1 rthwards Housing Asbestos Management Plan October 2014 Last Review October 2014 Reviewed by Simon Roffey Issued by Larry Patrick Next Review Due October
2 Table of Content Section Content 1.0 Purpose 2.0 Background Information 3.0 Asbestos legislation 4.0 Roles and Responsibilities 5.0 Primary Asbestos Procedure 6.0 Asbestos Register 7.0 Communication of Asbestos Information 8.0 Regulation 4 of CAR2012; The Duty to Manage 9.0 Asbestos Management 10.0 Asbestos Removal / Abatement Works 11.0 Labelling of Asbestos Containing Materials 12.0 Asbestos Awareness Training 13.0 Asbestos & Fire Surveyor Training 14.0 Responsive Repair and Empty Homes Works; The SSR Process 15.0 Home Improvement Service; Capital Programme Schemes of Works 16.0 Manchester Equipment and Adaptations partnership; MEAP 17.0 Plan to Improve the Quality of Asbestos Register Data 18.0 Audit Plan Appendices 1 Responsive Repairs and Empty Homes Works; The SSR Process 2 Manchester Equipment and Adaptations partnership; MEAP Asbestos Protocol 3 Other Area Specific Asbestos Management Arrangements 2
3 1.0 PURPOSE The purpose of this document is to demonstrate key management processes relating to asbestos management within rthwards Housing occupied or managed premises. This management plan applies throughout rthwards Housing and covers all non-domestic premises including the common parts of premises such as retirement housing, multi storey blocks and other blocks of flats / premises with common parts. This management plan applies throughout rthwards Housing premises and covers all employees, agency and contract staff, tenants and their visitors, service users, visitors, contractor partner staff and all other persons for whom rthwards has a direct or relevant indirect responsibility for the purpose of protecting their health, so far as is reasonably practicable. 2.0 BACKGROUND INFORMATION Asbestos is the generic name given to a group of naturally occurring fibrous minerals. There are three main types of asbestos. Crocidolite, commonly referred to as blue asbestos, Amosite, commonly referred to as brown asbestos and Chrysotile, commonly referred to as white asbestos. Breathing in asbestos fibres can cause serious diseases. It is the single greatest cause of work-related deaths in the UK, responsible for around 4500 deaths a year. There is no specific legal requirement to remove asbestos in all cases, a managed approach is viable; thought this will be subject to the assessment of risk; i.e condition of the asbestos material. Asbestos was commonly used as a building material in the United Kingdom from the 1950s through to the mid-1980s. It was used for a variety of purposes and was ideal for fireproofing and insulation. Common locations with rthwards Housing properties are asbestos cement eaves soffits, asbestos cement sheets forming garages, asbestos insulating board panels as boxing to services risers, floor tiles and textured coatings to ceilings. 3
4 3.0 ASBESTOS LEGISLATION The primary legislation referred to is; The Health and Safety at Work etc. Act 1974 The Management of Health and Safety at Work Regulations 1999 (as amended) The Construction Design and Management Regulation 2007 The Control of Asbestos Regulations 2012 (CAR 2012) CAR 2012 is supported by a number of Approved Codes of Practice. The broad duties under regulation 4 the Duty to manage in non domestic premises are summarised as Take reasonable steps to find out if there are materials containing asbestos in non-domestic premises, and if so, its amount, where it is and what condition it is in; Presume materials contain asbestos unless there is strong evidence that they do not; Make, and keep up-to-date, a record of the location and condition of the asbestos containing materials - or materials which are presumed to contain asbestos; Assess the risk of anyone being exposed to fibres from the materials identified; Prepare a plan that sets out in detail how the risks from these materials will be managed; take the necessary steps to put the plan into action; Periodically review and monitor the plan and the arrangements to act on it so that the plan remains relevant and up-to-date; and Provide information on the location and condition of the materials to anyone who is liable to work on or disturb them. There is also a requirement on anyone to co-operate as far as is necessary to allow the dutyholder to comply with the above requirements. 4
5 4.0 ROLES AND RESPONSIBILITIES The person with the overall responsibility for Asbestos Management This management plan is implemented throughout all rthwards teams Adequate resources are made available for implementation of this plan Responsible Person Chief Executive The person with responsibility for the Asbestos register: Primary point of contact re Asbestos register matters. Audit & oversee the update the asbestos register as required. Undertake programme of duty to manage re-inspections. Competent Person Position Asbestos and Fire Surveyor The person with responsibility for the Capital & Maintenance programmes of works: Ensure compliance with overall duties of CAR 2012 with regard to work on Asbestos materials Ensure compliance with regulation 4 The duty to manage in non-domestic dwellings. Ensure that this management plan is reviewed annually or sooner if required. Responsible Person Position Director Property services The person with responsibility for developing and reviewing the premises Asbestos Management Plan. Annual review or sooner if required. Undertake a programme of audits to confirm compliance with the asbestos management plan. Where deficiencies are noted, raise the matter with the relevant manager/s Competent Person Position Asbestos and Fire Surveyor The person with responsibility for staff training: Ensure compliance with overall training requirements of CAR 2012 as determined by Health &Safety training strategy. Responsible Person Position: Strategic HR Partner 5
6 5.0 PRIMARY ASBESTOS PROCEDURE Overview as per the flowchart below; Stop work / Do not start work; Presume the material is asbestos Refer the matter to your immediate line manager. Update Asbestos Register. End Is there any clear evidence that the material is non-asbestos? Arrange for Priority assessment of the material Is the material reported as being Damaged Arrange for assessment of the material Unsure Resident or staff at potential asbestos risk? Presume asbestos Is the material asbestos? Update Asbestos Register. End Pending outcome of priority assessment, assuming asbestos Instigate management measures; to abate the potential risk i.e vacate the immediate area / close the door Is the material asbestos? Arrange for Asbestos work Update Asbestos Register. End Update Asbestos Register. End 6
7 6.0 THE ASBESTOS REGISTER rthwards Housing Stock rthwards Housing uses the asbestos module of the Promaster asset management database as the asbestos register. The asbestos register is based on current HSE asbestos survey guidance re material & priority algorithms and includes advised actions. Asbestos data is stored at block level i.e common areas to blocks to flats and also at the individual property level. The asbestos register contains asbestos surveys data from 2007 to current date. At the individual property level, the older data is based on visual only Type 1 asbestos surveys as per MDHS100 carried out on 20% of the stock at the time. This data was then cloned up to equivalent property types per estate. It is acknowledge that this Type 1 survey data was based on non intrusive inspections with caveats re limited access. Asbestos surveys are now carried out in accordance with current asbestos survey methodology HSG264. As of October 2014 the following information applied; rthwards Housing manages in the order of 13,395 individual premises. Properties with cloned data; 74% of stock Properties with surveyed data; 26% of stock. As of March 2014 there are now 1389 new full Refurbishment asbestos surveys in place. There is a total no. of 77,718 individual lines of asbestos data for these properties. Each line of data has a risk rating. This is automatically calculated by Promaster. This risk rating is based on standard risk algorithms relating to the material itself & the likelihood of disturbance. High risk 0% Medium risk 2%. te; the majority of these locations relate to no access areas i.e roof voids to blocks of flats, within pipe boxing in occupied flats or ground floor sub floor voids areas where asbestos is presumed as a default due to no access. Low risk; 16% Very Low risk; 62% n asbestos 20% 7
