT TO SCALE

ASBESTOS SURVEY SAMPLE POINTS ENTRANCE WEST RAMP EAST RAMP LEVEL 1 LEVEL 2 LIFT & STAIRWELL KEY TO ACM PROJECT REFERENCE NUMBER DATE OF SURVEY ADDRESS PICTURE REFERENCE NUMBER 02 08-01-2009 LOCATION LEVELS 1-2 ALLHALLOWS MULTI-STOREY CAR PARK 13 GREEN HILL BEDFORD NO ACCESS THIS DRAWING WAS PRODUCED BY V.E.M. THIS DRAWING IS NOT TO SCALE

ASBESTOS SURVEY SAMPLE POINTS LEVELS 3, 5 & 7 LEVELS 4, 6 & 8 LIFT & STAIRWELL KEY TO ACM PROJECT REFERENCE NUMBER DATE OF SURVEY ADDRESS PICTURE REFERENCE NUMBER 03 08-01-2009 LOCATION LEVELS 3-8 ALLHALLOWS MULTI-STOREY CAR PARK 13 GREEN HILL BEDFORD NO ACCESS THIS DRAWING WAS PRODUCED BY V.E.M. THIS DRAWING IS NOT TO SCALE

ASBESTOS SURVEY SAMPLE POINTS LEVEL 9 LEVEL 10 LIFT & STAIRWELL KEY TO ACM PROJECT REFERENCE NUMBER DATE OF SURVEY ADDRESS PICTURE REFERENCE NUMBER 04 08-01-2009 LOCATION LEVELS 9 & 10 ALLHALLOWS MULTI-STOREY CAR PARK 13 GREEN HILL BEDFORD NO ACCESS THIS DRAWING WAS PRODUCED BY V.E.M. THIS DRAWING IS NOT TO SCALE