8 Common areas to blocks of flats At the block level there is a combination of older type 2 asbestos surveys as per MDHS100 and more recent management surveys as per HSG264. The Duty to manage Regulation 4 of CAR applies to these locations. They are subject to a programme of reinspection As of March 2014 the following information applied; rthwards Housing manages the following blocks of flats with enclosed common areas; 24 Multi-storey flats 12 Retirement schemes 246 Medium & Low rise blocks of flats. There are 2697 individual locations spread over these 282 blocks of flats. Each line of data has a risk rating. This is automatically calculated by Promaster. This risk rating is based on standard risk algorithms relating to the material itself & the likelihood of disturbance. High risk; 0% Medium risk; 7%. te the majority of these locations relate to hard to access communal plant rooms / roof void areas with presumed asbestos as a worst case scenario. Low risk; 27% Very Low risk; 54 % n Asbestos ; 12% rthwards Offices Asbestos registers for rthwards Housing controlled offices are not on Promaster. Each office has its own assessment / asbestos register in place. These are subject to annual review / consultation by the Asbestos and fire surveyor. The rthwards Housing occupancy basis varies into two broad categories rthwards Housing as a leaseholder / owner with responsibility for maintenance in the premises, where the duty to manage asbestos as per Regulation 4 of CAR applies. There are 3 no. offices - Cheetham Hill Road, Monsall Road, and Whitemoss Road. rthwards Housing as a tenant or occupying part of a building with no direct maintenance responsibility. As a minimum a duty to co-operate with the duty holder applies as per Regulation 4 of CAR. There are 3 no. offices - Floor 6 Hexagon Tower, Southchurch Parade offices in Collyhurst, Hendham Vale Depot. 8
9 7.0 COMMUNICATION OF ASBESTOS INFORMATION The following is a summary of key communication pathways; The asbestos & fire surveyor role exists as a reference point re asbestos matters. Access to asbestos data / Information; There is an intranet based screen tools that allows rthwards Housing officers access to a summary of asbestos register information. Asbestos registers as PDF files are issued to rthwards Housing site managers for offices / retirement schemes & multis storey flats. That information is retained on site. For Job ticketed Responsive repair works via Manchester Working limited. A summary of asbestos register information is accessible via physical job ticket or PDA device For asbestos queries generated by responsive repair or void property works. This is attended to via the Surveyor with Special responsibility (SSR) mechanism. This mechanism is detailed in the flowchart known as SSR Asbestos procedure in the appendix and also in section 14 of this management plan. For capital programme schemes of works, scheme specific asbestos survey information is generated by the asbestos & fire surveyor. This information is shared by the contractor by a project officer / contract administrator. For more detail refer to the section 15 of this management plan. A sharepoint website regarding asbestos has been established to improve the flow of current asbestos information within rthwards and to our partnering contractors. There is an existing management arrangement re Manchester Equipment & Adaptations Partnership (MEAP) adaptations. Asbestos information is shared. For more detail refer this mechanism is detailed in the flowchart known as MEAP procedure as per appendix and section 16 of this management plan. A sharepoint website regarding asbestos has been established to improve the flow of current asbestos information within rthwards and to our partnering contractors. Enquiries from residents are attended via the SSR mechanism as above. A PDF file of the asbestos register for their property can be issued. In addition there is a standard leaflet Asbestos in your home & information links on the rthwards Housing website. Enquiries from the Emergency Services are also attended to via The SSR procedure during normal work hours. In event of an out of hours query with an immediate asbestos information requirement, rthwards contact centre ( ) has access to summary records of the rthwards housing asbestos register. 9
10 In addition to this, PDF files of the asbestos registers for rthwards managed Multi-storey blocks & Retirement schemes are typically shared with the fire service annually. Leaseholders have access to asbestos information via rthwards current leaseholder management arrangements such as the leaseholder s forum. Enquiries from the press / media organisations are attended to as per rthwards Housing overall communication strategy. Update of asbestos data / Information For responsive repair or void property works i.e new asbestos found, new non-asbestos information or removed asbestos information. This is attended to via the Surveyor with Special responsibility (SSR) mechanism with a mechanism for new information to be uploaded to the asbestos via an intranet based screen tool. For capital programme schemes of works, updated asbestos survey information i.e asbestos found or removed is channelled to the asbestos & fire surveyor via the CDM Health &Safety file mechanism. The Asbestos & fire surveyor arranges for the asbestos register to be updated. For Manchester Equipment & Adaptations Partnership (MEAP) adaptations. Asbestos information is shared. The Asbestos & fire surveyor arranges for the asbestos register to be updated. For other full asbestos surveys by UKAS accredited asbestos survey consultants. There is a regular data extract from the asbestos consultants in a promaster compatible format. The asbestos & fire surveyor retains the final administrative check before the new information is uploaded onto the asbestos register. 8.0 REGULATION 4 OF CAR 2012; THE DUTY TO MANAGE There is an ongoing programme of re-inspections of asbestos containing materials where regulation 4 of the duty to manage applies i.e the common areas of blocks of flats and is undertaken by the asbestos & fire surveyor. Reinspection intervals are determined by promaster, they can be up to two years but the typical reinspection is annually. The promaster asbestos database is updated by the asbestos & fire surveyor with administrative support. Regulation of CAR does not apply to domestic premises, therefore such inspection are not carried out. However it is acknowledged that there is best practice reference to an equivalent inspection regime within domestic premises in HSG264. Also some social housing providers to do as best practice. rthwards Housing will monitor / review matter in line legal advice & developing practice of other social housing organisations 10
11 . 9.0 ASBESTOS MANAGEMENT Presume materials contain asbestos unless there is strong evidence that they do not The decision to remove or manage asbestos materials in place is based on an assessment of risk by competent person. In line with current HSE guidance it is considered reasonable to manage in place, if asbestos containing materials are in good condition & unlikely to be disturbed. The option to divert planned works can be considered ASBESTOS REMOVAL / ABATEMENT WORKS Asbestos removal / Abatement works should be carried out in accordance with CAR 2012 and associated guidance from the HSE. The use of licensed asbestos removal contractors is typical as a practical & standard control measure. However the use of asbestos trained non licensed contractors is viable where applicable i.e roofing work or localised removal of textured coatings to ceilings LABELLING OF ASBESTOS CONTAINING MATERIALS Labelling of asbestos containing materials is limited to secure plant rooms only. Typically rthwards Housing does not label asbestos materials in Common areas of flats or within individual dwellings. Current asbestos management arrangements with our partnering contractor (Asbestos information on job tickets) & provisions for site copies of asbestos registers (i.e paper copy of asbestos register held by caretakers on site in multi-storey blocks) are generally considered sufficient. Where there are specific circumstances warning labels may be applied. This will be based on the specific need to label and appropriate information will be issued to residents ASBESTOS AWARENESS TRAINING Asbestos awareness training is a per rthwards Housing overall Health & Safety training strategy. In summary this consists of generic asbestos awareness training for all employees via e-learning, backed up by specific asbestos awareness training for those most likely to disturb asbestos materials or those who control others that might. There was a one off purge with training by UKATA accredited training organisation. There is ongoing regime of refresher training for employees subject to their role. This is carried out by the in-house asbestos & fire surveyor and/or rthwards e-learning tools with records of attendance retained centrally by the learning development team. rthwards partnering contactor Mears / Manchester Working limited have their own arrangements for their employees and that of their contractors. rthwards Housing has management mechanisms to validate this. 11
12 13.0 ASBESTOS & FIRE SURVEYOR TRAINING The training requirement for the asbestos & fire surveyor is different. The minimum qualification would be the P402. The current asbestos & fire surveyor holds the P Cert re asbestos & other fibres and is certified competent person; CCP (asbestos) with 20+ years working in the asbestos management sector RESPONSIVE REPAIRS AND EMPTY HOMES WORKS; SSR PROCESS This is attended to via the Surveyor with Special responsibility (SSR) mechanism. This mechanism is detailed in the flowchart known as SSR Asbestos procedure in the appendix. In essence the SSR is the primary contact re any asbestos queries. They are the administrative link that routes asbestos queries from site / resident to our partnering contractor Manchester Working Ltd. They then arrange for competent persons / organisations to carry out activities such as bulk sampling, assessment of risk, air testing & remedial action as required (removal / encapsulation). Historically Manchester Working Ltd only did localised sampling specific to the planned work. However this has now switched to provision of full management survey of the whole property with localised refurbishment. This will provide better quality whole property information. SSR s have access to the asbestos register data via an intranet based screen tool. The SSR s also channel new information (asbestos & non asbestos) back to the asbestos register via an intranet based screen tool. The asbestos & fire surveyor retains the final administrative check before the new information is uploaded onto the asbestos register. There are 4 no. SSR s. based at the Hendham vale offices. 3 no. typically cover responsive repairs, the other covers void properties. There is a management tier above the SSR s. The 3 no. responsive repair managers at Hendham Vale offices control their geographic function. The legal team manager at Hendham Vale controls their technical function. Other Area specific Asbestos Management Arrangements do exist; they are detailed in Appendix 3 In event of non standard query or technical asbestos issue they refer the matter to their managers / the asbestos & fire surveyor. A sharepoint based SSR database system is being developed in-house to supersede the existing SSR mechanism that is based on paper records, PDF files & s. 12
13 15.0 HOME IMPROVEMENT SERVICE; CAPITAL PROGRAMME SCHEMES OF WORKS The primary administrative contact is the project officer / contract administrator for the scheme. Asbestos is a minuted item in the regime of contract meetings (i.e kick start, pre-contract, progress). The project officer / contract administrator request asbestos information from the rthwards housing asbestos & fire surveyor & provide detail of nature & scope of works. I.e scheme address list and what sort of works are planned. The need for additional refurbishment asbestos surveys will be considered by the rthwards Housing Asbestos & Fire surveyor. Managers will ensure sufficient resources are made available to carry out these additional Refurbishment asbestos surveys. In the case of grant funded schemes or other free to user scheme i.e mass Installation of Solar panels. The need for additional asbestos surveys will be considered as above. The Asbestos & fire surveyor arranges for / generates asbestos survey information for the project officer / contract administrator The nature / scope of the planned work will determine the nature of the asbestos survey information required for the scheme i.e. how intrusive the works are. The need for additional refurbishment asbestos surveys in excess of existing management surveys will be determined by the asbestos & fire surveyor on a scheme by scheme basis. Typically UKAS accredited asbestos survey organisations are used for such additional refurbishment asbestos surveys. In most cases the property will be occupied so full refurbishment asbestos will not be viable. The typical scenario is a localised refurbishment survey i.e kitchen / bathroom with a management survey of the remainder of the property. The project officer / contract administrator should ensure the issued asbestos information is shared with contractors / relevant others. A site copy should be maintained. In event of additional asbestos queries i.e possible asbestos found on site. This is routed by the agreed asbestos emergency arrangements. Typically this will be via the principal contractor for the scheme Manchester Working Ltd. They then arrange for competent persons / organisations to carry out activities such as bulk sampling, assessment of risk, air testing & remedial action as required (removal / encapsulation). The project officer / contract administrator should ensure that new asbestos information is feedback into the asbestos register. The formal route is via the CDM coordinator for the scheme. Within the Home Improvement Services there are three teams delivering capital schemes of works, with approximately 14 no. persons who may 13
14 assume the role of project officer / contract administrator. There is a management tier above the project officer / contract administrators. In event of non standard query or technical asbestos issue the project officer / contract administrator they refer the matter to their managers / the asbestos & fire surveyor MANCHESTER EQUIPMENT AND ADAPTATION PARTNERSHIP; MEAP This is not a delegated function of rthwards Housing from Manchester City Council. That primary function lies with the MEAP team. This mechanism is detailed in the flowchart known as MEAP procedure as per appendix. The MEAP team can carry out adaptations to rthwards managed premises. Therefore there is an established joint asbestos management process between rthwards Housing and MEAP as there is a shared duty re asbestos management. MEAP take the lead re arranging for additional asbestos surveys / asbestos remedial works etc. They share information with rthwards, assuming the MEAP work is not done as part of a rthwards Housing capital programme schemes of works Regular liaison with MEAP is controlled via the Investment & strategic asset management team. Asbestos is a minuted item PLAN TO IMPROVE THE QUALITY OF ASBESTOS REGISTER DATA It is acknowledged that there is cloned data and type 1 data on the asbestos register. There is a need to have a plan to improve that data given the limited scope of survey & use of caveats. There is a continuous programme of refurbishment survey in void properties and management surveys in occupied premises. This new information is used to replace cloned or type 1 data. It is acknowledged that there are no access areas with presumed asbestos identified within our portfolio of blocks of flats & maisonettes. This is a worst case scenario, subject to confirmed access. There is a plan in place to access these areas systematically and therefore improve the quality of data. 14
15 18.0 AUDIT PLAN It is acknowledge that there is a need to carry out audits as appropriate to confirm compliance & quality issues. This will also demonstrate that rthwards housing is acting with due diligence. These audits have happened to historically, however these were informal in nature & not fully recorded. An audit plan & recording mechanism has been developed. The rthwards Housing Asbestos & fire surveyor will lead on this matter. The audit plan covers; rthwards Housing Asbestos management plan & Asbestos management processes. This will be subject to annual review or sooner if required. Asbestos surveys by UKAS accredited asbestos survey organisations; typically 1 in 20 surveys will be reviewed. The asbestos survey organisations used are encouraged to carry out their own internal audit regime in rthwards managed premises (as long as this does not impact on residents). Asbestos removal contractors used as part of capital programme schemes of works. These contractors will technically be controlled by the principal or main contractor. rthwards will carry out a joint audit with the relevant contractor / principal contractor. The number of audits will be subject to the nature & number of planned asbestos works. Asbestos removal contractors used as part of responsive repairs schemes of works. These contractors will technically be controlled by our partnering contractor Mears. rthwards will carry out a joint audit with our partnering contractor Mears. The number of audits will be subject to the nature & number of planned asbestos works. Typically this will be carried out on a monthly basis. 15
16 Appendix 1 rthwards Housing Surveyor with Special Responsibility (SSR) Asbestos Procedure Purpose This document is intended as a summary of key element of the SSR Asbestos procedure. The information is presented as 3 no. flow charts. It is intended to signpost appropriate action by the rthwards SSR, surveyor, manager or other employee in event of asbestos query re responsive or void property works. Background rthwards managers / employees are not expected to put themselves at asbestos risk i.e taking a sample for asbestos analysis / work on asbestos. Sampling of suspect asbestos materials should be is referred to competent persons & work on asbestos materials should be carried out by asbestos contractors in accordance the Control of Asbestos Regulations Date of issue / version 19/03/2014 Review Review of this procedure by rthwards managers is advised annually or sooner if required. The findings of any such review should be recorded. Page 1 of 4 16
17 rthwards SSR Asbestos Procedure Issue date; 19/03/2014 Part 1 - Pre AS1 A - SSR procedure instigated by report of damaged / disturbed or suspect asbestos i.e contact from MWL or resident B - SSR procedure instigated by rthwards surveyor visit SSR attends site - information collated i.e photograph / information re location & type/ quantity of damage etc.. All information from surveyor to the SSR? i.e photograph / information re location & type/ quantity of damage etc. All information received by SSR? SSR checks on existing or known asbestos data i.e asbestos risk by address or Surveyors folders Is there any clear evidence that the material is non-asbestos? SSR informs relevant persons End. Arrange for Priority assessment of the material significant damage to the material? Standard assessment Resident / staff at risk by elevated airborne fibre levels? / Possibly Surveyor contacts SSR / Manager; Resident advised Instigate measures; to abate the potential risk i.e vacate the immediate area / close the door As required SSR raises actions on civica; i.e air test / board up etc. AS1 process; Continues on AS1 page Page 2 of 4 17
18 rthwards SSR Asbestos Procedure Issue date; 19/03/2014 Part 2 AS1 process; Identification & Assessment te Presuming asbestos is reasonable in the case of floor tiles or textured coatings only, where there is pre-existing data that confirms the asbestos status. If in any doubt or for other materials such as Board or lagging an inspect / sample is advised via MWL. Standard process in event of significant damage also refer to Pre AS1 stage & attend to as priority works te SSR raises request on civica for MWL to attend S Asbestos Sample (S) or presume (P) P Surveyor complete relevant sections of the AS1 data MWL attend as per appointment Has the inspection happened? Access issues? rthwards advised. If required a missed appointment HASL letter issued by rthwards SSR completes / validates the AS1" data AS1 Data issued by MWL AS1" data validated by the SSR Management review Did the inspection happened (as per agreed timescale? Asbestos? SSR raises asbestos actions on Civica for MWL to attend Continues on AS2 page; removal & encapsulation n asbestos HASL letter issued to the resident Data upload to Asbestos Register End. Page 3 of 4 18
19 rthwards SSR Asbestos Procedure Issue date; 19/03/2014 Part 3 AS2 process; Removal & Encapsulation (as identified as per the AS1 process) Standard process in event of significant damage" also refer to Pre AS1 stage & attend to as priority works Letter of support for waiver issued to asbestos contractors by rthwards Waiver for tifiable licensed works to HSE? MWL make arrangements to attend & complete works Have the works happened? Access issues? rthwards advised. If required a missed appointment HASL letter issued by rthwards AS2" data issued by MWL confirming works complete AS2" data validated by the SSR Works done on time? Management review End. Data upload to the asbestos database HASL letter issued to resident indicating removal or encapsulation Page 4 of 4 19
20 Appendix 2 20
21 Appendix 3 Other Area Specific Asbestos Management Arrangements Higher Blackley Sub Floor Voids In the Higher Blackley area there are 280 no of properties where there is suspect asbestos insulation to the ground floor sub floor void. The subfloor void is to earth. This asbestos is the remains of an old district heating systems. The pipe work was removed at an unknown time but there is insufficient evidence to confirm the asbestos was adequately removed. Therefore Asbestos is presumed present. The sub floor void to the ground floor is treated as a restricted area. There are management measures in place to control access by maintenance works. Records are maintained of sub floor voids where asbestos is still presumed present & also where it has been confirmed non asbestos or decontaminated. If access is required to a sub floor void to facilitate repairs i.e. rotten floor joists, then a licensed asbestos contractor is engaged to decontaminate the sub floor void first. Where there are intrusive works planned in such properties i.e. full electrical rewire, the relevant rthwards surveyor / manger will ensure that contractors are made aware of the potential for asbestos in the sub floor void. This mechanism is managed via the SSR s / Managers at Hendham Vale officers. 21
22 Appendix 3 Assheton Estate; Asbestos board in meter cupboards Asbestos insulating board is typically present as a backboard / base board and a shelf. This location is considered to be more at risk of accidental damage by maintenance works than when originally assessed. The following management arrangement was developed in March 2013 re the 89 no properties affected. A programme of inspection was instigated with remedial works to be carried out to make good any historical damage, paint seal & label the location. That task was completed. This asbestos location is already shared with our partnering contractor for responsive repairs. Asbestos removal is not considered a practical solution in the sort to medium term, as that requires the electricity & gas supply to the property (and potentially the adjacent property) to be disconnected and relocated in order to remove the asbestos. The plan in the short to medium term is to manage and maintain this asbestos location in place. In order to validate that approach a planned programme of re-inspections within this property type is planned. 25% of these properties will be reinspected annually re condition & state of encapsulation. This process will be managed via the SSR s / Managers at White moss road office. In addition to this when a rthwards surveyor visits a property of this type for any other inspection; rthwards will make use of that visit to inspect the asbestos board in the meter cupboard. The officer will be expected to look in the meter cupboard to check for any signs of damage and if possible take a photograph (to forward to the SSR). If in any doubt i.e. possible damaged asbestos, the officer will raise the matter the SSR who will investigate further and arrange remedial actions as required. Regulation 4 of CAR2102; the duty to manage does not apply as this is a domestic dwelling. However the inspection regime identified above, is considered appropriate (for this particular property type) given the residual duty of care rthwards Housing has to its residents. 22
23 Appendix 3 Appleford Estate; Asbestos board in meter cupboards The Appleford estate is considered similar but not identical to the Assheton estate re asbestos board in the meter cupboards. There are 58 no. known affected properties on the Appleford estate. The similarities with the Assheton estate are that the meter cupboard is in the same location in the kitchen and there is an asbestos backboard present in the meter cupboard. The differences with the Assheton estate are that timber boards were present in front to all or part of the asbestos backboard. Asbestos warning stickers are present, the material has been paint sealed at some point and that no asbestos board mid shelves were noted. Given those differences the asbestos backboard on the Appleford Estate is considered to be less likely to be disturbed. A similar manage and maintain in place regime as per the Assheton estate is considered reasonable. This includes a similar (but less frequent inspection rate) spread over a 6 year cycle, to confirm that the remaining asbestos in good condition and adequately sealed / labelled. 23
HAVEBURY HOUSING PARTNERSHIP
HS028 HAVEBURY HOUSING PARTNERSHIP POLICY ASBESTOS MANAGEMENT Controlling Authority Director of Resources Policy No. HS028 Issue No. 3 Status Final Date November 2013 Review Date: November 2016 Equality
More informationPolicy for the Management of Asbestos in Council Premises (Corporate and Housing)
Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Page 1 of 14 1. Policy Statement 1.1 This policy is designed to provide a clear acknowledgement of the responsibilities
More informationAsbestos Management Policy
Central Bedfordshire Council www.centralbedfordshire.gov.uk Asbestos Management Policy The Housing Service Version 1.0 Directorate Social Care Health and Housing Service Housing Service Approved by Director
More informationPolicy for the Management of Asbestos in the Workplace
Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS
More informationUNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN
UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep
More informationControl of Asbestos Policy
Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director
More informationAsbestos at work guide
Asbestos at work guide Contents Introduction.... 2 Frequently asked questions.... 4 The Control of Asbestos Regulations 2006... 5 Types of asbestos survey.... 7 1 Introduction This document provides a
More informationASBESTOS CONTAINING MATERIALS POLICY
ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible
More informationAuthor G Morton July 2015. Newcastle University Asbestos Management Plan 2015
Newcastle University Asbestos Management Plan 2015 1 Contents 1.0 Introduction 2.0 Asbestos Management Duty Holder Responsibilities 2.1 Asbestos Manager (Head of Maintenance) 2.2 University Asbestos Survey
More informationAsbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all
Asbestos Policy Lead officer: Jeff Scott Date agreed: May 2013 Review date: May 2016 Working together to deliver quality homes and a better environment for all Page 1 of 11 Contents Page 1 Introduction
More informationAsbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy
ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.
More informationASBESTOS MANAGEMENT POLICY AND GUIDANCE
ASBESTOS MANAGEMENT POLICY AND GUIDANCE Belvoir High School Policy and Procedures Date approved 08/10/2013 Signed by Chair of Governors (Mr B Lovegrove Date approved 08/10/2013 Signed by Executive Principal
More informationAsbestos Management Plan. Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose
Asbestos Management Plan Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose The Health and Safety at Work etc Act 1974 places a duty on employers to take all
More informationAsbestos Survey Report
0340 Asbestos Survey Report Sunnyside Court Avondale Road Southport PR9 0NU Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ
More informationASBESTOS POLICY AND PROCEDURES
ASBESTOS POLICY AND PROCEDURES a CORPORATE RESOURCES DEPARTMENT PROPERTY SERVICES POLICY FOR THE MANAGEMENT OF ASBESTOS IN BUILDINGS OWNED AND/OR OPERATED BY LEICESTERSHIRE COUNTY COUNCIL LCC ASB/001 ISSUE
More informationManaging Asbestos Policy
Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH
More informationASBESTOS MANAGEMENT PLAN
ASBESTOS MANAGEMENT PLAN PREPARED BY: Scott Gregory: Estates - Property Services DATE: 18/04/2014 STATUS: Draft ISSUE: 2014 (02) September 2014 NEXT REVISION DATE: April 2014 Contents 1.0 Introduction
More informationAsbestos Management Policy
Asbestos Management Policy Originator: Approval date: Policy and Strategy Team Sovini Board PCHA Board OVH Board/EMT 3 rd December 2012 22 nd November 2012 25 th September 2012 Review date: December 2013
More informationAsbestos Management Plan
Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 3 April 2014 Issue Date Nature of revision Prepared by Approved by 2 April 2013 First
More informationThe Management of Asbestos containing Materials
The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...
More informationAsbestos Policy & Procedure
Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and
More informationAsbestos in your home
Asbestos in your home Is it a problem? BVT RESIDENT A P P R O V E D This leaflet aims to address any concerns that you may have regarding asbestos and where it may be found in your home. It will cover
More informationReview Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date
Policy No: RM78 Version: 1.0 Name of Policy: Corporate Asbestos Management Policy, Organisational Arrangements and Procedures Policy Effective From: 24/10/2013 Date Ratified 12/09/2013 Ratified Health
More informationAccommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy
Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within
More informationPolicy on the Management of Asbestos
WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other
More informationAsbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)
Asbestos Policy Reference Number: NHSCT/09/192 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)
More informationMAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE:
TITLE: PAGE: 1 OF 23 Maidenhead and District Housing Association Asbestos Policy and Management Page 1 of 23 TITLE: PAGE: 2 OF 23 FOREWORD This document details the system for the management of health
More informationBeech Housing Association Asbestos Management Policy
Beech Housing Association Asbestos Management Policy Policy Statement The aim of this document is to define a policy for the control and management of the risk of exposure to asbestos within the dwellings
More informationManaging asbestos in buildings:
Managing asbestos in buildings: A brief guide Who is this guidance for? This guidance is for, anyone who is responsible for maintenance and repairs in a building, which may contain asbestos. The duty to
More informationAsbestos - Frequently Asked Questions
Asbestos - Frequently Asked Questions 1. What is asbestos? Asbestos is the name given to a group of fibrous minerals which occur naturally in the earth. These are grouped into two mineral types known as
More informationAsbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff.
Appendix 1 Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust Asbestos Policy Approved by Date Review Date Target Audience Trust Board November 2007 November 2008 All
More informationASBESTOS POLICY MANAGEMENT PLAN
ASBESTOS POLICY & MANAGEMENT PLAN HS20 Version V2 Approved by: Health, Safety and Security Committee Date approved: March 2011 Ratified by: Hospital Executive Committee Date ratified 24 th April 2012 Document
More informationASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU
ASBESTOS MANAGEMENT PLAN Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU CONTENTS 1. INTRODUCTION 2. HOW DOES THE BOROUGH OF POOLE MANAGE ITS ASBESTOS
More informationHow To Manage Asbestos At A University
DIVISION OF FACILITIES MANAGEMENT Locked Bag 588 Boorooma Street Wagga Wagga NSW 2678 Australia Tel: +61 2 6933 2286 Fax: +61 2 6933 2180 www.csu.edu.au/division/facilitiesm ABN: 83 878 708 551 Asbestos
More informationAsbestos Management Plan
Harlow Council Asbestos Management Plan Version 4 Scope: This management plan applies to the management of all asbestos containing materials to properties under the ownership/management of Harlow Council
More informationAsbestos Awareness Training Requirements
Asbestos Awareness Training Requirements Guidance Note 3 Jan 14 1 Introduction This Guidance Note gives practical information about asbestos awareness training. Sample wording for a tool box talk briefing
More informationASBESTOS MATERIALS IN SCHOOLS
CODE OF PRACTICE FOR MANAGEMENT OF ASBESTOS MATERIALS IN SCHOOLS CONTENTS 1. Introduction 1.1 Scope 1.2 The OPW Health and Safety Unit 2 Background 2.1 General Information 2.2 Main Risks 2.3 Main Risk
More informationControl of Asbestos. Blue crocidolite Brown amosite White chrysotile
Control of Asbestos Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work related cause of death from ill health. Past exposure is now
More informationBEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD
BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD CARRIED OUT BY: VINTEC LABORATORIES LTD SURVEY DATE: 08-01-2009 PREPARED BY: JAMES BROTHERTON CHECKED BY: ANDREW
More informationBield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS
Bield Housing and Care POLICY, PROCEDURES and MANAGEMENT PLAN for ASBESTOS CONTAINING MATERIALS Approved on: 24 April 2014 By Health & Safety Management Group Implementation date: 1 June 2014 Review Date
More informationContents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember
Asbestos advice This guide explains what asbestos is, why it might be a problem, where it might be found, how we survey your home for it and how to deal with asbestos. Asbestos advice If you would like
More informationSTRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE
BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals
More informationPolicy for the Management of Asbestos in Buildings
in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably
More informationPolicy for the Management of Asbestos
CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A R FRO Policy for the Management of Asbestos Author Keith Jones Estate Controls Assurance Officer / Environmental Management Co-ordinator Policy
More informationThe Control of Asbestos Regulations 2006
The Control of Asbestos Regulations 2006 A guide for safety representatives Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work-related
More informationAn Introduction to Asbestos, Legislation and Licensed
An Introduction to Asbestos, Legislation and Licensed Contractor Selection MARK W ROBERTS Director Kitsons Environmental Europe Ltd Chair ARCA CHRIS BISHOP BA, C.Chem MRSC, MCQI CQP, CCP (Asbestos) Head
More informationasbestos in your home
asbestos in your home managing asbestos safely in your home Please note that our Plus Dane customer contact telephone numbers refered to throughout this leaflet have now changed to: 0800 169 2988 [free
More informationAsbestos Management Procedure
Asbestos Management Procedure Reference: HS/021/2010 Version No: 2.0 Issue Date: July 2010 Document Control Document Ref: HS/021/2010 Date Created: Jan 2010 Version: 2 Date Modified: Revision due December
More informationIf you own, occupy, manage or have responsibilities for
Who is this guidance for? If you own, occupy, manage or have responsibilities for non-domestic premises which may contain asbestos, you will either have: a legal duty to manage the risk from this material;
More informationCaution Asbestos. Asbestos advice for residents
Caution Asbestos Asbestos advice for residents Customer Approved This leaflet has been designed to address concerns and questions about asbestos in homes. It explains what it is, where it could be found,
More informationManagement of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division
Management of Asbestos Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Getting it Wrong! Asbestos What is it? With the Naked Eye! Naturally occurring silicates
More informationUKATA. Certificate in Asbestos Awareness. Category A
UKATA Certificate in Asbestos Awareness Category A Page 1 of 7 Introduction This syllabus sets out the guidance issued by the United Kingdom Asbestos Awareness Association (UKATA) for the provision of
More informationROYAL HOLLOWAY, UNIVERSITY OF LONDON
ROYAL HOLLOWAY, UNIVERSITY OF LONDON ASBESTOS MANAGEMENT POLICY (Version 2) This Policy defines the College s arrangements for the management of asbestos and the measures to be taken for the protection
More informationASBESTOS MANAGEMENT POLICY
ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...
More informationH2 Opening Statement Asbestos
H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of
More informationAsbestos in the home
Asbestos in the home Introduction Your safety is important to us, so we want to explain why asbestos can be dangerous, where you might find asbestos in your home, what we are doing to minimise any risk
More informationFrequently Asked Questions. What is asbestos? 2. How is asbestos harmful? 2. What illnesses does asbestos cause? 3
Duty to Manage Asbestos in Non-Domestic Premises Frequently Asked Questions Page What is asbestos? 2 How is asbestos harmful? 2 What illnesses does asbestos cause? 3 How many people die as a result of
More informationAsbestos Management Plan. April 2011
Reviewed by: Approved by: Health & Safety Management Committee Management Board -. R3. Part 1: Introduction Part 2: Policy Part 3: Organisation and Responsibilities Part 4: Procedures Appendices: 1 Management
More informationAsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk
AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk Mencap Office, 4 Mount Folly Square, Bodmin, Cornwall. PL31 2DG. Management Survey and Asbestos Register January 2011 (Two of the samples
More informationASBESTOS MANAGEMENT SURVEY REPORT
ASBESTOS MANAGEMENT SURVEY REPORT for THE MORAY COUNCIL of B3239-1140002 Produced by ESG Asbestos Ltd, a wholly owned subsidiary of ESG Bretby Business Park, Ashby Road, Bretby, Burton upon Trent, Staffordshire
More informationWYG Asbestos Demolition Survey Report
Rossendale Borough Council The WYG Asbestos Demolition Survey Report November 2 www.wyg.com creative minds safe hands Document Control Project: Client: Job Number: File Origin: The,, Asbestos Demolition
More informationPOLICY Contents. 1.0 Introduction Statement
POLICY Contents 1.0 Introduction Statement 2.0 Legal Responsibility 2.1 Asbestos Management Hierarchy 2.2 Duty Holders Responsibility 2.3 Employees Responsibility 3.0 Asbestos Management Procedure 4.0
More informationRSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours
RSPH Level 3 Certificate in Asbestos Project Management February 2013 10 Guided Learning Hours 2 Prior Learning Hours Description The Control of Asbestos Regulations impose duties on every person who has,
More informationCITYWEST HOMES POLICY ON THE MANAGEMENT OF RISKS FROM ASBESTOS
CITYWEST HOMES POLICY ON THE MANAGEMENT OF RISKS FROM ASBESTOS Version Number 1.0 Status Author Final Head of Health and Safety Implementation Date 01 October 2008 Date of Next Formal Review September
More informationReport to Cabinet Item 25 June 2014
Report to Cabinet Item 25 June 2014 Report of Deputy Chief executive (operations) 12 Subject Asbestos Management Policy Purpose To consider the council s Asbestos Management Policy. Recommendation To approve
More informationEfficiently Maintaining Commercial Buildings. Asbestos Awareness
Efficiently Maintaining Commercial Buildings Asbestos Awareness What are the risks? Asbestos was used extensively between the 1950s and 1980s in both domestic and commercial buildings and although its
More informationDate of issue: January 2014. Date of next review: February 2016. Author: V Thornton. Service area applies to: Operations. Link to the 5 Pledges: Yes
Title: Asbestos Policy 2013 Date of issue: January 2014 Date of next review: February 2016 Author: V Thornton Service area applies to: Operations Link to the 5 Pledges: Yes Approved by: Date approved:
More informationDerby City Council. Asbestos Management Plan
Derby City Council Asbestos Management Plan April 2014 Page 1 of 44 Index of Contents 1.1 Introduction 3 1.2 Glossary of Terms 4 2.0 Action Plan 2.1 Scope and purpose 6 2.2 Competent persons who they are
More informationAsbestos Awareness Syllabus (Category A)
Asbestos Awareness Syllabus (Category A) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of asbestos awareness training as contained
More informationA Guide to Asbestos in your Home
A Guide to Asbestos in your Home IL25 A Guide to Asbestos in your Home A Guide to Asbestos in your home South Derbyshire District Council Housing Services Civic Offices, Civic Way, Swadlincote, Derbyshire
More informationVersion 1 2010. Introduction page 3. Our Commitment Page 4. Will I be exposed? Page 6. Where will it be? Page 8. Translation page 12
A t e n a n t s G u i d e t o A s b e s t o s Version 1 2010 Introduction page 3 Our Commitment Page 4 Will I be exposed? Page 6 Where will it be? Page 8 Translation page 12 Contents Introduction Page
More informationAsbestos Management Policy (Version 3)
Asbestos Management Policy (Version 3) Contents Page Introduction 3 College Policy Statement for Asbestos Management 3 Objectives (of this Policy and Procedure) 3 Application of Policy 4 Licensed Asbestos
More informationDealing with. www.stroud.gov.uk. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS
www.stroud.gov.uk Dealing with Management of Asbestos containing materials Many building materials may contain asbestos fibres, often this does not mean that they pose any danger if they are not disturbed.
More informationTenants` Asbestos Handbook Guide
Tenants` Asbestos Handbook Guide Tenants` advice for asbestos in the home What is Asbestos? Asbestos is a naturally occurring mineral which can be found in rocks all over the word, including Scotland.
More informationAsbestos in your home. Information on living with Asbestos
Asbestos in your home Information on living with Asbestos Why I have I got this leaflet? You have received this leaflet as Slough Borough Council have identified, through an inspection process, that you
More informationASBESTOS POLICY AND MANAGEMENT PLAN
ASBESTOS POLICY AND MANAGEMENT PLAN 1. INTRODUCTION 1.1. The Control of Asbestos at Work Regulations 2006 requires employers to prevent the exposure of their employees to asbestos, or where this is not
More informationAsbestos-Containing Materials in Buildings: Asbestos Management Plan for LBC Housing
LUTON BOROUGH COUNCIL, BUILDING AND TECHNICAL SERVICES CENTRAL DEPOT, KINGSWAY, LUTON LU4 8AU. Asbestos-Containing Materials in Buildings: Asbestos Management Plan for LBC Housing In accordance with the
More informationAsbestos Policy and Management Plan 2013-16
Policy reviewed by Thomas Eggar Solicitors, January 2013 Equality Assessment completed January 2013 Policy reviewed by the Health and Safety Committee, February 2013 Policy reviewed and adopted by the
More informationSAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN)
KING S COLLEGE LONDON Health, Safety & Environmental Protection Office SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN) Issue Date: May 2012 Issue Number:
More informationAsbestos in the home. www.tworivershousing.org.uk. for you - for your community - not for profit
Asbestos in the home www.tworivershousing.org.uk for you - for your community - not for profit Facts about asbestos, where it may be used and what to do if you find it. Introduction This leaflet addresses
More informationASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL
ASBESTOS SAMPLING REPORT Urban Design Louisa Ryland House Sampling to Ceiling in Room 01 44 Newhall Street Birmingham B PL TECHNICAL REPORT: 09H/56 150 Phoenix House Valepits Road Garretts Green Birmingham
More informationFREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk
FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com Asbestos Awareness Toolbox Talk ASBESTOS AWARENESS Why is it a Problem Asbestos was extensively used as a building material in the UK from the
More informationAsbestos Update on Regulations, Risks, Management and Obligations
Asbestos Update on Regulations, Risks, Management and Obligations Steve Shutler BSc(Hons), CMCIEH, CMIOSH, CoC (Asbestos) SB Asbestos Management Ltd 5 Reasons to take asbestos seriously CAR 2012 Legislation
More informationAsbestos Management Plan
Safety Standard Asbestos Management Plan Version 8.0 May 2015 Page 1 of 60 Engineering Maintenance & Infrastructure Safety Standard Asbestos Management UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT
More informationAsbestos Management Plan
Asbestos Management Plan This procedural document was previously incorporated within the Asbestos Management Policy and Procedures CORP/HSFS 10 v.3 Did you print this document yourself? The Trust discourages
More informationProperty Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.
Property Services information sheet - number 3 Asbestos December 2008 rev 1 You may have materials that contain asbestos in your house. A. What is asbestos B. What do you do if you have asbestos in your
More informationAsbestos awareness for Craftsman. Presented by Bob Miller & Andrew Knight
Asbestos awareness for Craftsman Presented by Bob Miller & Andrew Knight What do you know about asbestos? Outline four things you know about asbestos. What could be asbestos here? What is asbestos? Asbestos
More informationPolicy on Asbestos Safety
Policy on Asbestos Safety November Index. Aims and Objectives. Policy Reference. Asbestos Safety Policy Statement 4. Responsibilities 5. Asbestos Register 6. Asbestos Survey 7. Staff Asbestos Training
More informationAsbestos awareness. University of Brighton 2016
Asbestos awareness University of Brighton 2016 What is asbestos? Asbestos is a naturally occurring mineral which has been in use for over 2,000 years. It was named by the Greeks, meaning is inextinguishable.
More informationmanaging asbestos in church buildings
managing asbestos in church buildings A joint briefing paper produced by Church Growth Trust and Stewardship April 2013 Briefing Paper 1 Lamb s Passage, London EC1Y 8AB t: 020 8502 5600 e: enquiries@stewardship.org.uk
More informationPolicy 7 Management of Asbestos
Policy 7 Management of Asbestos 1.0 Introduction Development & Infrastructure recognise both the need to protect their employees from the risks associated with encountering asbestos and the potential for
More informationAppendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6
Policy Policy Contents General Statement 2 Assessment 2 A Written Plan 2 Control of Access to -containing Materials 2 Monitoring and Maintenance 2 -related Emergencies 3 Arrangements for Controlling Work
More informationADVICE to safety representatives
UNITE LEGAL SERVICES - TRUST YOUR UNION ADVICE to safety representatives Unite has launched a new asbestos campaign aiming to: Raise members awareness of asbestos hazards at work Provide advice to Unite
More informationHow To Manage Asbestos
ASBESTOS Asbestos related illnesses are still on the increase Asbestos found in domestic properties is not a threat if Regulations and Good Practice are observed It is only a "danger" if suspected ACM
More informationPrincipal Designer Guidance
Principal Designer Five or more employees 1 CONTENTS INTRODUCTION 3 Further reading / additional resources 3 QUESTION 1: POLICY AND ORGANISATION 4 4 4 QUESTION 2: ARRANGEMENTS/PROCEDURES FOR HEALTH AND
More informationMANAGEMENT OF ASBESTOS POLICY
MANAGEMENT OF ASBESTOS POLICY The application of this policy and procedure ensures that no employee receives less favourable treatment on grounds of sex, trans-gender status, sexual orientation, religion
More informationSummary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)
Asbestos The University s asbestos management procedure follows the stages set out in guidance provided by the HSE (HSG64), as follows. (The numbers in the boxes below refer to the subsequent sections
More informationA short guide to managing asbestos in premises
A short guide to managing asbestos in premises A short guide to managing asbestos in premises Health and Safety Who is this guidance for? If you own, occupy, manage or have responsibilities for non-domestic
More informationAsbestos - Where Does it Go and How to Prevent It
Asbestos in the home Raven Your safety is important to us. So we want to explain where you might find asbestos in your home, why it can be dangerous, what we are doing to reduce any risk to you, and what
More information